Home

KOHLER K-1161-F-0 Installation Guide

image

Contents

1. 1 Prepare Site Corner Installation Installation en angle Instalaci n en esquina Flooring NOTICE Adequate floor support must be provided Consult the roughing in information packed with the bath for specific floor loading requirements Install adequate floor support NOTICE To ensure a successful installation it is critical that bath be installed on a level subfloor Verify the subfloor is level Adjust for level if necessary Framing CAUTION Risk of property damage Do not support the bath by the rim The bath must be supported by the leveling blocks only or bath base depending upon your bath model If the load weight of the bath is supported by the perimeter of the bath rim damage will occur NOTICE The bath must be installed into a corner 1084210 2 B 6 Kohler Co Prepare Site cont NOTICE For drop in models To ensure the bath does not rest on the rim frame the floor or construct a frame for a raised installation Ensure the bath is supported by the leveling blocks or bath base only Refer to the rough in information packed with this bath Construct the framing according to the roughing in information packed with the bath If an apron will be installed construct the required additional support at this time Refer to the installation instructions packed with the apron Plumbing NOTE For through the floor dra
2. Toda la informaci n que aparece en la gu a est basada en la informaci n m s reciente disponible al momento de publicaci n En Kohler Company nos esforzamos por alcanzar nuestra misi n de mejorar el nivel del buen vivir de quienes disfrutan de nuestros productos y servicios Nos reservamos el derecho de efectuar cambios en las caracter sticas embalaje o disponibilidad del producto en cualquier momento sin previo aviso Dedique unos minutos para leer esta gu a Si tiene alg n problema de instalaci n o funcionamiento ll menos al 1 800 4 KOHLER desde los EE UU 1 800 964 5590 desde Canad 001 877 680 1310 desde M xico 1084210 2 B 2 Kohler Co Tools Outils Herramientas Plus Plus Mas e 6 large head galvanized nails Clous galvanis s 6 a t te large Clavos del 6 galvanizados de cabeza grande e Conventional woodworking tools and materials Outils et mat riels conventionnels de menuiserie Herramientas y materiales convencionales de carpinteria e Drop cloth Bache de protection Lona e Plastic liner optional Rev tement en plastique optionnel Cubierta de plastico opcional e RTV silicone sealant optional Mastic transparent a la silicone optionnel Sellador de silicona RTV opcional e Construction adhesive optional Adh sif de construction optionnel Adhesivo de construcci n opcional e Cement or mortar optional Ciment ou mortier optionnel Cemento o mortero opcional e 2x4s or 2x6s 2 x 4
3. niveau M thode de ciment ou de mortier NOTICE Ne pas utiliser de pl tre ou un m lange pour cloison s che car ces mat riaux ne fourniront pas un scellement durable Utiliser uniquement du ciment ou du mortier taler une couche de ciment ou mortier de 2 5 1 cm sur le plancher Placer une couche en plastique ou mat riau similaire sur le ciment ou le mortier O Avec de l aide placer soigneusement la baignoire dans l emplacement d installation V rifier que la baignoire est 1 niveler le lond du dessus de la baignore et 2 galiser le long de l orifice du drain Si la baignoire n est pas nivel e des cales devront tre utilis es sous la baignoire Connecter la pi ce de raccordement du drain au siphon Retirer la pellicule protectrice du rebord de la baignoire Appliquer un boudin de silicone autour du rebord de la baignoire M thode d adh sif de construction Appliquer g n reusement du mastic adh sif de construction de haute qualit la base de la baignoire Avec de l aide placer soigneusement la baignoire dans l emplacement d installation V rifier que la baignoire est 1 niveler le lond du dessus de la baignore et 2 galiser le long de l orifice du drain Si la baignoire n est pas nivel e des cales devront tre utilis es sous la baignoire Connecter la pi ce de raccordement du drain au siphon Retirer la pe
4. prevents water from seeping behind the wall and allows for an alcove installation of many drop in baths when a flanged version is not available The basin area requires no additional support when the subfloor is level and square with the stud framing Consider using shims for additional support if the subfloor is uneven Kohler Co 3 1084210 2 B Before You Begin cont Plan for adequate mounting and connection space for the faucet Verify adequate support for the faucet Large deck mount faucets are not appropriate or safe for this installation as they may be inadvertently used as a means of support Provide properly dimensioned framing The illustrations shown may not represent your actual product The installation instructions still apply This bath conforms to ANSI standard Z124 1 2 All dimensions are nominal Kohler Co reserves the right to make revisions in the design of products without notice as specified in the Price Book Avant de commencer ATTENTION Risque d endommagement du mat riel Ne pas soulever la ZN baignoire par le rebord La baignoire doit uniquement tre support e par les blocs de mise niveau ou sa base selon le modele Si la charge de la baignoire est support e par le p rim tre du rebord de baignoire un endommagement peut avoir lieu Respecter tous les codes de plomberie et de b timent locaux Planifier avec
5. ba era para obtener los requisitos de carga espec ficos para el piso Instale el soporte de piso adecuado AVISO Para asegurar una instalaci n exitosa es muy importante que la ba era se instale en un subpiso a nivel Verifique que el subpiso est a nivel Ajuste a que quede a nivel si es necesario Estructura de postes PRECAUCI N Riesgo de da os a la propiedad No apoye la ba era por los bordes La ba era tiene que quedar soportada s lo por los bloques niveladores o la base de la ba era dependiendo del modelo de su ba era Si la carga de peso de la ba era es soportada por el per metro del borde de la ba era ocurrir n da os AVISO La ba era se debe instalar en esquina AVISO Para modelos de sobreponer Para asegurarse de que la ba era no descanse en el borde construya una estructura de postes de madera en el piso o una estructura de postes de madera para un instalaci n elevada Aseg rese de que la ba era quede soportada s lo en los bloques niveladores o base de la ba era Consulte el diagrama de instalaci n provisto con esta ba era Construya una estructura de postes de madera conforme al diagrama de instalaci n provisto con la ba era Si va a instalar un fald n construya el soporte adicional requerido en este momento Consulte las instrucciones de instalaci n que se incluyen con el fald n Plomer a NOTA Para instalaciones de desag e bajo el nivel del piso Ne
