Home
        Monticello Mont-12-BK Instructions / Assembly
         Contents
1.              The base has predrilled holes in the inside and outside bolt channels so you can easily secure  your greenhouse to a wood platform  Screw 5 4 screw into hole in base  through weed until screw is flush with base profile  Continue  process around outside and inside of greenhouse  until it is evenly secured            NOTE         5 4 screw is designed to      used with wood  When securing base to  foundations made of materials other than wood  use an appropriate fastener         112  Usesk    1 ground anchors with six A 2 anchor brackets on the inside of the greenhouse to    secure it to the ground  Place one on  11 2B Serew each A 1 ground anchor through  sach side at the front  center and back  hele in center of bracket  Usea screw driver  through the top of  11 24 Attach each anchor bracket with two A 1 anchor to screw  set screws      the Inside bolt  channels      completely into soll     base profile  Secure each with two bolts               Secu      greurd          
2.           4  6          gutters are secured together using B 5 connectors and attached to  side profiles using B 3 connectors on the outside of the greenhouse   The B 35 connector uses the set screw in the center hole of B 5  connectors at seams  Loosen and slide set screws to line up  with connectors making sure the seams line up and the  gutters remain straight     4 66 Begin at the three seams and arrange set screws so middle screw le  centered  Fit B 5 connector onto gutter and hold in place  using the two end bolts           4      Loosen set screws on side profiles and slide down  Fit wide part of B 3 connector onto set  screw  Slide up into place fitting gutter set screw at other end  Tighten set screws and  secure with belts     NOTE  The bottom of B 3 connector extends past the edges of side and  __ comer profiles  B 3 connector sits over B 5 connector  Secure all with balts     20 of 44 WWW               COR    Assemble Front Wall and Gable            Make certaln the places are      the correct positions before assembling   A Carefully follow the order of assembly to ensure an easy Installation   Wear proper safety gear Including work shoes  gloves and goggles   Prepare required set screws as shown In step 1 1       MOTE  Have the hex shaped indent facing up  Screw in until itis flush with bottom of mut so  it slides easily into bolt tracks  After inserting into bolt track  screw      until it holds in place              5 1 The door frame is 6514  high from the ba
3.      at the front  Push panel into roof ridges          channel until the other end reste  on gutter ledge and then slide  towards F 1 profile at back                        _  MOTE  W 2 panels are installed in step 8 7       NOTE  VIEWS FROM OUTSIDE       6 568 From Inside  fit one F 1 profile with 8 50 Hold two profiles together in place at ridge  three set screws next to panel  Position using one B 4 connector  Line up center hole  profile so set screws face inside and with long hex bolt in roof ridge  Place washer on    middle set screw is closer to top  Fit  ether end into B 4 connector and  secure with one bolt  Repeat to install     1 profile on opposite side            long belt and secure all screws with three bolts          B 4 1  5 2    3  5 5     1    35 of 44                              COR    8 6  Continue working from back to install section four   Femove plastic film from beth sides of one W 1  panel  With side marked        Resistant     facing outside  install the next panel  on the right at the back  Push panel  Inte roof ridge channel until the  other end rests on gutter ledge 3  and then slide towards F 1 W 1    install W 1 panel      left       NOTE VIEW FROM OUTSIDE                            From inside  fit one F 1 profile with  two set screws facing Inside next  to panel  Hold in place with one B 4 8 60 Held two profiles together at ridge using one B 4  connecter on right side  Secure with  two bolts  Repeat to install    1    connector  Secure with
4.     NOTE  VIEW FROM INSIDE          Assemble Roof Ridge    Make certain the places are In the correct positions before assembling   Carefully follow the order of assembly to ensure an easy Installation   Wear proper safety gear Including work shoes  gloves and goggles   Prepare needed set screws as shown      step 1 1     MOTE  Have the hex shaped indent facing up  Screw in until it is flush with bottom of nut so    it slides easily into bolt tracks  After inserting into bolt track  screw in until it holds in place           Prepare the two    1 and one F 1E roof profiles  They will line up in a row and joined using  two       connectors using a total of eight set screws and two long hex bolts   Arrange profile      bolt track is facing up                 Slide set screws into bolt  track on  each end of profile as shown     T 1B Line up three profiles in a straight line with K   1E in  the middle  Hand tighten set screw on each end  of K  1 profile to hold in place     7212 Adjust position of set screws and long hex bolt to fit holes      B 5 connector  Position each        connector with the long hex bolt in center hole  and center te the  seam where the profiles join                   Secure B 5 connector by attaching bolts  te the set screws  HOTE  Long hex bolt is    Wey RSW CON 30 of 44    7 2  Use twe people and a step ladder  Place step ladder inside greenhouse   Have one person Inside greenhouse supporting ridge as you slide     into  position  Avold touching top of 
