Home
        Salsbury Industries 4395BLK Installation Guide
         Contents
1.  of the footing should be sloped for water runoff        When digging the hole for the footing  be careful to not puncture  water  sewer  or gas lines     Hardware for attaching the pedestal to the concrete footing is not  included  J bolts are shown in the illustration as an example  The  concrete footing should include reinforcing steel and four  4  1 2     anchor studs protruding at least 1    above the concrete surface   Place the anchor studs in a 4    x 10    pattern in the concrete to align  with the holes in the pedestal base     When the concrete has cured sufficiently  install four  4  leveling nuts  on the anchor studs  Set the pedestal on the leveling nuts with the  four  4  anchor studs protruding through the holes in the pedestal  base plate  Adjust the leveling nuts to square up the pedestal   Install four  4  nuts and washers on the anchor studs and tighten  securely                       SALSBURY INDUSTRIES  1010 East 62  Street  Los Angeles  CA 90001 1598  Phone  1 800 624 5269 Int l Phone  323 846 6700  Fax  1 800 624 5299 Int l Fax  323 846 6800             Installation instructions are provided as general guidelines  It is advised that a professional installer be consulted  Salsbury Industries assumes no product assembly or installation liability   Copyright    2011 Salsbury Industries  All rights reserved   Rev  04  12 15 11     
2. Mail Package Drops     4375       Bolt Mounted Pedestal Installation Instructions  U S P S  APPROVED          Installing the Bolt Mounted Pedestal        When you install a curbside or roadside mailbox  make sure that it is  easily accessible to the mail carrier  By regulation a locked mailbox  should be 41    to 45    from the ground or street surface up to the point  of mail entry  The door should be set back 6    to 8    back from the  front face of the curb or the road edge  However  you should check  with your local postmaster to ensure that the mailbox is installed  according to local regulations  Itis important to note that it is not the  responsibility of mail carriers to open mailboxes that are locked   accept keys for this purpose  or lock mailboxes after delivery of the    mail    To install the bolt mounted pedestal  begin by digging a hole for the poe CONCRETE  concrete footing and then prepare the concrete  The top surface of z ANCHORS  the footing should be about 12    by 18     See the illustration for the f i NOT  relative position of the rectangular footing to the pedestal and mail i INCLUDED       package drop  The concrete should extend into the ground 24    or  greater if your local frost line is deeper  Installing the concrete below  the frost line will prevent movement during ground freezing and  thawing  The bottom of the hole for the concrete footing should be   filled with a depth of about 6    of gravel to promote drainage under the    post  The top
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
EVGA 7 16GB Black  Wiley Adobe Creative Suite 4 Design Premium All-in-One For Dummies  Bedienungsanleitung CAB EASYFLEX L, XL und XXL Seite 1 / 7  Beep&park®/keeper™ Manual de instrucciones    Istruzioni per il montaggio 010813 7085630  G01096 - gerbion  Manual - KanexPro      Copyright © All rights reserved. 
   Failed to retrieve file