Home

Arrow CHD1010 Instructions / Assembly

image

Contents

1. e P eal NOT Part No 21 Truss Post Insert fits inside Part No 20 Truss Post and is not shown above lt Wy Right Door You will need for this page NOTE Washers are to be used on painted parts only Washers NUAIR are not necessary on unpainted parts and there are not enough to use on every screw and bolt a Post Insert and Join as shown Insert Large Screws along both sides of the Truss Post where holes align 4 Align the bottoms of the Truss Post and Truss Repeat instruction 1 to build a second Truss 10641 Post Assembly Set aside for use on next page positioned as shown below attach Shear Plates where indicated below Attach Shear 10642 Plates using Small Bolts and Nuts to Upper Chord first then to the Lower Chord Do not tighten at this time With the Upper and Lower Chord Trusses Repeat instruction 3 to build a second Chord Truss Assembly Set aside for use on next page Leave top holes open LS wz La Build two Assemblies SB I Build two Assemblies Holes must align in ily direction CORRECT ZEEE INCORRECT Truss Post Insert fits INSIDE Truss Post as shown
2. until all Side Wall Angles are installed along the entire length of the building At the front and rear of the building secure Wall Angles with Large Screws as shown All Side Wall Angles overlap by 8 1 4 21 0 cm D Once the first Side Wall Angles are in place continue ARROW Storage Products 23 8 Wall Panels IMPORTANT At this time take a moment to ensure the building is level and square Measure diagonally across the building from opposite corners when these measurements match the building is square For the remainder of assembly it will be important that the building is both level and square Crimped Rib A NOTE FASTEN TO TOP FRAMES Whenever a crimped rib and an uncrimped rib meet the crimped rib should be placed UNDER the uncrimped rib if possible See next page 7822 FASTEN TO WALL CHANNELS N OTE Use the diagram to the right when attaching Wall Panels d e Secure the top row to Top Frames z Secure the middle row to Wall Channels Secure the lower row to Floor Frames Secure the circled holes to the Panel next to it FASTEN TO FLOOR FRAMES Corner Panels lay under Front and Side Panels 24 Wall Panel 10 x10 3 0 m x 3 1 m building shown with Small Screws Be sure to overlap ribs as shown on the previous page Working one side at a time lift
3. Leg of Roof Beam Bracket must face center of Gable as shown 26 Gable Brace N Gable must fit UNDER Side Wall Angle at corner Working with one Gable at a time 2 attach the Gables to the top Rear Frame with Small Screws The Gable should be attached using the row of holes closest to the outside of the building Do not insert screws into the two holes closest to where the Gables join These will be used to attach the Track Support later ff To secure Gables together position XS A 3 the Gable Brace as shown below and insert a single Small Bolt and Nut jj through the second hole from the bottom only f Leave two holes open on each side of the Gable peak to attach Track Support 10 x10 3 0 m x 3 1 uilding shown Attach Gable to holes closest to the Outside of the building Outside Attach Brace with bolt thru second hole from bottom only Position Track Supports as shown Secure Track Supports to Gable using one Small Bolt and Nut Secure to Rear Frame using two Small Screws ARROW Storage Products 9 Continued You will need for this page 10649 my aa SS shown QTY 13 Roof Beam 10649 Leave Hole Open Z 10649 Top View of Gables Seal the gap between the Gables using the Tape should wrap around O weather strippin
4. Allow enough working space so it is not difficult to move parts into position for assembly Be sure there will be enough space at the entrance for the doors to completely open Also there needs to be enough space outside the building to be able to fasten the panel screws from the outside e Before assembling any parts your base should be constructed and an anchoring system should be ready to use ARROW Storage Products BEFORE YOU BEGIN Your Commander Shed has a Modular Design aS j This means your Commander CN Shed can be extended to virtually any length with the addition of Extension Modules Extension Modules can be installed when you first construct your building or they can be added to it later How you assemble your building will depend upon how many Extension Modules you have purchased See below to see how many Modules are included in your building How your building was shipped Now that you have received your building you need to take inventory of what you have to ensure nothing is missing Nominal Extension Size Modules Depending on the size building you purchased your building arrived 10x10 in two or more cartons Locate the carton label you should have one 10x15 carton labeled C1GA and one labeled C2GA Also if you purchased ae a building 15 4 6 m in length or longer you should have at least one Ua carton labeled GA5M 10x25 1 5 5 C1GA This carton contains the pai
