Home

Installation and Operating Instructions GR 05 DC Group

image

Contents

1. 1 J uunj ol s vun or 1 ET yi I 1 I I 1 1 LLT lle Jt WH SEA izlezevlivl D NTT mlezlizi N DASGOYD oeoo aNa 00 2 00 ye u tywoioua X K L L z AYROLOsd X KKUK 22 BE 0 S y O UN 1400 eyes o a kala eG lenu BY WOJ Aiho sip oe o 001 DW sa 51 ZZ 12 246 5 D Ne s 4 011402 BY S UN 1 00 Y dnoi6 jnouyim suu ls s Ul onu mi p sul p s no JOSUAS eui xg si e u Beiols Ionuoo dnol5 20 50 JO4jU09 bieuo OG S0 OM 3d S0 M o 9d SO WesbeIg uono uuoS suayeay 9 OL si je u lt q d uun lt 15 uono uuoo Ajddns HE N 61 c VI Jojogluoo Buneeu ebieyo iKueduuoo y l n ino suonon nsul v 5 Aey Aselyixny uoneyiqeu noo uono uuoo Ajddns Jamod yue YBIH N Uon np l jenu o Pe ee ee VL s un joujuo9 dnolb ol 4 1 1 izizzlevlivli PIN 1
2. 21 pue 47 24615 Suliqeu g lduiexg 1 A1 9 1 Onuo2 ddu JO u9 IAS l Hue L pou d se i leuonppezz Z 4140 41 24615 Suliqeu y lduiexg 1 A1 9 1 1400 ddu JO UOMAS aH Ue O4 U0D uono uuo ddns Jamod le N 1 Bulyoyms 6une u 0 1 O Od5050 rm Tao 9 w g zz a m l is m a a n M HOOF S m ute iz vAr 0 0 0 1Z N 18961 natsu ddruo 060 2193 l 19 e u 1 y TY o PUN Ionuoo 6 BY WO si ZZ LZ leuis Ionuoo y spun 1400 1nouliA swas S ul s1 e y 10 S yun Ionuoo5 9q s0 ohoevizana 2 00 n qso mz A G O O ea Ora 031 may wiv p sul pis no JOSUSS yun Ionuoo bieu5 NIA 50 MZ oq S0 MZ 0 2090 Wesbeiq uono uuoo After Sales Service For customer service please contact the Robert Bosch Hausgerate GmbH Robert Bosch Hausgerate GmbH Deutschland Order service Spare parts ordering Phone 01801 22 33 55 Phone 01801 33 53 04 Fax 01801 33 53 07 Fax 01801 33 53 08 E mail spareparts bshg com The Robert Bosch Hausger
3. Mounting Connection terminals Dimensions W x H x D Weight E5 adjuster input characteristic curve adjustment KUP adjuster proportional characteristic curve reduction LED KU Lights up when KU terminal is activated Scope of Delivery 05 DC group control unit Installation and operating instructions 1 N AC 230 V 50 Hz Approx 1 5 VA gt 100 kOhm 2 mA short circuit proof 0 91 V to 1 43 V DC safety overlap 1 68 V 1 95 V 0 91 V to 1 43 V DC safety overlap 1 68 V 1 95 V 100 maximum Between 0 C and 50 C Il according to DIN 57700 with integration in power distribution cabinet IP20 according to EN 60529 DIN EN 50350 and DIN 44576 draft 3 x DIN 43880 modular spaces Top hat rail 7 x 2 5 mm cross section 54 x 88 x 61 mm Approx 140 g Between 30 and 30 factory default 0 Between 100 and 0 factory default 30 KU 1 VS 50 D KUP 96 KUP adiuster Proportion of the input signal when KU terminal characteristic curve switching is activated E Nr 21 0303 01 15 30 2 plex DC Gruppensteuergerat G 0 E5 adiuster Proportional increase or decrease in the control signal from the central control unit E5 96 ROS5DC ER Power supply connection Characteristic curve switching AT A2 Z2 71 Control signal from central control unit Control signal to storage heater
4. X Dimplex Installation and Operating Instructions GR 05 DC Group Control Unit 0 91 to 1 43 V DC for electric storage heaters with electronic DC charge controller Table of Contents Contents o Q o Unit Description Technical Information Operating Instructions for Users nstallation and Operating nstructions for Technicians Start Up Control Characteristic Curve Correcting Basic Settings Connection Diagram After Sales Service O O O O1 N N Unit Description The GR 05 DC group control unit enables individual control of groups of heaters for example in a flat that is connected to a storage heating system in a multiple unit building The atmospherically controlled charge value of the upstream central control unit is transferred to the group control unit via a control line The specified charge level of the central control unit can be raised or lowered proportionally via the E5 adjuster The desired proportional charge 100 to 0 can be set via the KUP heating curve switching percent adjuster according to the charge rate value when the KU heating curve terminal is activated Technical Information Connection voltage Power consumption Input resistance Output current Input signal at the Z1 Z2 terminals Output signal at the A1 A2 terminals Number of controllable charge controllers Ambient temperature Protection class Degree of protection Standard Space requirements
