Home

Ariel 9090k Installation Guide

image

Contents

1. 2 2170 85 4 Saar Aasoe mmf Install the screw M6x25 Qmp Active chain wheel of glass SIZE 920x920x2170 mm 36 2 x36 2 x85 4 ILLUSTRATION OF INSTALLATION 1 The products should be installed by technical guy who are got the certificate or those technical who are assign by dealers The main power switch and electronic leakage device should be installed 2 The plug of electronic should be installed above the steam generator and the length of electronic wire not less then 1800MM from the earth 3 There are should be with main power switch for hot and cold water pipe of steam room and the water pipe should be connect to drainage water pipe 4 Install the products according to the diagram of installation When fixed the place for the products ATTENTION 1 In order to be tripped and fell down pay more attention when get into the steam room Please don t shut the finger in the door in order to be hurt 2 In order to avoid damaging the surface of products please do not use hardness and sharpness tool to curve the products 3 In order to course fire no smoking inside the bathroom 4 the jets of steam and drainage pipe both are high temperature when products working in order to be hurt please be careful 5 In order to be tripped and fell down please keep clear of the bathtub after taking shower each time 6 It will be leaking if the glass glue plastic sheet be off then please add
2. case will drainfor 2 minutes 2 The application of the back lamp Press amp the sidelight is on Press again the ceiling ee 4 lamp is out press L a third press the sidelight is out too C e Q m6 3 The steam function STEP 4 f Pl ion th f eie dain heel oe diaes Press 2 startup the steam function the water case 4x25 l I p will pump water automati cally After 60minutes or so it PJ will generate steam When the water case is lack ofwater l A the controller will replenish automatically 4 The air draft function Under the condition of turnning on press can start Ke up air draft function pressagain will colse it l 5 The setting of time or temperature 5 Assembly of sliding door 4 i 7 par dhesiiding doom onte thet 1 Press pitch can adjust the time from 1 99 P E i a 2 Press f b pitch can adjust the temperature from it balance ee 30 60 STEP 5 4 4 WSK OHNO OVOoOs D Time adjustment pitch Q Temperature adjustment pitch 3 CeilingLamp Back Lamp pitch 4 Time adjustment pitch 5 Temperature adjustment pitch Fan Pitch D Steam Pitch 8 Main Cock Pit
3. some more for recover 7 1f there are marks of water please clear with soft cloth and toothpaste 8 In order to be blocked of drainage device please keep clean of the surface of bathtub 9 Please do not hang up heavy things on the steam room or the handle of steam room 10 Please deal with the products according to the local laws when it is no longer be use 11 Any request please contact with local dealer ATTENTION FOR USAGE 1 check if power and cold hot water switch be turn on or be turn off each time before use this product 2 check if power of electronic leakage device be get through or not Checking way Press testing button light of power be off press button of restart then light of power be on lt is not being what mentioned above after operated step by step then that shows the electronic protection device out off control or there is something wrong with the electronic leakage device so should ask professional to check and maintain the product 3 Turn off the main power of control panel after stop usage The plug of power should be pull out because only turn off all the functions of control panel that is not stop the power 4 People with hypertension or drunk are not allowed to have sauna steam bath Children should have sauna steam bath under adult s instruction 6 Please don t shut the finger in the door in order to be hurt when get into the steam room 7 In order to be tripped and fell down pay more attention when ge
4. ARIFI gt C gt N INSTALL DIRECTION STEAM BATHROOM MODEL WS 9090K O Your best choice No advanced advice will be submit before we change our design and size The pictures may be a little different from the real products Our company keep the final explanation right O TECHNIQUE PARAMETER Voltage Frequency Water Volatge Power of steam generator Ac110 V 60Hz 0 1 0 2Mpa 2 65KW CONSTRUCTION SKETCH Handrail SIZE 920x920x2170 mm 36 2 x36 2 x85 4 Glass door o e x 2 o Ko o gt e Self clean system Step 1 Step 2 Pour into cleaning NS liquid from here Step 3 Cleaning method 1 Clean the steam engine regularly at least once by every 2weeks or after using 20 times 2 Inject citric acid as main cleaning liquid add 1 5L each time after 10 minutes turn on and When the system turns on press amp button to start the steam function for about 30seconds and then shut down the system After vent the stagnant water repeat 2 or 3 times 3 CAUTION The system must be shut down before injecting Step 4 Packing list CONSTRUCTION SKETCH two pieces of glass body two pieces of fixed glass AI Nn door two pieces of sliding gla
