Home

Palram 701526 Use and Care Manual

image

Contents

1. X 1 mess eS IE
2. 7 2 0 4 nn Click d m E o LN NS NN N E Nl N W N 0 m
3. I 816 lt E T gt M Y W 7 en K v
4. RTT T Wu N N N N M 27 1 A 63657 7 il 7 P jm SE Z 7 NNN s 2 lt T K WW M 11 i 1 i i n 1 at Sea d R AT Z Z X J N J J J 4 2 J 24 J f 5 J 4 J J 7 4 J 4 N WH d pr m CDE 1 7 2 2 P j 6 1 2 OY lt lt ER 0 Y 5
5. 115cm 45 46cm 18 804 46 18 56 22 818 60cm 23 1 n O 830 1200 Item cm Inc Oty Qty 834 57 22 4 816 118cm 46 gt T 826 15 52 826 115 52 Spare Parts Item Oty Item Qty Item Qty 126cm 49 23 spare 65 4 25 461 x 66 spare 411 x40 spare 462 56 5cm 22 OS SS E o mM 365cm 143 85cm 722 4 1
6. 2 Ja v S Y E 4 lt 1 I N 3 3 3 N y k N 1 N S SC
7. Utilisez le maillet en caoutchouc si n cessaire tout en prenant soin de ne pas abimer les connecteurs en plastique c Notes by steps ar Etape 3 Le profil 821 doit tre plac sur la partie droite pour tre connect au profil 822 Le profil 821 est celui au connecteur situ l extr mit Etape 4 Apr s avoir connect le profil 816 tous les autres nettoyez les zones de connexion avec le chiffon Ne placez la bande couvrante qu une fois la connexion s che et propre Apposez la bande couvrante de part et d autre de la connexion comme mentionn sur l illustration 4 Etape 5 Les profils 800 et 801 doivent tre align s et connect s comme indiqu sur l illustration de la page 7 a et b Les 23 prises doivent tre ins r es dans chaque connexion en veillant ce que les deux points l avant de la prise soient l horizontal pour un assemblage plus simple Etape 9 Utilisez la partie 95 comme mod le afin de mesurer l cart entre les poaux 800 et 801 du mur et du toit de la serre Etape 11 1e profil 806 doit tre plac sur la partie droite Le profil 805 doit tre plac sur la partie gauche quand on les regarde depuis le devant de la serre Etape 12 Faire glisser le panneau 550 depuis la fin du rail et l ins rez dans sa position finale comme indiqu sur l illustration c Etape 16 Faites attention bien assembler la fen tre comme in
8. par grands vents Veillez ne pas toucher de fils lectriques avec les profils en aluminium Veillez toujours porter des chaussures et des lunettes de protection lorsque vous manipulez des copeaux d aluminium Rangez soigneusement et l abri tous les sacs en plastique hors de la port e des enfants La serre doit tre pos e et fix e sur une surface plane Veillez ne rien poser contre la serre lors de son montage ou n exercer de pression sur elle Floignez les enfants de la zone de montage Ne placez pas votre serre sur une zone expos e des vents forts Cette serre ne supporte pas des vents 70 km h N essayez pas de monter cette serre si vous tes fatigu apr s avoir pris des m dicaments ou bu de l alcool ou si vous tes sujet des tourdissements Si vous utilisez un escabeau veillez suivre les consignes de s curit du fabricant Ne laissez jamais dans la serre des objets chauds tels que des grils r cemment utilis s des lampes souder etc est recommand de fixer la serre au sol Cependant si vous voulez la fixer v rifiez qu il n y a aucun tuyau ou c ble dans le sol avant d y enfoncer les pieux c conseil g n raux Ce montage consiste en un assemblage de pi ce il sera plus simple de le monter deux Une demi journ e est n cessaire pour r aliser le montage S lection du site choisissez un lieu ensoleill et prot g des arbres Si vous montez votre serre directement sur une base solide e
9. Assembly Instructions e Instructions de montage Snap amp Grow 6 x8 4 Extension 374x190x209cm 1474 x7 434 x82 Base Size 365x186x209cm 314 6 x16 494x190x209cm 19447434 X824 6 x20 614x190x209cm 24134 x7434 X824 Email infoA palram com 1 www palramapplications com IMPORTANT Please read these instructions carefully before you start to assemble this greenhouse Please carry out the steps in the order set out in these instructions Keep these instructions in a safe place for future reference t Safety Advice We strongly recommend the use of work gloves during assembly Do not attempt to assemble the greenhouse in windy or wet conditions Do not touch overhead power cables with the aluminum profiles Always wear shoes and safety goggles when working with extruded aluminum Dispose of all plastic bags safely keep them out of reach of small children The greenhouse must be positioned and fixed on a flat level surface Do not lean against or push the greenhouse during construction Keep children away from the assembly area Do not position your greenhouse in an area exposed to excessive wind Do not attempt to assemble this greenho
10. diqu e sur l illustration 16a Le profil 809 doit tre plac lorsque l a ration est ferm e pour emp cher tout cart Soyez sur que le profil 809 correspond parfaitement l illustration 16b Le bord du 809 doit tre plac en direction de la goutti re Etape 19 Faire glisser le panneau 550 depuis la fin du rail et l ins rez dans sa position finale comme indiqu sur l illustration a et b Etape 20 Entrez dans la serre et tourner les 23 prises 1 4 de tour dans le sens des aiguilles d une montre Etape 21 Les profils 814 doivent tre ins r s depuis les 4 coins de la serre installez ensuite entre eux le profil 815 Etape 23 Assurez vous d utiliser la longue vis 450 pour s curiser le stopper de la porte comme indiqu sur l illustration b Item cm Inc Qty Item cm Inc Oty cm Inc Qty Item cm Inc Oty Item cm Inc Oty 115cm 45 819 575cm22 i o 112 5cm 44 1 12 5cm44 7 824 118 46 domin E 0 gt 44 3 46cm 18 822 113cm 51 4 825 75m 12 113cm 44 jj 3 n 856 119 46 814 90 35 2 7 3 55 5cm 21 1 d 815 60cm 23 x2 803 8 55 5em 21 817 118 46
