Home

Salsbury Industries 4395BLK Installation Guide

image

Contents

1. of the footing should be sloped for water runoff When digging the hole for the footing be careful to not puncture water sewer or gas lines Hardware for attaching the pedestal to the concrete footing is not included J bolts are shown in the illustration as an example The concrete footing should include reinforcing steel and four 4 1 2 anchor studs protruding at least 1 above the concrete surface Place the anchor studs in a 4 x 10 pattern in the concrete to align with the holes in the pedestal base When the concrete has cured sufficiently install four 4 leveling nuts on the anchor studs Set the pedestal on the leveling nuts with the four 4 anchor studs protruding through the holes in the pedestal base plate Adjust the leveling nuts to square up the pedestal Install four 4 nuts and washers on the anchor studs and tighten securely SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Phone 1 800 624 5269 Int l Phone 323 846 6700 Fax 1 800 624 5299 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2011 Salsbury Industries All rights reserved Rev 04 12 15 11
2. Mail Package Drops 4375 Bolt Mounted Pedestal Installation Instructions U S P S APPROVED Installing the Bolt Mounted Pedestal When you install a curbside or roadside mailbox make sure that it is easily accessible to the mail carrier By regulation a locked mailbox should be 41 to 45 from the ground or street surface up to the point of mail entry The door should be set back 6 to 8 back from the front face of the curb or the road edge However you should check with your local postmaster to ensure that the mailbox is installed according to local regulations Itis important to note that it is not the responsibility of mail carriers to open mailboxes that are locked accept keys for this purpose or lock mailboxes after delivery of the mail To install the bolt mounted pedestal begin by digging a hole for the poe CONCRETE concrete footing and then prepare the concrete The top surface of z ANCHORS the footing should be about 12 by 18 See the illustration for the f i NOT relative position of the rectangular footing to the pedestal and mail i INCLUDED package drop The concrete should extend into the ground 24 or greater if your local frost line is deeper Installing the concrete below the frost line will prevent movement during ground freezing and thawing The bottom of the hole for the concrete footing should be filled with a depth of about 6 of gravel to promote drainage under the post The top

Download Pdf Manuals

image

Related Search

Related Contents

Copyright © All rights reserved.
DMCA: DMCA_mwitty#outlook.com.