5.    A            Monticello           h perahu          Made in the USA    8 x 12    Greenhouse  Assembly Instructions    071812       nverstone          hreen Products fara Brighter Future     Customer Service   877  373 3078 Email  customerservice amp risew com  amp 5 Fleetwood Drive  Rockaway  MJ  0178645       Introduction    Thank you for purchasing your Monticello  8x12 Greenhouse  The Monticello lineis proudly made in the USA         leading commercial greenhouse maker using the same professional grade materials and design  The frame  is constructed with the        aluminum with lead free powder coated paint  The panels are  professional grade Smm twin polycarbonate selected for their insulation and durability    The Monticello line is a modular system  which uses      5x6 greenhouse that  can ba easily expanded in four foot   sections upto 24 feet by    feet at any time  This model consists of an 8x8 greenhouse with one four foot  extension and includes two roof vente  each with it s own automatic vent opener to ensure proper ventilation and  maintain optimal temperature  When properly assembled and maintained  this greenhouse will provide years of  enjoyment  It        be expanded as your needs expand    Our greenhouse has been designed to be easily assembled  Although all but one step can be completed by one  person  we recommend using a helper for the entire assembly  You will need assistance from another person to  assemble the roof  Allow six to eight hours to com
6.  9 1   Unpack contents of Automatic Window Opener  Screw adjusting  knob partially inte threaded end of cylinder  Do NOT tighten             9 16 Fit piston rod connected to arm    into       and oF ayida Turn cylinder wes Palaa       yp  next te adjusting knob are visible  e ar      eme             9 1   Continue pushing cylinder onto piston red until holes       end of cylinder line up with holes in arm A  Push    arms apart if necessary  Secure with 9 10 Turn adjusting screw clockwise  a threaded stud on each side  until arms are aproximately      0 45     apart          n                   c A                SL eee       7 4           T ie     T  u       B     E    2       ic    p  2      TT               9 1E Repeat steps 9 1A through 8 1D  to prepare the second    Automatic Window Opener     NOTE You will use the Gripping Channels in next steps  You do  nat need the other included parts in Window Opener package        Handle          9 24 Remove plastic film from both sides of V 2 9 2B Placeopener with arm    on bottom  factory assembled vents  With side labled inside vert  Mark screw placement               inside    facing up  lay panel Using 9 1 screw  apply pressure to  on flat clean surface  E puncture the panel and predrill  Measure and e    holes for next step   mark center     of vant                    We RSW CON 39 of 444    9 20 Gerew two 6 1 screws through V 2 panel  Line up gripping channel on other side  Continue to  screw until secure  Do not over tighten
7.  Assemble Right Wall sssi Ji  Assemble Back Wall   14  Assemble Left Wall        Assemble Front Wall and Ga ble    21  Assemble Back Gable wuss 27  Assemble Roof Ridge         20  Assemble           22  Install Roof Vents sarcs 20  Install Doors Lo 4   Secure to Platform smaa 44   A         Phillips Screwdriver  include      23 inch spacer  include       5 foot bungee cord finduded     RY FUSE a CORR    Constructing a Wood Platform       IMPORTANT  It is very important to begin with    level surface  Check your foundation to ensure it is level at every  point  If you are not building on a wood deck  we recommend constructing a wood platform so you can properly  secure the greenhouse  You must assure your foundation is square and level before beginning assembly     After choosing a location  proper preparation of the site is essential  The site must be level  Create a wood  platform using a perimeter of pressure treated two by fours filled with either soll  sod or gravel         NOTE When constructing the greenhouse on a wood deck  make certain the    surface is level  Creating an additional wood platform is not necessary     Buy pressure treated 2x4 lumber  Y ou will use two layers with the corner positions staggered for maximum  strength  The finished dimensions will be 101  by 14 954     Materials  Tools   Four 10    pressure treated 2x4 lumber cut to 9712  Spirit Level  Four 14    pressure treated 2x4 lumber cut to 14614  Corner Square  Sixty five    3  wood screws Phillip
8.  as It  may damage the vent     3   We          9 2D Repeat steps 9 2A through  Do    9 20 to prepare second vent   i 3  ae i B a  4          Nx         s  M    Connactor Gripping Chanrel G    a       9 3  From inside  hold           mE  opening      roof panels  Hook           R  top lip of vent onto curve           ridge prole R 1                             W2    gt             VIEWS FROM FRONT   NOTE  VIEW FROM OUTSIDE       9 36 Outside of vent rests on top of ledge on W 2 profile  Open vent so you can attach the other  arm of opener to top of inside W 2 profile  Screw two 5 1 screws through panel and into  gripping channel on other side to secure  Do not over tighten as It may damage the vent         9 3   Espeat steps 98 54  through 9 38 to  install second vent         NOTE  VIEW FROM OUTSIDE       Connector    8 4  From inside screw 5 6 screw and spacer into the    holes on each end of the top of the vent  This will secure the vent to the greenhouse in very  windy Seno           Inetall Doore       Make sure the places are In the correct positions before assembling            Carefully follow the order of assembly to ensure an easy installation   Wear proper safety gear including work shoes  gloves and goggles     IMPORTANT  The door and doortrack are different for the left and right sides  Study the  diagrams before installing to ensure you have the parts correctly placed                10 1  From outside  prepare to install right and left door tracks   The door trac
