Home
Best Barns brandon_1220df Instructions / Assembly
Contents
1. NOT behind the trim Secure gable to wall by nailing through the i 3 gable plate with 10d sinkers Nail siding along the 1x4 trim board with 8d galv nails N pe 2 Install gable on the front wall Important Bottom edge of siding extends over 1x4 trim Paint this edge Step 12 Install 2x4 Tie Plates 1 Install a 2x4 6 board over the sidewall against the rear gable plate Use 10d sinkers 2x4 6 Tie Plates LA Sidewall 2 Install another 2x4 6 board next to the first one 3 Install 2 two 48 long 2x4 at the front of the building 4 Install 2x4 tie plates on the opposite sidewall La 2x4 4 Tie Plates Cut to Fit Step 13 Layout Roof Trusses 1 Layout the truss spacing from the rear of the building Measure from the inside of the 2x4 gable frame when marking the location of the first truss Important When marking the opposite wall place the X mark on the same side of the line so your trusses are parallel when they are installed 2 Install metal hangers to the tie plate with 1 1 2 hanger nails The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate Detail D 2x4 Tie Plate Detail D iy ce Measure From Backside of 2x4 Step 14 Set Roof Trusses Set roof trusses Secure trusses to metal hangers with 1 1 2 hanger nails Rear Gable Step
2. Sinkers Galv Common box box 8d box 7d box 6d box 6d 1 1 2 Hanger Nails Door Hinges Door Latch Barrel Bolts Collar Ties Truss Rafters Wall Studs Door Jacks Wall Plates Wall Plates Wall Plates Wall Plates Gable Studs Fascia Blocks 90 86 1 4 72 71 1 2 68 1 2 1 lb 58 1 2 1 Ib 48 ea 3 34 3 4 ea 4 5 23 1 2 ea 0 22 1 2 2 8 x 20 1x4 Metal Plates 12 x 24 2x4 Metal Truss Hangers 3 8 5 x 48 Bottle Glue 3 8 5 x 24 Plywood Gussets 3 1 2 x 32 1 Ib 1 Ib 1 Ib 1 Ib box Hinge Screws Truss Gussets Truss Gussets Soffit Boards Soffit Boards Front Gable Soffit 8 1 2 x 48 2x4 Truss Jig Blocks 10 Siding Panels 48 x 75 1 4 1x6 Gable Trim 87 Siding Panels 16 x 75 1 4 1x6 Fascia Trim 84 Siding Panels Gables 48 x 40 1x4 Corner Trim 75 3 4 Siding Panels Gables 48 x 28 1x4 Wall Trim px Roof Sheathing Roof Sheathing 83 1 2 Lng 59 1 2 Long 1x3 Door Trim sides 1x3 Door Trim top Ta 71 3 4 Roof Sheathing Roof Sheathing 72 Long 48 Long Install Optional Shingles Install metal roof edge the perimeter of the building Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands NIe INIA o TDN A o N IN Pre built Do
3. Support If installing the optional window you can cut the opening in the siding 5 Install a 16 siding panel with the cut edge flush with the side of the door opening 71 1 2 Header Support 6 Install the last siding panel The siding will extend 3 1 2 past the wall frame Siding Extends 3 4 Below Plate Step 8 Assemble Door Wall Doors Centered 1 Assemble a wall frame using 3 three 72 wall studs and 2 two 34 3 4 long 2x4 wall plates Use 10d sinkers 2 Install a 71 1 2 long 2x4 red end as a header support on each wall frame lt lt 71 1 2 Header Support Red Ends 3 Cut 2 two more 34 3 4 plates from 58 1 2 long 2x4s and assemble another wall frame _ 19 374 4 Locate a 16 wide siding panel that has a LAP edge Position this panel with the cut edge flush with the 2x4 header support and extending 3 4 below the bottom plate Do not nail along the LAP edge until the other siding panel is installed 5 Cut a siding panel in half lengthways Select the panel with the tongue edge Install this panel with the cut edge extending 3 1 2 beyond the end of the frame The siding should extend 3 4 below the bottom plate Tongue Edge gt i Lg o 71 1 2 Header l Support Cut Edge Extends3 1 2 Beyond Frame LAP Edge Install the remaining siding on the other front wall frame Cut the 24 wide siding panel i to extend 3 1 2 past the end of the w
