1. INSTRUCTIONS 1 Locate and mark studs at a minimum of 48 From floor suggested rail heights 7 3 and 4 2 Position rail in place Rail should begin and end n the middle of a stud 3 Level Rail 4 Mark top and bottom screw holes over studs 5 Mark top screw holes every 6 between studs 6 Drill pilot holes 1 8 pilot holes into studs s 3 8 pilot holes into drywall Ta Install wall anchors in 3 8 drywall holes Use pushpin black to engage anchor by inserting and into anchor hole Push until a snap sound is heard 8 Mount rail onto wall using m 10 2 screws 9 Hook rail cover over rail Snap in place by pushing on middle of cover WARNING Rail must begin and end on studs 16 stud spacing and be installed on stud or thicker drywall 48 rail must hit 4 studs for maximum weight capacity Anchors must be used in top holes every 6 between studs Failure to follow installation instructions can result in injury or death Do not ovedoad