Home

Ultra-Fin SN312 Use and Care Manual

image

Contents

1. You can download the Ultra Calc program for free on our website www ultra fin com Tubing Selection Ultra Fin is typically designed and installed with 1 2 tubing 5 8 O D Larger diameter tubing my be used up to 3 4 7 8 O D with larger sized turnkeys specified If you plan to use tubing larger than 1 2 5 8 O D please refer to our Approved Tubing List for reference The Approved Tubing List is located in the installation section www ultra fin com Caution Do not use tubing with an EVOH barrier on the exterior of the tubing However tubing manufactured with a polyethylene layer extruded over the EVOH oxygen barrier is approved Approved Tubing for use with Ultra Fin Using a tubing brand from our Approved Tubing List will ensure a silent interface between the pex tubing when attached or crossing wood joist Installing other types of tubing may create a slight ticking noise as the tubing expands during operation This noise is created by the outer layer of EVOH barrier when it is in direct contact with wood To design a silent heating system be sure to install Ultra Fin with approved tubing only Please refer to our Approved Tubing List located in the installation section www ultra fin com Drilling Joists For standard installation joists should be drilled 3 below floor sheathing spaced according to the calculations you made However there are some exceptions to this rule e When the joists a
2. AU JI JIN IN 12 gt LANL Ii IIIA 18 Tm IMI 12 14 ULTRA FIN HIGH TEMP 150 180 F If you plan to use a high temperature boiler you want to design your system according to Ultra Fin High Temp Depending on your joist spacing you will typically need Ultra Fin s installed at 24 centers HANGING Sample Layouts Ultra Fin HIGH TEMP 150 180 F TUBING SPACING_16 JOIST SPACING III II III ITI AON IIT DIMI DIMI 24 12 24 TUBING SPACING_19 JOIST SPACING III 22 NII III 29N ULTRA FIN WORKS GREAT WITH HARDWOOD FLOORS One of Ultra Fin s most popular features is its compatibility with hardwood floors However any hardwood floor can suffer shrinkage or other damage if it is not installed correctly Make sure your flooring installer follows the manufacturer s instructions for your hardwood product and review the checklist below Hardwood Checklist Hardwood reacts to relative changes in humidity
3. Maximum tubing length is 300 ft DAF WARNOCK HERSEY B m CERTIFICATION Maximum tubing length is 300 ft aag WARNOCK HERSEY B ym CERTIFICATION NOTE This checklist is for general consultation only It is not INSIDE JOIST TEMP INSIDE JOIST TEMP intended to replace the guidelines and instructions of your flooring manufacturer i j ioi o FLOOR TEMP Lal FLOOR TEMP Contact Information Tubing through joists Tubing through joists a o o o Call toll free 1888 565 2267 Email info ultra fin com E A 7 3 gt o oe Fax toll free 1888 565 2228 office hours 7 00 4 00 PST 18 R R 120 130 e i a 150 160 170 180 ULTRA FIN COM ULTRA FIN INC WATER TEMPERATURE 70 Room Temp WATER TEMPERATURE 3 60 Room Temp f 70 Room Temp f 60 Room Temp Hanging The Tubing With Snake Hangers You Must Always SUBFLOOR SHEATHING Right Way GWB CEILING SUBFLOOR SHEATHING Wrong Way Snake Hanger Placement Attaching Ultra Fins Attaching ing asl IS easy TURN key just follow these steps Lap two Ultra Fins over a section of tubing and insert two TurnKeys 4 Fasten the Ultra Fins together by twisting both TurnKeys 90 Spray foam or styrofoam insulation R 20 fiberglass with vapor barrier Insulating Above Heated Areas 10 JOIST SUBFLOOR SHEATHING 3 31 2 GWB CEILING NOT
4. by expanding and shrinking To maintain the integrity of your hardwood floor here are some of the steps to consider in your floor installation M Before your hardwood floors are installed make sure that all plastering and concrete work is completely dry Mi Make sure the home heating system is operating M Make sure the home has been heated at 72 F 22 C for at least five days before flooring delivery M Allow concrete to cure for a minimum of 30 days before hardwood floors are installed M Climatize flooring materials at room temperature for at least 10 14 days prior to installation Vi Use a moisture meter to measure the moisture content in the sub QUICK CALC for Ultra Fin MODULATING Hanging QUICK CALC for Ultra Fin HIGH TEMP Hanging Drilling Sq Ft 2 Tubing Sq Ft 3 Fin Pairs floor Moisture content should be between 6 and 12 If the moisture content exceeds 12 turn up the heat and open the basement windows 1 2 Drilling Sq Ft 1 5 Tubing Sq Ft 2 6 Fin Pairs Sq Ft 1 3 Tubing Sq Ft 2 6 Fin Pairs Sq Ft 1 3 Tubing Sq Ft 3 0 Fin Pairs M Use a moisture meter to measure the moisture content of the hardwood flooring to be installed For flooring less that 3 wide the difference in humidity between the sub floor and the hardwood must be less than 4 For flooring greater than 3 wide the difference in humidity between the sub floor and the hardwood must be less than 2