4. you install the doors Step 18 Install Doors amp Hardware 4 5 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail below 2 Install 5 hinges to the left side of the door frame To position the hinge properly hold the rectangular plate against the frame Use 1 3 4 black screws 3 Install hinges to the right side of the other door Before you fasten the hinges to the door trim temporarily prop the doors in the opening Leave a space at the top of the doors and between the doors and the side trim to allow room for the doors to expand when they absorb moisture If your door opening is out of square the space around the doors will not be even You can remove and reposition the side trim to make allowances for this The side trim does not have to be flush with the frame of the door opening You can move the trim in or out to make the door spacing equal Install hinges to trim with 2 screws Install Door Latch lt Siding Extends Past Trim Barrel Bolt on the back of left door 6 Install a barrel bolt on the lower back of the door to secure this door in place when closed You will need to drill a hole for the round shaft to drop into 7 Install another barrel bolt at the top of the door Wo OSB Shim Material Packaged In Component Kit 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 7 16 7 16 Sinkers Galv
5. 15 Install Eave Soffit amp Corner Trim 1 Locate a 5 wide x 24 siding panel that has a tongue edge Install this panel under the truss overhang at the rear of the building Install the siding soffit panel with the beveled edge flush with the end of the trusses and the cut edge against the gable siding Use 6d galv nails 2 Install 4 four more full length siding panel under the trusses Cut the last panel to fit 3 Install soffit panels on the ee Bee Hee opposite side Start with a 24 long panel that has a LAP edge Soffit 4 Cut 87 3 4 long 1x4 trim boards Beveled Edge to length and install at the corners Step 16 Install 1x6 Fascia amp Roof Sheathing 1 Starting at the rear of the building install 4 x6 OSB roof panels and 1x6 7 white pine fascia boards on each side flush with the face of the siding on the back gable Install the fascia so the bottom edge of the roof sheathing will rest on the 1x6 Install a 22 1 2 long 2x4 block between the trusses to receive the fascia where they join together The 2x4 block has a bevel cut on the top edge Use 8d galv nails to install fascia All 1x6 7 Fascia Board i SZ xo Fase 22 1 2 Long 2x4 w Beveled Edge 2 Install roof sheathing per layout below Make sure the trusses are plumb and the roof sheathing meets the center of the truss Use 7d sinkers spaced 12 apart The top row of r
6. 5 Install the other siding panels Cut the last panel to extend 3 1 2 beyond the wall frame IS The siding will be 1 2 below the top of the wall frame on all walls __ Siding Extends 3 1 2 Past 2x4 Stud Step 5 Assemble 10 Long Sidewalls 1 Position 2 two 2x4 48 boards and 2 two 2x4 72 boards together and indicate with X marks where the wall studs will be located 48 Wall Plate 72 Wall Plate X X X X X X he Lae a 2321 4 le 2E 48 Wall Plate 72 Wall Plate 2 Install 72 wall studs between the top and bottom plates Nail both wall frames together 3 Repeat to assemble 3 three more 10 long sidewall frames 4 Cut one of the 48 wide siding panels in half lengthways 5 Square wall frame Select one of the 2 wide panels with the tongue edge and install this panel with the cut edge flush with the end of the wall and extending 3 4 below the bottom plate 6 Install 2 two more siding panels The siding will be 1 2 below the top of the wall frame on all walls Siding 1 2 Below Top Plate Ss Tongue Edge Cut Edge Siding Extends 3 4 Below Plate 7 Select 1 one of the 10 wall frames and repeat to apply siding to another sidewall frame Step 6 Assemble Sidewalls for 20 Building Length 1 Select one of the 10 sidewalls assembled in Step 5 Butt a 10 wall frame against the wall with siding DO NOT nail these frames together so they can be separated later 2 Square the w
