Home
        ScaleBlaster SB-175 Instructions / Assembly
         Contents
1.             Balance of ScaleBlaster signal cable  to power    box terminal Cable Tie oa    4   Wrap the loose end of the signal cable securely around the pipe   in any one direction     the proper  number of turns as noted in Chart A     5   Make sure the wraps are flush against one another  wrapped tightly and not overlapping  Continue  until you reach the recommended number of wraps     6   Wrap a second cable tie at the end of the wrappings securing the signal cable tightly   Figure B     Figure B                Scien Balance of ScaleBlaster signal cable  baden    maximum    chart i  box terminal Cable Tie Cable  TI ChartA    Wrap Requirement  PVC or PEX pipe   7   Route the loose end of the signal cable back to the    power box  Trim excess cable to length  SB 175  8   Carefully strip the outer plastic shield from the end of the   inzat  signal cable leaving 1 2    to 5 8    of bare cable  Twist the Pipe Size Layers   Wraps  bare cable and insert the end in the other terminal post 1 2 Double    38 wraps  on the power box and tighten the receptacle post  3 4    Single 70 wraps                         l   Single 57 wraps  1 1 4    Single 50 wraps    post and pull out the wire    inside dimensions    NOTE   To remove the wire  loosen the receptacle      Example   Double 38 wraps is a  total of 76 wraps  38 wraps on first    Never under wrap or over wrap the coil  layer and 38 on second layer       COPPER PIPE INSTRUCTIONS    1   Follow the same instructions in steps 1 6 for 
2.  wrapped pipe  No gaps or loose wire wrappings allowed   See chart on pages 6  amp  7 to wrap the coil and to determine the proper number of wraps        3    LOCATION OF THE SB 175 UNIT  1   The most desirable place to install the unit is on the main water line that enters the house     2   The power unit should be mounted on a wall or other solid surface within five feet from an electrical  outlet and within ten feet from where the pipe will be wrapped     3   Once the main water inlet pipe to the house is located  identify a section of pipe that is at least 12    inches straight and at least two feet away from any major electrical interference  example   an  electric motor     Installs on the incoming water supply line    At least 12 inches of straight pipe    main water  shutoff valve               Keep signal cable at  least two feet away  from any major  electrical interference              No more than ten feet  of wire is allowed  between the power box  terminals and the  signal cable location  wrapped on the pipe            Keep wires from  touching each other    going from the  terminals to the signal  cable location on the    pipe     SB 175 comes with a  5 foot power cord             Install the signal cable  on the incoming cold  water supply line  entering the home as  close to where it comes  into the house as  possible                   water going to house    Important  For best results  wrap signal cable on a  straight section of pipe of 12    or more  Keep 
3. PVC  CPVC and PEX pipe  Use Chart B for Copper  2   Instead of a single coil wrapping around the pipe  a second one is added for copper pipe     3   YOU MUST KEEP THE SECOND WRAPPING IN THE SAME DIRECTION AS THE FIRST  Wrap  right over the top of the first layer continuing in the same wrapping direction as the first layer      clockwise or counterclockwise  This second layer must also be tight and touching the prior wrap      Figure C   a Chart B                                             Figure G Wrap Requirement  COPPER pipe    lt     See wrap     gt  SB 175  hse i Pipe Size  Layers   Wraps  1 2    Double   50 wraps  3 4    Double   50 wraps  4   Wrap a third cable tie around the pipe and both wires  ji   Double   45 wraps  Pull the cable tie tight   Figure D  1 1 4    Double   40 wraps  Figure D   inside dimensions            Example   Double 50 wraps is a  total of 100 wraps  50 wraps on first  layer and 50 on second layer                                        Never under wrap or over wrap the coil     5   Follow same instructions in steps 7 8 for PVC  CPVC and PEX pipe     ACTIVATING THE SYSTEM    1   Plug control box into electrical outlet after mounting the control box on the wall and wrapping the  signal coil     2   The LED light on the front panel should light up     3   Operation of the ScaleBlaster SB 175 system can be confirmed by observing the illumination of the  LED indicator located on the face of the power unit  Power on   green light on far right side wil
4. SB 179    Installation  amp  Operation Manual    Residential Unit    Indoor Outdoor Installation       IDENTIFY THE SB 175 COMPONENTS    Your new ScaleBlaster SB 175 unit includes the following components     1   One  1  SB 175 power unit that  works on 115VAC or 230 VAC  automatically  If 230 VAC is desired   replace plug  This unit comes with a  5 foot power cord     2   Mounting brackets  4  and  mounting bracket screws  4     3   Signal Cable  56    and four  4  nylon  cable ties   4   Warranty Card   5   Extended Warranty Card    6   Installation  amp  operation manual       2    ded    ded                          IE    The bee soferrart    SB 175    Installation    Operation Manual    Residential Hames   IddoarfOurdoor Model                      The ScaleBlaster unit can be installed on a horizontal or  vertical Copper  PVC  CPVC and or PEX pipe     If a magnet will stick to your incoming water line  you have galvanized  pipe  In this case  you will need to replace a small section of pipe  about  10 11 inches  with either pvc or copper pipe        Before You Start Installing    Finding The Main Cold Water Pipe   The water shutoff valve is on the main cold water pipe  Install the ScaleBlaster unit on this  pipe as close to where it comes into the house as possible  This will ensure that the outside  spigots and kitchen are being treated     If you cannot access the cold water pipe before it splits   Follow the main cold water pipe back as far as possible from the water 
