Home

Salsbury Industries 4325D-COP Installation Guide

image

Contents

1. column on a deluxe post or on a post in a concrete footing The mounting plate on the top of the pedestal has four tapped holes There are four 5 16 x 1 2 long hex washer head bolts provided with the pedestal to fasten the mailbox to the top of the pedestal Set the mailbox on the pedestal top plate and open the lower door Install the hex washer head bolts through the mailbox holes into the four holes in the pedestal top plate Check that the bolts are sufficiently tightened USPS Regulations It is important to note that it is not the responsibility of mail carriers to open mailboxes that are locked accept keys for this purpose or lock mailboxes after delivery of the mail When you install a mailbox on a curbside or roadside make sure that it is easily accessible to the mail carrier Customers are required to contact the local post office before installing the mailbox to ensure its correct placement and height at the street Generally mailboxes are installed at a height of 41 45 inches from the road surface to the inside floor of the point of mail entry and are set back 6 8 inches from the front face of curb or road edge to the mailbox door Phone 1 800 624 5269 Fax 1 800 624 5299 SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Int l Phone 323 846 6700 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consu
2. concrete footing 4370 1 Sided First check to see that all the parts and fasteners in the carton have been located and identified according to the illustration below Also refer to the illustration below to position the parts correctly 1 Attach the small right angle bracket to the post with the long leg on top with two 2 5 16 x 1 long hex washer head bolts 2 Attach the long square tube arm to the small right angle bracket with two 2 1 4 20 x 1 2 long flat head socket screws 3 Attach the large decorative arch to the post and the long arm with four 4 5 16 x 1 long hex washer head bolts 4 Attach the other small right angle bracket with the long leg on the bottom with two 2 5 16 x 1 long hex washer head bolts 5 Attach the short square tube arm to the small right angle bracket with two 2 1 4 20 x 1 2 long flat head socket screws This completes the assembly Sab 4370 Assembly U S P S APPROVED When you install a curbside or roadside mailbox make sure that it is easily accessible to the mail carrier By regulation it should be 41 to 45 from the ground or street surface up to the inside floor of the mailbox The door should be set 6 to 8 back from the front face of the curb or the road edge However check with your postmaster to ensure that the mailbox is installed according to local regulations 4372 2 Sided First check to see that all the parts an
3. push down until the top nut is pressed against the anchor plate After the concrete has hardened re tighten the top bolt SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Phone 1 800 624 5269 Int l Phone 323 846 6700 Fax 1 800 624 5299 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved
4. you install a mailbox on a curbside or roadside make sure that it is easily accessible to the mail carrier Customers are required to contact the local post office before installing the mailbox to ensure its correct placement and height at the street Generally mailboxes are installed at a height of 41 45 inches from the road surface to the inside floor of the point of mail entry and are set back 6 8 inches from the front face of curb or road edge to the mailbox door Phone 1 800 624 5269 Fax 1 800 624 5299 SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Int l Phone 323 846 6700 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Roadside Mailboxes 4325 2 Wide Spreader Installation Instructions U S P S APPROVED Thank you for selecting Salsbury s 4325 aluminum roadside mailbox We are confident that the quality and construction of this product will provide years of maintenance free use Installing Roadside Mailbox on a 2 Wide Spreader This instruction sheet is for installing two 2 4325 roadside mailboxes on a 2 wide spreader on a bolt mounted or in ground mounted standard pedestal ordered separately Other installation instructions are available for insta