7. NANA AAA AAA AMAIA AMAA EER EEE ER EEE EEE EE EEE EEE EREE EEE EEE ER EEE EERE EREE EEEE EE EEEE EEEE EEE EEEE EER EEEE E Assembly Book l Revised April 26 2012 G J ADD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DON the Brandon _ Building Size 12 x 20 Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2011 SAPDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDN WANG ddd ddd qd dada dqddd da dqdqqda EEEE EE EEEE EE EEE EOE EEE EE EEEE EE EEE EE EEE EE EEEE EE EEE EOE EEE EOE EEEE EE EEE EE EEE EER EE EEE EE EEE ER EE EERE E IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our Brandon kit These instructions will construct a 12 x20 building If you received two books use the one with the latest revision date The material that is included in our kit is listed on the back page The optional floor package if ordered will be supplied by a local lumber supplier Our kit does not include the shingles the quantity needed is listed on the back page The siding is primed You will need to apply a finish coat using latex acrylic paint Our framing lumber
8. a length of 12 0 Layout 2X4 Joist Headers 2 pes for 16 joist spacing see above 2x4 Floor Joist 17 pcs 7 Install floor joists between the joist headers Square 4 4 Treated Runners _4 pes floor section Measurement will be 203 5 8 Install 4x4 Treated Runners 4 pcs this section against the section assembled above Flooring 5 8 or 3 4 8 pcs 8 Install 4x8 flooring over the 2x4s Use 8d galv Screw Floor Nails 4 lb spiral nails Galv Box Nails 5S lb 16d Step 1 Assemble Trusses Building Tip To aid in the assembly of the trusses temporarily screw 2x4 blocks to Ey the floor There are short 2x4s that may have an angle on one end supplied in kit This will insure that all the trusses are assembled the same 1 Screw 2 two 2x4 blocks to the 12 wide end of the floor at the corner see below 2 Place two truss legs together Position the notch in the 2x4s called a bird s mouth into the 2x4 blocks Important You must have 12 0 between the bird s mouth Affix more 2x4 blocks above the truss legs to hold the truss members in place 3 Secure the tops together with a wood gusset Apply wood glue between the 2x4 boards and the gusset Nail the gusset to the 2x4s with 6d common nails Use 14 nails per gusset 4 Install a 2x4 90 collar tie between the 2x4 boards Hold in place with 2x4 blocks Install 12 x24 gussets to the ends of the collar tie Glue and nail using 14 nails per gusset 5 T
9. all fame Step9 Set Walls 1 Secure wall panels together at the corners Use 4 four 10d coated nails per corner Nail wall panels to the floor Nail through the bottom plate Space 10d sinkers 24 apart 2 Install the 2x4 door header between the front wall panels Nail through the wall stud into the ends of the header Toenail into the top wall plates Wall trim installed later will hide where the siding butts the front wall panels 3 Install a 2x4 6 boards at both sides of the door opening to hold the wall straight Nail along the siding edge where it overlaps the 10 long panel 10 Long Rear Wall Panel Nail Along Siding Edge 2x4 Door Header Drawing shows a building JEA m with the doors centered pi anit dh Step 10 Install Rear Trim 1 Install 1x4 75 3 4 corner trim boards to the rear wall Install trim flush with the 2x4 top plate and flush with the siding on the sidewalls Use 8d galv nails spaced 12 apart 2 Cut 1x4 6 trim boards to fit between the corner trim boards Flush Across Top Top Plate l xq Thim s Side Wall Rear Wall s five 1x4 75 3 4 Corner Trim ery 3 Install trim on the front wall of the building Step 11 Install Rear Gable 1 Install a gable on the rear wall The gable siding will extend over the 1x4 trim on the lower wall
