Home
        Duramax Building Products 00314 Use and Care Manual
         Contents
1.                                                                                                         Inside d                      Fig 1  Use  S2  Fig  2   Use  S1  screws   screws  Fix  FCB  Fix  CB2B  to  FCB    to  CCB   Leave it and  CB1B     loose                    Fig 3  Fixto  CMB  Fig 4  Use  S1  Fig 5  Use  S1   with  S1  screw  screws  Fix  CB3LB  screws  Fix  CB3LB   to  CMB  columns  to  FCB                                                      13 Continue connecting the back panels and columns  in sequence along base  B22  and  B21   Fix columns  to base with  S1  screws     14  Fixthe corner column  CCB  to last panel and  base     15  Working from outside use  S1  screws to secure  the corner column  CCB  to bases  B21  and  EXTL                                                                                                                                                                                                                            Back Wall                                                                                           EXT  B21                  m          Outside 51    16  stabilize the side panels with center bands  CB3B  amp  CB3XB   Fixthe center band fitting  FCB  to corner  column  CCB  see figure 1  Follow figures 2  3  4 and 5                                                                                                                                                                                                             
2.                                                  Fig 1  Use  S2  Fig  2  Use  S1  screws  Fig 3  Fix to  CMB Fig 4  Fix to  CMB  screws  Fix  FCB  Fix  CB3B  to  FCB  Wess        wie  to  CCB   Leave it and  CB2B      loose                                               Fig 5  Use  S1  Fig 6  Center band joint  screws  Fix  CB3XB  must be cover with  CBC   to  FCB   cover to avoid the injury                                                                 b                    17  Working from inside  continue connecting the side I ic  panels  SP4  and columns  CMB  in sequence along        B2B   amp   EXTL  base  Use  S1  screws to fix columns    to base     Q                                                                                                                                                             Inside          18  siide corner column  CCB  into side panel  SP 4   pushing the column to the side panel                                         Inside       19  Working from outside use  S1  screws to  secure column to bases  B2B  and  B1LB                        20  stabilize the side panels with center bands  CB3LB    amp   CB2B   Fix the center band fitting  FCB  to corner  column  CCB   See Fig 1  Follow the Fig  2  3  4  amp  5                                                                                                                                                                                                                                              
3.                                            Fig 1  Use  S2  Fig 2  Use      iN   screw  Fix  FCB   S1  screws  Fix 69         to           Leave  CB3LB  to  FCB  Inside  itloose  and  CB3XB                                       Fig 3  Use  S1  Fig 4  Fix to  CMB  Fig 5  Use  screws  Fix  CB3LB  with  S1  screw   S1  screw   to  CMB  columns  Fix  CB2B  to  FCB                                                                                                                                                                                 21  Insert      side panel  FSP4  into the groove  of column           Start at the bottom with panel at  an angle then push into place                              22  Slide door column  CDLB  into the U Channel  Base  B1LB  on the left side of the door  Line up  the pre drilled holes on  CDLB  Column with pre   drilled holes on U Channel Base  B1LB   Secure  with two  S1  screws from inside     see blowup detail                                                                                                                    23  Attach the center band  CB1B  to door  column  corner column and center band  CB2B    See figures 1 and 2          Fig 2  Use  Fig 1  Use  S1  screws   CBE  E BIB  to   FCB  and  CB2B    CDLB     After completing the center band assembly fully tighten  the four center band fittings  FCB  to the comer column   CCB                                                            Inside             24  Fix the center band  CB4B  t
