1. If the IE CT detects wrong termintated conductors in an installation or cable the conductor LED F for the respective conductors always light in pairs The conductor LED for the terminal pole at the near end of the installation line lights continuously the conductor LED for the terminal pole at the far end is flashing 1 IE CT near end of Installation line far end of IE CT Mainframe Installation line Installation line Test Box Oo i Sn A 2 OA Oa Bo 32 a 3 Oe EEE 1 6 3 oo 1 aN 4 Of HO 4 E a To e a z Se 6 6 8 8 In our example two errors are detected 1 Wrong wiring error code 5 conductor LED 5 lights continuously and conductor LED 6 flashes 2 Wrong wiring error code 5 conductor LED 6 lights continuously and conductor LED 5 flashes The error code for wrong wiring is digit 5 Note O The near end of an installation line is the terminated side that the IE CT Mainframe is connected to The far end of an installation line is the terminated side the IE CT Test Box is connected to 23 5 11 Switch Setting Error Code 6 If the Selection Switches are not correctly set C on the IE CT Mainframe i e if the installation has more conductors than selected the IE CT Mainframe will recognize this If connected conductors have been separated with the Selection Switches the respective red conductor LED F will light The error code for wrong switch setting is digit 6 5 12 Battery
2. E CT Mainframe and IE CT Test Box then start the installation test and line identification as shown below D Press the Start Key D to turn on the IE CT Mainframe press Start Key 2 During the test run the green LED G flashes The test is finished when the green LED stops flashing The green LED flashes The green LED G lights without interruption if no errors were detected the installation is OK Press the Error Key H to get the number of the connected Test Box This number is shown as a flashing digit in the numeric display B The green LED flashes without interruption no errors were detected If installation errors are detected the conductor LED F of the respective poles will light red and the error code digit lights in the numeric display B Example interruption error code 3 of wires 1 2 and 3 5 If more than one installation error is detected press the Step Key H to display the other errors press Step Key 20 After the last error is displayed a flashing digit is shown in the numeric display B This digit stands for the number of the connected Test Box 7 If you press the Step Key H again as long as the Test Box number is flashing the error list is shown a second time see item For repeated testing continue as described under item 1 The IE CT Mainframe can be turned off at any time by pressing the Start Key 5 4 Line Identification The IE CT Mai
3. Error Code 7 If the battery power is too low the IE CT Mainframe will show this in the numeric display B Testing can still be continued after this message just press the Error Key H to erase this message However if the battery is not replaced by a new one the battery voltage will no longer be sufficient for testing after some time In this case the numeric display will only display a lighting bar The error display for low battery power is digit 7 5 13 Split pair Error Code 8 Split pair stands for the coincindent exchange of two wires from different wire pairs when terminating the cable from both ends see example below It is absolutely necessary to eliminate this error for high frequency transmission ways If the IE CT detects this error the wire LEDs F will display the exchanged wires Example for the split pair error exchange of two wires from two pairs In this case the red LEDs no 3 4 5 and 6 will light BC wire pair 2 A ul Bi 6 T 6 4 a 4 50 O5 wire pair3 1 The error code for split pair is digit 8 24 6 Error Indication Green Numeric Error LED Meaning LED Display does not the respective LED extraneous light flashes or lights voltage does not all LED s are off line interrupt light does not LED assigned to the conductor light respective wire lights interrupt does not LED assigned to the short circuit light respective wire lights does not The