5. N Not this direction Assemblies from previous page Truss Post Assembly 2 Chord Truss Assembly 2 Next insert the Upper Lower Chord Truss O Assembly into the Truss Post Assembly as shown Secure with Small Bolts and Nuts Do not tighten at this time Repeat for other side Attach Truss Splice to Truss using Small Bolts and Nuts as shown below but do not tighten at this time Temporarily secure the peak of the Truss using two Small Bolts and Nuts as shown Attach Knee Braces to D Truss using Large Screws as shown Do not tighten at this time With the Truss assembled check that the width of the Truss is 118 1 4 300 4 cm across the top and bottom of the Truss If so tighten all fasteners Repeat steps to build additional Trusses e 118 1 4 Number of Trusses Needed NOTE o ambe or Trusses you wi of Modules ofTrusses 44 need to construct your building 10 x10 3 0mx3 1m a will depend on the size of your building All TET buildings require at least two Trusses See the 10x15 3 0 m x 4 6 m a chart to the right to determine the number of 10 x20 3 0mx6 1m 2 Trusses needed for your building 10 x25 3 0 m x 7 5m 3 10x30 30mx90m 4 L 6 13 You will need for this page 4 Lay out the parts and position them as shown Overlap the Rear Frames by lt Rear Wall Channel Rear Wall Diagonal 4
6. 1 LEAVE THIS HOLE OPEN A 10 x10 3 0 m x 3 1 m building shown NOTE Work one corner at a time Be sure I 44 to finish a corner before moving on to the next one ARROW LEAVE THESE HOLES OPEN Storage Products 31 Roof Assembly Chart 10 x10 3 0 m x 3 1 m EP End Panel 8578 8579 RP Roof Panel 7743 RP RP EP RC F R Front and Rear Ridge Cap 10621 RC MID Mid Ridge Cap 10680 8 y 1 a A a No Extension Modules L Left Roof Trim 80017 R Right Roof Trim 10620 M Mid Roof Trim 6015 s a a A a A a a a m g cI Strip of Tape 10 x15 3 0 m x 4 6 m NOTE The symbol indicates a 2 5 1 cm strip of weather stripping tape Cut the number of strips indicated for your size building and set aside for later use J E 1 Extension Module x a v 2 v m RP 5 a a A a r 10 x20 3 0 m x 6 1 m gt a po w 2 Extension Modules x x m s a a A a A a a a a v a v a v A a m 10 x25 R gt N V L 3 0
7. how Panels are positioned Below are end views showing Panel position Left Door Right Door 10623 80051 10623 Inside H up Inside sss sir END VIEW Hinge Side Hinge Side END VIEW 38 13 Door Assembl You will need for this page NO HARDWARE NEEDED FOR THIS STEP Vert Door Brace Hinge Horiz Door Brace Position Horizontal Door Braces and D verica Door Brace Hinge and Vertical IMPORTANT For parts 10635 Door Brace Latch as shown NOTE and 10678 the side of the part Doors in the image below are shown pictured with fewer holes goes along the from the inside of the building Pay close attention outside of the door to how parts are positioned Make sure hinge holes in the Vertical Door Brace Hinge line up with hinge holes in Door Panel Hinge Left Door 10635 10637 10678 F Right Door A ee L all n A Inside a Inside Holes in Door Brace must line up with holes in Door Panel ARROW Storage Products Vert Door Brace Slide Vertical Door Braces into position 3 with ends inside Horizontal Door Braces Double check that the open ends of the Vertical Door Braces face the edges of the Door see image to right and secure with Large Screws in each Door NOTE Doors are shown pictured from insid
8. jqe9 yyy l ued IeM jaued JOON uonduosaq Hed TN C lt LO CO NOO ONT ON uoe o Ay DONIC TAG NIVW LSI SLYYVd 8 Part No 30 Truss Post Insert fits inside Part No 29 Truss Post and is not shown below x 5 NOTI Part 10627 Front Wall Channel No 18 may be joined in pairs Bend to separate H0L ry 4 4 4 4 y 4 4 4 4 y y 90elg BUY SSNIL aal dS ssn SSNIL PJOUD JOMO7 ssni puoug seddn J su SOd SSNI SOd ssniL we g JOO DIN JBUUEYD IEM PIS PIIN wel 4 DIS 6uv leM P S deo fpIY PIN WI JOOY Jaued JOOY 9UEd IEM uonduosaq Hed JTINGOW NOISN41X3 JTINGOW B SYOO LSI 1 SLYVd 61 8 L 9 G vl tl cl ONT ON uowe9 Aey OL CN ma Mm F CN CN CN CN CO DTN yeyoelg 1log ueo 90Bg 100 EIUN g0eg euoBeid J00q jebeysy 100q wuj 100q dol BuiH 921g JOO JENA u2 e 921g 100 EINA 991g 100 E UOZIJOH j ued 100d 437 l ued 100q 4i a6ulH jaued 100q uogduos q Hed ued ON woe oO TN OT WOO CO M CEO O 0 ho N 3 11H Extension Module
9. mx 7 5 m i RP RP RP RP RP RP RP RP RP RP 3 Extension Modules i RP RP RP RP RP RP RP RP RP RP L NI v M M R 10 x30 3 0 m x 9 0 m RP a a J 4 Extension Modules x ERC MID RC MID RC MID I RC MID ERC FIR m kJ a v a v a v a v a v a v a v a v A v a v a v a v m v You will need for this page 9 4 Begin weather stripping the roof ridge Apply more e Starting with rib 5 below every rib that is over a Truss should be secured with a Small Bolt and Nut and then sealed with a strip of tape Roof Panel of the weather stripping after each additional Panel is installed A strip of weather stripping tape 2 5 1 cm long should be applied over each bolt that is on a rib overlap and under the Ridge Cap Attach the first four Panels 5 8 in the order given in the diagram on page 30 Use the Roof Panel Diagram on page 30 while assembling the roof shown to the right and then cover with two 2 5 1 cm strips of weather stripping tape Install Panels 9 10 and seal with weather stripping tape 3 Secure rib 5 with two Small Bolts and Nuts as Attach Panels 5 10 according to the diagram on page 30 NOTE Weather stripping tape should be applied in 4 a continuous strip along the len
10. secure with Large Bolts and two Square Nuts on each Bolt Position the Door Handle on the face of the Left Door and secure with Large Bolts and Square Nuts This completes the Left Door assembly Next position the Door Handle on the face of the Door and secure with Large Bolts and Square Nuts This completes the Right Door assembly Slide Latch Plate into position on the right Door Outside IMPORTANT Once the building is fully assembled measure across the door opening and check that it is 98 1 4 249 6 cm If it is not move the front walls in or out slightly to match this dimension This must be done BEFORE anchoring Slide end of Latch Plate behind Door Brace Hanging the Doors After the doors have been assembled install hinges on one door using flathead screws and nuts Use the image to the left as a guide to proper hinge position Next position one door in the doorway of the building and secure the hinges from top to bottom to the door jamb but do NOT fully tighten With all hinges in place hold the door in alignment and slowly tighten the bolts on the door jamb side of the hinge Repeat to hang the other door Swing the doors carefully to check alignment If doors are misaligned slightly loosen the bolts on the door jamb side of the hinge and realign the door
