Home

Best Barns woodville_1012 Instructions / Assembly

image

Contents

1. Step 14 Install Roof Sheathing Install roof sheathing on the steep side of the roof Use a straight edge to align the top of the sheathing with the top of the truss See Detail B Make sure the trusses are plumb and the roof sheathing meets the center of the truss Use 7d sinkers spaced 12 apart The top roof sheathing will not extend to the ridge This will allow an opening for air ventilation when you install a ridge vent Detail G 2x3 Board S Roof Taine i TANSY Sheathing 42 x 72 42 x 80 Remove From Shipping Pallet I Important Make sure the gable is plumb and the roof sheathing extends 6 1 2 past the 2x3s along the face of the gable gsus See Detail G i i in ki Detail B Install Shingles not included in kit 1 Install felt paper and metal roof edge the permitter of the building 2 Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Building Tip Install ridge vent in lieu of shingles caps Ridge vent provides ideal ventilation preventing heat or moisture from damaging your building or its contents g y Air Space Building Length Shingles 10 x12 10 x16 Material Description Roof Shingles tata Ridge vent provides pooh eae Tee ideal ventilation Step 15 Install Gable Overhang 1 While a helper holds the 47 long 2x3
2. door opening Install a 43 long trim board across the top 4 Assemble the loft doors The loft door frames are temporarily held together with corrugated fasteners this is the back side of the door frame Place the doors on level surface face side down Cut the siding from above step to the size of the door frame Secure the siding panel to the frame with 1 screws provided 5 Install loft doors using the smaller 4 hinges Use the shorter 1 1 4 screws The screws have a square head The bit is packed with the screws Install barrel bolts on the inside Step 5 Layout Plates for Back Wall 10 O Wall Plate Position 2 two 2x4 10 boards Z X IX X together and indicate with X marks Sere thie wal etadewill be located 41 1 4 24 24 Step6 Assemble Back Wall 1 Install 72 wall studs between the top and bottom plates Nail studs to plate using 2 two 10d sinkers on each end of the stud 2 Install 2 two 56 1 2 long 2x4 as tie plates over the top plate The 2x4s will be 3 1 2 56 1 2 Tie Plate y short of the end of the wall frame s ere ee ee ee 56 1 2 Tie Plate 3 1 2 i Top Plate Wall Stud 3 Square wall frame Measure diagonally corner to corner Locate a 36 3 4 x 77 1 4 siding panel with the Tongue edge Install the siding panel on the left corner with the cut edge flush with the end of the wall and flush with the top of the 2x4 tie plate The s
3. truss an 34 1 4 Long Gable Stud 4 Screw 3 three 16 long 2x4 blocks across the bottom of the 2x4 bottom cord Use 2 1 2 screws 5 Turn the gable over Install the siding extending 3 4 below the bottom 2x4 Use 6d galv nails Space 12 apart Tip Lay 2 x4 OSB sheathing under the studs to prevent gable studs from being knocked loose when nailing the siding _ Siding Extends 3 4 Below Plate Step 3 Assemble Front Gable IS If you don t need loft access from the outside attach loft door frames to the gable to create a decorative look and weather tight storage area 1 Assemble another gable frame Install a 36 long 2x4 between the wall studs If installing operating loft doors install the 36 long 2x4 between the gable studs where shown below LZ os LEG CS aes 34 1 4 Long ee 36 Long 2x4 Gable Stud 2 Turn the gable over Install the siding extending 3 4 below the bottom 2x4 3 Cut siding from the loft door opening flush with the edge of the opening Siding Extends 3 4 Below Plate Step 4 Install Front Gable Overhang and Front Loft Doors 1 Apply 47 long 2x3 boards to the front gable These boards have a blue marking on one end Install this end at the top Install 2x3s flush with the top of the gable frame Use 10d sinkers 2 Install a 42 1 4 long 2x3 at the sides of the gable flush with the frame 3 Install 29 1 4 long 1x3 trim boards on each side of the loft