6. nailing in flange to the studs Kohler Co 15 1084210 2 B S curiser la baignoire aux montants Mod les bride Percer un petit trou pilote dans la bride de cloutage chaque emplacement de montant Ajouter des cales entre la bride de cloutage et les montants pour liminer tout espace Clouer des planchettes de 1 4 6 mm sur les montants de fa on se c ler contre le rebord de la bride Utiliser des clous galvanis s 6 large t te ou des vis pour s curiser la bride de cloutage aux montants Fije la ba era a los postes de madera Modelos de reborde Taladre un peque o orificio guia a trav s del reborde de clavado en los lugares donde hay un poste de madera A ada cu as entre el reborde de clavado y los postes de madera para eliminar la separaci n O Clave los listones de enrasar de 1 4 6 mm de espesor en los postes para emparejar el borde con el reborde de clavado Utilice tornillos o clavos galvanizados de cabeza grande 6 para fijar el reborde de clavado a los postes de madera 6 Install Plumbing CAUTION Risk of property damage A watertight seal must exist on all bath drain connections The watertight seal will prevent property damage Connect the trap to the drain Install the faucet valving according to the faucet manufacturer s instructions Do not install the faucet trim at this time Open the hot and cold water sup
7. or 2 x 6 Listones de 2x4 6 2x6 e Water resistant wall material Mat riau hydror sistant du mur Material impermeable de la pared e Rag Chiffon Trapo e Finished wall material Mat riau du mur fini Material de acabado de la pared Before You Begin CAUTION Risk of property damage Do not support the bath by the rim The A bath must be supported by the leveling blocks only or bath base depending upon your bath model If the load weight of the bath is supported by the perimeter of the bath rim damage will occur Observe all local plumbing and building codes Carefully plan moving the bath into the installation area This bath will not easily fit through doorways When planning the installation area provide access to all final plumbing connections for servicing To ensure a successful installation the floor must be level Adequate floor support must be provided Consult the roughing in sheet packed with the bath for specific floor loading requirements This bath is designed for corner installations only If an optional apron will be used construct the required additional support and install the optional apron before the finished floor and wall materials are completed Refer to the installation instructions packed with the apron If the finished wall material will come into contact with any top surface of the bath it is recommended that tiling in bead be installed The tiling in bead
8. 77 680 1310 from within Mexico Merci d avoir choisi la compagnie Kohler Merci d avoir choisi la compagnie Kohler Votre produit de la compagnie Kohler refl te la v ritable passion du design d artisanat d art et d innovation repr sentant la compagnie Kohler Nous sommes confiants que sa fiabilit et beaut surpasseront vos exigences les plus lev es vous satisfaisant pendant les ann es venir Toute l information dans ce guide est bas e sur la derni re disponible au moment de la publication A la compagnie Kohler nous aspirons remplir notre mission d am liorer le niveau de vie gracieux pour chaque individu affect par nos produits et services Nous nous r servons le droit d apporter des modifications aux caract ristiques emballages et disponibilit s des produits tout moment et ce sans pr avis Veuillez prendre s il vous pla t quelques minutes pour tudier ce guide En cas de probl me d installation ou de performance veuillez composer le 1 800 4 KOHLER partir des E U le 1 800 964 5590 partir du Canada ou le 001 877 680 1310 partir du Mexique Gracias por elegir los productos Kohler Gracias por elegir los productos de Kohler Su producto de Kohler Company refleja la verdadera pasion por el dise o la mano de obra la artesan a y la innovaci n que forman parte de Kohler Company Estamos seguros que su confiabilidad y belleza exceder n sus m s altas expectativas d ndole satisfacci n por a os
9. Installation and Care Guide Guide d installation et d entretien Gu a de instalaci n y cuidado Corner Acrylic Baths Baignoires acryliques en alc ve Ba eras acr licas de instalaci n entre tres paredes K 1145 K 1145 F K 1155 K 1155 F K 1161 K 1161 F K 1161 LA K 1245 K 1245 F M product numbers are for Mexico i e K 12345M Los n meros de productos seguidos de M USA Canada 1 800 4KOHLER corresponden a M xico Ej K 12345M M xico 001 877 680 1310 kohler com OF KOHLER 2008 Kohler Co 1084210 2 B Thank You For Choosing Kohler Company Thank you for choosing Kohler Company Your Kohler Company product reflects the true passion for design craftsmanship artistry and innovation Kohler Company stands for We are confident its dependability and beauty will surpass your highest expectations satisfying you for years to come All the information in this guide is based upon the latest product information available at the time of publication At Kohler Company we strive to fulfill our mission of improving the level of gracious living for each person who is touched by our products and services We reserve the right to make changes in product characteristics packaging or availability at any time without notice Please take a few minutes to review this guide If you encounter any installation or poon roblems please call 1 800 4 KOHLER from within the USA 1 800 964 5590 rom within Canada or 001 8
