Home

The Forever Cap FCOD88 Installation Guide

image

Contents

1. First Measure the opening of your chimney s clean out opening Second Remove the door from the frame by sliding it up Three Slide the frame into the opening Adjust the tabs so the they fit tightly against the inside sides of the chimney Four Remove the frame from the opening Five Using RTV silicone adhesive chalking Apply the chalking on both the backside of the frame and the face of the chimney around the opening Six Slide the frame back into the opening Using duck tape Tape the frame to the chimney to hold it in place while it dries Wait at least 24 hours before removing the tape and reinstalling the door

Download Pdf Manuals

image

Related Search

Related Contents

Manual de instruções VEGABAR 52  Untitled - Aviasport  Page 1 Page 2 ダニカッ ト乳剤2 0、 日産化学工業株式会社` 20ーー 年  Thermosystem Condens Manual de Usuario  IBM 3000 Printer User Manual  日本フリーザー2008年度版  Black Box 120H User's Manual  Product Instructions  

Copyright © All rights reserved.
Failed to retrieve file