4.                             7 Assemble back center bands  CB3B  and  CB3XB  with middle  joining support  MJ    Use  S1  screws            Assemble the center bands  CB2B   amp   CB3LB  with  S3  screws with nuts  Follow Overlapping Method    shown below   Make 2 sets   Add one  CB3LB  for each extension     Overlapping Method    For Center Band  Roof structure  RS3B   amp   RS3SB   S  22    Use a hammer to  align the holes     Step 5          9  Working from inside  continue connecting the side  panels  SPt  and columns  CMB  in sequence along   B2B   amp   EXTR  base  Use  S1  screws to fix columns  to base                             Foreach extension add one side panel  SP4  and  one middle column  C MB  in extension base U channel   EXTR   amp   EXTL                                                                                                                                                   10  Slide corner column  CCB  into side panel  SP4   pushing the column to the side panel                                         11  Working from outside use  S1  screws to  secure the column to bases  B22  and  EXTR                           12  Stabilize the side panels with center bands  CB3LB    amp   CB2B   Fix the center band fitting  FCB  to corner  column  CCB  See Fig 1  Follow the Fig  2  3 4  amp  5                                                                                                                                                                              
5.                        A  E   WY    ys                            LA        f                 v EN  NJ                                 I H jf  XQ                fill                               bly  See figure   bly     ch the middle column fittings  FMC  from  cture  RS1B  assem                         f stru       ack roo  10  Pull the back roof structure assem  See figure     9  Deta  b          11  Detach the center bands  CB3XB   amp   CB3B   assembly from the back wall ofthe shed  Follow the  figures                                                                                                                                                                                                                                            e   I     Fig 1  Detach            from Inside back LO   CB2B   Then detach  CB3B      amp   CB2B  from  FCB                                    Fig 2  Detach  CB3XB  from Fig 3  Detach  CB3XB  from  CMB   Fig 4  Detach  CB3      CB2B   Then detach  CB3XB  assembly from  CMB     amp   CB2B  from  FCB               12  From outside back of the shed  detach the base  angles from the corner column  CCB  at both corners  and remove the corner columns  See fig 1    From inside detach the  B21   amp   B22  base angles  from middle column  CMB   See fig 2                                                                                                                                                                                                      
6.       DURA IA Xio    US POLYMERS INC    torag    OWNER   S MANUAL         Instructions for Assembly  Size 8 x 6  with  Extension Kits                                                                                                                                                                                                                                Customer  Service Hotline     800  483 4674    www uspolymersinc com                                                                                                                                                                                                                                                             Your Total Solution To maintenance Free Storage Sheds       All Weather Durable PVC PART 1    Won t Dent  Rust  Rot or Mildew ASSEMBLING SHED WITH EXTENSION KIT        Never Needs Painting     61    Wide Double Doors      Easy Assembly PART 2       High Wind Tested ADDING EXTENSION KIT TO EXISTING SHED      Snow Load Tested 20lbs sq foot        Pad Lock Ready  Lock not included  Note  For shed with extension use this manual only       Wooden or Cement Foundation Needed    Available Kits     Foundatn Git Avalable Requires two people and takes about 4 5 hours for Installation       Modular 2 5    Extension Kits Available                   8 x6  Window Kits Available all us for any missing or damaged parts     Do not return to the store              Duramax Storage Shed  Limited Fifteen Year Warranty    U S  Polym
7.      Outside    fig  1    13  Come back to 8  x 6  Extension Kit manual  PART 1  and follow the steps accordingly     