11. the Panels into D place and secure top and bottom of Panels hole of the Panel everywhere Panels overlap as shown below Note When attaching to corner panels use screws D Place a Small Bolt and Nut through the center Place small bolt thru center hole where Panels overlap L LL 25 Continue until ALL Wall Panels have been installed ARROW Storage Products Left Gable Right Gable Bracket Edge Trim GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MIS TAKEN FOR ONE GABLE SEPARATE GABLES BEFORE CONTINUING Edge Trim Plastic YA eo ka 69835 Edge Trim MUST cover Gable edge Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables Failure to do so could result in injury two Small Bolts and Nuts per Bracket Leg of Install Roof Beam Brackets on all Gables using D Bracket must face center of Gable as shown
12. your building you must take into ime ix hi fone consideration use and permit requirements 10 x30 3 0 mx 9 0 m 357 1 2 908 1 cm Aconcrete base is best for most purposes buta wood platform may be suitable for light use Before beginning construction check OPTION 1 Concrete Slab local building codes regarding footings The slab should be at least 4 10 2 cm thick It must be level location and other requirements and flat to provide good support for the frame The following are the recommended materials for your base 1x 4 s 19 mm x 89 mm will be removed once the concrete cures e Concrete Sheet of 6 mil plastic e We recommend for a proper strength concrete to use a mix of 1 part cement 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Base 1 Dig a square 6 15 2 cm deep into the ground remove grass 2 Fill up to 4 10 2 cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 1x4 19 mm x 89 mm lumber Note Finished Slab dimensions with lumber removed 5 Pour in concrete to fill in the hole and the frame giving a Platform Slab will extend 2 5 cm beyond floor frame on total of 4 10 2 cm thick concrete Be sure surface is level all four sides Seal this 2 5 cm of wood with a roofing cement not included or bevel concrete when pouring Allow 3 5 hours for constru
13. 0 3 0 m x 3 1 m building shown Just as in the rear carefully position D the Front Wall Assembly as shown and secure with a Large Screw on both sides Install Front and Rear Side Wall Channels using Large Screws Position the Door Jambs as shown D and secure to the Front Wall Panel using Small Screws Double check that the holes in the Door Jamb line up with the holes in the Wall Post Hinge If they do not the Left and Right Door Jambs are most likely switched IMPORTANT When install ing the Front Wall Assembly in the building two people should position and hold the Assembly in place un til it is secure Failure to do so could result in bending ML l the Front Frame and Fascia 4 pieces V 10622 80037 22 7 Wall Angles You will need for this page LS SB lt LS M N iim B fii o QTY 4 QTY 4 QTY 4 Starting at the middle of the building install all D Side Wall Angles along the side of the building Secure overlaps with Small Bolts and Nuts first then insert Large Screws where the Wall Angles meet the building frame 0 x10 3 0 m x 3 1 m building shown All angles overlap by 8 1 4 21 0 cm
14. 10 2 cm and connect them to the Wall Post in the center of the Rear Wall using Small Bolts and Nuts as shown Do not tighten at this time Small Bolts and Nuts as shown Attach both Rear Wall Channels using Small Bolts and Nuts Slide the Rear Wall Diagonals into the Frame and secure with Large Screws D Attach other two Wall Posts at the sides of the Rear Wall using a SB OUTSIDE SB u o QTY 30 Corner Panel LEAVE HOLES OPEN ALONG SIDE OF WALL A 1 OUTSIDE NOTE Place washers on all bolts and Y AUN A 84 screws used on painted parts This o SS will help to prevent leaks and corrosion Panel to each corner of the Rear Wall as shown The Corner Panel should only be secured to the Wall Panel where the panels overlap Do not secure the Corner Panel to the Rear Wall itself this will be done in Step 5 Using Small Screws attach a Wall Panel and Corner Carefully set the Rear Wall Assembly aside for use in Step 5 ARROW Storage Products 15 Wall Post Front Wall Front Wall Hinge Channel Diagonal Left Front Wall Assembly Right Front Wall Assembly 6 Long Fascia Short Fascia 10627 40 SB Ji LS Lay out the parts and position them as D shown Double check that holes align as 10628 shown If holes do not align the Wall Post Hinge is most likely upside down Insert the Front Wall