10. abundante de adhesivo de construcci n de alta calidad en la parte inferior de la base de la ba era O Con ayuda mueva con cuidado la ba era al lugar de instalaci n Verifique que la ba era 1 est a nivel en la parte superior de la ba era y 2 est a plomo del lado del desag e Si la ba era no est a nivel puede que necesite colocar cu as debajo de la ba era Conecte el tubo del desag e a la trampa Retire la cinta protectora del borde de la ba era Aplique una tira continua de sellador de silicona alrededor de todo el borde de la ba era 5 Secure Bath to Studs Flange Models 1 4 6 mm Thick Furring Strips Coyaux de 1 4 6 mm Listones de enrasar gruesos de 1 4 6 mm Drill a small hole through the nailing in flange at each stud Percer un petit trou pilote sur la bride de cloutage a chaque montant Taladre un peque o orificio a trav s del reborde de clavado a la altura de cada Stud Montant Poste de madera 6 Large Head Galvanized Nails Clous galvanis s 6 a t te large Clavos del 6 galvanizados de cabeza grande Drill a small pilot hole through the ern ee flange at each stud location Add shims between the nailing in flange and the studs to eliminate any gaps Nail 1 4 6 mm thick furring strips to the studs to shim out to the edge of the nailing in flange Use 6 large head galvanized nails or screws to secure the
11. and 001 877 680 1310 from within Mexico Implied warranties including that of merchantability and fitness for a particular purpose are expressly limited in duration to the duration of this warranty Kohler Co and or seller disclaims any liability for special incidental or consequential damages Kohler Co 21 1084210 2 B One Year Limited Warranty cont Some states provinces do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of special incidental or consequential damages so these limitations and exclusions may not apply to you This warranty gives you specific legal rights You may also have other rights which vary from state province to state province This is Kohler Co s exclusive written warranty Garantie limit e d un an Les produits de plomberie KOHLER sont garantis contre tout d faut mat riel et de fabrication pour un an a partir de la date de l installation Kohler Co jugera a sa discr tion de la r paration du remplacement ou du r glage appropri et ceci apr s toute inspection faite par Kohler Co de tous d fauts d s une utilisation normale et ceci pendant un 1 an partir de la date d installation Kohler Co n est pas responsable des co ts de d montage ou d installation L utilisation de nettoyants l int rieur du r servoir annulera la garantie Pour obtenir un service garantie contacter Kohler Co par l interm diaire de votre vendeur plo
12. attention le d placement de la baignoire dans l emplacement d installation Cette baignoire ne s ajustera pas facilement dans les passages de portes Lors de la planification de l emplacement d installation fournir l acc s aux connexions de plomberie finales pour le d pannage Pour assurer une installation r ussie le sol doit tre nivel O Un support ad quat doit tre fourni Consulter le plan de raccordement emball avec votre baignoire pour les sp cifications de la pr paration du sol Cette baignoire est con ue pour des installations en angle uniquement O Si un bandeau optionnel sera utilis construire le support additionnel requis et installer un bandeau optionnel avant que le sol fini et les mat riaux du mur soient compl t s Se r f rer aux instructions d installation emball es avec le bandeau Si le mat riau du mur fini sera en contact avec la surface sup rieure de la baignoire il est recommand qu une bande carreler soit install e La bande carreler pr vient l eau de s infiltrer de derri re le mur et permet une installation en alc ve de plusieurs baignoires encastr es lorsqu une version bride n est pas disponible L espace du bassin ne n cessite pas de support additionnel lorsque le plancher est nivel et d querre avec les montants du cadre Consid rer d utiliser des cales pour un support additionnel si le plancher n est pas nivel Planif
13. calidad en la parte inferior de los bloques niveladores Con ayuda mueva con cuidado la ba era al lugar de instalaci n Verifique que los bloques niveladores descansen directamente en el subpiso Cambie la posici n o coloque cu as seg n sea necesario Verifique que la ba era 1 est a nivel en la parte superior de la ba era y 2 est a plomo del lado del desag e Si la ba era no est a nivel puede que necesite colocar cu as debajo de la ba era O Conecte el tubo del desagiie a la trampa 1084210 2 B 12 Kohler Co 4 Secure to Subfloor Bath Base Models Cement or Mortar Method Construction Adhesive Method M thode ciment ou mortier M thode adh sif de construction M todo de cemento o mortero M todo de adhesivo de construcci n Apply construction adhesive to the bath base Cement or Mortar Appliquer un adh sif de Ciment ou mortier construction a la base de la Cemento o mortero baignoire Aplique adhesivo de construcci n a la base de la ba era NOTICE The bath must be secured using one of the following two methods cement or mortar bed or construction adhesive NOTICE Ensure the subfloor is level before proceeding If necessary use shims to achieve level Cement or Mortar Bed Method NOTICE Do not use gypsum cement or drywall compound as these materials will not provide a durable bond Only use cement or mortar Spread a 2 5 1 cm thick la
14. cesitar hacer un orificio para desag e para realizar las conexiones del desag e Para instalaciones de desag e arriba del nivel del piso No es necesario hacer el orificio Instale la tuber a seg n el diagrama de instalaci n provisto con la ba era Tape los suministros y verifique que no haya fugas 1084210 2 B 8 Kohler Co Prepare el sitio cont Fije el desagiie en la ba era seg n las instrucciones del fabricante del desag e A n no conecte la trampa Coloque una lona limpia en el fondo de la ba era Esto asegurar a evitar que la superficie de la ba era se raye durante la instalaci n 2 Install Tiling In Bead optional NOTICE Tiling in bead should be installed if the finished wall material will come into contact with any top surface of the bath The tiling in bead prevents water from seeping behind the wall and allows for an alcove installation of many drop in baths when a flanged version is not available NOTICE If K 1179 tiling in bead is used the bottom edge of the tiling in bead may have to be trimmed This will ensure a proper fit in the installation location Thoroughly clean the bath rim Install the tiling in bead Refer to the manufacturer s instructions for proper installation Installer le carrelage optionnel NOTICE Une bande carreler devrait tre install e si le mat riau du mur fini sera en contact avec toute surface sup r