8.   roof panel until it reaches  RS3  roof structure for each  panel  See fig 1     6  Insert      sagging support  RS14B  from inside  the shed by sliding in between roof structure  RS5   and roof panel until ittouches the other roof structure   See fig 2                 Parts Needed      1  Door Left   1  Door Right    1  Attach the doors left and right  see fig 1  with Loose pin hinges on door columns  CDLB  and  CDRB                                                                                                                        Note       prevent water leakage it is important       that these instructions are followed     1  After completing the assembly apply silicone  around the perimeter of the base U channel   Seal the corners  joints and base of door column also                                                                                                  Ne J    DY                                                                                             Inside       Mp               Base U channel    2  After completing the panel assembly  apply  silicone around the roof plugs  This is optional and  should be done for heavy rain areas if needed                                            F  Optional Ventilation Kit    ACCESSORIES                   CODE DESCRIPTION QTY       VENTILATION COVER 2            VENTILATION COVER PIN 4          VENTILATION COVER  VC  VENTILATION COVER PIN   VCP     TOOLS YOU WILL NEED    Power Drill  Dia 5 32   4 2mm  drill bit  Dia 
9.  2 x 32mm   5 32  x 1 14      CB4B FRONT CROSS CENTER BAND 2 SHEET METAL SCREW 8  RSIXB   51 ROOF STRUCTURE 4 57 DIA  4 2 x 10mm   5 32  x 3 8    RS2B RS2 ROOF STRUCTURE 4 SHEET METAL SCREW 8 ROOF STRUCTURE  558  DOOR STOPPER  DSH   RS3B RS3 ROOF STRUCTURE 2  RS4XB RS4 ROOF STRUCTURE 2  RS5B RS5 ROOF SRTUCTURE 4  RS8B RS8 ROOF STRUCTURE SUPP  LONG 4                  8598 859 ROOF STRUCTURE SUPP  SHORT 4  MJ MIDDLE J OINING SUPPORT 3 SAGGING SUPPORT        RS10B   510 ROOF STRUCTURE SUPPORT 2  RS11B   511 ROOF STRUCTURE SUPPORT SHORT 1 2  85128   512 ROOF STRUCTURE SUPPORT LONG 1 4 N  RS14B SAGGING SUPPORT 8 S  DSH DOOR STOPPER HORIZONTAL 1                      SPA SIDE PANEL 7           FPLB FACIA PANEL LEFT 2  FPRB FACIA PANEL RIGHT 2 o     RPA ROOF PANEL 4  RRS RIDGE COVER 2 l    gt    DL LEFT DOOR 1 DOOR COLUMN FITTING DOOR COLUMN FITTING  DR RIGHT DOOR 1 nd ji  FSP A FRONT SIDE PANEL 2 A  Tools You Will Need f  Cordless Drill   Philips Head CORNERCOLIMNTTTNG PVC 30 DEGREE TONT  Hammer or Rubber mallet  Carpenters Square  8  Step Ladder L     Adjustable pliers  Level   3ft   Tape Measure MURIS  Caulk Gun  Waterproof Clear Silicon     Sealant oz  Hand Gloves             ROOF PIN  PIN  ROOF PLUG WITH  WASHER  PPG     8  x 6  Exploded View                                One Extension Parts List       Note  Check all parts prior to installation                                                                                                        CODE DESCRIPTION QTY  EXTL EXTE
10.  Always place panels into frame at an angle  on top and slide in sideways and downward  for easy insertion     Make sure panels are right side up  with panel shingles facing down   Check the stamped label on top                    of all panels   FSPT           4          3  Slide corner column          into side panel   FSP   pushing the column to the side panel     4  Working outside use  S1  screws to secure  column to bases  B1RB  and  B2B                     Inside                                                 Inside             Outside                                                     5      stabilize the front panel attach the front center  band right  CB1B   Start with the center band fitting   Fixto corner column  CCB  with  S2  screws  To  continue See figures  fig 1   fig 2  and  fig 3      To insure easy assembly Locate  the identification number of each                   Fig 1  Use  S2  screw     Fix  FCB  to  CCB    Leave it loose     6  Attach center band            to door column   CDRB  and base channel  B 1RB            Fig 1  Use  S1  screw   Fix            to  CDRB                                                                       Fix  CB1B  to    Fig 2  Use   S1  screw   Fix            to  base  B1RB                 Fig 3  Fix the  EPS  at      end  of  CB1B   amp   CB4B         bh           Fig 3  Use  S1  screw     Fig 2  Use  S1  screw      CB1B  to  CDRB      FCB                                                                                   
11.  Assemble roof structure  RS2B  to  RS8B   and  RS9B  with 8  S1  screws        10  Assemble  RS3B   amp    5358  with  S1  screws  2 sets      See fig 1  ni        10    insert 90 degree joint  RJ   into the  RS3B  U   channel Roof support  Use a hammer to push in  Use     S1  screws to fix  Repeat      other end of  RS3SB     See fig 2 and fig 3    Add one  RS3SB  for each extension                          Refer Page No 5 for  Overlapping Method  of  RS3B   amp   RS3SB                                                      11  Assemble the roof structure  RS5B  into  RS6B  with 6  83  screws with nuts   Make 2 sets   Add one  RS6B  for each extension         12  Assemble the roof structure  RS5B  into  RS7B  with 6  53  screws with nuts   Make 2 sets   Add one  RS7B  for each extension     13  Assemble      roof structure RS5B   amp   RS6B  into roof  structure  RS 13B  with 8 S3  screws with nuts at both ends   Make 2 sets         This step 13 applies only for Ver  2 0 Extension kits    If you have a Ver  1 1 extension kit  the RS13B part  will notbe in the extension kit and you can skip this  step        14  Assemble the roof structure RS5B   amp   RS7B  into roof  structure  RS 13B  with 8 S3  screws with nuts at both ends   Make 2 sets     This step 14 applies only for Ver  2 0 Extension kits   If you have a Ver  1 1 extension kit  the RS13B part  will notbe in the extension kit and you can skip this  step        15  Place the assembled front roof structure into position