15. Channels into the Wall D Post and Wall Post Hinge as shown and 1 secure with Small Bolts and Nuts 10627 f e f Insert Front Wall Diagonals into the Front SB 3 Wall Assembly as shown and secure with l Large Screws 10628 ats Assemble two Front Frames together with I CY the Long and Short Fascias as shown below and secure using Large Screws Door Header Assembly n 3 Continued You will need for this page SB A ss M N wO Ge o QTY 12 QTY 8 2 Assemblies from previous page Left Front Wall Assembly Right Front Wall Assembly Door Header Assembly SB s Slide the Door Header Assembly down onto sB OL Front Wall Assemblies as shown and F bh sB secure with Small Bolts and Nuts Once these sB g pieces are joined take care when moving them as the SB Door Header may bend Using Small Screws attach a Front Wall 6 Panel and Corner Panel to each corner of the Front Wall as shown The Corner Panel should only be secured to the Front Wall Panel where the panels overlap Do not secure the Corner Panel to the Front Wall itself this will be done in Step 6 Also leave the holes closest to the door open in the Front Left Front Wall Assembly Right Front Wall Assembly Wall Panel These will be used to attach the Door Jambs in Step 6 IMPORTANT A mi
16. DO NOT fully tighten Ridge Cap d M4 bolts until you have both Ridge DO NOT secure ends of Ridge Caps Cap bolts in place This will ease assembly until Peak Caps are in place Bolts must be fully tightened before moving on to the next page 2 s _ h Alternate sides while securing 1 roof panels E a FO l 10 x15 3 0 m x 4 6 m building shown 36 You will need for this page B fn o QTY 4 QTY 16 Left Trim Slide Peak Cap legs under Ridge Cap and secure Ridge Cap ends with four Small Bolts and Nuts on each end as shown and secure with Small Screws Do not fasten the last screw on each end Pay close attention to where the Left and Right Roof Trim pieces are located If you are erecting a 10 x15 3 0 m x 4 6 m or larger building install Mid Roof Trim along the re mainder of the roof edge Roof Trim overlaps as shown to the right Position the Roof Trim Caps as shown below and secure with a Small Screw Using your thumb and index finger ov
17. Fully tighten when done 44 ANCHORING OPTIONS IMPORTAN is Doors must hang and swing level before anchoring building Anchor your building at this time See below for details on anchoring After anchoring drill a 5 8 1 6 cm hole at least 2 5 1 cm into your base to receive the left side Cane Bolt and hold the door left side only closed e Please take a moment to ensure that the building is installed in accordance with these instructions and with all applicable regulations Anchoring Down The Building The entire floor frame MUST be securely anchored once the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 6 mm Wood Screws There are 1 4 6 mm Contains 4 Anchors with Cable Clamps and dia holes provided in the frames for proper anchoring installation instructions Come V OVER THE BEAMS AND INTO THE GROUND Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws Arrow Anchoring Kit Model No AK100 or 68383 Recommended for use with the concrete base Contains Corner gussets perimeter clips hardware 1 4 masonry drill bit and installation instructions An Anchor Kit may b
18. Owner s Manual ARROW Storage Products amp Assembly Guide www arrowsheds com All Sizes sharp edges iges Gloves must be worn at all times to reduce risk of injury a n I l 10x10 122 1 4 x 127 1 2 Customer Service Base Size 310 5 cm x 323 9 cm 1 800 851 1085 or Additional 122 1 4 x 57 1 2 assist arrowsheds com per Module 310 5 cm x 146 1 cm F b tructi 5 BASE BUILDING DIMENSIONS T Size rounded off to the nearest foot s ieee tegen en ae Exterior Dimensions Interior Dimensions Door Approx t Storage Roof Edge to Roof Edge Wall to Wall Opening Size Area Width Depth Height Width Depth Height Width Height 10 x 10 101 Sq Ft 697 Cu Ft 123 1 4 128 3 4 92 1 2 118 1 4 123 1 2 91 1 4 98 1 4 72 3 4 3 0mx3 1m 9 4 m 19 7 m3 313 1cm 327 0cm 235 0 cm 300 4cm 313 7cm 231 8 cm 249 6 cm 184 8 cm Each Module adds an additional 57 1 2 146 1 cm in length 47 2 Sq Ft 4 4 m 2 additional storage area and 324 Cu Ft 9 2 m3 additional storage volume SAFETY PRECAUTIONS Safety precautions MUST be followed at all times throughout the construction of your building ap ae Ca
19. Sheet 67468 Peak Cap Arrow Logo 66609 Hinge 66778 Lock Eyelet 66183L R Roof Trim Cap 66781 Spring Latch 67545B Weather Stripping 6228 Track Support 2 Phillips CO OO DOA OO N i sk k nN O Confirm that all hardware and parts are present before attempting to assemble your building For missing parts contact Customer Service Do not return to store Part Numbers Part Number 1 Each part has an identifying part number on it 2 Part Numbers are referenced in each step 3 Unpainted parts have a stamped in number and painted parts have a number that is inked on Remove inked on numbers with soap and water after assembly HARDWARE C2GA GA5M C2GA Hardware Packed loose in carton Part Part No Description Latch Plate Shear Plate LT Shear Plate RT Slide Bolt Cane Bolt Door Handle F Hardware 7003 Shear Plate LT 7004 Shear Plate RT 65103 Hex Nut 8 32 65923 Small Bolt 8 32 x 3 8 10 mm 65004 Small Screw 8AB x 5 16 8 mm 66611 Large Screw 10AB x 1 2 13 mm 66646 Washer Sheet 67293B Weather Stripping Some Tips for Assembly At the top of each page you will see one or more Part Cues like the one to the right These Part Cues are designed to help you quickly identify the parts needed for each step Various fasteners are used throughout the construction of your building In each step you 2 Phillips 0 Quantit