5. inside regular wood frame floor systems By converting the entire floor system into a giant heat radiator Ultra Fin generates uniform warmth and comfort at unprecedented cost savings and convenience When you install Ultra Fin you start by installing the tubing You can either run the tubing parallel to the joists using SnakeHangers or you can drill the joists and run the tubing through the holes You attach the aluminum Ultra Fins by lapping two fins over a section of tubing then inserting two TurnKeys and giving them a 90 degree turn EZ AA t S AO S en Simply connect your tubing to the supply and return manifold and you re ready to insulate the system Yes it s just that easy K ULTRA FIN MODULATING 100 150 F If you plan to use a modulating boiler your system will need a few more Ultra Fins to distribute the heat with the lower operating temperature Depending on your joist spacing you will typically need Ultra Fins installed at 18 centers HANGING Sample Layouts Ultra Fin MODULATING 100 150 F TUBING SPACING_16 JOIST SPACING III Mii III 18 TUBING SPACING _19 JOIST SPACING II III HII III HNN ITI
6. E For all Ultra Fin installations ensure the insulation rests flush with the bottom of the joists and that a minimum 2 air space is always maintained between the Ultra Fins and the insulation Insulating Above Unheated amp Exposed Areas NHEATED AREA_10 JOIST SUBFLOOR SHEATHING on 2 5 5 GWB CEILING R EXPOSED AREA_10 JOIST SUBFLOOR SHEATHING 2 2 5 5 GWB CEILING Ultra Fin Sic You can choose to install Ultra Fin SIDE key from above before the floor sheathing is installed Fasten the Ultra Fins together by twisting the SideKey 90 Ultra fins installed with SideKeys Lap two Ultra Fins over a section of tubing and insert one SideKey Done Finish by attaching the SideKey to the joist with a fastener Ultra Fin Can Operate at the Same Temperature as Removed Baseboard Radiators The Ultra Fin system is typically 2 to 3 below subfloor Safe from nails and screws Design a Tubing amp Ultra Fin Layout A Calculate the Number of Heating Zones Look at the overall square footage of the home and the total number of rooms How many rooms does the home have With the exception of small interior spaces such as hallways and powder rooms this is the number of heating zones you will want to install B Sketch the Floor Plan Sketch the floor plan and mark out the heating zones you intend to install complete with length and width measurements
7. ULTRA FIN Radiant Floor Heating System kk INSTALLATION GUIDE amp k k k Welcome to Ultra Fin Ultra Fin is the leader in cost efficient and high comfort radiant floor heating Ultra Fin is a hydronic system designed specifically for wood frame housing that is simple to install and is compatible with all floor coverings including carpet tile slate and hardwood How Ultra Fin Works The Ultra fin system uses tubing to circulate hot water through the under floor joist Soaces where heat is conducted to louvered aluminum Ultra Fins attached to the tubing The Ultra Fins radiate the heat and warm the air in the joist spaces creating hot air convection The heated air warms the floor uniformly and the floor radiates gentle heat throughout the living space above FLOOR SURFACE WARM AIR WARM AIR CONVECTION ae CURRENTS CONVECTION CURRENTS f E AN q re COOL AIR COOL AIR The science behind the Ultra Fin system What Makes Ultra Fin Different Traditional radiant floor systems are based on heat contact transfer technology where hot water tubing makes direct contact with floor layers Compared to Ultra Fin these systems are overly complicated time consuming to install provide lethargic heat response and require complicated construction measures such as extra floor layers or concrete Ultra Fin creates new efficiency by generating hot air convection