12.  B1RB     U channel Back  B21      U channel Back  B22      U channel Side  B2B    2  Dia  4 2 x 16mm Screws  S1   n    eeded For Each Extension     1  1  1  1  2  2                      Parts   1  Extn  U channel left  EXTL    1  Extn  U channel right  EXTR    6  Dia  4 2 x 16mm Screws  S1     1  Use pressure treated wood studs 2  x 4  5 x 10cm   to build a foundation structure that has an outside  dimension of 65  x 96   1651mmx2438 4mm      la use pressure treated wood studs 2    x 4  5 x 10cm   to build a foundation structure that has an outside  dimension of 32  x 96   812 8mm x 2438 4mm  for each  extension     OR 16  use pressure treated wood studs 2  x 4     5 x 10cm  to build a foundation structure that has an  outside dimension of 97  x 96   2463 8mm x 2438 4mm   for shed with one extension              Lay 2 x 4   5cm x 10cm  Flat       2  Using exterior grade        3 4   19mm  plywood  cut  and fit together the sheets to form solid plywood floor  as shown  Foundation must be square and level     3  Start with U Channel bases  B21   amp   B22  to insure  a quick and accurate layout    Position all bases        B1RB  B2B  on wood  foundation  It is critical that you allow 61 1 4   1556mm   between front bases  B1RB          B1LB  for door  placement  Measure in all directions as shown in fig 1   Make sure the U channel assembly is a perfect square           For each extension add one  EXTL   amp   EXTR  in    back side  moving  821  6  822  backwards     Wooden Pla
13.  fig 1    fig 2  and  fig 3   Z          Add one   5118  for each extension     MA 7 e    WW                                                                                            TN    C    oA                                      Make sure the hole in   5108   face outward on both side                                                                                                           27  Attach the roof structures support  RS12B  with  RS5A  and  RS5A  with  S1   screws  See fig 1 and 2              This step 27 applies only for Ver  2 0    Extension kits  If you have a Ver  1 1      MEA       extension kit  the  5128 part will not 22        be in the extension            you can     YS  skip this step  MEM   oe  Z    7     7                                                                                                                                                                                                                                                                            D  Roof panels                 Parts Needed  Parts Needed For Each Extension    4  Roof Panels          2  Roof Panels  RP 4    2  Facia Panel Left  FPLB    1 Ridge Cover  RRS    2  Facia Panel Right  FPRB   16  RoofPlugs w Washer  PPG    2  Ridge Cover  RRS   16  Roof Pins  PIN    64  Roof Plugs w Washer  PPG   4  Sagging Support  RS14B    64  Roof Pins  PIN    8  Sagging Support  RS14B                                                  1  Place facia panel  FPRB  to front roof stru
14.  on top of door columns  Line up pre drilled holes with  door column fittings  FDCL   amp   FDCR   Use  S1  screws to fix front roof structure to the door columns with left  and right door fittings           Front Inside Of Shed TP                                                                                                       16  Fixthe door stopper horizontal  DSH  to the front roof structure  from inside with 8  S1  screws  Position the latch hole to face down     U channel opening  inside the shed                             Inside Shed                17  Place the assembled back roof structure into position on top of columns  CMB   Line up pre drilled holes  with column fittings  FMC   Use  S1  screws to fix back roof structure to  FMC      Inside Back of Shed                                                                                                                                                 Make sure front and back    assembly  the  RS2B   roof 4  structure position towards  inside the shed as shown in  Fig 1  amp  Fig 2              j                                                                                                                                                        18  Insert the 90 degree joint  RJ    Assembled with roof support RS3B  amp  RS3SB   in to the roof structure  RS1XB   See fig   Follow Fig  2 and 3     After assembly make sure this roof  structure   s U Channel is positioned  down                         Es    Notice the U 