20. all 10 3 0 m wide Arrow buildings 4 cable clamps No digging or concrete They install quickly and easily to pouring just insert cable under roof help organize space and create over roof beams into augers and twist more useable space as an attic or augers into the ground For buildings workbench Will hold up to 250 Ibs larger than 10 x9 3 0 m x 2 6 m use 2 kits 113 kg evenly distributed om ARROW LPR Some drilling required to fit buildings without mid wall bracing Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonry drill bit are included SHELF UNITS Heavy duty galvanized steel shelf units help organize stor age space They easily mount on the wall or sit on the floor Fits all Arrow buildings Model No SS404 Model No SS900 A e Makes 8 to 12 20 3 30 5 cm Grey color wide shelves in any length 3 shelves e Brackets braces Holds up to 85 Ibs 38 kg TOOL HANGING RACK hardware included even weight distribution Model No TH100 Lumber is not included The perfect tool organizer Twin x Some drilling required to fit buildings without mid wall bracing 25 1 2 64 8 cm steel channels plus five heavy duty snap in han
21. at the base and at the top This will make roof panels fit better and holes will better align a k V NOT H Be sure to carefully follow the Roof Panel 44 Placement Order Diagram on this page Crimped Rib Whenever a crimped rib and an uncrimped rib meet place the crimped rib UNDER the uncrimped rib Roof Panel Placement Order 8579 2 1 8578 e 8578 E 4 j 3 Sj FRONT 30 don t focus weight FASTEN TO NEXT PANEL WITH BOLT AND NUT DO NOT FASTEN AT THIS TIME You will need for this page EO Secure the End Panel to the Main Roof Beam D by placing a Small Screw in hole 1 from the diagram below Carefully remove the Gable Edge Trim once the Panel is in position Fasten Panel to Gable by placing Small Bolts and Nuts through holes 2 7 Fasten the holes in order Secure the Panel to the outer Roof Beam by Q placing a Small Screw in hole 8 Repeat for other three End Panels FASTEN TO NEXT PANEL An Awl may be used to help align holes that are only slightly misaligned Take care not to bend or warp the metal and always practice proper tool safety NOTE If Roof Beam holes do not line up 84 with Roof Panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up 1
22. ction and a week for curing time for good water drainage OPTION 2 Wood Platform These are the recommended materials for your base 2 x 4 s 38 mm x 89 mm Pressure Treated Lumber 5 8 15 5 mm 4 x 8 1220 mm x 2440 mm Plywood exterior grade e 10 amp 4 penny Galvanized Nails e Concrete Blocks optional NOTE Pressure Treated Lumber must not be used where it will make contact with your storage building The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction HARDWARE C1GA C1GA Hardware No No Description List 65103 Hex Nut 8 32 2922 65923 Small Bolt 8 32 x 3 8 10 mm 256 65004 Small Screw 8AB x 5 16 8mm 354 66611 Large Screw 10AB x 1 2 13mm 209 66625 Long Bolt 10 32 x 3 4 19 mm 2 66783 Flat Head Screw 8 32 x 1 2 13 mm 65106 Square Nut 10 32 65943 Large Bolt 10 32 x 7 16 11 mm 66646 Washer
23. e building Inside Open ends of Vertical Door Braces must face edge of Doors ej C 7 Left Door I a 5 Inside 40 41H Step 13 Continued Plastic Washer You will need for this page Diagonal Brace A Position parts as shown and secure to upper inside corner of left Door with Large Screws Spring Latch attaches to Latch Plate using Small Bolts and Nuts Place three Plastic Washers behind top hole of Spring Latch as shown this will help alignment B Where Braces overlap insert a Long Bolt through all Braces and Door Panel and secure with Y a Nut f ee y C Secure Diagonal Braces to Doors in all corners 9 A gt with Large Screws SN aX 10626 10626 10626 10626 MEL Inside Li Inside 41 Cane Bolt Bracket Secure all Diagonal Braces to the Vertical Door Braces with Large Screws as shown Next position the Cane Bolt Bracket back to back against the Vertical Door Brace closest to the ce
24. e purchased online at www arrowsheds com You can also purchase one over the phone by calling 1 800 851 1085 See accessories page for details 45 H CARE amp MAINTENANCE Exterior Care For a long lasting finish clean and wax the exterior surface We recommend washing with a mild soap solution DO NOT use power washing to clean your shed Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region Combustibles and corrosives must be stored in air tight containers designed for chemical and or combustible storage Corrosive chemicals such as fertilizers pesticides and herbicides should be cleaned off the interior and exterior surfaces immediately Rust caused by chemical damage is not covered by the warranty DO NOT STORE POOL CHEMICALS IN YOUR SHED THIS VOIDS YOUR WARRANTY Rust protection precautions may help to stop rust from developing or stop it quickly as soon as it appears e Avoid nicking or scraping the coating surface inside and out e Keep roof and base perimeter free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint e Various paint manufacturers provide pr
25. ecure with two Small Bolts and Nuts at each end Next install the outer Roof Beams in the same manner 7 Remove Bolts holding Truss peaks together from Repeat until all Trusses have been installed En T Oute JL Outer Side of beams with small holes must face up 20 5 Rear Wall Install You will need for this page LS LS tne itis QTY 2 7 QTY 4 Assemblies from Step 2 Side Wall e Rear Wall Assembly Channel 10 x10 3 0 m x 3 1 m building shown Carefully position the Rear Wall Assembly D in place at the rear of the building and secure to Side Frame with one Large Screw per side as shown Slide one end of the Front and Rear Side D Wall Channel behind the Corner Panel and secure with a Large Screw Secure the other end with a Large Screw when done Repeat for the other Front and Rear Side Wall Channel Storage Products 21 6 Front Wall Install You will need for this page QTY 2 7 QTY 4 4O Assemblies from Step 3 Left Door Front Wall Assembly Side Wall Channel LS LS FIRM 10 x1