5. cut back on phosphates   resulting in an increase in spotting  and cloudiness  We recommend using Cascade Action Pacs with Dawn or Cascade All   in one Action Pacs for best cleaning results  Another product that works best is Lemi    Shine  You may also add white vinegar in the rinse cycle     After the first 90 days  we strongly recommend you drain out your water heater  You will  be amazed at what ScaleBlaster has cleaned out of your pipes        Commercial  amp  industrial models available for pipes up to 40       Manufactured by    File No  E232081     UD  vs    2SF0       ENVIRO TECHNOLOGIES  Established 1989    Phone  800 756 7946 or 727 562 5186   Fax  727 562 5187  10 13 ScaleBlaster com    
6. heater and install the  ScaleBlaster there  By doing this  all of the home s water may not be treated  and in some  cases only the hot water may be treated  However  the hot water line is the most important to  treat and is the main cause of lime scale formation     Well Water Installation   For customers that are on a private well  the best place to install the ScaleBlaster unit is after  the well   s pressure tank  If that is not possible  the ScaleBlaster unit can be installed prior to  the pressure tank     Softener Loop   The ScaleBlaster unit can be installed on a softener loop  Installing on a softener loop gives  treatment to all of the water that a softener would treat  Water to the kitchen faucet and outside  spigots may not be treated when the ScaleBlaster unit is installed this way     Find The Pipe Size   If you do not know the actual pipe size  place a ruler in front of the pipe and measure the  outside diameter  Use Table 1 to determine the size of the pipe  The actual pipe size is always  rated by the inside dimensions of the pipe     COPPER PVC  CPVC  amp  PEX  Outside Diameter   Actual Size      5 8       Table 1 HE    11 8     13 8     15 8     21 8          A Tight Wrap Is Very Important   It is extremely important to the effectiveness of your ScaleBlaster unit that the signal cable  wire be wrapped correctly  If there are any gaps between the wraps  your ScaleBlaster unit  will not work to its full capacity     Nylon cable ties       Example of a properly
7. l stay  lit Figure E   When pipe is wrapped and unit is turned on the far right light will stay lit and the other  lights will oscillate back and forth  Figure F      cm  NID  I  lef   AIN ZIN BS  1 mea Power En  Signal Indicator  Indicators  MAINTENANCE    The best feature of the ScaleBlaster SB 175 is that there is NO MAINTENANCE REQUIRED  No salt   batteries  moving parts or costly repairs  Just check the LED light for proper operation     WARRANTY  amp  EXTENDED WARRANTY    This unit comes with a 5 year warranty to be free from defects in material and workmanship under normal  use from the date of purchase  A 5 year extended warranty is available on this unit at a very minimal cost     90 DAY MONEY BACK GUARANTEE    We are so sure you will be satisfied with ScaleBlaster  we are offering a 90 day money back guarantee  from the date of purchase if you are not 100  satisfied with the product     ENJOYING THE SCALEBLASTER SYSTEM    There is no maintenance with the ScaleBlaster unit itself  No bags of salt to haul  around  wasted water or batteries to change  Best of all  you are protecting the  environment     Allow up to 90 days to realize the full effects  Initial descaling may make things worse  for awhile  especially in the dishwasher and aerators  This is normal  Simply clean out  the screens or aerators  With dishwashers  we recommend cutting back on soap usage   unless you have been using a water softener   In July of 2010  manufacturers of  dishwasher soap detergents 
8. the    signal cable as far away as possible from tees   elbows  couplings  valves and any curved pipe           MOUNTING THE POWER UNIT    The unit can be mounted indoors or outdoors in an upright vertical position on a wall  or other non enclosed area  NOTICE  If mounting the power unit outside  it must  be kept out of the direct sunlight  The installer must supply the mounting screws  for the type of surface the unit will be mounted on   We recommend a number 8  screw     Mount power unit on a solid surface using  enclosed mounting brackets and screws  LED light  See    details on bottom  of page 7        INSTALLING THE SIGNAL CABLE       Insert the pre stripped end of the signal cable into one of the two signal terminals and tighten   Follow instruction on how to wrap pipe with wire on next two pages  pages 6  amp 7      Seer Ge        gt   lt  gt     Twist down to see hole to put wire in  put stripped wire in hole  making sure the two bare  wires do not touch  then twist up to tighten     Wrapping the pipe with the  ScaleBlaster Signal Cable    PVC  CPVC  or PEX PIPE INSTRUCTIONS    1   Insert the pre stripped end of the signal cable into one of the two signal terminals and tighten   2   Route the signal cable to the inlet pipe  Hold cable parallel and next to the pipe   3   Wrap one of the cable ties tightly so that the signal cable is secured to the pipe   Figure A           Straight section of pipe away  Fi A from angles  tees  valves and couplings  igure  i           
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Technical Data - Schneider Electric    WINDMASCHINE  User manual  Phonix S900CMO mobile phone case      Harbor Freight Tools 14 in. 2 HP Cut_Off Saw Product manual  Inscription Stage Electroculture & Pyramides Yannick Van Doorne    Copyright © All rights reserved. 
   Failed to retrieve file