Home
Rod Desyne CH100-68-48-7 Installation Guide
Contents
1. TRAVERSING DRAPERY ROD INSTALLATION INSTRUCTION A E RAR iS Using bracket B mark screw hole at the desired bracket height locations Repeat for each bracket using level if needed B Untighten and turn bottom latch D C2 i i a J N e J X e J N P J N J E J coon Insert the wall anchors F into the dry wall and attach bracket B using mounting screws E If mounting to wood attach the bracket with the screws without the wall anchors Drill pilot holes into screw marked locations Use 1 8 drill bit if drilling into wood and 3 16 drill bit if drilling into dry wall Pull the two telescoping rods apart from the center until separate Add desired amount of carriage slides onto the track from the middle then put rods back together Turn top screw until flush with bracket to allow for rod installation Attach finials onto each end of rod Put screw on finial into white inserts and begin to turn until flush and tight Clip drapery to carriage slide clips For three piece rod packaged as one rod inside the other and another stand alone rod just add slides by sliding from the open end of rod Connect all rods together when finished Extend rod to desired length and slide telescopic rod through all brackets Turn bottom latch on center bracket inward and tighten with screw driver Repeat on remaining brackets AB
Download Pdf Manuals
Related Search
Related Contents
Sam4s ER-380 Cash Register User Manual Vers une nouvelle philologie Ensayos clínicos Congratulations! 人感センサー付 - アイリスオーヤマ SIERRA DE CALAR PENDULAR SEGHETTO A PENDOLO PSTK Copyright © All rights reserved.
Failed to retrieve file