26. erbend the bottom flange of the D Position Left and Right Roof Trim as shown below a small screw where Roof Trim overlaps after installing Roof Trim Caps are positioned as shown side roof trim at the corner inward enough so the right SB and left roof trim caps fit onto right and left corners 80017 Left Roof Trim 6015 Mid Roof Trim 6015 Mid Roof Trim 10620 Right Roof Trim 4 10620 Right Roof Trim SBFF Y 80017 SS Left Roof Trim 10 x15 3 0 m x 4 6 m building shown ARROW Storage Products 37 Door Panel Hinge Left Door Panel Right Door Panel Refer to page 11 for Door assembly overview Position Door Panels as shown D and secure using Small Bolts and WIV The best way to assemble the Nuts NOTE Door Panels in the NOTE Doors is on a flat elevated image below are shown pictured from the surface such as a table or workbench inside of the building Pay close attention to
27. ext place two Middle Roof Beams back to back and secure with two Small Bolts and Nuts as shown above This is the Main Roof Beam Install the Main Roof Beam and secure with two CY Small Bolts and Nuts at each end Next install the outer Roof Beams in the same manner 3 Remove Bolts holding Truss peaks together from Storage Products 19 All remaining Truss Assemblies Side Wall Channel Roof Beam NOTE tvou are erecting a 10x10 3 0 m x 3 1 m building skip this page ATu Aad and move on to page 21 All Truss Sections are assembled in the same manner as the Truss Section just erected Install one additional Side Frame per side for each additional Module Overlap Side Frames by 8 1 4 21 0 cm Refer to page 13 to see how many Trusses should be included in your building Pg One Side Frame per side is added for each additional Extension Module 10650 57 1 2 146 1 cm behind the previous Truss erect a Truss Assembly and secure using a Large Screw on each side Once two Truss Assemblies are in place connect them with a Mid Side Wall Channel and secure with Large Screws Support Trusses until Mid Side Wall Channels are in place Step 1 6 Next place two Middle Roof Beams back to back and secure with two Small Bolts and Nuts as shown This is the Main Roof Beam Install the Main Roof Beam and s
28. g tape as shown gap between Gables Secure two Front and Rear Roof Beams together with a single bolt to form the Main Roof Weather Stripping Tape Beam as shown above The end of the Main Roof Beam with the open hole should face the Gable Position the Front and Rear Roof Beams as D shown below and attach to Gable and Truss using two Small Bolts and Nuts per side Install the Main Beam first Tape BOTH Gable joints before installing Roof Beams Side of Beams with small holes must face up FF TI i a 1 10 x10 3 0 m x 3 1 m building shown Attach the Roof Beam Brace to the Track Support with one Small Bolt Tab end attaches to Roof Beam and Nut as shown Rotate to align with Roof Beam and 9 secure to Roof Beam with one Small Bolt and Nut as shown Repeat Steps 9 2 thru 9 9 to install Gables at the front of the building The Gables in the front of the building are installed exactly as the Gables in the rear of the building Attach Brace to Gable then rotate to align with Roof Beam Repeat Steps 9 2 thru 9 9 to install front Gables ARROW Storage Products 29 Read thru all of Roof Assembly before beginning Step 10 i M PO RTANT Atthis time take a momentto ensure errr the building is level and square Measure the building diagonally again to make sure the building is square The building should be square
29. gers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back HOW TO ORDER of any door Fits all Arrow _ storage buildings We recommend that you purchase accessory items from your local storage building dealer whenever possible however because the full line of accessories is not always available from all dealers Arrow is offering them to you on a direct basis Purchase Online at www arrowsheds com SPECIAL NOTICE ON DELIVERY If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re delivery charge assessed by the carrier Purchase over the phone by calling 1 800 851 1085 Visa or Mastercard only Allow 2 weeks for Delivery ASSEMBLY NOTES Slide Bolt may need adjustment If Slide Bolt does not align properl ma 1g y you may to align properly need to insert plastic washers between the door and the Slide Bolt to ensure proper fit Adjust number of plastic washers until desired fit is reached ta Ss ARROW Storage Products
30. gth of the roof _ 33 11 Continued J J SS For 10 x10 3 0 m x 3 1 m ONLY NOTE DO NOT fully tighten Ridge Cap bolts until you j 84 have both Ridge Cap bolts in place This will ease Overlap two Front and Rear Ridge Caps assembly Bolts must be fully tightened before moving on to as shown and secure with two Small the next page Bolts and Nuts End of Ridge Cap with four holes must face toward the outside of the building Do not secure at this time Z Atl Z You will need iim gt Z Ridge Cap QTY 2 F R For 10 x15 3 0 m x 4 6 m or larger Overlap one Front and Rear Ridge O Cap and one Mid Ridge Cap as shown and secure with two Small Bolts and Nuts End of Ridge Cap with four holes must face toward the outside of the building Do not secure at this time e Zi gt Ridge Cap Ridge Cap F R Mid 35H 1 1 Continued for Extension Modules You will need for this page 9 Continue to apply weather stripping NOTE ou are erecting a 10 x10 3 0 m x 3 1 m building skip this page and move on to paqe 36 Ridge Cap FR Ridge Cap Mid Roof Panel Sah cc a _ S ae ta epply NOTE E DO NOT fully tighten Ridge Cap bolts 4 until you have both Ridge Cap bolts in Where the last two Panels overlap over the place This will ease assembly Bolts must be D Truss insert t