15. ction Adhesive Method Apply a generous amount of high quality construction adhesive to the bottom of the leveling blocks With help carefully move the bath into the installation area Verify the leveling blocks are resting directly on the subfloor Reposition or shim as needed Verify the bath is 1 level across the top of the bath and 2 plumb along the drain side If the bath is not level shims must be used under the bath 1084210 2 B 10 Kohler Co Secure to Subfloor Leveling Block Models cont Connect the drain tailpiece to the trap S curiser sous plancher Mod les blocs de mise niveau AVERTISSEMENT Risque de blessures corporelles Ne pas soulever la bagnoire AN par le rebord Soulever la baignoire par la base uniquement NOTICE La baignoire doit tre s curis e en utilisant une des deux m thodes suivantes ciment ou mortier ou adh sif de construction NOTICE S assurer que le plancher est nivel avant de proc der Si n cessaire utiliser des cales pour accomplir la mise niveau M thode de ciment ou de mortier NOTICE Ne pas utiliser de pl tre ou un m lange pour cloison s che car ces mat riaux ne fourniront pas un scellement durable Utiliser uniquement du ciment ou du mortier taler une couche de ciment ou mortier de 2 5 1 cm sur le plancher except o les blocs de mise niveau seront localis s D gager tout cimen
16. er applying cleaner Rinse and dry any overspray that lands on nearby surfaces Do not allow cleaners to soak on surfaces Use a soft dampened sponge or cloth Never use an abrasive material such as a brush or scouring pad to clean surfaces 1084210 2 B 20 Kohler Co Care and Cleaning cont For detailed cleaning information and products to consider visit www kohler com clean To order Care amp Cleaning information call 1 800 456 4537 Entretien et nettoyage Pour de meilleurs r sultats prendre ce qui suit en consid ration lors de l entretien de votre produit KOHLER d purs tester la solution de nettoyage sur une surface la moins vidente avant de l appliquer sur la totalit de la surface Essuyer les surfaces et rincer compl tement avec de l eau imm diatement apr s l application de nettoyant Rincer et s cher tout claboussement sur les surfaces avoisinantes Nepas laisser les nettoyants sur les surfaces e Utiliser une ponge ou un chiffon doux et humide Ne jamais utiliser de mat riau abrasif tel que brosse ou ponges r curer pour nettoyer les surfaces Pour l information d taill e de nettoyage et des produits consid rer visiter www kohler com clean Pour commander des informations d entretien et de nettoyage composer le 1 800 456 4537 Cuidado y limpieza Para obtener los mejores resultados tenga presente lo siguiente al limpiar su producto KOHLER Siempre pruebe la
17. evise que no haya fugas en las conexiones de desagiie Llene la ba era hasta el rebosadero Verifique que no haya fugas 7 Complete Installation Rim Models Finished Deck Comptoir fini Cubierta acabada Finished Wall Mur fini Pared acabada Apply silicone sealant Appliquer du mastic la silicone Water Resistant Wall Aplique sellador de silicona Material Water Resistant Wall Mat riau hydror sistant Material du mur Mat riau Material de pared hydror sistant du mur resistente al agua Material de pared Framing resistente al agua Rim Sx i Rebord N Cadre Rim Bane Estructura Rebord de postes Borde 2x4 Studding Finished Deck Material Mat riau du comptoir fini Montant 2x4 Postes de 2x4 Le Material de acabado de la cubierta Finished Wall Apply silicone Material sealant Mat riau mur Appliquer du mastic fini la silicone Material de la Aplique sellador de silicona pared acabada Silicone Sealant Mastic la silicone Rebord Sellador de silicona Borde For Finished Deck Installations If applicable carefully remove the protective tape from the bath rim Cover the framing with water resistant deck material Using silicone sealant seal the joints between the bath rim edges and the water resistant deck material Tape and mud the water resistant deck material Install the finished deck material 1 16 2 mm away from t
18. he rim This will create a groove to apply the silicone sealant Apply a bead of silicone sealant in the groove between the finished deck and the rim For Finished Wall Installations Kohler Co 17 Cover the framing with water resistant wall material Tape and mud the water resistant wall material 1084210 2 B Complete Installation Rim Models cont Install the finished wall material 1 4 6 mm above the bath deck This will create a groove to apply the silicone sealant Apply a bead of silicone sealant in the groove between the finished wall and the rim For All Installations Install the faucet trim according to the manufacturer s instructions Compl ter l installation Mod les rebord Pour des installations de comptoir fini O Si applicable retirer d licatement la pellicule protectrice du rebord de la baignoire Recouvrir le cadre avec du mat riau hydror sistant En utilisant du mastic la silicone sceller les joints entre les rebords et le mat riau hydror sistant du comptoir Appliquer le mat riau hydror sistant du comptoir Installer le mat riau du comptoir fini 1 16 2 mm l cart du rebord Ceci va cr er une rainure pour appliquer du mastic la silicone Appliquer du mastic la silicone dans la rainure entre le comptoir fini et la garniture Pour des installations de mur fin
19. i Recouvrir le cadrage avec du mat riau hydror sistant Poser et appliquer le mat riau hydror sistant du mur Installer le mat riau du mur fini de 1 4 6 mm au dessus du comptoir de baignoire Ceci va cr er une rainure pour appliquer du mastic la silicone Appliquer du mastic la silicone dans la rainure entre le mur fini et le rebord v our toutes les installations O Assembler la garniture de robinet conform ment aux instructions du fabricant Termine la instalaci n Modelos de borde Para instalaciones de cubierta acabada Si aplica con cuidado retire la cinta protectora del borde de la ba era Cubra la estructura con material de cubierta resistente al agua Utilizando sellador de silicona selle las juntas entre los filos de los bordes de la ba era y el material de cubierta resistente al agua Adhiera el material de cubierta resistente al agua con cinta y yeso Instale el material de acabado de la cubierta a 1 16 2 mm del borde Esto crear una ranura para aplicar el sellador de silicona Aplique una tira de sellador de silicona en la ranura entre la cubierta acabada y el borde Para instalaciones de pared acabada Cubra la estructura de postes de madera con material de pared resistente al agua 1084210 2 B 18 Kohler Co Termine la instalaci n Modelos de borde cont Adhiera el materia