15.  structure supports  RS9B  at the left side  of the shed  Use  S1  screws to fix    See Fig 1  amp  Fig 2    23  Place the assembled roof structure   RS5B   amp   RS7B  into position on roof  structure supports  RS9B  at the right side  of the shed  Use  S1  screws to fix    See Fig 3  amp  Fig 4                                                                                                                                     24  Attach      roof structures  RS4XB  to   RS3B  with  S1  screws  see fig  1  amp  2     24a  Attach the roof structures  RS4XB  to   RS5B    RS6B  assembly and  RS5B    RS7B   assembly with  S7  screws  see fig  3  amp  4     25  Attach the roof structures  RS4B  one  end to roof structure  RS3SB with  S1   screws  see fig  1 amp  2  Fix the other end to roof  structure  RS6B   amp   RS7B  with  S1  screws  see fig  3  Fix the middle portion to  RS6B   amp    RS7B  roof structure with  51  screws see  fig  4    For each extension add two  RS4B  roof  structure                                                                                                     a                                                                                                                                                                                                                                                               26  Attach roof structure support  RS10B  A    and  RS11B  to roof structures  RS5B   RS10B   RS6B   amp   RS7B  using  S1  screws  See SERE   
16.  up to 115 mph in a controlled  laboratory environment  Natural high wind areas create wind at unpredictable speeds that are    very difficult to capture accurately by location  As such we cannot guarantee the performance  of the shed in these extreme situations           Adding Extension      to Existing Shed                1  Remove one ridge cover  RRS  from the back side    See the figure     TI P Use a drilling machine to remove the pins and plugs   from the ridge cover  roof panel and facia panel           gt A Care should be taken not to damage the panels   76      Extra pins  plugs and washers are available in the    accessory box                 2  Remove from back side left and right roof panels   See the figure                                                                                         ugs  PPG  and pins  PIN   el and detach it from the           5         o S        o    co  5     mom   gt      oo        oo       co  T  MET                    Q                   NS   SS  N    N             in     Ug      eo   g  2 5  og      I2  o           gag              v On         oO           255  oo     SOE                                 sae  pean                                               2                                9   gt   5                  43          N                     ge                e         u                 gt       E            LO                                                                                                           
17. 1 2   12 5mm  drill bit    Optional ventilation kits can be installed on any of the wall  panels  However  we recomend mounting them on the top  ofthe shed s back wall     1  Place the ventilation cover  VC  as shown in fig 1   Using a pencil  mark the two side hole locations     2  On the marked hole locations  drill out two holes using  dia  5 32   4 2mm  drill bit as shown in fig 2  These holes  will be used to attach the ventilaion cover with the ventilation  cover pins  VCP                  3  Use a dia  1 2   12 5mm  drill bit to drill out as many       holes as desired behind the ventilation cover mounting Side View  area as in fig 3                                      4  Attach the ventillation cover  VC  with the ventilation  cover pin  VCP  as in fig 4  Outside    5  Repeatthe same to fix the second ventilation cover                                                              High wind area installation instructions    Note  To ensure that your shed withstands high winds   you will need the following reinforcement        Parts needed  Parts needed for each extension   CODE DESCRIPTION QTY CODE DESCRIPTION QTY  54 DIA  4 2 x 16mm   5 32  x 5 8     54 DIA  4 2 x 16mm   5 32  x 5 8    SHEET METAL SCREW 36  notincluded with shed  SHEET METAL SCREW 8   notincluded with shed   55 M6 x 40mm   1 4  x 1 1 2   55 M6 x 40mm   1 4  x 1 1 2    Anchor bolt with nut 22  notincluded with shed  Anchor bolt with nut 6  notincluded with shed        1  Shed or shed foundation should 