31. lace on it sandbags or other weights on the floor frame to temporarily anchor it 3A ASSEMBLY TIPS amp TOOLS Watch the Weather Closely Be sure the day you choose to install your building is dry and calm Do NOT attempt to assemble your building on a windy day Be careful on wet or muddy ground Use Teamwork Whenever possible two or more people should work together to assemble your building One person can hold the parts or panels in place while the other person fastens them together and handles the tools This makes the process of assembling your building faster and safer Tools and Materials Here is a list of some basic tools and materials you will need to assemble your building Decide which method of anchoring and the type of base you will use to make a complete list of the materials you will need Work Gloves Safety Glasses Step Ladder No 2 Phillips Screwdriver Magnetic Tip Preferred Utility Knife or Scissors Pliers Carpenter s Level Tape Measure WHAT YOU NEED Power Drill Cordless Variable Speed Nut Driver or Wrench Square String for squaring the frame Awl to align holes Lumber and or Concrete Hammer and Nails Spade or Shovel Hand Saw or Power Saw How to Select and Prepare Your Building Site Before you start to assemble your building you will want to decide on a good location The best location is a level area with good drainage
32. nimum of two people should be used at all times when handling or maneuvering the Front Wall Assembly When installing the Front Wall Assembly in the building two people should hold the Assembly in place until it is secure Fail ure to do so could result in bending the Front Frame and Fascia pieces LEAVE HOLE OPEN LEAVE HOLES OPEN ALONG SIDE OF WALL LEAVE HOLE OPEN 17 8H 4 Truss Installation You will need for this page Assemblies from Step 1 Truss Assemblies 2 Side Frame Side Wall Channel 10632 Assemble two sets of Side Frames by A ercon them by 8 1 4 21 0 cm and inserting two Small Bolts and Nuts as shown 10632 above These will form the left and right Floor Frames Notched side of Frame must 32 7 8 83 5 cm from the edge of each Floor tace insides pullding D Frame erect a Truss Assembly and secure 10632 using a Large Screw on each side Once two Truss Assemblies are in place connect them with a Mid Side Wall Channel and secure with Large Screws Support Trusses until Mid Side Wall Channels are in place Truss Spacing Ca me som Ce 5742 iarom Side of beams with small holes must face up LE 1 AL Outer Oute Roof Beam a End View of Double Beam WL Step 1 6 N
33. nted parts needed to erect a 10 3 1 m building You should have one C1GA carton C2GA This carton contains the un painted parts needed to Nominal Extension erect a 10 3 1 m building You should have one C2GA Size Modules carton 3 0mx3 1m GASM This carton contains the Extension Module Review the 3 0mx4 6m chart to the right to determine how many GA5M cartons 3 0mx6 1m you should have received 3 0mx7 5m Please note Most illustrations in this assembly manual depict a 10 x10 3 0 mx 9 0 m 3 0 m x 3 1 m building A 10 x10 3 0 m x 3 1 m building contains a front and rear wall section and one truss section see page 9 Each additional Extension Module simply adds one more truss section to the building see page 11 Every truss section is identical to every other truss section and the instructions clearly indicate how to assemble any length building Read all instructions carefully 4 H CONSTRUCTING A BASE Before you assemble your building you must construct a base The length of your base shown as L in the diagrams below will depend on the length of your building See below Nominal Size of Modules Length L For each additional module beyond the m lengths listed increase the length of 10x10 30mx31m Oo 1271 2 323 90m_ your base by 57 1 2 146 1 cm tox15 3 0mx4 6m 469 9 cm 10 x20 3 0 mx6 1 m 242 1 2 616 0 cm IMPORTANT When deciding on a base Papas for
34. nter of one Door as shown Slide the Cane Bolt Bracket to the bottom of the Door and secure with three Large Screws Repeat for other Door Align the Cane Bolt with the holes in the Cane Bolt Bracket and Vertical Door Brace and secure with six Large Screws as shown Repeat for other Door Right Door Inside Latch Plates shown for alignment only install on page 44 Left Door You will need for this page LS ins QTY 20 Astragal Secure the Horizontal Door Brace D to the Door with Large Screws TAN N If holes do not align insert screw Position Door Trim and Astragals as NOTE 0 j E shown and secure with Large Screws Lock Eyelet slides thru Astragal on right Door and is secured with two Large Bolts and Square Nuts Pay close attention to the position of each part 4 at an angle 10647 INSIDE OUTSIDE Left Door Right Door INSIDE v Outside OUTSIDE Outside 43 13 Continued You will need for this page wr nt ne m Y YY WKY YY WO NWO MD QTY 8 QTY 4 QTY 36 Slide Latch Plate into position on the left Door Lett Door Next position the Slide Bolt on the face of the i Door and