5. Installing the In Ground Mounted Post for the Mailbox Into Concrete When you install a curbside or roadside mailbox make sure that it is easily accessible to the mail carrier By regulation it should be 41 to 45 from the ground or street surface up to the inside floor of the mailbox The door should be set back 6 to 8 back from the front face of the curb or the road edge However you should check with your local postmaster to ensure that the mailbox is installed according to local regulations Dig the hole for the concrete footing and prepare the concrete You will need approximately 4 1 2 cubic feet The top surface of the footing should be about 12 by 18 and extend 36 into the ground See the illustration for the relative position of the rectangular footing to the post and mailbox The bottom of the hole for the concrete footing should be filled with about 6 of gravel to promote drainage under the post The top of the footing should be sloped for water runoff The concrete must be below the frost line Otherwise the post will l T move when the ground freezes Be careful not to puncture water l Se F sewer or gas lines when digging holes for footing mix Prod the mix with a stick while filling to reduce any air pockets If you want to conceal the concrete pour it to within a few inches of the top of the hole and cover with soil after the concrete has set Use a carpenter s level on the sides of the post
6. Roadside Mailboxes 4325 Installation Instructions U S P S APPROVED Thank you for selecting Salsbury s 4325 aluminum roadside mailbox We are confident that the quality and construction of this product will provide years of maintenance free use Model 4325 Roadside Mailbox Installing Roadside Mailbox Directly to a Pedestal This instruction sheet is for installing the 4325 roadside mailbox directly to a bolt mounted or in ground mounted pedestal ordered separately Other installation instructions are available for installing the mailbox on a 2 wide spreader a 3 wide spreader in a wall or column on a deluxe post or on a post in a concrete footing The mounting plate on the top of the pedestal has four tapped holes There are four 5 16 x 1 2 long hex washer head bolts provided with the pedestal to fasten the mailbox to the top of the pedestal Set the mailbox on the pedestal top plate and open the lower door Install the hex washer head bolts through the mailbox holes into the four holes in the pedestal top plate Check that the bolts are sufficiently tightened USPS Regulations It is important to note that it is not the responsibility of mail carriers to open mailboxes that are locked accept keys for this purpose or lock mailboxes after delivery of the mail When you install a mailbox on a curbside or roadside make sure that it is easily accessible to the mail carrier Customers are
7. accessible to the mail carrier Customers are required to contact the local post office before installing the mailbox to ensure its correct placement and height at the street Generally mailboxes are installed at a height of 41 45 inches from the road surface to the inside floor of the point of mail entry and are set back 6 8 inches from the front face of curb or road edge to the mailbox door Model 4325 Roadside Mailboxes SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Int l Phone 323 846 6700 Int l Fax 323 846 6800 Phone 1 800 624 5269 Fax 1 800 624 5299 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Roadside Mailboxes 4325 3 Wide Spreader Installation Instructions U S P S APPROVED Thank you for selecting Salsbury s 4325 aluminum roadside mailbox We are confident that the quality and construction of this product will provide years of maintenance free use Installing Roadside Mailboxes on a 3 Wide Spreader Model 4325 Roadside Mailboxes This instruction sheet is for installing three 4325 roadside mailboxes on a 3 wide spreader on a bolt mounted or in ground pedestal ordered separately Other installation instructions are available for installing the mailboxes o
8. d extend 36 into the ground a See the illustration for the relative position of the rectangular footing to the post and mailbox The bottom of the hole for the concrete s footing should be filled with about 6 of gravel to promote drainage f i under the post The top of the footing should be sloped for water runoff The concrete must be below the frost line Otherwise the post will move when the ground freezes Be careful not to puncture water sewer or gas lines when digging holes for footing Four 4 1 2 13 by 8 long J shaped anchor bolts and eight 8 12 2 13 nuts are provided Attach the anchor bolts to the base of the post with four 4 nuts under and four 4 nuts over the bottom mounting plate Pour the concrete into the hole prodding the mix with a stick while filling to reduce any air pockets Press the anchor bolts on the bottom of the post into the concrete until the bottom plate is resting on the top surface of the wet concrete Use a carpenter s level on the sides of the post to ensure that the post is aligned vertically Periodically check the vertical alignment of the post as the concrete is curing The concrete will shrink as it hardens leaving a space between the anchor and the concrete when it is cured To prevent this loosen the top bolt one full turn prior to inserting into the wet concrete After the anchor is inserted into the wet concrete place your foot on the top of the threaded anchor and