20. ier pour le montage ad quat et l espace de connexion pour le robinet V rifier le support ad quat pour le robinet Les larges robinets mont s sur comptoir ne sont pas appropri s ou s curitaires pour cette installation ayant t utilis s par inadvertance comme moyen de support Pr voir un cadrage aux dimensions appropri es Les illustrations peuvent tre diff rentes de votre produit actuel Les instructions d installation s appliquent tout de m me Cette baignoire est conforme au standard ANSI Z124 1 2 Toutes les dimensions sont nominales Kohler Co se r serve le droit d apporter toutes modifications sur le design des produits et ceci sans pr avis tel que sp cifi dans le catalogue des prix 1084210 2 B 4 Kohler Co Antes de comenzar PRECAUCION Riesgo de da os a la propiedad No apoye la ba era por los bordes La ba era tiene que quedar soportada s lo por los bloques niveladores o la base de la ba era dependiendo del modelo de su ba era Si la carga de peso de la ba era es soportada por el per metro del borde de la ba era ocurrir n da os Cumpla con todos los c digos locales de plomer a y construcci n Planifique con cuidado c mo va a mover la ba era al rea de instalaci n Esta ba era no cabr f cilmente a trav s de los marcos de las puertas Al planificar el rea de instalaci n provea acceso a todas las conexiones de plome
21. ieure de la baignoire La bande carreler pr vient l eau de s infiltrer de derri re le mur et permet une installation en alc ve de plusieurs baignoires encastr es lorsqu une version bride n est pas disponible NOTICE Si la bande carreler K 1179 est utilis e le rebord inf rieur de cette derni re devra tre court e Ceci assurera un bon ajustement dans l emplacement d installation Bien nettoyer le rebord de baignoire O Installer la bande a carreler Se r f rer aux instructions du fabricant pour une bonne installation Instale las tiras selladoras opcional AVISO Se debe instalar una tira selladora si la pared acabada entrar en contacto con las superficies superiores de la ba era La tira selladora evita que el agua entre detr s de la pared y permite la instalaci n encajonada entre tres paredes de muchas ba eras de sobreponer cuando la versi n con reborde no est disponible AVISO Si se utiliza la tira selladora K 1179 el filo inferior de la tira selladora puede necesitar recortarse Esto asegura que quede bien en el lugar de la instalaci n Limpie a fondo el borde de la ba era Instale la tira selladora Para una correcta instalaci n consulte las instrucciones del fabricante Kohler Co 9 1084210 2 B 3 Secure to Subfloor Leveling Block Models Clear spaces for leveling blocks D gager les espaces pour les blocs de mise a niveau Limpie l
22. in installations A drain hole will need to be cut to accommodate the drain connections For above the floor drain installations A hole will not need to be cut Position the plumbing according to the roughing in sheet packed with the bath Cap the supplies and check for leaks Attach the drain to the bath according to the drain manufacturer s instructions Do not connect the trap at this time Place a clean drop cloth on the bottom of the basin area This will prevent the surface of the bath from scratching during the installation process Pr parer le site Sol NOTICE Un support ad quat doit tre fourni Consulter le plan de raccordement emball avec la baignoire pour les sp cifications de la pr paration du sol Installer un support de sol ad quat NOTICE Pour assurer une installation r ussie il est critique que la baignoire soit install e sur un plancher nivel V rifier que le plancher est nivel Ajuster la mise niveau si n cessaire Cadrage ATTENTION Risque d endommagement du mat riel Ne pas soulever la A baignoire par le rebord La baignoire doit uniquement tre support e par les blocs de mise niveau ou sa base selon le mod le Si la charge de la baignoire est support e par le p rim tre du rebord de baignoire un endommagement peut avoir lieu NOTICE La baignoire doit tre install e en angle NOTICE Pour des mod les encastr s Pour a
23. incia a provincia El presente documento constituye la garant a exclusiva por escrito de Kohler Co Kohler Co 23 1084210 2 B 1084210 2 B KOHLER
24. l de pared resistente al agua con cinta y yeso Instale el material de la pared acabada 1 4 6 mm sobre la cubierta de la ba era Esto crear una ranura para aplicar el sellador de silicona Aplique una tira de sellador de silicona en la ranura entre la pared acabada y el borde Para todas las instalaciones Instale la guarnici n de la grifer a seg n las instrucciones del fabricante 8 Complete Installation Flange Models Water Resistant Wall Furring Strip Material Tasseau Mat riau List n de enrasar hydror sistant du mur Material de pared resistente al agua Finished Wall Covering Rev tement de mur fini Revestimiento de la pared acabada X Bride de cloutage Reborde de clavado WWASASASASAS AS SASAS AAS SASS Nailing In Flange LEZ 777 2271112 Silicone Sealant Mastic la silicone Sellador de silicona 2x4 Studding Montant 2x4 Postes de 2x4 O If applicable install the optional removable apron at this time Refer to the manufacturer s installation instructions Apply a bead of silicone sealant to the nailing in flange NOTICE Provide a 1 4 6 mm gap above the bath deck when installing the water resistant wall material and finished wall material This gap will create a groove for the silicone sealant O ns a 1 4 6 mm gap between the paperbound edge and the bath deck cover the framing with water resis
