Home

Minka Lavery 1359-177 Instructions / Assembly

image

Contents

1. the center of the outlet box as shown Set Screw Assembly 10 Assemble the ceiling loop nipple nuts and hickey to center 1 4 IPS support pipe and adjust overall length to allow the ceiling loop to hold the canopy flush to the ceiling When the adjustments have been completed Toate secure the three nuts as shown 11 Attach the chain to the fixture loop Slip the lock collar and canopy over the upper end of the chain Open the end link of chain and lift the fixture to attach to the ceiling loop and secure the link 12 Lace the fixture wires ground and safety cable through the chain and loop exiting through the side of hickey Run cable through the top of the outlet box and secure to structural member locking with the set screw assembly CONNECTING THE WIRE Fig 3 13 At this point connect the electrical wire as shown in figure 3 making sure that all wire connectors are secured If your outlet has a ground wire green or bare copper connect the fixtures Ground Wire to it If not 1 4IPS 1 2 dia pipe Not provided Fixture wires consult your electrician for proper grounding Fig 3 14 Tuck these wire connections neatly into the ceiling FIXTURE FIXTURE junction box and then raise the canopy all the way to the Sa Wi cage ceiling Raise the Lock Collar and thread onto ceiling Loop 7 i una protruding through canopy Your installation is now complete Return power to the junction box and test the fixture Note Ill
2. INSTALLATION INSTRUCTIONS Item 1359 177 03 16 2009 READ AND SAVE THESE INSTRUCTIONS WARNING SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER ASSEMBLING THE FIXTURE Fig 1 1 Carefully remove the fixture from the carton and check that all parts are included as shown in the illustration 2 Shut off power at the circuit breaker and remove old fixture including the mounting hardware 3 Secure the upper Poly Assembly A to Light Cluster Assembly H pull the wires from top Loop until taut 4 Align the pre drilled holes on the Arm B to the Stud I on the bottom of upper Poly Assembly A and Point K on the top of upper Poly Assembly A and secure them with Cap Nut J and Thumb Screw C separately 5 Adjust the Arms G1 G2 and G3 on the Light Cluster Assembly H to the proper position as shown in Fig 1 6 Screw the Finial F to the bottom of Light Cluster Assembly H 7 Screw the Glass Shade D over the Socket Cup E by twisting it clockwise as shown in Fig 1 8 Install the light bulbs not included in accordance with the fixture s specifications DO NOT EXCEED THE MAXIMUM WATTAGE RATING HANGING THE FIXTURE Fig 2 IMPORTANT For a safe and secure installation these fixtures must be installed by means of support that is independent of the outlet box SUGGESTED INSTALLATION 9 Provide a 1 4 IPS pipe with one end securely mounted to a beam or a structural member The other end should protrude through
3. ustration Fig 1 on this manual is for installation purposes only It may or may not be identical to the fixture purchased Green Ground Notice It is important to use proper chain pliers not included UL american __To OPEN and CLOSE the chain included with this lighting Z fixture Do not open them with other tools that may LISTED association twist or stress the chain links It is important to use proper chain pliers like the ones shown in the diagram LA 1411E

Download Pdf Manuals

image

Related Search

Related Contents

見積・納品・請求3  Supermicro Superblade SBM-GEM-001Gigabit Ethernet module    LEDD-17021-LD9  Magic Chef MCBL5CG User's Manual  EPSON PhotoQuicker 3.2 操作ガイド  MODE D`EMPLOI DES STATUTS-TYPES DE LA SARL COMPOSEE  

Copyright © All rights reserved.
Failed to retrieve file