Home
        Zurn-Wilkins 34-375XL Installation Guide
         Contents
1.     RV SENSING  E    PORT O RING ry       RV COVER  J  BOLTS  RV SEAT  Acar  FLANGE  RV SPRING GUIDE   gt       a  RV SPRING         _ 8    RV DIAPHRAGM      lt     gt  RV    RV PLUNGER    _7 COVER O RING  RV SENSING             lt    __ gt     PORT O RING    RV COVER                                                                                                                to side can help it slide on over o ring  Replace three RV COVER BOLTS            fe oa  remaining bolts   amp  NUTS    8  Place device in service and test per  TESTING PROCE   DURES   FLOW CHARACTERISTICS  MODEL 375 1 1 4    2   STANDARD  amp  METRIC   0 0 3 2 6 3 FLOW RATES  V s  9 5 12 6 15 8  9 20 4   0  1 1 4   32mm  8    ba  wg 15 TEN  8   10 en E r 2    bas a  5 34  0 50 100 150 200 250  FLOW RATES  GPM      Rated Flow  Established by approval agencies   ZURN  ZURN WILKINS  WILKINS 1747 Commerce Way  Paso Robles  CA 93446 Phone 855 663 9876 Fax 805 238 5766 3             www zurn com    Troubleshooting    When the relief valve discharges intermittently it can be almost always assumed that the device is functioning correctly and that the  discharge is caused by systems problem such as inlet pressure fluctuations or water hammer due to quick closing valves     PROBLEM POSSIBLE CAUSES CORRECTIVE ACTION  1  SUDDEN OR RAPID SPITTING 1  Drop in inlet pressure  A  Install an in line spring loaded check  2  Sudden increase in downstream valve upstream of backflow   pressure due to water hammer from B  In
2. 1  1 1 4    2  2 1 2   6  8   10   a 150  A REPAIR KIT FOR 375 s  5 100 RUBBER PARTS  i 1 1 4    2  RK114 375R  u 30 COMPLETE INTERNALS     1 1 4    2  RK114 375  a VESSEL  i 7 FLOW roa GPM  i 829 Beia Rete ey          Proper performance is dependent upon licensed  qualified personnel performing regular  periodic testing according  to ZURN WILKINS  specifications and prevailing governmental  amp  industry standards and codes and upon following    these installation instructions  Failure to do so releases ZURN WILKINS of any liability that it might otherwise have  with respect to that device  Such failure could also result in an improperly functioning device                 ZURN  ZURN WILKINS  WILKINS 1747 Commerce Way  Paso Robles  CA 93446 Phone 855 663 9876 Fax 805 298 5766 4       IS375 114 2  REV  4 13  www zurn com    
3. Model 375  375B    Reduced Pressure Principle  1 1 4  2         ZURN        Installation U Testing Q Maintenance Instructions WILKINS    CAUTION  Installation of Backflow Pre   venters must be performed by qualified   licensed personnel  Theinstaller should  be sure the proper device has been  selected for the particular installation   Faulty installation could result in an  improperly functioning device     ZURN WILKINS Model 375 Reduced  Pressure Principle Backflow Preventers  are for use on water lines where a health  hazard could exist if a backflow situation  were to occur     Proper performance is dependent upon  following these installation instructions and  prevailing governmental and industry stan   dards and codes  Failure to do so  according  to ZURN WILKINS Limited Warranty       releases ZURN WILKINS of any liability  that it might otherwise have with respect to  that device   Such failure could also result  in an improperly functioning device    Damage to the device could result wherever  water hammer and or water thermal expan   sion could create excessive line pressure   Where this could occur  shock arresters  and or pressure relief valves should be  installed downstream of the device     1  Before installing a Model 375 Backflow  Preventer  flush the line thoroughly to remove  alldebris  chips and other foreign matter  If re   quired  a strainer should be placed upstream  of the Backflow Preventer    CAUTION  Do not use a strainer in sel     dom used emergen