25. llicule protectrice du rebord de la baignoire Appliquer un boudin de silicone autour du rebord de la baignoire Fije al subpiso Modelos con base de ba era AVISO La ba era debe asegurarse utilizando uno de los dos m todos siguientes cemento o mortero o adhesivo de construcci n AVISO Aseg rese de que el subpiso est a nivel antes de continuar Si es necesario coloque cu as para lograr poner a nivel M todo de cemento o mortero AVISO No utilice cemento de yeso o pasta para paneles de yeso estos materiales no proporcionar n una adherencia duradera S lo utilice cemento o mortero Extienda una capa de 2 5 1 cm de espesor de cemento o mortero en el subpiso Coloque una cubierta de pl stico o material similar sobre el cemento o mortero Con ayuda mueva con cuidado la ba era al lugar de instalaci n Verifique que la ba era 1 est a nivel en la parte superior de la ba era y 2 est a plomo del lado del desag e Si la ba era no est a nivel coloque cu as debajo de la base de la ba era 1084210 2 B 14 Kohler Co Fije al subpiso Modelos con base de ba era cont Conecte el tubo del desag e a la trampa Retire la cinta protectora del borde de la ba era Aplique una tira continua de sellador de silicona alrededor de todo el borde de la ba era M todo de adhesivo de construcci n Aplique una cantidad
26. mbier centre de r novation revendeur par internet ou par crit Kohler Co l attention de D partement du service client le 444 Highland Drive Kohler Wisconsin 53044 USA ou en composant le 1 800 4 KOHLER partir des E U le 1 800 964 5590 partir du Canada et le 001 877 680 1310 depuis le Mexique Les anue implicites y compris celles de qualit marchande et d aptitude un emploi particulier se limitent express ment la dur e de la pr sente garantie Kohler Co et ou le vendeur d clinent toutes responsabilit s contre tous dommages occasionn s impr visibles ou corr latifs Certains tats provinces ne permettent pas la limitation sur la dur e de la garantie ou l exclusion ou la limitation sp ciale de dommages occasionn s ou corr latifs un accident ainsi ces limitations ou exclusions pourraient ne pas s appliquer dans votre cas Cette garantie vous donne des droits l gaux sp cifiques Vous pouvez galement avoir d autres droits qui varient d un tat province l autre Ceci constitue la garantie crite exclusive de Kohler Co Garantia limitada de un a o Se garantiza que los productos de plomeria KOHLER estan libres de defectos de material y mano de obra por un a o a partir de la fecha de instalaci n Kohler Co a su criterio reparar reemplazar o realizar los ajustes pertinentes en los casos en que la inspecci n realizada por Kohler Co determine que dichos defectos ocurrieron du
27. os espacios para los bloques niveladores Spread a 2 5 1 cm layer of cement or mortar bed material SS Ftaler un lit de ciment ou de mortier d une paisseur de 2 5 1 cm A Extienda una capa de 2 5 1 cm de cemento o mortero WARNING Risk of personal injury Do not lift the bath by the rim Lift the bath from the bottom only Leveling Blocks Blocs de mise niveau Bloques niveladores NOTICE The bath must be secured using one of the following two methods cement or mortar bed or construction adhesive NOTICE Ensure the subfloor is level before proceeding If necessary use shims to achieve level Cement or Mortar Bed Method NOTICE Do not use gypsum cement or drywall compound as these materials will not provide a durable bond Only use cement or mortar O Spread a 2 5 1 cm thick later of cement or mortar on the subfloor except where the leveling blocks will be located Clear any cement or mortar away from the leveling block locations O Place a plastic liner or similar material over the cement or mortar With help carefully move the bath into the installation area Verify the leveling blocks are resting directly on the subfloor Reposition as needed Verify the bath is 1 level across the top of the bath and 2 plumb along the drain side If the bath is not level shims must be used under the leveling blocks Connect the drain tailpiece to the trap Constru
28. plies Check all connections for leaks Run water into the bath Check the drain connections for leaks Fill the bath to the overflow Check for leaks Installer la plomberie ATTENTION Risque d endommagement du mat riel Un joint tanche doit tre pr sent sur toutes les connexions de drain de baignoire Le joint tanche doit pr venir tout dommage Raccorder le siphon au drain Installer les valves du robinet conform ment aux instructions du fabricant du robinet Ne pas installer la bague du robinet ce moment Ouvrir les alimentations d eau chaude et froide V rifier s il y a des fuites dans les connexions Faire couler l eau dans la baignoire V rifier s il y a des fuites O Remplir la baignoire jusqu au trop plein V rifier s il y a des fuites Instale la plomer a PRECAUCI N Riesgo de da os a la propiedad Debe existir un sello herm tico A en todas las conexiones del desag e de la ba era Este sello herm tico evitar da os a la propiedad O Conecte la trampa al desagiie Instale las v lvulas de la grifer a seg n las instrucciones del fabricante de la grifer a No instale la guarnici n de la grifer a en este momento 1084210 2 B 16 Kohler Co Instale la plomeria cont Abra los suministros del agua fria y caliente Revise que no haya fugas en las conexiones Haga circular agua en la ba era R
29. r a finales para dar servicio Para asegurar una instalaci n exitosa el piso debe estar a nivel Se debe proveer el soporte de piso adecuado Consulte el diagrama de instalaci n provisto con la ba era para obtener los requisitos de carga espec ficos para el piso Esta ba era est dise ada s lo para instalarse en esquina Si va a utilizar un fald n opcional construya el soporte adicional requerido e instale el fald n opcional antes de terminar el revestimiento del pS y las paredes Consulte las instrucciones de instalaci n que se incluyen con el fald n Si la pared acabada entrar en contacto con las superficies superiores de la ba era se recomienda instalar una tira selladora La tira selladora evita que el agua entre detr s de la pared y permite la instalaci n encajonada entre tres paredes de muchas ba eras de sobreponer cuando la versi n con reborde no est disponible El rea del fondo no ob ning n soporte adicional siempre que el subpiso est nivelado y a escuadra con la estructura de postes Considere el uso de cufias como soporte adicional en caso de que el subpiso no est nivelado Planifique el espacio adecuado de montaje y conexi n de la grifer a Verifique que haya soporte adecuado para la grifer a Las grifer as grandes de montaje en cubierta no son adecuadas ni seguras para esta instalaci n puesto que pueden utilizarse inadvertidamente como medio de sopo