4. 10d sinkers Nail siding along the 1x3 trim board with 6d galv nails Step 12 Layout for Truss Spacing 1 Layout the truss spacing on the left sidewall facing building Start at the back of the building Measure from the inside face of the wood gusset when marking the location of the first truss 2 Locate the truss hangers there are left and right hangers Select the right hangers 3 Using 1 1 2 hanger nails install the right hangers to the 2x6 tie plate The top hanger flange should line up with the X mark a Long Side Nailed to Wall Plates _ 7 Rear Gable Wood Gusset LL 2x6 Tie Plate be a E a SS fi Inside of Building I Important When marking the opposite wall use the left hangers and place the X mark on the same side of the line so your trusses are parallel when they are installed Step 13 Install Trusses amp Loft Floor 1 Install the ee ee vas hanger to the sano site ae Secure truss to meta Lha o ie 1 1 2 Be ee hanger nails OO Ape LAS K fe ae ai Note The center truss will Y not have a bottom cord A P be NO Install front gable W Install OSB loft 3 n er oe rear and front trusses Notch the flooring around the le studs on the Secure floor with 7d sinkers Note Some OSB aie nt gables panels may be atta eis the shipping pallet Kin Note The rear loft floor ped will extend about 1 4 past the bottom truss cord
5. 12 apart Tool List Hammer amp Phillips Screwdriver _J Power Drill Screwdriver _ Framing Square amp Level _ Measuring Tape _ Hand or Circular Saw 2 8 Step Ladders Tongue Edge Always wear Safety glasses when cutting or nailing Constructing Details for Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not Foundation size is 10 O x 11 9 Check local building codes in your area the construction may have to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider 1 Cut 2x4 12 joist headers to 11 9 Layout for 16 on center joist spacing X marks where floor joist will be placed X X X Joist Header X x X e 15 1 4 j e16 l6 2 Cut 2x4 10 floor joist to 9 9 Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements if necessary to obtain 10 0 building width Joist 9 9 Long Nail the 2x4s to the 4x4 runners to keep the 2x4 frame from moving Material Description 10 x 12 shed 10 x 16 shed It is important that the floor be 2x4 Joist Header S level and square Before nailing 2x4 Floor Joist the flooring measure the floor 4x4 Treated Runners diagonally corner to corner Flooring 5 8 or 3 4 Then measure the o
6. 5 00 ET Monday thru Friday After business hours call 724 866 HELP 4357 or email to help barnkits com The material that is included in our kit is listed on the back page The optional floor package if purchased will be supplied by a local lumber supplier Our kit does not include the shingles the quantity needed is listed on the back page The siding is primed You will need to apply a finish coat using latex acrylic paint Some of the framing lumber was used in the shipping pallet Unpack the material from the pallets then unscrew the OSB sheathing it will be used for the loft flooring Unscrew the 2x4s from the shipping pallet This material will be used for wall bracing and wall plates The bit for the screws is packed in the hardware bag Stacking the boards according to size will make them easier to find when needed Some boards have colored ends All the 72 long 2x4s have black ends stack these boards together Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners The siding is made in 4x8 sheets with grooves cut into the face the long edge is beveled so that the siding overlays where they butt LAP Edge To identify which edge we want you to use we will refer to the edge as either the LAP Edge or the Tongue Edge Nail siding with 8d galv nails spaced
7. WANA AIA AIA AAAI AAAI Add ddd ddd ddd ddd ddd ddd ddd ddd dqd ddd gqd gad ddd gqdgqdgddddddddddddddddddddddddddddddadd a Best Barns USA Assembly Book Revised November 13 2014 G Deluxe Woodville 10 x 12 Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2010 ZO DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDD DDN RANGA dd dd dqdqdqdq ddd ddd dqdd EEEE EEEE dada ddd ddd dqdd dada dq dd dada dad dada ddd ddd ddd dada dada dada dada dada ddd dddddddddddddddddddg AD DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DUN IMPORTANT INFORMATION ABOUT YOUR SHED KIT This manual will show the assembly for the 12 x 10 Woodville building kit If you received duplicate books use the one with the latest revision date The foundation size should measure 10 0 wide by 11 9 long Do Not make the foundation larger than the building size The siding should project beyond the foundation for water to expel properly from the sidewalls Read the instructions before starting the assembly of the building If you have any questions about assembling the kit call 800 245 1577 Business hours 8 00