4. ST NO  3   Purpose    To test operation of the differential relief valve    Requirement    The pressure differential relief valve must operate to maintain the   ZONE  between the two check valves at least 2 PSID less than  the supply pressure     Procedure    1  Close by pass valve  C  and open by pass valve  A     2  Open by pass valve  B  very slowly until differential gauge  needle starts to drop  Hold the valve at this position and  observe the gauge reading at the moment the first dis   charge is noted from the relief valve  Record this as the  opening differential pressure of the relief valve     7           2 TEST COCK   3 TEST COCK                              1 TEST COCK                                                FLOW FLOW   gt  ZR   WILKINS 5 gt   175 PSIG 180   F   2 SHUT OFF   1 SHUT OFF VALVE       VALVE       BY PASS BY PASS  VALVE  A      VALVE  e   Bono    BY PASS  VALVE  B     I     VENT HOSE                                                                                             HIGH SIDE HOSE  LOW SIDE HOSE       Maintenance Instructions    All Model 375 Reduced Pressure Principle Backflow Preventers  must be inspected and maintained by licensed personnel at  least once a year or more frequently as specified by local codes   Replacement of worn or damaged parts must only be made with  genuine  ZURN WILKINS  parts  The ZURN WILKINS Certificate  of Limited Warranty provides that failure todo so    releases ZURN  WILKINS of any liability that it might o
5. cy waterlines such  as fire lines     2  Provide adequate space around the  installed unit so that the test cocks will be  accessible for testing and servicing     3  WARNING  If installation of a Model  375 is in a building  a suitable drain ar   rangement MUST be provided to drain  off spillage from the relief valve  An air  gap at least two times the pipe diameter  mustbe provided between the relief valve  and the drain piping to prevent a cross   connection  Air Gap AG 12 not intended  to support weight of drain pipe   CAUTION  Do not pipe the relief valve  solidly to a floor drain  sewer or sump     CAUTION  An adequately sized drainis  required to prevent possible water dam   age due to relief valve discharge              PROTECTIVE E gt   ENCLOSURE    OPTIONAL  WATER  METER    2    PIPE   DRAIN LINE CAN NI  BE ANY STANDARD  PIPING MATERIAL     A                                                 fir                                        L  INLET SHUT OFF                       l   Witkans i IN  9                                                     DIRECTION OF FLOW  gt           4  Install valve at least 12 inches above  surrounding flood level    5  Always consult local codes for installa   tion methods  approvals and guidance     OUTDOOR INSTALLATION   Model 375 Backflow Preventers may be  installed outdoors only if the device is  protected against freezing conditions   Exposure to freezing conditions will result  in improper function or damage to the  device  The insta
6. e gauge test kit     TEST NO  1   Purpose    Test  2 check valve for tightness against reverse flow   Requirement    The valve must close tight against reverse flow under all pressure  differentials    Procedure     1  Attach the  HIGH  hose to test cock  2 and the  LOW   hose to test cock  3    Close  2 shut off valve    Open test cocks  2 and  3    Open by pass valves  C  and  A  and bleed to atmosphere  until all air is expelled    Close by pass valve  A   Open by pass valve  B  and  bleed to atmosphere until all air is expelled  Close by pass  valves  B  and  C     Attach the  VENT  hose to test cock  4    Slowly open by pass valves  A  and  C  and keep by pass  valve  B  closed    Open test cock  4    Indicated pressure differential will drop slightly  If pressure  differential does not continue to decrease  the  2 check  valve is considered tight    TEST NO  2   Purpose    Test  1 check valve for tightness and record pressure drop across   1 check valve    Requirement    The static pressure drop across  1 check valve shall be greater than  the relief valve opening point  test  3   and at least 5 0 psid   Procedure    1  Close by pass valve  A     2   3   4    NO    0    2  Close test cock  4  and disconnect VENT  hose from test  cock  4    3  Open by pass valves  B  and  C  bleeding to atmosphere   then close by pass valve  B  restoring the system to  normal static condition    4  Observe the pressure differential gauge and note this as    the  1 check valve PSID     TE