18. Fitting  FCC    N  4  Middle Column Fitting  FMC    4  90 Degree J oint  RJ        1  Insert the middle column fitting  FMC  into  top of the middle columns  CMB   Fix the  column to fittings with  S1  screws from inside  the shed                                                                                                                                                                   2  Insert the corner column fittings  FCC  into  the corner columns  CCB   Fix with  51  screws  from out side of the shed                                                                                                                                          Insert the door column fittings  FDCL  and  FDCR   left and right into the door columns  CDLB  and   CDRB   Fix with  S1  screws from inside the shed                                                                                                              Front roof structure assembly    4  Assemble front roof structures  RS1XB  2nos  and middle joining  support  MJ   together with 4  S1  screws as shown in fig          5  Assemble roof support  RS8B  and  RS9B   to  RS1XB  assembly with only 4  S1  screws        6  Assemble roof structure  RS2B  to  RS8B   and  RS9B  with 8  S1  screws     Back roof structure assembly    7  Assemble back roof structures  RS1XB  2 nos  and middle joining  support  MJ   together with 4  S1  screws          8  Assemble roof support  RS8B  and  RS9B   to  RS1XB  assembly with 8  S1  screws  iv       O 
19. NSION  U  CHANNEL LEFT 1  EXTR EXTENSION  U  CHANNEL RIGHT 1  W  CMB MIDDLE COLUMN 2  CB3LB BACK CENTER BAND LONG 2        COLUMN FITTING MIDDLE COLUMNS  CMB   RS3SB   53 ROOF STRUCTURE SHORT 2  RS4B  RS4 ROOF STRUCTURE 2    568 RS6ROOF STRUCTURE 2 Ul  RS7B   7 ROOF STRUCTURE 2      RS11B   11 ROOF STRUCTURE SUPPORT SHORT 1  RS12B   512 ROOF STRUCTURE SUPPORTLONG 1  R536   CB3LB   gt  A  RS13B   513 ROOF STRUCTURE 8  RS14B SAGGING SUPPORT 4  SPA SIDE PANEL 2  RPA ROOF PANEL 2  RRS RIDGE COVER 1 an       RS6B   RS7B   RS13B   RS11B   RS12B   LJ  SAGGING SUPPORT  RS14B   ACCESSORIES  CODE DESCRIPTION QTY        2 L 7  FMC MIDDLE COLUMN FITTING 2  PPG ROOF PLUG w WASHER 16       PIN ROOF PIN 16              51       4 2 x 16mm   5 32  x 5 8    SHEET METAL SCREW 40  53 M4 x 10mm   M5 32     3 8    MACHINE SCREW WITH NUT 62                                       S      SS          2          N X    2 SA es  S      2     gt  e     lt              lt   lt  NX        SSK         1   KS SAS                                         Exploded View with One Extension                 A  Foundation  amp  Base Frame     PART 1  Assembling Shed With Extension Kit    Note  It is important that these instructions  are followed step by step   DuraMax must be installed on a level wooden platform    ora level concrete foundation          Wooden platform is extra and is not included   Don t install under windy conditions         Parts needed      U channel Front left  B1LB      U channel Front right 
20. be placed on  concrete footing by use of anchor bolt and nut   Using a carpenters square  line up corners  Align  U Channel base  mark the concrete through the     holes in the base and drill concrete with 1 2   dia   12 5mm  concrete bit to accept anchor bolts to a             1 3 4   44mm  depth  Replace base and secure             with 1 4  x 1 1 2   M6 x 40mm  anchor bolts    See fig                       Base U channel                                     Concrete          Anchor bolt  amp  nut    2  Attach each side panel  SP4  on the bottom to  the U channel base  Using a dia  3mm  1 8   drill  with a power drill  make two equal distance holes  on the U channel base through the side panel    Drive a self tapping screw  S4  through the base  U channel to the side panel  Repeat this for every  side panel  See blowup                                                                                         bh  Base U channel             3  Attach each side panel  SP4  on top to the roof  structure  RS1  and  RS3   Using a dia  3mm  1 8    drill with a power drill  make two equal distance  holes on the side panel through the roof structure   Drive a self tapping screw  S4  through the side  panel to the roof structure  Repeat this for every side  panel  See blowup               RS1   amp   RS3   roof structure                                                       Base U channel    Important Warranty    Information       The Duramax shed has been tested and passed wind loads of
21. channel up position                                                                                                                                                       on roof structures  RS1XB   j     f          Vy          2                     Z  Y A    4             B         4A                                Secure         90 degree joint to  RS 1XB  Fix  RS2B  to 90 degree  with  51  screws on top ofthe four joint  RJ   through  RS3B   corner columns  CCB   with  S 1  screw     Secure  RJ   with  FCC  using  S2   screw on all the four corner columns                    19  Fix the  RS3B  6   5358  to middle column  fitting  FMC  with  S1  screws                                            D    fig 1 to 4                                                                                                                      20  Place the assembled roof structure  RS5B   amp  RS6B   into position on roof structure supports  RS8B  atthe  left side of the shed  Use  S1  screws to fix   See Fig 1  amp  Fig 2                21  Place the assembled roof structure  RS5B    amp   RS7B  into position on roof structure supports   RS8B  at the right side of the shed    Use  S1  screws to fix                    See Fig 1  amp  Fig 2                                                                                                                               Back Inside                                       22  Place the assembled roof structure   RS5B   amp   RS6B  into position on roof 