30. rante el uso normal en el transcurso de un 1 a o a partir de la fecha de la instalaci n Kohler Co no se hace responsable de los gastos de desinstalaci n o instalaci n El uso de limpiadores de inodoro que se colocan dentro del tanque anular la garant a Para obtener el servicio de garant a comun quese con Kohler Co a trav s de su distribuidor contratista de plomer a o distribuidor a trav s de Internet o escriba directamente a Kohler Co Attn Customer Service Department 444 Highland Drive Kohler WI 53044 USA o llame al 1 800 4 KOHLER desde los Estados Unidos al 1 800 964 5590 desde Canad o al 001 877 680 1310 desde M xico Toda garant a impl cita en relaci n a productos de uso comercial incluyendo la comercializaci n e idoneidad del producto para un uso determinado se limita expresamente a la duraci n de la presente garant a Kohler Co y o el vendedor no se hacen responsables por concepto de da os particulares incidentales o indirectos 1084210 2 B 22 Kohler Co Garantia limitada de un a o cont Algunos estados provincias no permiten limitaciones en cuanto a la duraci n de una garant a impl cita o a la exclusi n o limitaci n de da os particulares incidentales o indirectos por lo que estas limitaciones y exclusiones pueden no aplicar a su caso Esta garant a le otorga ciertos derechos legales espec ficos Adem s usted puede tener otros derechos que var an de estado a estado y prov
31. rte Provea una estructura de postes de madera que tenga las dimensiones correctas Es posible que las ilustraciones mostradas no representen su producto real Las instrucciones de instalaci n aun aplican Esta ba era cumple con la norma ANSI Z124 1 2 Todas las dimensiones son nominales Kohler Co se reserva el derecho de modificar el dise o de los productos sin previo aviso tal como se especifica en la lista de precios Product Identification Model K Please write the exact identification number copied from the label on the box This information will assist our customer service representatives should you need their assistance in the future Save this manual for future reference Identification du produit Mod le K Veuillez noter le num ro exact d identification copi de l tiquette sur l emballage Cette information assistera les repr sentants du service client le en cas de besoin d assistance future Kohler Co 5 1084210 2 B Identification du produit cont Conserver ce manuel pour future ref rence Identificaci n del producto Modelo K Escriba el n mero de identificaci n exacto copiado de la etiqueta de la caja Esta informaci n ayudar a nuestros representantes de servicio al cliente en caso de que usted necesitara ayuda en el futuro O Guarde este manual para referencia futura
32. rte inferior solamente AVISO La ba era debe asegurarse utilizando uno de los dos m todos siguientes cemento o mortero o adhesivo de construcci n Kohler Co 11 1084210 2 B Fije al subpiso Modelos con bloques niveladores cont AVISO Aseg rese de que el subpiso est a nivel antes de continuar Si es necesario coloque cu as para lograr poner a nivel M todo de cemento o mortero AVISO No utilice cemento de yeso o pasta para paneles de yeso estos materiales no proporcionar n una adherencia duradera S lo utilice cemento o mortero Extienda una capa de 2 5 1 cm de espesor de cemento o mortero en el subpiso excepto donde se colocar n los bloques niveladores Limpie todo el cemento o mortero de los lugares para los bloques niveladores Coloque una cubierta de pl stico o material similar sobre el cemento o mortero Con ayuda mueva con cuidado la ba era al lugar de instalaci n Verifique que los bloques niveladores descansen directamente en el subpiso Cambie la posici n seg n sea necesario Verifique que la ba era 1 est a nivel en la parte superior de la ba era y 2 est a plomo del lado del desag e Si la ba era no est a nivel puede que necesite colocar cu as debajo de los bloques niveladores Conecte el tubo del desag e a la trampa M todo de adhesivo de construcci n Aplique una cantidad abundante de adhesivo de construcci n de alta
33. sembler la garniture de robinet conform ment aux instructions du fabricant Termine la instalaci n Modelos de reborde Si aplica instale el fald n desmontable opcional en este momento Consulte las instrucciones de instalaci n del fabricante O Aplique una tira de sellador de silicona en el reborde de clavado AVISO Provea una separaci n de 1 4 6 mm arriba de la cubierta de la ba era al instalar el material de pared resistente al apua el material de la pared acabada Esta separaci n crear una ranura para el sellador de silicona Dejando una separaci n de 1 4 6 mm entre el filo con protecci n de papel y la cubierta de la ba era cubra la estructura de postes de madera con el material de la pared resistente al agua Adhiera el material de pared resistente al agua con cinta y yeso Instale el material de la pared acabada 1 4 6 mm sobre la cubierta de la ba era Esto crear una ranura para aplicar el sellador de silicona Aplique una tira de sellador de silicona en la ranura entre la pared acabada y el borde Instale la guarnici n de la grifer a seg n las instrucciones del fabricante Care and Cleaning For best results keep the following in mind when caring for your KOHLER product Always test your cleaning solution on an inconspicuous area before applying to the entire surface e Wipe surfaces clean and rinse completely with water immediately aft
34. soluci n de limpieza en un rea oculta antes de aplicarla a toda la superficie Limpie con un trapo las superficies y enjuague completa e inmediatamente con agua despu s de aplicar el limpiador Enjuague y seque las superficies cercanas que se hayan rociado No deje por tiempo prolongado los limpiadores en las superficies e Utilice una esponja o trapo suave y h medo Nunca utilice materiales abrasivos como cepillos o estropajos de tallar para limpiar las superficies Para obtener informaci n detallada de limpieza y los limpiadores a considerar visite www kohler com clean Para solicitar informaci n sobre el cuidado y la limpieza llame al 1 800 456 4537 One Year Limited Warranty KOHLER plumbing products are warranted to be free of defects in material and workmanship for one year from date of installation Kohler Co will at its election repair replace or make appropriate adjustment where Kohler Co inspection discloses any such defects occurring in normal usage within one 1 year after installation Kohler Co is not responsible for removal or installation costs Use of in tank toilet cleaners will void the warranty To obtain warranty service contact Kohler Co either through your Dealer Plumbing Contractor Home Center or E tailer or by writing Kohler Co Attn Customer Service Department 444 Highland Drive Kohler WI 53044 USA or by calling 1 800 4 KOHLER from within the USA 1 800 964 5590 from within Canada
