Home

Operating Instructions for Advertising Pillar

image

Contents

1. the advertising fabric to the bottom plate Connect the Advertising Pillar to 22V power The inside lighting if ordered switches on and the fan starts blowing Lift up the fabric to support the fan until the Pillar is fully blown up In between 1 2 minutes the Advertising Pillar is set up Deflation of the Pillar If a lighting system is on the bottom plate make sure that the fabric is not lying on the warm lights after deflation This can cause damages on the fabric Conditions of service Ideal results are in non windy weather The usage of the Advertising Pillar is allowed if it is barely windy and lightly raining The usage of the inflatable is not allowed if the conditions are rough wind and rain Operating Instructions Advertising Pillar doc
2. Operating airlebniswe Instructions for Advertising Pillar Dirk Joachimsmeier Tel 0291 90 24 691 Fax 0291 90 24799 Mobil 01 70 33 00 300 dirk joachimsmeier airlebniswelt com airlebniswelt GbR SchitzenstraBe 50 59872 Meschede Tel 02 91 90 24 691 Fax 02 91 90 24 799 info airlebniswelt com www airlebniswelt com Gesch ftsf hrer Dominik Stracke Dirk Joachimsmeier Steuernr 334 5701 0624 FA Meschede Sparkasse Meschede Kto 466 49 BLZ 464 510 12 Please read these instructions carefully before setting up the display These instructions are part of the sales contract between the customer and airlebniswelt GbR Description of function This inflatable is a display with a height of 2 to 4m which is set up with one fan Due to the continous pressure of the fan the display keeps in shape The fan must be running all time Place of installation The area of operation needs to be a horizontal place of 1m Remove this area from dirt and light items which wrt T can be absorbed by the fan and destroy the fan These La items can also change the color of the inflatable To avoid damages and soiling of the inflatable make sure that in the radius Hmax of the Skydancer are no power supply lines pylons chimneys guttering traffic signs as well as oily sharp edged or dirty objects err Installation ee Prans E on 2 Do a final visual check before you fasten the Velcro of ae _

Download Pdf Manuals

image

Related Search

Related Contents

  GP83 Service Manual (簡) H6081B-R(3.0).cdr  Lenovo Essential G50-45  HelpSmith - WinFluor V3.7.6 - Spider  Enterasys SecureStack A2 Switch 48 10/100 ports  DIQ/S 182-MOD System 182  Guía del usuario  IR detectors user's guide    plawa-feinwerktechnik GmbH & Co.KG MOVO.1 User's Manual  

Copyright © All rights reserved.
Failed to retrieve file