22. cture  right side                                            2  Line up the holes with roof structure and fix the roof  plugs w washers  Use a hammer  rubber mallet  to drive  in roof pin  See figures 1  2and 3 for details  Place facia  panel left  FPLB  to the front roof structure left side   Make sure  FPLB  overlaps on  FPRB   Repeat action to  fix facia panels on backside  See Fig  4  5  amp  6                                                                                                                 3  Start attaching the roof panels from  FPLB   corner side by sliding the roof panel          to  roof structure  Locate the hole positions of the    roof panel and roof structure  Fix roof plugs with Note Do not insert Plugs  washers  Use a hammer to drive in roof pins  See eq at this point   figures 1 thru 6    gt   Add two roof panels for each extension                          4  Attaching the          cover  RRS  on top ofthe   roof panels          start from the front side of the   shed  See Fig 7 Fig 8 Fig 9 KEY  Add one ridge cover for each extension  Roof Plugs       Use a screw driver to align the  holes     Z Insert roof plugs into roof panels  only as indicated                          Y      y           A                          i 4               y                Li                                       y      M    E W                                    5  Insertthe sagging support   5148  from inside the  shed by sliding in between roof structure  RS5  and
23. er Inc  will send a replacement part free of charge  in the event of material defects and or  workmanship for a period of fifteen years from the date of purchase     This warranty is extended only to the original purchaser  A purchase receipt or other proof of date of original  purchase will be required before warranty service is rendered  In no event shall we pay the cost of flooring   labor  installation or any other costs related thereto     This warranty only covers failures due to defects in material or workmanship which occurs during normal  use and does not extend to color change arising due to normal weathering or to damage resulting from  misuse or neglect  commercial use  failure to follow assembly instructions and the owner s manual  including  proper anchoring of the shed   painting  forces of nature and other causes which is beyond our control     Claims under this warranty must be made within the warranty period by calling 1 800 483 4674 or mail in  a dated sales slip and clear photograph of the part to     U S  Polymers  Inc   6915 Slauson Avenue  Commerce  CA 90040    We reserve the rightto discontinue or change components  If a component has been discontinued or is  not available  U S  Polymers  Inc  reserves the rightto substitute a component of equal quality as may be  compatible     Limits and Exclusions    There are no express warranties except as listed above  The warrantor shall not be liable for incidental or  consequential damages resulting from the u
24. o  CDLB  and base  B1LB    See Fig  1  2 and 3                          Fig 2  Use    Fig 1  Use                                                     S1  screw   S1  screw  Fig 3  Fix the  EPS   Fix            to Fix  CB4B  to atthe end of   CDLB  base  B1LB       1    6                   25  Make sure the door opening between the door  columns  CDLB  and  CDRB  is 61 1 4   1556mm    This will ensure a perfect fit for the doors                                                                                                                                                                                   C  Roof Frame pad       Parts Needed  Parts Needed For Each Extension     4  R51 Roof Structure  RS1XB   2  RS3 Roof Structure Short  RS3SB    4  R2 Roof Structure  8528   2    54 Roof Structure  RS4B    2  R53 Roof Structure  RS3B   2  RS6 Roof Structure  RS6B    2  RS4 Roof Structure  RS4XB   2  RS7 Roof Structure  RS7B    4  R55 Roof Structure  RS5B   1  RS11 Roof Structure Support Short  RS11B    4  R58 Roof Structure Support  RS8B   1  RS12 Roof Structure Support Long  RS12B    4  RS9 Roof Structure Support Short  RS9B   8  RS13 Roof Structure  85138    2  Middle Joining Support  MJ   2  Middle Column Fitting  FMC    2  RS10 Roof Structure Support  RS10B    1  RS11 Roof Structure Support Short  RS11B    1  RS12 Roof Structure Support Long  RS12B    1  Door Stopper Horizontal  DSH    1  Door Column Fitting Left  FDCL    1  Door Column Fitting Right  FDCR    4  Corner Column 