8. iding should extend below the bottom plate Use the 8d galv nails spaced 12 on center 5 Install a 48 3 4 x 77 1 4 siding panel in the center of the wall frame Install a 36 x 77 1 4 panel witht he LAP edge last Tongue Edge 36 3 4 Panel Cut Edge Siding Extends 3 4 Below Plate Step 7 Assemble Front Wall Panels 1 Install 6 six 72 wall studs between 2x4 10 top and bottom plates 2 Cut 2 two 2x4 6 boards to 69 1 2 in length Install a pre built 2x3 door header and the 2x4s as header support under the door header 3 Install 2 two 56 1 2 long 2x4 as tie plates over the top plate The 2x4s will be 3 1 2 short of the end of the wall frame 4 Square wall frame 56 1 2 Tie Plate 3 1 2 56 1 2 Tie Plate 2x3 Door Header 69 1 2 Header Support n _ __ to stud 64 1 2 Door Openin z 5 to stud 24 3 4 to stud 27 3 4 to Opening Step 7 Assemble Front Wall Continued 5 Locate a 16 x 77 1 4 siding panel that has a LAP edge Position the cut edge flush with the left side of the door opening Do not nail the LAP edge until the other siding is applied 6 Locate the 12 3 4 wide siding with a tongue edge and install on the left end of the front wall 8 8 7 Install 2 two 6 siding panels over the door opening flush with the top plate 8 Install another 16 wide siding panel with the cut edge flush with the side of the door opening 9 Install the last sidi
9. ng panel LAP Edge e Edges Butt Sd ether Tongue Edge lt ender e a Edo Cut Step8 Assemble Sidewalls 1 Position 68 1 2 and 65 1 2 long 2x4 boards together and indicate where the wall studs will be located Mark the ends that will butt together with the letters A and B 68 1 2 Wall Plate 65 1 2 Wall Plate 19 374 24 23 1 4 24 e T Step 8 Assemble Sidewalls Continued 2 Install 72 wall studs between the top and bottom plates 3 Nail frames together Use 10d sinkers 4 Fora 12 long building cut a 70 1 2 long 2x6 board in half so the center 2x6 tie plate will span where the sidewalls meet 5 Install 2 two 35 1 4 and a 70 1 2 long 2x6 boards as tie plates over the top plate The 2x6s will extend 3 1 2 beyond the end of the wall frame 6 Square wall frame 70 1 2 Long 2x6 Tie Plate x q 35 1 4 Long 2x6 Tie Plate 7 Locate 2 two siding panels that are 77 1 4 long and cut them to a length of 75 3 4 8 Install a 75 3 4 long siding panel with the LAP edge extending 3 1 2 beyond the frame 9 Install another siding panel in the center 10 Cut and install the last siding panel Siding should extend 3 1 2 past wall frame Siding Extends 3 1 2 Past Wall 11 Assemble another sidewall frame Step9 Set Lower Walls 1 Secure wall panels together at the corners Use 4 four 10d coated nails per corner Nail wall panels to the floor Nail th
10. pposite Screw Floor Nails corners These measurements will be the same 1f the floor is square Galv Box Nails Step 1 Assemble Trusses l 2 7 Assemble the last truss without the bottom cord AZ 9 Turn truss over and apply gussets Position 2 two half trusses between a 116 1 4 long 2x4 bottom cord Hold truss parts in place by temporarily screwing 2x4 blocks to the floor There are short 2x4 blocks supplied in the kit for this purpose Use the 2 1 2 wood screws Secure the tops together with a 22 3 4 long ridge block and wood gusset Nail the gusset with 16 sixteen 6d common nails Secure the truss bottom legs to the bottom cord with wood gussets Note You may have to spread the truss bottom to fit the bottom 2x4 Use 12 nails per gusset Assemble 3 three more trusses Turn trusses over and apply wood gussets to the opposite side 2x4 Block 2x4 Truss Half 2x4 Block 2x4 116 1 4 Bottom Cord Lower Gusset Wood Gusset with 2x4 Block Locate wood gussets with a 2x4 block attached to one side Attach this block gusset to the bottom of each truss leg Secure to leg with 6d galv nails and E e wood glue N A Do Not remove blocks from floor until Step 2 is completed Step 2 Assemble Rear Gable 1 Position 2 two half trusses between a 116 1 4 long 2x4 bottom cord 2 Secure 2x4 gable studs to the truss with 10 ten 1 x4 metal plates 3 Install wood gusset to bottom of