9. d fasteners in the carton have been located and identified according to the illustration below Also refer to the illustration below to position the parts correctly 1 Attach the small right angle bracket to the post with the long leg on top with two 2 5 16 x 1 long hex washer head bolts 2 Attach the long square tube arm to the small right angle bracket with two 2 1 4 20 x 1 2 long flat head socket screws 3 Attach the large decorative arch to the post and the long square tube arm with four 4 5 16 x 1 long hex washer head bolts 4 Repeat steps 1 through 3 above for the second arm on the other side of the post This completes the assembly General Note Use the four 4 hex head bolts provided to install the mailbox to the deluxe post The nylon spacers install between the bottom of the 4325 mailbox and the top of the deluxe post arm 4372 Assembly Phone 1 800 624 5269 Fax 1 800 624 5299 SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Int l Phone 323 846 6700 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Roadside Mailboxes 4325 In Ground Mounted Post Installation Instructions U S P S APPROVED
10. lling the mailboxes on a 3 wide spreader directly to a pedestal or in a wall or column on a deluxe post or on a post in a concrete footing The mounting plate on the top of the pedestal has four tapped holes There are four 5 16 x 1 2 long hex washer head bolts provided with the pedestal to fasten the spreader to the top of the pedestal The four black plastic caps may be used to cover the exposed heads of the bolts The roadside mailboxes are each mounted to the spreader using four 5 16 x 1 1 2 long carriage bolts one 1 thick aluminum spacer flat washers and hex acorn nuts Two of these kits are provided with the spreader one for each of the mailboxes Set a roadside mailbox in one of the positions on the spreader and open the lower door Install the carriage bolts through the mailbox holes through the spacers and through the four holes in the spreader After assuring that the square shanks under the bolt heads are securely in the square holes in the bottom of the mailbox attach the flat washers and hex acorn nuts to the bottom of the bolts Make sure the nuts are sufficiently tightened Repeat for the second 4325 roadside mailbox USPS Regulations It is important to note that it is not the responsibility of mail carriers to open mailboxes that are locked accept keys for this purpose or lock mailboxes after delivery of the mail When you install a mailbox on a curbside or roadside make sure that it is easily
11. lted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Roadside Mailboxes 4325 Wall or Column Mounted Installation Instructions U S P S APPROVED Thank you for selecting Salsbury s 4325 aluminum roadside mailbox We are confident that the quality and construction of this product will provide years of maintenance free use Model 4325 Roadside Mailbox Installing Roadside Mailbox in a Wall or Column This instruction sheet is for installing the 4325 roadside mailbox in a hole in a wall or column Other installation instructions are available for installing the mailbox direct to a pedestal on a 2 wide spreader on a 3 wide spreader on a deluxe post or on a post in a concrete footer It is recommended to have the unit present before starting the wall or column construction to obtain the best possible installation The rough opening should be sized approximately 1 2 larger that the outside dimensions of the unit Due to construction variations and method of fastening the unit in the installation the fastening hardware is not included Choose fasteners that are appropriate for the construction method USPS Regulations It is important to note that it is not the responsibility of mail carriers to open mailboxes that are locked accept keys for this purpose or lock mailboxes after delivery of the mail When
12. n a 2 wide spreader directly to a pedestal in a wall or column on a deluxe post or on a post in a concrete t footing There are four 5 16 x 1 1 2 long hex washer head bolts and one 1 The mounting plate on the top of the pedestal has four tapped holes thick aluminum spacer provided to fasten the middle mailbox and the tightened fi spreader to the top of the pedestal Open the lower door of the l N l If mailbox and install the four bolts Make sure the bolts are sufficiently Ta ws F The other two mailboxes are each mounted to the spreader using four 5 16 x 1 1 2 long carriage bolts one 1 thick aluminum spacer lt X flat washers and hex acorn nuts Two of these kits are provided with ne KFO the spreader one for each of the mailboxes Set a mailbox in one of the end positions on the spreader and open the lower door Install the carriage bolts through the mailbox holes through the spacer and through the four holes in the spreader After assuring that the square shanks under the bolt heads are securely in the square holes in the bottom of the mailbox attach the flat washers and hex acorn nuts to the bottom of the bolts Make sure the nuts age are sufficiently tightened Repeat for the remaining mailbox USPS Regulations It is important to note that it is not the responsibility of mail carriers to open mailboxes that are locked accept keys for this purpo