8. for each zone NOTE Ultra Fin highly recommends having separate heating zones tubing circuits for each room in the house C Measure the Joist Spacing The joist spacing in the floor system will usually be 12 16 or 19 In rare instances it could be 24 When you have determined the joist spacing you are ready to calculate the tubing spacing for each zone Heat Loss and Material Calculation When installing an Ultra Fin system you need an installation layout that fits the home and the surrounding climate Use Ultra Fin s Ultra Calc software to calculate the BTU s and materials required for your installation You need the following information e The type of heat source your system will use e g boiler heat pump etc e The anticipated operating temperature of your heat source e The average mean temperature for your area or location referred to as design temperature in the Ultra Calc program click the DESIGN TEMP tab e The length and width of each room in the home e The ceiling heights of each room e The size and R factor of every window and whether or not they are single or double paned e The R factor of the insulation in the walls and ceilings or at least the insulation type and thickness Enter these numbers into the Ultra Calc program on your computer Ultra Calc will tell you e Tubing and Ultra Fin material and spacing requirements e BTU requirements for the boiler not water source
9. gt lt gt gt NOT TO SCALE gt NOT TO SCALE PULL THROUGH PULL THROUGH J AR A WD TO MANIFOLD gt gt lt gt lt gt NOT TO SCALE NOT TO SCALE PULL THROUGH If you run the tubing through the joists it s still easier to start pulling in the middle of the room
10. re manufactured truss joists refer to the joist manufacturer s instructions regarding drilling in the joist web before automatically drilling 3 below sheathing e When the joists are 8 or less in depth you may still drill 3 below floor sheathing but you must use a thinner special insulation product JOIST HOLE DETAILS_SOLID WOOD JOIST _ SUBFLOOR _ Se gt eee SHEATHING N O DRILL 1 DIA HOLES MIN 2 FROM EDGE DRILL 1 DIA HOLES ANYWHERE BETWEEN DOTTED LINES 91 2 SOLID WOOD JOIST ees o GWB CEILING JOIST HOLE DETAILS_WEB JOIST SUBFLOOR eee JOIST FLANGE TOP DRILL 1 DIA HOLES ANYWHERE IN WEB JOIST WEB 91 2 JOIST FLANGE BOTTOM oo u ee GWB CEILING TET BER 1 BRR 11 111 i 111 1 1 hhh aan BER wae iII 111 Li BER RRR wae BER ERE 1 BER aan 111 1 1 11 i 1 uR BER 1 Lit 11h 1 BER RER 1 BER i 1 11 1 1 TER 1 BRR iii EBR 1 11 BER EER 111 ERR BERI BER 1 1 1 1 BRR ERR BRR BRR i iiA Pulling Tubing If you choose to drill the joists and run the tubing through the joists use the following procedure to pull the tubing through the holes For each heating zone feed one continuous length of tubing thro
11. ugh the holes and back to the supply return manifold On turns against outside walls bend tubing into a flat D shape so that it can take one Ultra Fin Always allow 10 of straight tubing on the D bend On turns against inside walls bend the tubing into a V shape and clamp it to the side of the box joist so it can take two Ultra Fins Make sure you allow 10 of straight tubing on each side of the V bend Connect the ends of the tubing circuit to the supply return manifold Test circuit with water under pressure INSIDE AND OUTSIDE WALL CONDITIONS _ DETAILS TYPICAL INSIDE WALL CONDITION NOL ddld 6 4 FLOOR JOISTS 19 O C OUTSIDE WALL TYPICAL OUTSIDE WALL CONDITION INSULATION AGAINST OUTSIDE JOIST gt INSTALLATION TIP You can save time pulling tubing by starting to pull your coil from the middle of each zone room When you have finished pulling the tubing through one half of the zone and back to the supply return manifold measure the length of tubing you need to complete the remaining half of the zone and its return run to the manifold Roll that length off the tubing coil and cut it allowing some extra length to be safe See diagram below INSERTING TUBING PULL THROUGH PULL THROUGH R an y A y CO A

Download Pdf Manuals

image

Related Search

Related Contents

Black & Decker CM4000SC Use & Care Manual  Samsung LW26A33W Kullanıcı Klavuzu  PDF Istruzioni d`uso SF/SFD 2-A (IT)  Installation and Operation Manual  Guida per l`Utente  haddam volunteer fire company engine 6  MANUAL DE INSTALAÇÃO  Sony VAIO VGNTZ210E/P    

Copyright © All rights reserved.
Failed to retrieve file