10. all frame Install a full width siding panel but do not nail along the long edge that overlaps the 10 wall frame You can nail this edge after the wall panels are installed This will enable you to separate the wall panels making them easier to handle Bo Not Nail Along This Edge 6 Wall Plate 10 Wall Panel from Step 5 Sap 3 Install another full width siding panel and the 2 wide siding panel 4 Wall Plate 4 Repeat to apply siding to the other 10 wall frame Step 7 Assemble Door Wall Offset Doors IL To position the door opening in the center of the wall go to Step 8 To position the door opening on the right side of the front wall flip the walls and apply siding to the opposite side of the wall frames 1 Cut 2 two 11 plates from a 34 3 4 long 2x4 Assemble wall frame using 2 two 72 wall studs and 2 two 11 long 2x4 wall plates 2 Assemble the larger wall frame using 4 four 72 wall studs and 2 two 58 1 2 long 2x4 wall plates 3 Install a 71 1 2 long 2x4 red ends as a header support on each wall frame 71 1 2 Header 71 1 2 Header lt __ Support Support gt Red Ends Red Ends lt lt T 24 19 3 4 Siding 1 2 Below Top Plate LAP Edge Install a 16 wide siding panel with the cut edge flush with the door opening The LAP edge will extend 3 1 2 beyond the wall frame and extending 3 4 below the bottom plate 71 1 2 Header
11. e overhang the floor so the gable lays flat 2 Install gable siding using 6d galv nails across the top of the gable frame Use 8d galv nails LAP along the bottom edge See Note Below Edge N Siding Extends 3 4 Below Bottom Plate Install Siding on Ends 3 Install siding on the other gable frame Exterior Siding LAP Edge The siding is made in 4x8 sheets with grooves cut into the face the long edge is beveled so that the siding overlays where they butt To identify which edge we want you to use we will refer to the edge as either the LAP Edge or the Tongue Edge Nail siding with 8d galv nails spaced 12 apart Tongue Edge Step 4 Assemble 12 Back Wall 1 Position 2x4 68 1 2 boards together and indicate with X marks where the wall studs will be located Mark the ends that will butt together with the letters A and B 68 1 2 Wall Plate 68 1 2 Wall Plate 3NA lg 24 gt __19 3 4 24 68 1 2 Wall Plate 2x4 6 Wall Studs SQ 2 Install 72 wall studs between the top and bottom plates Assemble wall frames with 10d sinkers two 2 nails at each stud end Nail both wall frames together Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is square 4 Install the 1st siding panel with the LAP edge extending 3 1 2 past the wall frame The bottom will extend 3 4 below the bottom plate Tip Use 3 4 trim board as a gauge
12. is imported to provide you the highest quality available However if you need to replace any lumber for any reason please do so and we will reimburse you Our Deluxe Brandon includes pre built barn doors pre cut siding and roof sheathing for EZ assembly IMPORTANT Unpack the material from the pallet then unscrew the bottom 2x4s from the pallet runners The bit for the screws is packed in the hardware bag Remove the OSB panel from the sheet goods pallet it will be used for roof sheathing Stacking the boards according to size will make them easier to find when needed Some boards have colored ends All the wall studs have black ends stack these boards together Do Not discard any material until your building is complete If you have any questions about assembling the kit call 800 245 1577 If you are calling after normal business hours call 724 866 HELP 4357 or email to help barnkits com Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners lt measure from here a When measurements are given for a board woOoO y y y length or width it is from the longest side Tool List __ Hammer amp Hand Saw Power Drill screwdriver _ Framing Square amp Level _ Measuring Tape _ Power Circular Saw 2 8 Step Ladders Always wear safety glasses when cutti