5. ate GmbH is available for you 7 days a week 24 hours a day Replacement part descriptions and replacement part orders from Robert Bosch Hausgerate GmbH on the internet under http Avvvvv dimplex de quickfinder Robert Bosch Hausgerate GmbH sterreich Order service Spare parts ordering Phone 0810 240 260 Phone 0810 240 261 Fax 01 60575 51212 Fax 01 60575 51212 E mail hausgeraete ad bshg com E mail hausgeraete et bshg com To process your order we require the production number E no and the production date FD of the unit This information is listed on the type plate Our emergency service team is also available on weekends and bank holidays 459238 66 63gb 07 03 A Subiect to technical changes Glen Dimplex Deutschland GmbH Phone 449 0 9221 709564 Am Goldenen Feld 18 Fax 49 0 9221 709589 95326 Kulmbach Germany E mail kundendienst hauswaerme glendimplex de Internet www dimplex de
6. charging of your storage heater In order to ensure the utility company s technical connection requirements are met your electrician will carry out the precise setting of all necessary values on the central control unit and the charge controllers Setting the intensity actuator charge selection button on a storage heater For automatic operation the intensity actuator is set at the right hand stop factory setting i e the storage heater charges at the value specified by the charge control In areas with reduced heating needs e g bedrooms the charging of the storage heater can be reduced by turning the charge selection button to the left No charging takes place at the left hand stop In order to prevent operating errors and unintentional re setting for automatic operation it is recommended that the controller button be removed from the storage heater s intensity actuator and covered with the closing cap Should no charging of the storage heater be necessary in the summer months even on cooler summer nights we recommend taking the entire heating system out of operation For more information consult your authorised electrician Please observe the technical connection requirements of your local utility company KU A 0 5 whl caps KUP 96 E5 46 XC Dim plex DC Grupbensteuergerat GROSDC E Nr 21 0303 01 KUP adjuster E5 adjuster Adjusting t
7. he charging on the group control unit Different user preferences may require correction of the charging specified by the central control unit e g in a flat within a multiple unit building The specified charge value can be changed via the E5 adjuster Attention Changes will not become apparent until the following day after charging has been completed Only adjust E5 in small increments e Insufficient charging increase E5 by 5 e Excess charging lower E5 by 5 Lowering charge Increasing charge 0 0 2 15 15 15 15 30 30 30 30 E5 E5 Setting the lowering function Your technician may install a lowering function heating curve switching KU In this case it is possible to reduce charging proportionally via a switching contact e g if the flat is not used for a longer period of time holidays weekend houses etc With the KUP heating curve switching percent adjuster the amount of input signal can be set in percent This setting affects the level of the reduction The factory default is 30 Installation and Operating Instructions for Technicians Installing the central control unit Installation should only be carried out by a technician authorised by the utility company responsible The regulations of the local utility company as well as the relevant VDE association of German engineers regulations are to be observed The unit requires 3 DIN 43880 modular spaces Safety according to protection cla
8. nection For initial start up of storage heaters the following must be charged according to your installation and operating instructions Start up protocol Abbreviation Designation Factory setting Date of value setting Date of value change E5 Charge level 0 KUP Heating curve 30 switching percent Control characteristic curve The connection betvveen the set charge rate LAD and the input control signal UST at the 21 22 terminals is indicated as follows E1 Full Charge 20 5 C E15 Base LAD UST V charge start r Charge start 0 gt 1 43 2 10 1 38 KUP 30 b 20 5 30 1 27 o 40 1 22 50 1 17 0 60 1 12 70 1 07 80 1 01 External temperature C E2 Charge start 12 25 C 90 0 96 Full charge 100 0 91 Characteristic curve for lower operation KU heating curve switching control and KUP heating curve switching percent setting 30 Characteristic curve for the factory default of the upstream charge control unit E2 15 C E 15 15 and E1 12 C and E5 0 at the group control unit Heating curve switching Heating curve switching is active via a bridge between the KU heating curve switching terminal and L charge Depending on the KUP heating curve switching percent setting value the input charge signal Z1 Z2 is proportionally reduced to an adjustable level KUP heating curve switching percent factory default 30 The output charge