25. se  mark the concrete through the  holes in the base and drill concrete with 1 2   dia   12 5mm  concrete bit to accept anchor bolts to a  1 3 4   44mm  depth  Replace base and secure  with 1 4  x 1 1 2   M6 x 40mm  anchor bolts     not provided     B  Walls  amp  Columns             Note All panels are clearly marked and care should be        taken to use the correct one     Parts Needed   4  Corner Column  CCB          1  Left Door Column  CDLB    1  Right Door Column  CDRB    4  Middle Column  CMB    7  Side Panels  SP 1    2  Front Side Panels  FSP    2  Front Center Band  CB1B    2  Side Center Band  CB2B    1  Back Center Band short      CB3B    1  Back Center Band long  CB3XB    2  Frontcross center band _  CBA4B    1  Middle J oining Support  MJ    4  Center Band Fitting  FCB      1  Center Band Cover  CBC     l iide right door column  CDRB  into the U Channel  Base  B1RB  on the right side of the door  Line up  the pre drilled holes on  CDRB  Column with pre   drilled holes on U Channel Base  Secure with two   S1  screws from inside     See blowup detail fig 1                                             2  Middle Column   2  Side Panels     2  Back Center Band long          Parts Needed For Each Extension      CMB    SP 1    CB3LB                                                                       Inside       fig 1          2  Insertthe front side panel  FSP 4  into the groove  of column  CDRB   Start at the bottom ofthe panel at  an angle then push into place    
26. se of this product  or arising out of any breach of this warranty   All express warranties are limited to the warranty period set forth above  Some states do not allow the  exclusion or limitation on how long an implied warranty lasts  so the above limitations may not apply to  you     This warranty gives you specific legal rights and you may also have other rights which vary from state to  state and country to country           8    x 6    Parts List                                                                                                                                                                       gt   Note  Check all parts prior to installation  ACCESSORIES       CODE DESCRIPTION QTY CODE DESCRIPTION QTY LEFTDOOR COLUMN RIGHT DOOR COLUMN  B1LB FRONT  U  CHANNEL LEFT 1 FDCL DOOR COLUMN FITTING LEFT 1    1     FRONT  U  CHANNEL RIGHT 1 FDCR DOOR COLUMN FITTING RIGHT 1  B2B SIDE  U  CHANNEL 2 FCC CORNER COLUMN FITTING 4  B21 BACK  U  CHANNEL LEFT 1 FMC MIDDLE COLUMN FITTING 4  B22 BACK  U  CHANNEL RIGHT 1 FCB CENTER BAND FITTING 4 CORNER COLUMNS  CCB  MIDDLE COLUMNS  CMB   CMB MIDDLE COLUMN 4 RJ 90 DEGREE J OINT 4  CCB CORNER COLUMN 4 PPG ROOF PLUG w WASHER 64  CDLB LEFT DOOR COLUMN 1 PIN ROOF PIN 64 LJ  CDRB RIGHT DOOR COLUMN 1 EPS END PLUG SQUARE 4  CB1B FRONT CENTER BAND 2 CBC CENTER BAND COVER 1  CB2B SIDE CENTER BAND 2 51 DIA  4 2 x 16mm   5 32  x 5 8   LEX CMT LM  CB3B BACK CENTER BAND SHORT 1 SHEET METAL SCREW 168  CB3XB BACK CENTER BAND LONG 1 52 DIA  4
27. tform  Not Included     The following are a list of lumber and sizes you will need   Pressure Treated   Wood Studs  Exterior Grade  CDX    4ea 2  x 4  x 89   50 x 88 9 x 2260 6mm  3 4  19mm plywood  2ea 2 x 4     65   50    88 9    1651      lea 3 4 x 48     96    19 x 1219 2 x 2438           lea 3 4  x 17  x 96    19 x 431 8 x 2438 4mm   L Brackets  4ea    Wooden Platform for Each Extension  Not Included   The following are a listof lumber and sizes you will need     Pressure Treated   Wood Studs  Exterior Grade  CDX    2ea 2 x4 x89   50 x 88 9 x 2260 6mm  3 4   19mm  plywood  2ea 2 x4 x32   50 x 88 9 x 812 8mm  lea 3 4  x 32  x 96    19x812 8x2260 6mm   L Brackets  4ea                  32   812 8mm      lt           11 1 2     292 1mm              20    508mm     L  BRACKET  19 1 2   495 3mm   M    96   2438 4mm                65     1651mm                                Foundation Structure             48     1219 2mmM   17  4318mm  32   812 8mm                96   2438 4               Plywood Floor                    92 1 4     2343mm                 92 1 4     2343mm             61 1 4     1556mm   Door Opening                   Right Side    Left Side Fig 1          U Channel Layout    4  Using    carpenters square  line up all corners   Secure base to wood foundation using  S1  screws    Concrete foundation    Ab  Shed or shed foundation should be placed  on concrete footing by use of anchor bolt and nut   Using a carpenters square  line up corners  Align  U Channel ba
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Manuel d`utilisation Nokia Drive 2.0  Dominator 2  BY50FW 取扱説明書  Magazine N°52 Mai 2010 Dossier : Centre  20D-UM003 - Rockwell Automation    電動車いすのご利用にあたって (PDFファイル 668KB)    Copyright © All rights reserved. 
   Failed to retrieve file