11. e greenhouse wall and roof area Step 11 Profile 806 should be placed on the right hand side Profile 805 should be placed on the left hand side when viewed from the front Step 12 Slide the panel 550 till the end of the rail and insert it into it s final position as shown in illustartion c Step 16 Be careful to assemble the window in the position as shown on picture 16 a profile 809 should be placed while the vent is closed to cover any gap Ensure profile 809 is fitted correctly as shown on picture 16 b The lip on 809 should face toward the gutter Step 19 Slide the panel 550 till the end of the rail and insert it into it s final position as shown in illustartion a and b Step 20 Step inside the greenhouse and turn all 23 plugs a 1 4 of a turn clockwise Step 21 Profiles 814 should be inserted from the four corners of the greenhouse then insert profile 815 in between them Step 23 Ensure you use long screw 450 to secure the door catch 43 as shown in illustration b IMPORTANT Lisez attentivement ces consignes avant de commencer le montage de la serre Suivez l ordre des tapes de montage Respectez les tapes de montage d finies dans cette notice Conservez ces consignes de montage dans un endroit s r pour r f rence future c consigne de s curit Il est recommand d utiliser des gants de travail lors du montage de la serre N essayez pas de monter la serre par temps de pluie ou
12. irit level For base alignment e Phillipshead screwdriver e Cloth e Sort the parts and check against the contents parts list e Carry out the assembly steps in the order set out in the instructions e Ihe front of the greenhouse is the wall including the door and the back is the opposite wall e After assembly fit the greenhouse to the base using connectors no 35 and fit the whole unit to a leveled final e You may use Silicon lubricant spray in order to help you slide the profiles on the connectors Do not spray the Polycarbonate panels Use the rubber malet if necessary Avoid shaking the plastic connectors ar gt Notes by steps Step 3 Profile 821 should be placed on the left hand side to be connected to profile 822 Profile 821 is the one with the connector at the end Step 4 After connecting profiles 816 to each other clean the connection area using a cloth Place the cover strip on the conection only when it is clean and dry press the cover strip from one side of the connection to the other as mentioned in picture 4 Step 5 Profile 800 amp 801 should be aligned and connected according to the illustration on page 7 a amp b plug 23 should be inserted to each connection while the two dots on the front of the plug should be in horizontal posi tion for easy assembly Step 9 Use part 95 as a template in order to measure the gap between posts 800 amp 801 of th
13. n b ton utilisez les trous d j pr par s sur la base en m tal fournie Les pi ces du composant doivent tre v rifi es et plac es port e de main Mettez toutes les petites pi ces vis etc dans une coupelle pour viter de les perdre Prot gez le toit de la neige et des feuilles c Entretien PouVr nettoyer la serre utilisez un produit d entretien doux et rincez l eau froide propre N UTILISEZ PAS d ac tone de produits inflammables ou autres d tergents sp ciaux pour nettoyer les panneaux transparents Pi ces de rechange Contactez le service client le au Pour toute information compl mentaire veuillez consulter notre site www palramapplications com gt Care amp Maintenance e M tre e Gants de travail e Maillet en plastique ou en caoutchouc e Tournevis cruciforme e Escabeau e Paire de ciseaux e Niveau e Chiffon e Triez les pi ces et v rifiez qu il n en manque aucune en comparant avec la liste des pi ces d tach es e Suivez l ordre des tapes de montage e Le devant de la serre consiste en la paroi comprenant la porte et le mur oppos constituent l arri re de la serre e Ensuite assemblez correctement la serre sa base en utilisant les connecteurs n 35 et v rifiez que l ensemble est de niveau e Vous pouvez utilisez un spray lubrifiant en silicone afin de vous aider ins rer les profils dans les connecteurs Veillez ne pas asperger les panneaux de polycarbonate
14. use if you are tired have taken drugs or alcohol or if you are prone to dizzy spells If using a step ladder or power tools ensure that you follow the manufacturers safety advice Hot items such as recently used grills blowtorches should kept away from the greenhouse walls We recommend the greenhouse is bolted to a concrete base or slabs fix hinges are not supplied However if you want to fix directly in to the concrete ensure there are no hidden pipes or cables in the ground before inserting the pegs gt General Advice This multi part assembly is best achived by two people Allow at least half a day for assembly process Site selection instruction choose a sunny level position away from overhanging trees If you are fixing your greenhouse directly to a solid concrete foundation use the pre drilled holes in the metal base supplied The component parts should be checked and laid out close at hand Keep all small parts screws etc in a bowl so they do not get lost gt Care amp Maintenance When your greenhouse needs to be cleaned use a mild detergent solution and rinse with cold clean water DO NOT use acetone abrasive cleaners or other special detergents to clean the clear panels For replacement parts call our service line For additional information please visit our web site www palramapplications com gt Care amp Maintenance e lape measure e Step ladder e Work gloves e Scissors e Plastic or rubber mallet e Sp

Download Pdf Manuals

image

Related Search

Related Contents

ADVAS-PT1 - カリーナシステム株式会社  Manuel d`utilisation  Psycho magazine Mieux être mode d`emploi novembre 2011  Manual de Uso y Cuidado Congelador  Ednet 86265    M1112 Administrator Manual  Bedienungsanleitung Operating Manual Leistungsschalter IZM IZM    User manual - produktinfo.conrad.com  

Copyright © All rights reserved.
Failed to retrieve file