13. ng or nailing Constructing Details for Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not Foundation size is 12 0 x 20 0 Check local building codes in your area the construction may have to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider Cut 17 seventeen 2x4 12 treated boards to 11 8 7 8 These will be the floor joists 2 Stagger the 4x4 timbers as shown below Cut 2 two 2x4 8 boards into 2 long blocks to secure the 4x4s where they butt together 3 Cut 2 two 2x4 8 to a length of 8 0 They 15 1 4 16 _ lt 16 _ will be used for the joist headers Layout from Ix Ix Ix X left for 16 on center joist spacing X marks where floor joist will be placed X X X X 4 Install the floor joists cut above between the 8 joist headers Secure with 16d galv deck nails Place floor assembly over the 4x4s Square floor assembly Measure the floor diagonally corner to corner These measurements will be the same if the floor is square It should measure 173 Tenail frame to the 4x4 runners axa12 Ruane ax4 8 Runner 4x8 Flooring l ax4 12 Runner BQ WN 4x4 8 Treated Runner 4x4 12 Treated Runner 2x4 8 Joist Header Material Description 2x4 Joist Headers 2 pcs 2x4 Blocking 2 pes 6 Cut 2 two 2x4 12 to
14. oof sheathing will be about 1 below the ridge to allow for ventilation Important Make sure the front gable is plumb and the roof sheathing extends 8 1 2 past the siding along the face of the gable 3 Install a 1x6 7 fascia board Install a 22 1 2 long 2x4 soffit block with beveled edge between the truss 4 Cuta 1x6 7 fascia board flush with the end of the roof sheathing 72 Long Panel 48 Long Panel 83 1 2 Long Panel Remove From Pallet 48 x 48 48 x 59 1 2 1x6 7 Fascia Boards 2x4 Block 3 Beyond ee Step 17 Install Front Gable Soffit and Door Trim 1 Install 86 1 4 long 2x4s under the roof sheathing against the front gable 2 Install 86 long 2x4s under the front edge of the roof sheathing Hold the 2x4s against the roof sheathing and screw through the sheathing into the 2x4 boards Use 1 5 8 long screws 3 Install 8 1 2 wide siding under the gable overhang as the soffit Use 6d galv nails 4 Install 2 two 87 long 1x6 trim boards over the 2x4 boards flush with the top of the roof sheathing Use 8d galv nails 5 Install 1x6 trim on the back gable 2x4 86 1 4 Long 2x4s 1x6 Gable Trim Soffit Siding Extends Below Trim No 1x3 Door Trim 5 Locate 2 two 1x3 72 long trim boards Tack these boards with a couple nails to each side of the door opening You may want to move the trim later when
15. ors 32 x 71 3 4 ea Pre built Door Header 67 1 2 Purchase Optional Shingles Roof Covering not supplied in kit 12 bdl 9 poes Roof Shingles Roof drip Edge 10
16. urn this truss over and apply wood gussets to the opposite side 6 Repeat 2 through 5 to assemble 8 eight more trusses Do Not remove blocks from floor until completing Step 2 Top Gusset gt Top Truss Member 12 x24 Gusset 2x4 Block 2x4 90 Collar Tie 2x4 Block Install collar tie the same distance from edge of floor _ 2 Nee eee ie 2x4 Block Step 2 Assemble Roof Gables 1 Butt 2 two 72 long 2x4s together and secure by nailing a 3 1 2 x 31 3 4 long ply wood gusset across the top where they butt together Use glue and 6d common nails Co 3 4 Plywood Gusset 72 long 2x4 Place 2 two truss members in the jig Secure the top together with a barbed metal plate 3 Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled above into the bird s month Make sure the 2x4 gable plate is straight If necessary tack 2x4 blocks to hold plate straight Barbed Metal Plate 2 gt 2x4 Gable Plate 23 1 2 Gable Stud Screw oo plate to truss leg with 2 1 2 screw Remove the two 2x4 blocks that held the collar tie in position 5 Install 2x4x23 1 2 gable studs Nail through the bottom plate with 10d sinkers and secure the top with barbed metal drive on plates 7 Repeat to assemble another gable Remove 2x4 blocks Step 3 Install Siding on Gables 1 Select one of the gable frames Turn the gable over letting the bottom plat
Download Pdf Manuals
Related Search
Related Contents
INAP378T APIX2 Transmitter pdf, 384.5 kB Philips DCM2020 User Guide Samsung SMX-F50SP دليل المستخدم Copyright © All rights reserved.
Failed to retrieve file