35. ssurer que la baignoire ne repose pas sur le rebord cadrer le sol ou construire un cadre pour une installation sur lev e S assurer que la baignoire soit support e par des blocs de mise niveau ou par la base de la baignoire uniquement de r f rer au plan de raccordement emball avec cette baignoire Construire le cadrage selon l information du plan de raccordement emball e avec la baignoire Kohler Co 7 1084210 2 B Pr parer le site cont Si un bandeau sera install construire le suppor additionnel requis ce moment Se r f rer aux instructions d installation emball es avec le bandeau Plomberie REMARQUE Pour des installation de drain travers le sol Un orifice de drain devra tre d coup pour accommoder les connexions de drain Pour des installation de drain au dessus du sol Un orifice ne devra pas tre d coup Positionner la plomberie selon le plan de raccordement emball avec la baignoire Boucher les alimentations et v rifier s il y a des fuites Attacher le drain la baignoire selon les instructions du fabricant du drain Ne pas connecter le siphon ce moment Placer une bache propre au fond du bassin Ceci vitera les rayures de la surface de la baignoire pendant l installation Prepare el sitio Revestimiento de piso AVISO Se debe proveer el soporte de piso adecuado Consulte el diagrama de instalaci n provisto con la
36. t ou mortier des emplacements de blocs de mise niveau Placer une couche en plastique ou mat riau similaire sur le ciment ou le mortier O Avec de l aide placer soigneusement la baignoire dans l emplacement d installation V rifier que les blocs de mise niveau reposent directement sur le plancher Repositionner au besoin V rifier que la baignoire est 1 niveler le lond du dessus de la baignore et 2 galiser le long de l orifice du drain Si la baignoire n est pas nivel e des cales devront tre utilis es sous les blocs de mise niveau Connecter la pi ce de raccordement au siphon M thode d adh sif de construction O Appliquer g n reusement un adh sif de construction de haute qualit la base des blocs de mise niveau Avec de l aide placer soigneusement la baignoire dans l emplacement d installation V rifier que les blocs de mise niveau reposent directement sur le plancher Repositionner ou caler selon le besoin V rifier que la baignoire est 1 niveler le lond du dessus de la baignore et 2 galiser le long de l orifice du drain Si la baignoire n est pas nivel e des cales devront tre utilis es sous la baignoire Connecter la pi ce de raccordement au siphon Fije al subpiso Modelos con bloques niveladores ADVERTENCIA Riesgo de lesiones personales No levante la ba era por los bordes Levante la ba era por la pa
37. tant wall material Tape and mud the water resistant wall material O Install the finished wall material 1 4 6 mm above the bath deck This will create a groove to apply the silicone sealant Kohler Co 19 1084210 2 B Complete Installation Flange Models cont Apply a bead of silicone sealant in the groove between the finished wall and the rim Install the faucet trim according to the manufacturer s instructions Compl ter l installation Mod les bride Si applicable installer le bandeau amovible optionnel ce moment Se r f rer aux instructions d installation du fabricant Appliquer du mastic la silicone sur la bride de cloutage NOTICE Fournir un espace de 1 4 6 mm au dessus du comptoir de baignoire lors de l installation du mat riau hydror sistant du mur et du mat riau du mur fini Cet espace va cr er une rainure pour appliquer du mastic la silicone En laissnt un espace de 1 4 6 mm entre le rebord broch et le comptoir de baignoire couvrir le cadrage avec du mat riau hydror sistant du mur O Poser et appliquer le mat riau hydror sistant du mur Installer le mat riau du mur fini de 1 4 6 mm au dessus du comptoir de baignoire Ceci va cr er une rainure pour appliquer du mastic la silicone Appliquer du mastic la silicone dans la rainure entre le mur fini et le rebord As
38. ter of cement or mortar on the subfloor Place a plastic liner or similar material over the cement or mortar With help carefully move the bath into the installation area Verify the bath is 1 level across the top of the bath and 2 plumb along the drain side If the bath is not level shims must be used under the bath base Connect the tailpiece of the drain to the trap Remove the protective tape from the bath rim Apply a continuous bead of silicone sealant around the entire rim of the bath Construction Adhesive Method Apply a generous amount of high quality construction adhesive to the bottom of the bath base With help carefully move the bath into the installation area Verify the bath is 1 level across the top of the bath and 2 plumb along the drain side If the bath is not level shims must be used under the bath Connect the tailpiece of the drain to the trap Remove the protective tape from the bath rim Apply a continuous bead of silicone sealant around the entire rim of the bath Kohler Co 13 1084210 2 B S curiser au sous plancher Mod les base de baignoire NOTICE La baignoire doit tre s curis e en utilisant une des deux m thodes suivantes ciment ou mortier ou adh sif de construction NOTICE S assurer que le plancher est nivel avant de proc der Si n cessaire utiliser des cales pour accomplir la mise

Download Pdf Manuals

image

Related Search

Related Contents

      Foxconn A74ML-K 3.0  Doc Mod SOC Paso VI  Manuel d`utilisation  Manuel d`utilisation  Manual de Instruções K 2.350  Generac 37kW NG Portable Generator User Manual  Jøtul I 570 FL  

Copyright © All rights reserved.
Failed to retrieve file