4. LED at the wrong conductor light far end flashes wiring does not LED assigned to the wrong switch light respective wire lights setting does not no LED lights low battery light does not LEDs of the respective split pairs light wire pairs light does not lighting no LED lights battery is light bar no good lights lighting no LED lights Test Box number does not bar was not detected light no display all LED off cabling is correct no installation errors were found lights a digit between all LED off display of the 1 and 9 flashes Test Box number 25 7 Intermittent contact If you are operating a termination unit such as wall outlet cable or adaptor where you supect an intermittent contact IE CT will help you to detect this error Intermittent contact detection requires constant checking of the connections when the termination unit is moving IE CT offers an additional operation mode Terminate the unit to be tested between the IE CT Mainframe and one of the Test Boxes see chapter 6 2 to check for intermittent contact To activate the intermittent contact test mode press Start Key D and Step Key H simultaneously when turning on the IE CT Mainframe First IE CT carries out a self test where the numeric display shows the digits O to 9 one after another then those LEDs light up that have been activated by the Selection Switches C Now IE CT is in the intermittent contact test mode and is testing continu
5. Weidmiiller 3 Weidmuller Interface GmbH amp Co KG Postfach 3030 32720 Detmold Telefon 49 5231 14 0 Telefax 49 5231 14 2083 info weidmueller com www weidmueller com 012005 50 01 BTR 899006 01 Weidmiiller O IE CT Bedienungsanleitung IE CT Kabel und Installationstester 3 Operating instructions IE CT Cable and Installation Tester 15 8808420000 IE CT IE CT Grundger t IE CT Mainframe O ou gt A TIOTMO Anschlussleitung 7 Segmentanzeige neun Einstellschalter unter dem Schutzgummi Ein Aus und Starttaste RJ45 Anschlussbuchse neun rote LEDs gr ne LED Step Taste zur Fehlerabfrage Fehlerbeschreibung Anschlussleitung RJ45 Anschlussbuchse IE CT Testbox IE CT Test Box K ou gt A TIOTMO attachment cord numeric display nine Selection Switches under protective cover ON OFF and Start Key RJ45 jack nine red LED green LED Step Key for error interrogation error description attachment cord RJ45 jack Contents 1 Introduction a5 ok ier ad wack ee ae es a ie ee hehe 16 1 1 Contents of Packing Unit essen ba 16 2 Safety Instructions unuau aaa aaa 16 3 F at r s 2 22 un ana TA AAA wage ea AAA 17 4 Startup Procedure een eeeen en 18 Oe Operation cerrando roer aer a a bd eE bN 19 5 1 Connection to Test Installation Lines 60 A A A Aa 19 5 2 Connection Test Patch Cables criar ria anta c 19 S a CMI AO ESE cl at arena ahs
6. ame wae EES 20 5 4 Line identification sd cage sce eh sierras ceed dd es ia ta os oe 21 5 5 s lection of Contact ASSIQUIMENO 22 c2daccndrevbacecbeuaatare o A 21 5 6 Extraneous Voltage Error Code 1 6 eee eee eens 22 5 7 Connection Error Error Code 2 estira ed aa 22 5 8 Conductor Interrupt Error Code 3 serbia eas tee ee dens Hees coe ewe ees 22 5 9 Short Circuit Error Code aaa ia e orar a 22 5 10 Wrong Wiring Error Code 5 sosa ad a E RARA NA ads 23 5 11 Switch Setting Error Code 6 wesen nase Bean a ana ee een 24 5 12 Battery Error Code li a en a an en AA AA ne ee 24 513 DIL Pal Error Code 8 rastras diia ari 268k ees 24 6 Error Indication 5 325 scsi E A AAA dhe edie eee es 25 7 Intermittent CONTACTA a A ARA AAA AAA RANAS 26 Bi SO o e 26 9 Technical Data lt lt inisicabobis sisi 27 10 Guarantees and warranties 0 0 0 00 000 een 27 15 1 Introduction By purchasing the installation tester IE CT you have decided to opt for an easy and professional piece of test equipment that is easy to use This tester is designed for quick and reliable recognition of installation faults in data and telecommunication wiring IE CT includes two devices IE CT Mainframe and IE CT Test Box The number of conductors of the cable installation and the pin assignment can be set individually Please read this user manual carefully before using the installation tester IE CT for the first time The housing of the IE CT Mainframe sho
7. case of inappropriated handling We decline liability for any consequential O Warranty will expire in case of non observance of this user manual and or the safety damages 16 Features Recognition and display of the most frequent installation errors short circuit line wire interrupt line wire mistakes split pair Self test function and intermittent contact test Error display for each conductor by eight red conductor LED s and one red LED for the shield F Display of no error by green LED G One key for ON OFF and start of the test operation D Separate Step Key H to display list of multiple errors Automatic shut off of the IE CT 30 seconds after the last use of key D or H Nine switches define the pin assignment C Numeric display shows error type B 9 conductor attachment cord A for testing shielded installation lines and cables with up to 8 conductors IE CT Mainframe and IE CT Test Boxes are equipped with RJ45 jacks E and K allowing also test of patch cords Protected against interference voltages up to 80 V AC DC 100 V up to 5 minutes Display of extraneous voltages for each conductor including readout of their polarity Easy use and interpretation of the test results with given help on the IE CT housing I Display for low battery power Length of installation cable to be tested up to 1000 m Automatic test operation is shown by flashing LED G Battery polarity reversal protection Line identi