11. rough the bottom plate Space 10d sinkers 24 apart 2 Cut the 2x4 from door opening Step 10 Install Trim 1 Install 2 two 1x3 62 long trim boards flush with the top of the front wall Use 8d galv nails 2 Install 1x4 75 3 4 trim boards at the front corners of the sidewall Install the trim flush with siding on the front wall 1x3 62 Trim Boards M ee SS 1x4 75 3 4 Trim Board T 3 Install 1x4x74 3 4 trim boards at the corners of the front wall 4 Install 1x4x72 boards along each side of the door opening Tack these boards with a couple ee ee Poa Over Ne nails you may want to move the trim later when you install the doors door opening 6 Install trim on the back of the building Step 11 Install Rear Gable 1 Apply 1x4 white pine trim to gable Install a 47 1 2 long 1x4 at the top of the gable These boards have a blue marking on one end Install this end at the peak Install the 1x4 gable trim extending 1 2 above the siding on the gable When installed later the roof sheathing will be flush with the top of the trim Install a 43 long 1x4 at the sides of the gable 1 2 above the siding on the gable A Install Ends With Blue Mark At Ridge 3 Install the rear gable on the back wall The gable siding will extend over the 1x3 trim on the lower wall NOT behind the trim Secure gable to wall by nailing through the gable blocks with
12. s against the front edge of the roof sheathing Screw the sheathing to the 2x3s with 1 1 2 long screws 2 Install the 42 1 4 2x3s on the side roof sheathing in the same manner 47 Long 2x3 Step 16 Install Gable Soffit and Trim 1 linstall soffit panels to the 2x3s Use 6d galv nails 2 Install 1x4 trim over the 2x3 boards Use 8d galv nails A 8 Soffit Panels 1x4 Gable Trim 3 Cut and install a 2x3 block to close off the opening at the bottom of the overhang lt lt Step 17 Install Doors amp Hardware 4 Ie ISA Instal 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail below 2 Install 5 hinges to the left side of the door frame To position the hinge properly hold the rectangular plate against the frame Use 1 3 4 black screws 3 Install hinges to the right side of the other door Before you fasten the hinges to the door trim temporarily prop the doors in the opening Leave a space at the top of the doors and between the doors and the side trim to allow room for the doors to expand when they absorb moisture If your door opening is out of square the space around the doors will not be even You can remove and reposition the side trim to make allowances for this The side trim does not have to be flush with the frame of the door opening You can move the trim in or out to make the door spacing equal In
13. stall hinges to trim with 2 screws Door Latch g Extends Past Trim Barrel Bolt on the back of left door Z 6 Install a barrel bolt on the lower back of the door to secure this door in place when closed You will need to drill a hole for cL lt si the round shaft to drop into ill 7 Install another barrel bolt at the top of the door OSB Shim Qty P E a cr ot Oo O N N Uo 2 o o HIN Ol TAR Ie fe A TA I gt 5 ar pami a O N P N 14 N JN N N 12 20 Meadowbrook and Woodville 10 x 12 Barn kit 2x4 amp 2x6 Framing Truss Bottom Cords 2x4 Boards Attached to Pallet Wall Studs black ends Wall Plates Gable Studs amp Framing Gable Studs amp Framing Gable Studs amp Framing Size Qty 120 116 1 4 J N 4 4 4 68 1 2 4 65 1 2 2 56 1 2 1 4 2 1 W ON 35 3 4 34 1 4 Gable Studs amp Framing 21 1 2 Truss Ridge Blocks 22 3 4 3 Gable Nailing Blocks 15 3 4 2 2x6 Tie Plates for Sidewalls 70 1 2 2 2x3 Framing 4 Gable Overhangs 47 4 2 4 Pre built Components 3 3 2 3 42 x 80 2 3 4 48 x 48 6 Miscellaneous Lumber __ _22 2 Roof Material by Owner Roof Shingles Roof drip Edge Description Size Whie Pine Trim Pes 1x4 Gable Trim a7 12 1x4 Gable Trim 43 i 1x4 Corner Trim 1x4 Corner Trim 7434 1x4 Door Trim 1x3 Top Door Trim G2 i 1x3 Lo
14. wer Wall Trim 1x3 Loft Door Trim 29 1 4 1x3 Loft Door Trim 43 Exterior Siding amp Soffit 48 x 77 1 4 2 12 x 77 1 4 36 x 77 1 4 48 x 75 3 4 16 x 77 1 4 6 x 32 1 4 Siding for Roof Gables 48 x 48 Siding for Roof Gables 16 x 30 Siding For Door Header 6 x 32 3 4 x 48 Front Soffit Panels Woodville model Hardware NO O s fe N OO 20 _ Truss Hangers 75 Hinge Screws Door Hasp 4 Barrel Bolts 6 Barrel Bolts 2 1 2 Screws 1 Screws 1 5 8 Screws 12 36 24 Door Hinges Door Hinges vA IS lS lS lo l gt gt TIAA r lel a fo jo je jeje N lele le le z o amp 5 Js I2 z 3 lx z 5 Zi 6 6IB IS Z z O 2 O mt 1x4 Drive on Plate Miscellaneous 3 1 2 x7 1 2 Center Truss Blocks w gusset 7 bdl 6 pcs

Download Pdf Manuals

image

Related Search

Related Contents

D20 (II) Installation Manual  König CSNBB100PI  TImage V8.4 Imaging Software Suite User Manual    Samsung 22" SyncMaster SA300B LS22A300BS/EN Bruksanvisning    JVC HR-S5400U User's Manual  Haier LSA02W User's Manual  Samsung Galaxy S6 edge User Manual  Opção de Ethernet  

Copyright © All rights reserved.
Failed to retrieve file