13. required to contact the local post office before installing the mailbox to ensure its correct placement and height at the street Generally mailboxes are installed at a height of 41 45 inches from the road surface to the inside floor of the point of mail entry and are set back 6 8 inches from the front face of curb or road edge to the mailbox door Fax 1 800 624 5299 SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Phone 1 800 624 5269 Int l Phone 323 846 6700 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Designer Roadside Mailboxes 4325 D Installation Instructions U S P S APPROVED Thank you for selecting Salsbury s 4325 D designer roadside mailbox We are confident that the quality and construction of this product will provide years of maintenance free use Model 4325 D Designer Roadside Mailbox Installing Roadside Mailbox Directly to a Pedestal This instruction sheet is for installing the 4325 D designer roadside mailbox directly to a bolt mounted or in ground mounted pedestal ordered separately Other installation instructions are available for installing the mailbox on a 2 wide spreader a 3 wide spreader in a wall or
14. se or lock mailboxes after delivery of the mail When you install a mailbox on a curbside or roadside make sure that it is easily accessible to the mail carrier Customers are required to contact the local post office before installing the mailbox to ensure its correct placement and height at the street Generally mailboxes are installed at a height of 41 45 inches from the road surface to the inside floor of the point of mail entry and are set back 6 8 inches from the front face of curb or road edge to the mailbox door SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Phone 1 800 624 5269 Int l Phone 323 846 6700 Fax 1 800 624 5299 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Roadside Mailboxes 4325 Deluxe Arm Post Installation Instructions Installing Arm s on Deluxe Mailbox Posts Thank you for selecting Salsbury s deluxe mailbox post We are confident that the quality and construction of the post will prove to be a good investment This instruction sheet is for assembling the 1 sided or 2 sided deluxe mailbox post Other instructions are available for installing the 4325 mailbox direct to a standard pedestal on a 2 wide or 3 wide spreader or a post in a
15. to ensure that the post is aligned vertically Periodically check the vertical alignment of the post as the concrete is curing Set the post in the hole and fill the hole with the prepared concrete SALSBURY INDUSTRIES 1010 East 62 Street Los Angeles CA 90001 1598 Phone 1 800 624 5269 Int l Phone 323 846 6700 Fax 1 800 624 5299 Int l Fax 323 846 6800 Installation instructions are provided as general guidelines It is advised that a professional installer be consulted Salsbury Industries assumes no product assembly or installation liability Copyright 2010 Salsbury Industries All rights reserved Roadside Mailboxes 4325 Bolt Mounted Post Installation Instructions U S P S APPROVED Installing the Bolt Mounted Post for the Mailbox onto Anchor Bolts When you install a curbside or roadside mailbox make sure that it is easily accessible to the mail carrier By regulation it should be 41 to 2 45 from the ground or street surface up to the inside floor of the mailbox The door should be set back 6 to 8 back from the front face of the curb or the road edge However you should check with your local postmaster to ensure that the mailbox is installed according to local regulations Dig the hole for the concrete footing and prepare the concrete You ere will need approximately 4 1 2 cubic feet The top surface of the footing should be about 12 by 18 an

Download Pdf Manuals

image

Related Search

Related Contents

Grundig Amira 17 17" Silver  CI-KVM4s&8s&16s USB ユーザーズ・マニュアル  Jwin JB-TH210 User's Manual    Service Manual - Vital Signs Monitor 300 Series  Owners Manual - Grace Design  複数の濃種ソコン等でインターネットを行う場合の接続例  Manual de Instruções    Brochure ASB Ltée - Ballard Sport Aircraft Ltd.  

Copyright © All rights reserved.
Failed to retrieve file