8. d by pressing the Step Key or automatically after 2 minutes 26 9 Technical Data Weight IE CT Mainframe IE CT Test Box Dimensions IE CT Mainframe B x H x T IE CT Test Box BxHxT Maximum line length Electric strength Automatic shut down Test voltage Power supply Attachment cords Termination system 10 Guarantees and warranties approx 185 g with battery approx 31 g 70 mm x 140 mm x 36 mm 30 mm x 68 mm x 23 mm approx 1000 m 80 V continuous connection 100 V short time up to 5 min after 30 s lt 5V 9 V block battery 9 conductors RJ45 Our general terms for sales and delivery are applicable for any guarantee and warranty 27
9. extraneous voltage is detected in an installation the test run is finished To test this line on installation errors shut off the extraneous voltage and start a new test run The error code for extraneous voltage is digit 1 5 7 Connection Error Error Code 2 If the conductors are not interconnected short circuit and the IE CT Test Box is not linked the IE CT Mainframe displays a connection error In this case either the IE CT Test Box or the IE CT Mainframe are not plugged in at all or plugged into the wrong jack The error code for connection errors is digit 2 5 8 Conductor Interrupt Error Code 3 In case of conductor interrupts at the tested installation or cable the red conductor LED F of the IE CT displays all interrupted conductors Select the number of conductors of the installation by using the Selection Switches C before you start the test run The error code for conductor interrupt is digit 3 5 9 Short Circuit Error Code 4 If the IE CT detects a short circuit between two or more conductors the conductor LED F will display all interconnected conductors If more than one short circuit is detected they are displayed as individual errors Even if the IE CT Test Box is not terminated the IE CT Mainframe displays short circuits The error code for short circuit is digit 4 Note O Terminating resistors used in an installation are also recognized as short circuits 22 5 10 Wrong Wiring Error Code 5
10. fication by recognition of up to nine test boxes Recognition and display for wrong set of pin assignment Low power consumption for long battery life 17 4 Startup Procedure Before operation put in the 9 V block battery first al 3 Unscrew the two screws on the bottom of the unit and take this part away You will find the battery case with the connector clip for the battery Press the clip on to the battery and put the battery into the battery case Should the battery be contacted with the wrong polarity the IE CT will not be damaged Close the lid and fasten the screws Now the installation tester IE CT is ready for use First do two test runs to get familiar with the functions of the IE CT EL Turn on the IE CT Mainframe with the Start Key D Now a test starts automatically it takes about 3 s The green LED G will flash When the test is finished the numeric display of the IE CT Mainframe shows as test result the digit 2 B Digit 2 means connection error the IE CT could neither detect a connection among conductors short circuit nor a connection to the IE CT Test Box After approx 30 s the IE CT Mainframe shuts off automatically or you turn it off by pressing the Start Key D 2 Now plug the attachment cord J of the IE CT Test Box into the RJ45 jack of the IE CT Mainframe E and start the test again by pressing the Start Key D When the test is finished the green LED G li
11. ghts continuously this means the test was successfully finished and no errors were found Now press the Step Key H the numeric display B of the IE CT Mainframe will show the number of the connected IE CT Test Box by a flashing digit flashing digit 1 means IE CT Test Box No 1 is connected After 30 s the IE CT Mainframe shuts off automatically or it can be turned off by pressing the Start Key D Unplug the IE CT Test Box attachment cord of the RJ45 jack E of the IE CT Mainframe and plug it in the enclosed attachment cord A Now you can start testing your installation or cable The following sections will give you more detailed information about connection and use of the IE CT 18 5 Operation 5 1 Connection to Test Installation Lines To test an installed line plug one end of the installation line to the IE CT Mainframe and the other end to the IE CT Test Box To do a simultaneous line identification plug one IE CT Test Box to each termination to be tested max 9 Test Boxes available as accessories Installation Lines rm JE Patch Panel Fr om Wall Outlets m IE CT Test Boxes IE CT Meintame 5 2 Connection to Test Patch Cables Patch Cable If you want to use the IE CT for error detection on patch cables plug one end of the patch cable into the RJ45 jack of the IE CT Mainframe and the other end into the RJ45 jack of the IE CT Test Box 5 3 Switch on and Test Terminate I
