Home

Arrow HM65 Instructions / Assembly

image

Contents

1. Seal this 9 16 1 4 cm of wood with a roofing cement not included or bevel this 9 16 1 4 cm of concrete when pouring for good water drainage OPTION 3 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the concrete cures Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Base 1 Dig a square 6 15 2 cm deep into the ground remove grass 2 Fill up to 4 10 2 cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 2 4 Construct a wood frame using four planks of 1x4 19 mm x 89 mm FRONT 78g 0 lumber DOOR 5 Pour in concrete to fill in the hole and the frame giving a total of 4 10 2 cm thick concrete Be sure surface is tevel Note Finished Slab dimensions with lumber removed Allow 3 5 hours for construction and a week for concrete curing time 9 Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 6
2. The floor frame must be square and level or holes will not align Step 3 NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to complete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall requires a washer CORRECT INCORRECT 1 Position front corner panels at the corners of the floor frame as shown The widest part of each corner panel must be placed at the front of the building Fasten the corner panels to the floor frame with two screws 2 Position rear corner panels at rear of building as shown The widest part of each corner panel must be placed along side of the building Fasten cor ner panels to the floor frame using four screws NOTE The wall panels come in two widths Each wall panel has a crimped rib on one side The crimped rib should go under the rib of the panel that follows it 3 Attach wall panels to the sides as shown NOTE Be careful to instali the correct panel in each position as shown 4 Double check the part numbers of the wall panels before proceeding 16 Corners Wall Panels 9388 Front Corner Panel 2 9392 Rear Corner Panel 2 9364 Wail Panel 2 Parts Needed For B we SIDE TOP VIEW SIDE STEP 9388 SUPPORT THE CORNER PANE
3. a windy day because the large panels acting as a sail can be whipped about by the wind making construction difficult and unsafe t J CARE amp MAINTENANCE Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water e Silicone caulking may be used for watertight seals throughout the build
4. A simple new floor frame system made of heavy duty hot dipped galvanized steel Use as base for plywood sand or stone Some drilling required to fit buildings without mid wall bracing Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground SHELF UNITS Each kit contains heavy duty Heavy duty galvanized steel shelf units help organize storage hot dipped galvanized steel tect D space They easily mount on the wall or sit on the floor Fits all corner gussets and 4 earth anchors Arrow buildings i TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin ugy l 25 1 2 64 8 cm steel channels WV i plus five heavy duty snap in 6 EnS PA aa aN hangers and a small tool holder for screwdrivers pliers etc Holders Model No 88404 Model No SS900 A slide along channel for fully Makes 8 to 12 20 3 30 5 cm Grey color adjustable spacing Great for wide shelves in any length e 3 shelves garage basement or the back Brackets braces e Holds up to 85 Ibs 38 kg hardware included even weight distribution of any door Fits all Arrow storage buildings Lumber is not included Some drilling required to fit buildings without mid wall bracing Base Coo The Base Fo ur Building OPTION 1 ARROW FLOOR FRAME KIT order No Fa5465 Arrow has the best base for your building in this simple kit It keeps stored items above the ground This kit should be us
5. L WITH A STEP LADDER UNTIL A WALL PANEL IS ATTACHED Crimped Rib Underneath 9392 9388 Panels rest on j frame as shown Step 4 9397 Rear Wail Angle 1 9925 Rear Wall Channel 1 9926 Side Wall Channel 2 Parts Needed For Frames 9400 Side Wall Angle 2 Door Track Assembly 1 The main frame pieces give rigidity to the side walls and provide a sur face for attaching the gables which support the roof 1 Fasten the rear wall angle across the inside top of the rear wall using screws 2 Fasten the rear wall channel across the middle of the rear wall using screws 3 Fasten the side wall angles across the inside top of the side panels using screws Side wall angles must overlap rear wall angle in corners 4 Fasten the side wall channels across the middle of the side panels using screws Fasten overlaps in rear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure Long Leg on Top STEP STEP STEP a Le zen A Facing in 9397 Short Leg on Bottom Detail Showing Center of Panel Screwed to Wall Channel Bolt and nut does not go thru wail channel at_overlap 7 Paris Needed For Step 5 Wall Panels 8995 Wall Panel 2 1 Fasten the wall panels at the top and bottom with screws 2 Fasten the center of each panel to the wall channel with screws Faste