5. ch 6 Install the glass door onto the tray Put the plastic pad onto the aluminum post of glass door if the length of the plastic is not suitable for the aluminum post you can cut it in suitable size then put it on the tray screw with bolts M6X25 p an 7 1 S Z A 17 3 Eg fe N 5 Pa e O A St4x20 Sc CD Paw a q N ea STEP 7 STEP 6 7 install the roof Leave the roof onto the top of shower body then fix tightly with bolts Then install spare parts A Finish assembling the whole set in order to aviod water and steam leaking except the position of sliding glass door do not use the silicone the silicone should be used on all else connecting position B While connecting the cold and hot water pipe wipe the silicone on the connecting mouth to make it will be connected very well C Sketchmapof pipe connection show as the picture D Assembly of spare parts shower and so on Afer all spare parts have been installed well put on the power supply and cold hot water switch to check whether all functions work DRAWING OF WATER CONNECTION OELECTRIC CIRCUIT SKETCH nstructions 1 You should install the water heater yourself yclean system 2 As the Y from the picture please make the f steam outlet connection according to
6. ss door two pieces of Packing 1 aluminum column two pieces of U shaped plastic seal 1 11 four pieces of water resist strip 12 i one tray one roof two pieces of up and down bended Packing 2 aluminum column with eight pieces of wheels oo 0O 13 O O one piece of post one pieces of steam pipe 2 3 eo Packing 3 oo o 14 3 O O O O O O one set shower two pairs of shaped handle eight 4 2 Ss 15 pieces of wheel with cover one set of glass towel shelf p E M6 25 screws 1 M6 35 screws 2 ST4 20 5 ig Spare p rts list screws 3 ST4 25 screws 4 ST4 20 screws 5 one instruction o g j SCREW 1 M6x25 Qum 4pcs 8 o 6 SCREW 2 M6x35 umm 4pcs 9 5 SCREW 3 St4x20 Oo 4pcs SCREW 4 St4x25 Orm 8pcs si 0 SCREW 5 St4x20 20pcs e m k 1 exhaust fan 7 cold hot water switche 2 room body 8 nozzle 3 mirror 9 seat 13 back light 4 temperature sensor 10 steam out 14 moveable shower 5 control panel 11 top shower 15 handril 6 shift switch 12 roof lamp 16 drainage 17 bottom tray WS 9090K WS 9090K INSTALLATION SKETCH 0 1500 59 The socket 5 of power and the socket of telephone Cold water pipe Hot water pipe 1800 1250 70 9 49
7. t into the steam room keep clean of the tray in order to be tripped and fell down Pay attention to the steam sprayer and water tank drainage they are in high temperature while working a 4 4 eWSK Attention INSTALLATION PROCESS The machine must be fixed in the circuit which protected 1 Assemble tteay If the ground is not smooth please adjust by creepage protectionand should be well connected with the the nail wader th tesy to keep ihe balance A i ofthe tray and ground ground Nontechnical people can not be fixed or removed at random STEP 1 6 Technical parameter Current protecting electrifying Waterproof Grade 2 Pae A o 110V 2650w_ I m4 22 fy Top light _Sidelight 7 deee Ai AC12V AC12V DC12V DC12V Deizv iH E Lt Oo T T T S T E ATPT d 2 Instali the shower body Follow the installation process install art the left and right side shower body fix KD it with ST4 20 screws 0 3 Install the shower body onto the tray Put the shower body onto the tray fix it STEP3 4 4 WSK 1 The electrical pitch WF Press O pitch can open the machine the temperature is the room temperature The time will show 30m At the same TEE E EE A time it will open the ceiling lamp Press again will close all the functions After the closure of the machine the water
8. the serial number y yiv eie ywater inlet Power STS Top shower mm n Hn D Water in Moveable shower TN clean system Acupuncture sprayer water outlet 3 aero FA i a Steam out panel a o A amp joa Earth line Drainage res Light Fan ia ACI2V DC12V 07

Download Pdf Manuals

image

Related Search

Related Contents

Review a representative Model 1089NP user manual  CAMERA IP  Oregon Scientific PE320 User's Manual  Pando P-720  Ksix B8977FTP00 mobile phone case  ARM-10 User Manual  Juniper Networks E-Series User's Manual  Origin Storage 320GB SATA 256-bit AES TCG OPAL  

Copyright © All rights reserved.
Failed to retrieve file