12. nframe recognizes up to nine different IE CT Test Boxes This feature allows the user to run installation tests and line identifications at nine different lines in one operation Turn on the IE CT and press the Step Key H The numeric display shows the Test Box number as a flashing digit B If a flashing bar appears instead the IE CT Mainframe did not recognize the number of the IE CT Test Box 5 5 Selection of Contact Assignment Not all installations use shielded 8 conductor cables Therefore the IE CT Mainframe offers the possibility to separate unused contacts for the test Contact assignment can be adjusted with the Selection Switches C Switch set ON means the corresponding wire has been connected Selection Switches 1 to 9 Adjust the nine Selection Switches after removing the protective cover Switch 1 to 8 stand for conductors 1 to 8 switch 9 stands for the shield of the termination Note O Make sure that at least one conductor with an even and one with an odd number are selected i e conductor 4 and conductor 5 21 5 6 Extraneous Voltage Error Code 1 The IE CT resists to extraneous voltages Short time up to 100 V If extraneous voltages should appear in the installation the IE CT can show their polarity and the respective conductor The positive pole of an extraneous voltage is displayed by continuous lighting and the negative pole is displayed by flashing of the respective conductor LED F If an
13. ously the 9 contacts at the connection for continuity If the connection of the tested unit is moved and the intermittent contact interrupts wire connections the respective LED turns out to display this interruption To leave the intermittent contact test mode press the Start Key If you press the Step key the IE CT displays the result of the self test and the number of the connected Test Box If no key is pressed the IE CT will shut off automatically 30 s after the last connection interruption 8 Self test Self test run The self test includes a split pair test of the connection cable e The green LED G flashes during the self test e The numeric display shows a dash during the following split pair test e Press the Step Key to close the split pair test e The numeric display B now shows the digits O to 9 one after another e Then those red LED F light up that were selected previously with the Selection Switches This allows to control the function of the 9 Selection Switches C e The red LEDs go out after the Step Key H has been pressed and the test result is displayed Test result The green LED lights permanently and the number of the respective Test Box flashes in the numeric display if no error was detected The green LED does not light in case of an error The detected error is displayed in the numeric display as it is described on the label on the IE CT Mainframe End of the self test The self test is finishe
14. ws the most important information for fault analysis 1 1 Contents of Packing Unit Please check the contents of the IE CT packing e Installation tester IE CT Mainframe e Installation tester IE CT Test Box No 1 e Attachment cord for the IE CT Mainframe e 9V battery e User manual e Protective bag e Label with english description e Label with french description putting into operation and handling of the device Please consider this too when leasing or O Important Please keep this user manual it contains important information about function passing it on to third 2 Safety Instructions e Protect the IE CT against humidity and moisture as well as against temperatures below O C 32 f or above 40 C 90 f e Clean the housing only with a humid cloth do not use any aggressive cleaning agents e Repairs on the IE CT shall be done exclusively by Weidmuller e Use only 9 V block batteries or rechargeable batteries e When opening the IE CT housing for battery change do not touch any components or the pc board e Use only original replacement parts from Weidmiller e Protect the IE CT against strong vibrations and shocks e Do not overbend the attachment cords e Always close the selection switches with the protective cover and do not allow any parts to fall into the opening e Do not press the switches harder than necessary e Take out the battery if the IE CT will not be used for some time instructions and in
Download Pdf Manuals
Related Search
Related Contents
Stiga SB 425 HD User's Manual UC-8410/8416/8418/8430 WinCE User`s Manual Samsung C188 用户手册 Promethean ActivBoard 387 L`invité de la rédaction Penalty, mode d`emploi Capsules Ça tourne… avec le « tourne à droite » ! f1 1 Jf r13 Manual de Utilização do VDownloader Kurzanleitung VITO ® oiltester Copyright © All rights reserved.