6. Left Doors Wall Panel Side Door Jamb Front Corner Panel Rear Corner Panel Door Track Rear Wail Angle Rear Wall Channel Rear Floor Frame Side Wall Angle Side Wall Channel Side Floor Frame Front Floor Frame NONMONFAHHH HNYONHONNNNHNNANNNNDND Assembly by Key No Paris Needed For Step 1 Door Track Assembly eine gear The door track assembly supports the sliding doors and reinforces the front wall Hint The holes in the top side of the door track are for fastening the gable Ze Ae to the top of the front wall in a later step Ss Ss E E 66769 000 eo 1 Position door slides onto the Long Leg on Top legs from the end of door track as shown in the end view Short Leg on Bottom END VIEW 2 Set this piece aside for later use Parts Needed For 9403 Front Floor Frame 1 9399 Rear Floor Frame 1 Floor Frame 9402 Side Floor Frame 2 1 Assemble the four corners of the floor frame using two screws at each corner as shown At the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE When Diagonal Measurements are Equal the Floor Frame If using a wood platform or is Square concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected
7. Owner s Manual amp Assembly Instructions col Model No EN65 A U ENBO6S U HM 65 A NW65 SA65 A _ i ry ny 1 ROE L hti ARROW World s Leading Maker of Storage Buildings SA RAO wee Missing Parts Questions on Assembly Call 1 800 851 1085 or assist arrowsheds com Do not return to dealer they are not equipped to handle your requests 709310611 CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES amp TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES WHEN HANDLING METAL PARTS Storage Area 27Sq Ft 142 Cu Ft 2 5 m 4 0 m BUILDING DIMENSIONS Size rounded off to the nearest foot nemes Exterior Dimensions Interior Dimensions Door Approx Base Roof Edge to Roof Edge Wall to Wall Opening Size Size Width Depth Height Width Depth Height Width Height 6x5 74 x 57 76 1 4 59 t 2 67 7 8 71 1 4 541 4 66 5 8 32 58 1 8 mx1 4m 188 0 cmx 144 8 cm 193 7cm 15 1cm 172 4 cm 181 0cm 137 8cm 169 2cm 81 3cm 147 3 cm BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly I
8. Peak Cap a g E gt Side Roof Trim T F 7 os m 3 Attach the side roof trim to the lower end of roof panels on each side of the building using screws at each panel overlap 4 Using your thumb and index fin ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 5 Fasten the roof trim caps to the side trim using a screw i Ta Zi Roof Trim Cap Tuck Flange Inward to Fit Inside of Roof Trim Cap za a Parts Needed For 6657 Door Handle Brace 2 10487 Right and Left Doors 2 Door Assembly 10499 Horizontal Door Brace 4 The steps on this page tell how to assemble the right door You will perform exactly the same procedures for the left door Each screw and bolt in the door requires a washer Pro ceed as follows 3 AN 10499 Ns Va 10487 SBa 66382 Left Door BS 1 Attach the door handle brace and handle to the door with 1 bolt as eb a 5o shown Don t tighten the bolt yet r 3 10487 osse g Right Door 2 Swing the door handle brace up to the hole on the opposite side of the x door and insert a bolt and nut ia A a a a J 66045 3 insert a second bolt in the door ES handle and tighten both bolts 6657 4 Puta horizontal door brace onto the top edge and bottom edge 10499 END VIEW 5 Attach the lower door guides and SHOWING bolts as shown 6 Repea
9. ater Familiarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and caim Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need 0 Gam Required Required Eye Goggles e Work Gloves No 2 Phillips Screwdriver Step Ladder Optional Time Savers Base Preparation With Hardened Magnetic Tip e Utility Knife Scissors e Wrench Nut Driver Hammer and Nails Note A power screwdriver or var e Pliers e Electric Cordless Drill Spade or Shovel able speed drill with Phillips tip at e Square Hand Saw Power Saw tachment can speed assembly by e Carpenter s Level i as much as 40 e Tape Measure String for squaring frame Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a l