35. oducts for rust treatment and coverage If surface rust does appear on your shed we recommend treating those areas as soon as possible following the paint supplier of your choice instructions e Our customer service department can provide the paint tinting formula for matching the color of your shed We also have touch up paint available for repairing small nicks and scratches Roof Keep the roof clear of leaves and snow Heavy amounts of snow on the roof can damage the building making it unsafe to enter Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by the screws Regularly check screws bolts nuts etc and retighten as necessary General A plastic sheet vapor barrier placed under the entire floor area may reduce condensation e Wash off inked part numbers on coated panels with soap and water e Silicone caulking may be used for watertight seals throughout the building Please note Manufacturer cannot be held responsible for any consequences due to buildings that are not installed per these instructions or for damage due to weather conditions or acts of God Keep these assembly instructions and owner s manual for future reference 46 ARROW ACCESSORIES ANCHOR KITS ATTIC KIT WORKBENCH KIT Model No AK4 Model No AT101 Anchor Kit contains heavy duty steel Heavy duty galvanized steel bars that augers 60 18 m of steel cable and fit
36. re must be taken when handling various pieces Practice caution with the tools being used in the of your building since many contain sharp edges assembly of this building Be especially familiar with Please wear work gloves eye protection and the operation of all power tools long sleeves when assembling or performing any maintenance on your building no children or pets at worksite Keep children and pets away from the worksite Do NOT attempt to assemble your building on a during construction and until the building is windy day The large panels can catch the wind like completely assembled This will help avoid a sail causing them to be whipped around making distractions and any accidents which may occur construction difficult and unsafe Do NOT attempt to assemble your building before don t focus weight double checking that you have all the parts J on roof indicated in the parts lists as well as all hardware page 6 11 Any building left partially assembled may be seriously damaged by even light winds IMPORTANT NOTE ON ANCHORING Your building MUST be anchored to prevent wind damage An anchoring kit is not supplied with your NEVER concentrate your weight on the roof of the I building and you have many options when it comes to building When using a step ladder make sure that anchoring See anchoring page for more info it is fully open and on even ground before climbing If you need to take a break from assembly p
37. wo Small Bolts and Nuts and seal fully tightened before moving on to the next with two 2 5 1 cm strips of tape page Install two more Roof Panels O Ridge Cap and secure with two Small Bolts and Overlap the last Ridge Cap installed with the next 9 Nuts as shown Repeat the steps on this page until you have only two Roof Panels remaining Before moving on to the next page all Ridge Caps should be in position but the ends of the Front and Rear Ridge Caps at the front and rear of the building should not be secured yet S Place strips of tape over bolts to seal SAX Under Ridge Cap Storage Products You will need for this page QTY Continue to apply weather stripping At this point there should be only two Roof 44 Panels remaining Install last two Roof Panels Because the last Ridge Cap is already in place and has been secured at one end you may need to move the Ridge Cap slightly to secure the last two Panels to the Main Roof Beams Finish weather stripping the roof under the 42 Ridge Cap and cut the tape just past the end of the roof Fold end of tape under roof edge Bolts under Ridge Cap pass thru slots where the End Roof Panel is overlapped by the Panel next to it labeled rib 5 below Roof Panel of Roof Panels to the Side Wall Angles with Small Screws on both sides of the building 43 With all Roof Panels in place secure the bottom rags
38. y Needed illi 2 Phillips Part No End View Part Name will see the abbreviations listed below used The fasteners used in each step are shown actual in the illustrations to help you identify which size at the top of each page If you are unsure fastener to use SB Small Bolt SS Small Screw LB Large Bolt LS Large Screw FS FlatHead Screw ss LNB Long Bolt which fastener to use hold it up to the picture and use the one that matches a gt So H80 4 4 y 8 8 4 y y y y G Y ALO wo 0 291 pie s9 u 5u 1 Buipiinq ino Bulj quiesse u ym pasn aq JSNW pue V UEI ul papnjoul osje s wuj 26p3 ose q usa awe 1u013 6uIH 180d IeM we g JOO PIN we g ooy Je y pue uo vesg uy jdg ssn SSNJL p1Oy9 13M07 ssn p10y9 seddn H SU sod SSNIL SOq ssnu SOd IEM BIOSB4 HOUS esey Buo1 uol diu5s q Hed 8E Le 9E Ge ve cE CE Le oe 62 82 IKA 9 l4 ON ONT ON wed uoweo Aey CN CN CN CN CN TNN CN TN WNT OTA CN CN YT TN N I uueuO IEM 8p S PIN jg uueuo IeM Opis Jeay pue uo14 OWE APIS jeuobelg e Je8y jauueyd eM Jeey owes Jeay jeuobeig JeM 1u013 JaUUeYD eM JOY 6uv leM apis a0eg we g ooy v21g ajqe yoyoeg weag ooy quer 100d 49 wuj Jooy 497 quer Joog yy deo abply zeay pue juol4 WH Jooy 1YB1y Jaued 19U109 Jaued IJEM 1u014 j ued pu3 J008 497 l ued pu3 400 yYybrY lqeS 191

Download Pdf Manuals

image

Related Search

Related Contents

スイングロータ Swing Rotor T4SS6  Ardour3 - Video Integration - Linux Audio Conference  Installation & User Manual of IndicPlus For CS2/CS3/CS4/CS5    Manuel de l`utilisateur  Robugtix Controller User`s Manual v1.2  

Copyright © All rights reserved.
Failed to retrieve file