7. e of the seal ring is unused  it is possible  to invert the seal ring  This would be considered a tem   porary solution to fixing a fouled check and should be re   placed with a new seal ring as soon as possible    7  Inspect seat surface for nicks or dings and replace if  necessary  Use fingernail to check for dings   Re grease seat o rings    8  Inspect seat o ring sealing areas in body and wipe clean    9  Reverse the above procedures to reinstall check valve  assembly  Drop  2 check assembly in body  Then drop   1 check assembly in and turn until  1 spring retainer  lines up with  2 seat  Then push both assemblies into  body  Insert sleeve against checks   Place sleeve down  against flat surface and push on body with rocking motion    Care should be taken to make sure the heavy spring is  installed in the No  1 check valve    10  Rock body side to side to help o rings slide in  If it does  not drop in completely  do not use screws to force it   An overly greased o ring might slide out of groove at top  of ball valve  Use a screw driver to push o ring back in  groove  then push body down in     SERVICING RELIEF VALVE   1  Remove three bolts holding relief valve module to body    2  Pull down and remove relief module to expose seat and  seal ring  These can be inspected without further disas   sembly  CAUTION  do not lose small o ring or large o ring  that fit between module and check body    3  To inspect diaphragm or replace seat diaphragm stem  assembly  remove the four 
8. k valves  by slightly opening each of the four test  cocks     3  Slowly open the downstream shut off  valve  The Model 375 Reduced Pressure  Principle Backflow Preventer is now in  service     4  If  spitting  or intermittent discharges  from the relief valve are noted  it could be a  result of pressure fluctuation and or a water  hammer condition in the system  If such  conditions exist  install a ZURN WILKINS  water pressure reducing valve  a Model  40XL2 check valve  or a Model 1250XL  water hammer shock arrester in compli   ance with industry standards as needed     5  After the Model 375 has been prop   erly installed  test the device  see  TEST  PROCEDURES    If the device fails the  test  remove the first and second check  valves and thoroughly flush the device  If  the relief valve fails to operate properly   inspect the sensing passage for clogging   see  MAINTENANCE INSTRUCTIONS     Clean rubber seals of all debris and place  unit back in service        Proposition 65 Warning This product contains chemicals known to the State of California to cause cancer  or birth defects or other reproductive harm           In accordance with U S  Federal Safe Drinking Water Act Lead Free requirements  as of January 4  2014  this product can only be used in water  systems considered non potable  Please contact your local water utility for further requirements           Testing Procedures    MODEL 375 REDUCED PRESSURE PRINCIPLE  ASSEMBLY    Equipment Required  Differential pressur
9. llation location must be  kept above 32  F  All the basic installation  instructions apply     If installation is in a pit or vault  the Back   flow Preventer must never be submerged  in water because this will cause a cross   connection  Make sure that the pit or vault  always remains dry by providing ample  drainage     INDOOR INSTALLATION   Indoor installation is preferred in areas  that are subject to freezing conditions  All  the basic installation instructions apply to  such installations     PARALLEL INSTALLATION   Where uninterrupted service from a single  meter connection must be maintained  two  or more Backflow Preventers may be con   nected in parallel  All the basic installation  instructions apply to parallel installation   Be sure to allow adequate room between  the units for testing and repair     PLACING THE DEVICE IN SERVICE  After the installation of a Model 375 has  been completed  place the unit in service  as follows     375 REDUCED PRESSURE PRINCIPLE  1  Start with both shut off valves closed   Slowly open the inlet shut off valve until the  backflow preventer is completely pressur   ized  A brief discharge from the relief valve  may occur while the device is pressurizing   The discharge should cease by the time the  shut off valve is fully open  Device should  function properly  If the discharge does not  stop  refer to  MAINTENANCE INSTRUC   TIONS  for repair procedures     2  After the device has been pressurized   vent all trapped air from both chec