10. ed with one of the following A To support a plywood deck B To be filled with sand We recommend the combined use of 1 an ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own base be sure to select the appropriate materials These are the recommended materials for your base 2 x 4 s 38 mm x 89 mm Pressure Treated Lumber 5 8 15 5 mm 4 x 8 1220 mm x 2440 mm Plywood exterior grade NOTE Pressure Treated Lumber must not be used where it will make contact with your storage building The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Treated Lumber comes in contact with your storage bullding your warranty will be voided 10 amp 4 penny Galvanized Nails Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local tumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails FRONT Tag Measure 16 24 40 6 cm 61 0 cm sections to construct DOOR Oeh inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Note Platform Slab will extend 9 16 1 4 cm beyond floor Allow 6 7 hours for construction frame on all four sides
11. f Angle 1 1 Fasten the roof beam smallholes on top to the gable brace of the front gable 2 Fasten the other end of the roof beam to the gable brace of the rear gable 3 Fasten the roof angle to the roof beam as shown using screws Le aga Zr 21 Parts Needed For 6442 Right Roof Panel 1 Right Roof Panel Installing the roof panels is best done with a step ladder Begin installing roof panels at the back right corner of the building Each screw and bolt in the roof requires a washer NOTE Ea Measure the building diagonally again and make adjustments to 6443 Serna pen 6442 make sure the building is square and level This will make the roof Eee EE panels fit better and holes will 6442 a 6443 align FRONT NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers and place them on the ground alongside the building in their proper positions 2 Position the right roof panel atthe back right corner and fasten to the gable and roof beam using screws and bolts as shown Do not fasten the lower end of the panel to the side wall angle at this time Hint Follow the fastener sequence shown for proper alignment 1 Install a left roof panel 6443 at the left rear corner of the roof Parts Needed For Front of Roof 6443 Left Roof Panel 1 6442 Right Roof Panel 1 1 C
12. ing Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES ROOF STRENGTHENING Sool FLOOR FRAME KITS heavy snow load KITS ENTF Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18 m of steel cable and 4 cable clamps No digging or concrete pouring just insert cable under roof over roof beams into augers and twist augers into the ground For buildings ATTIC KIT WORKBENCH KIT larger than 10 x9 3 0 m x 2 6 m use 2 kits Model No AT101 Model No AK100 Heavy duty galvanized steel bars that New concrete anchor system permits fit all 10 3 0 m wide Arrow buildings anchoring any size Arrow building They install quickly and easily to directly to a concrete slab Each kit help organize space and create contains heavy duty hot dipped more useable space as an attic or galvanized steel corner gussets and workbench Will hold up to 250 Ibs perimeter clips which fit over the floor 113 kg evenly distributed frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included MODELS FB47410 FB5465 FB106 A FB109 A and FB1014 A
13. mm Wood Screws There are 1 4 6 mm Contains 4 Anchors with Cable Clamps and dia holes provided in the frames for proper anchoring installation instruction OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete base 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 6 mm x 51 mm Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws 65103 8 32 Hex Nut 61 66045 Handle 2 Fr oo x i 66769 Door Slide 4 Hardware Remove from bag of screws and save for the last step 65900A 10Bx1 2 13 mm Black Screw 8 Packed with Screws 66646 Washer 181 5 sheets of 40 66382 Lower Door Guide 4 P 66775 Plug 2 Packed with Screws 65923 8 32x3 8 10 mm Bolt 61 65109 8 32 Acorn Nut 6 Packed with Screws 66183 Roof Trim Cap 2 right amp 2 left 65004 8Ax5 16 8 mm Screw 176 gt 67468 Peak Cap 2 Arrow Logo 67293 Weather Stripping 1 Parts List Roof Beam Roof Angle Right Gable Left Gable Side Roof Trim Right Roof Panel Left Roof Panel Horizontal Door Brace Door Handle Brace Gable Brace Ridge Cap Wall Panel Rear Right and