9. s Operating Instructions for Users General information For installation operation and maintenance please observe these installation and operating instructions This unit should only be installed and repaired by an experienced technician Poorly carried out repairs can endanger the users safety According to VDE association of German engineers regulations the installation and operating instructions must always be available and should be given to the technician working on the unit for his her information Should ownership change these installation and operating instructions must be passed on to the new user or owner This is how your heating system works The local utility company makes electricity available for electrical heating purposes during periods in which other customers require little or no electricity the so called off peak periods Utility companies offer electricity at discounted tariffs primarily during the night time release period n certain service areas electricity for heating purposes is additionally available during the daytime the so called additional release period For release and additional release periods the tariff conditions may vary Information can be obtained from your authorised electrician or local utility company The specified charging periods are generally released via a control unit ripple control receiver or timer by the utility company Charge control ensures the consumption based
10. signal A1 A2 is adjusted accordingly With a setting of KUP heating curve switching percent 0 the group control unit blocks charging Correcting Basic Settings Please note that if settings are changed corrections do not become apparent until the following day Fault description Adjuster correction Insufficient charging Increase E5 by 5 Excess charging Lower E5 by 5 For additional corrections please see the central control unit installation and operating instructions Sul5aeuo uono uuo Ajddns Jamod HE MoT g 8 205 x S LTS N 77 pue 47 jeuBis Suliqeu g lduiex3 Siam ss J N 9 1 011400 4oyoequoo 40 0Eyuo9 HS JO UONMS uun HHEL i ponad se i i i 2 i 744110 41 i 41 1 qeubis z m y iAuEduuo In ino4 Jo suonon ysul BU 5 se jd Aejas aeiixny J AI9591 01 U09 lddii JO UOHAS Olu HET uono uuo Ajddns J mod uoneyqeu uono uuo Ajddns N I SS d l WoOY si e u BE 0 S OL L PENA Re yal o sa V L z Buryoyims Bune u sun joyjuoo dnou 0 UONONPSY xx
11. ss 1115 ensured via either e Installation in a small distribution board according to DIN 57603 VDE 0603 e g N system distribution board e Installation in a distribution board according to DIN 57659 VDE 0659 According to DIN 44574 the group control unit should be installed in the coolest location i e the lowest mounting row of the distribution board Please ensure a clearance of at least one modular space on both sides GR 05 DC group control unit Q oO do 70 x m KUP E5 XC Dimplex PROTOMATIK DC Gruppensteuergerat ENE 21 0305 01 GR05DC Electrical connection When connecting the GR 05 DC group control unit please observe the following e The connections at the L and N terminals should not be interchanged e The KU heating curve switching pilot wire must be connected in phase with L e Should a phase be connected at a red marked terminal due to a mistake in the wiring the unit will be destroyed The group control unit permits connection of e 100charge controllers maximum e Control lines must be twin wire laid according to DIN 44573 According to the VDE directive 0100 these two wires may not be laid in one cable with network wires Reduction contact to characteristic L NIKU A1 A2 Z2 Z1 curve svvitching lovvering function Start Up H Z1 From central Z2 control unit A2 To storage Ai gt heaters Power supply con

Download Pdf Manuals

image

Related Search

Related Contents

  Softwarekonfiguration und Benutzerverwaltung - Q-DAS  アコーディオンドア やまなみ ウォッシュタイプ 取扱説明書  ProMark II - Titan Tool USA  JKC-B  Pioneer MEP-7000 DJ mixer  

Copyright © All rights reserved.
Failed to retrieve file