10. screws holding the two module  halves together  CAUTION  do not lose small o ring    4  Remove stem assembly  Inspect diaphragm and plunger  o ring for damage  Replace any damaged parts and ap   ply a light coat of grease to plunger o ring and place on  plunger  CAUTION  stem assembly is internally spring  loaded  Seat can be unscrewed from plunger to replace  diaphragm or spring  The seat surface must not be nicked  during disassembly or reassembly    5  There are two o rings that fit into the cover surface  one  large  one small  These o rings should not be greased   Insert stem into cover  Place second module half onto  cover  Push the seat down into the cover with your thumb  to align diaphragm bolt holes with cover and then insert  four bolts and tighten    6  Inspect o ring that seals between module and check body   Replace if necessary  Apply grease to the o ring and then  place on step on check body  Place small o ring into groove  between the two front bolts holes in relief valve module    7  Slide relief valve module onto check body  Rocking side    SEAT O RING  a    1 CHECK SEAT  E  O  SS ori SCREW  C gt  SEAL RING RETAINER    CE  POPPET SEAL RING    Cpp    roPPeT     2 CHECK ASSY G       SPACER  1 1 4     amp  1 1 2         1 CHECK SPRING        1 CHECK SPRING                    RETAINER  BODY BODY OUTLET  O RING  BOLT  Na SLEEVE BOLT  f O RING  BODY INLET 7       OO OCG  SLEEVE          RV SEAL RING  RV ac ae RV SEAL    2 RING RETAINER       RV BODY  O RING      
11. stall pressure reducing valve up  quick closing shut off valve installed stream of backflow unit   downstream  C  Install in line spring loaded check    valve downstream of backflow as  close to source as possible  but not  closer than 4 feet     2  LIGHT INTERMITTENT DRIP 1  Slightly fouled  1 check A  Clean  1 check and turn check valve  seal ring over or replace     Continuous discharge of the relief valve signifies a failure of some part of the device  To help determine the specific area of failure   close the  2 shut off valve  If the discharge stops  the  2 check requires service  If the discharge continues  the  1 check requires  service     1  CONTINUOUS DISCHARGE 1  Fouled  1 check  A  Clean check valves and turn check  2  Fouled relief valve seat  valve seal rings over or replace   3  Fouled  2 check  B  Clean relief valve seat and turn    relief valve seal ring over or replace     In summation  the amount of discharge is proportional to degree of fouling  Most problems occur in the  1 check which is where  debris enters the backflow preventer first     Performance Characteristics    SPECIFICATIONS    Maximum working water pressure 175PSI Capacity thru Schedule 40 Pipe  Maximum working water temperature 180  F 7  Hydrostatic test pressure 350PSI 10 ft sec    Relief Valve Discharge Rates 3                                                                                                    13 20  5  eS MODEL 375 475 8 975RPERPDA o  BACKFLOW PREVENTERS 8  200  rd 3 4    
12. therwise have with respect  to that device   Such failure could also result in an improperly  functioning device     The Model 375 Reduced Pressure Principle Assemblies should  be thoroughly flushed after backflow conditions occur to prevent  any type of corrosive deterioration to its components  Failure to  do so could result in malfunction of the device     GENERAL MAINTENANCE    1  Clean all parts thoroughly with water after disassembly   2  Carefully inspect rubber seal rings  diaphragms and o rings    ZURN WILKINS       2          1747 Commerce Way  Paso Robles  CA 93446 Phone 855 663 9876 Fax 805 238 5766    for damage   3  Test unit after reassembly for proper operation  see  Testing  Procedures     SERVICING CHECK VALVES  1  Close inlet and outlet shut off valves   2  Open No  2  No  3 and No  4 test cocks to release pressure  from valve   Unscrew 4 screws holding body down lift valve body upward   Twist and remove sleeve from body  Using finger or blunt  object  push in outlet end of body  both checks should slide  out the body inlet  A short object like a socket can be placed  on a flat surface  Place body over object so it pushes into  valve outlet and push down on body   Twist spring retainers counter clockwise to remove  from seat and access poppets   Inspect the rubber seal ring for cuts or embedded debris   To remove seal ring  remove screw and seal ring retainer     ZURN     WILKINS    3   4        www zurn com    Maintenance Instructions    If the reverse sid
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Dodge LX/DX-49 User's Manual  AKG C451B Professional Microphone  取扱説明書 - マックス  EmployerAccess  jachère environnement et faune sauvage dans le departement du  Tripp Lite B006-VU4-R User's Manual    Audiovox FPE1078 TV DVD Combo User Manual  LEYBOLD DIDACTIC GMBH Mode d`emploi 587 07 Instrucciones de      Copyright © All rights reserved. 
   Failed to retrieve file