14. n overlapping ribs as before ENIES Panels rest on frame as shown Crimped Rib Underneath Parts Needed For Step 6 Doordanh 9900 Door Jamb 2 The door jambs reinforce the door opening and provide an attractive STEP STEP e these steps for both door A 3 bolts TOP VIEW 1 Fasten a door jamb to the front Hex Nut pane with three bolts nuts andacorn Acorn Nut nuts as shown Push a plug into e hole at center of jamb closest to door opening SQ 2 Fasten the top of the door jamb to the door track with two screws Do the same for the bottom into frame wen Repeat steps 1 and 2 forthe opposite door jamb Screw 19 Step 7 Parts Needed For 5996 Right Gable 2 5997 Left Gable 2 Gables Braces 6658 Gable Brace 2 The gables go on top of the front and rear walls to support the roof beam NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Lift and fasten a right and left gable under angle at corner to the door track with screws 2 Join the left and right gables together with a gable brace using a bolt in the bottom 2 holes Repeat Steps 1 amp 2 for the opposite side of building coh TR tr an 7 i Hs a e eA AREE _ i AR ji eee Parts Needed For Roof Beam Angle 5964 Roof Beam 1 5982 Roo
15. nstructions Instructions are supplied in this manual and contain all appropriate information for your building model Review all instructions before you begin and during assembly follow the step sequence carefully for successful results Flooring and Anchoring Your storage building must be anchored to prevent wind damage A base is necessary to construct a square and level building Anchoring and base materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must agree with the numbers on the Parts List page elf you find that a part is missing include the model number of your building and contact Arrow Shed LLC Customer Service Department 1101 North 4th Street Breese Illinois 62230 1 800 851 1085 or assist arrowsheds com eSeparate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used l
16. ocation for your building The best location is a level area with good drainage Allow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside Before you begin the first steps in assembling your parts a base should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building Care must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing safety edge Keep children and pets away from worksite to avoid distractions and any accidents which may occur Never concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Practice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 or assist arrowsheds com Do not attempt to assemble the building on
17. over the joint at the peak with weather stripping tape Unroll the tape and press it down over the open ing at the ridge as you install each roof panel Do notcut the tape at this time 2 Install a left and right roof panel in the sequence and positions shown in Step 9 Follow fastener sequence and instructions in Steps 9 thru 11 while fastening roof panels Fasten overlap at center of roof panel rib using a bolt and nut NOTE Narrow roof panel rib with bead on it is always overlapped by wide rib of adjacent panel 3 Unroll the weather stripping tape press it down firmly and cut it 4 Fasten the lower end of the panels to the side wall angles using screws and washers 6442 Right Roof Pane Cut Weather Stripping and Fold Under 24 NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up ST m P Fasten Overlap at Center of Panel Weather Stripping Only STEP Tape l SSS SS gS mh Sy l 6443 Left Roof Panel Step 12 Parts Needed For 6869 Ridge Cap 1 1 Install the ridge cap on the com pleted roof section using bolts and nuts 2 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts Fasten the remaining peak cap in the same manner Ridge Cap Roof Trim 6015 Side Roof Trim 2
18. s and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 709310611
19. t steps 1 through 5 for the left door Step 14 1 From inside the building put the bottom of the right door assembly on your left when you are inside the building behind door jamb into the front frame track 2 Position the top of the door so that that holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 13mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Keep this Owner s Manual and Assembly Instructions for future reference Adjustment Holes Allow Parts Needed For Right Door Assembly 1 Door Installation amp Adjustment Left Door Assembly 1 Door Slide Door STEP Front Frame Track Door Slide Doors to Meet Evenly Along Their Length Right Door Left Door 27 EN65 A NW65 ENB65 Anchoring and Floor Frame Anchoring Anchor your building at this time Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem area

Download Pdf Manuals

image

Related Search

Related Contents

Sony KP-46WT510 User's Manual  User Manual  1-------------------- USER'S MANUAL – Software Section SOFTWARE  ガスふろ給湯器  RePlay ITA  SOLOS/CUTER User`s Manual  310910b GMAX II 3900, 5900, 5900HD, 7900 Repair  Samsung Samsung B7722 Užívateľská príručka  Revo REHVD0309-1 surveillance camera  Tonomètre numérique à aplatissement Keeler (D  

Copyright © All rights reserved.
Failed to retrieve file