9.  facing inside  fit        F 1 profile next to right panel  F 1 profile rests  against widest part of roof ridge and lines up with top of gutter     8 3   From inside  hold profile in place  with one B 4 connector  Secure       b    mm a      NOTE  VIEWS FROM OUTSIDE  NOTE  VIEWS FROM INSIDE     8 30 Fepeat step 8 26 through  amp  2C to secure install and secure F 1 profile on left side     B 3E Hold two profiles together at ridge using one B 4 connector  Secure with two bolts         r       NOTE  WIEWS FROM INSIDE   34 of 44              6 44 Continue working from front right corner  Remove    plastic film from both sides of one W 1 panel  With     side marked  UV Eesistant  facing outside  fit 2  top end of panel into channel in roof ridge near  corner  Push panel into reofridge channel    until the other end rests on gutter pr  ledge and then slide towards F 7  corner profile  Repeat to install  W 1 panel in front left corner                NOTE  VIEWS FROM OUTSIDE     8 40 Hold two profiles together at ridge usin  6 46 From inside  fit one    1 profile with two set cg B t              Securewith x  screws facing Inside next to panel  Hold in    place with one B 4 connector on right side   Secure with two bolts  Repeat to install F 1        8 54 Return te back right te install section three and  remove bungee cord nearest to back  Remove  plastic film from both sides of one W  1 panel   With side marked     UY Resistant    facing    outside  install the nextpanelontheleft
10.  from structures that could cause snow to drift on or around the greenhouse   Locate underground pipes or cables before preparing the site or anchoring the greenhouse     4  Prepare a Foundation     After choosing a location  proper preparation of the site is essential  The site must be level  The greenhouse  must be mounted to a bass  Construct the base first so the greenhouse can be securely mounted    We recommend constructing a wood platform base using a perimeter of two by fours filled with either soil   sod or gravel  Instructions for constructing a wood platform can be found on page 3 in this manual    Other suitable base options include wood decks and concrete slabs  Wood screws are included to secure the  greenhouse to a wood base  The greenhouse le secured to the ground from the Inside with ground anchors   See step 1 for details  If you are using a concrete base  get appropriate mounting screws before beginning     Make sure the corners are square by measuring the inside diagonals from both sides and making sure they  are equal  Use a spirit level ta make sure the base is level     Contact your local authorities regarding any required building permits or restrictions   44    Wey RSW CON Tof    Safety Advice      The greenhouse must be positioned and fixed on a flat  level surface      Dispose of all plastic bags safely  Keep them out of the  reach of small children               children and pets away from the assembly area until  the work is completed       Always
11.  inch spacer on base next to F 7 corner profile  Fit panel  into channel         1 profile and slide F 1 profile against spacer to ensure  proper placement  Position F 1 profiles so single set  screw is next to base on inside                           VIEW FROM INSIDE       4 2D Continue building the side wall from the inside  Use the spacer with each panel and the four  remaining    1 profiles  Repeat steps 4 2A through 4 2C        4 3 Add the last W 1 panel to complete the side  From the outside  fit    7 corner profile into  place and secure with two B 3 connectors           Fana              5 2     14    18 of 44                USI CODI                4 4A Prepare two    1 gutter profiles by sliding four set screws Into bottom  bolt track  Hand tighten each end set screw to hold in place        448 Prepare one  2 2 gutter profile with five set screws and the other G Z gutter profile with six set  screws  Slide set screws into bottom bolt track  Hand  tighten end set screw to hold in place     4 5  Working from inside  place G 1 and G 2 gutter profiles  fitting top edge of W 1 panels into  channels of gutters  Place one shart  3 1 Se d                            G 2 gutter profiles in the center  Seams  are centered to bolt tracks inF 1 profiles        4 5B Place        sat screw      the inside bolt track of the gutter  at each end  Hand tighten both set screws to hold      place  NOTE  VIEW FROM INSIDE                    VIEWS FROM INSIDE       WWW RETWW COM 19 of 44   
12.  to fit heles      B 2        channels      aera placing side  marked  UV Resistant     facing outside        em WARNING  The corners of W 5 panels are    WES   sharp  Use extreme caution when handling                 VIEWS FROM INSIDE       25 of 44          5 9A Prepare two F 7 corner profiles  Slide three set screws Into the same  bolt track  two on one end and one on other end  of profile  Position one set screw in center of  profile  It will      used in a later step   Tighten each set screw to               5 96 From outside fit F 7 profiles inte each side of front  a Arrange F 7 profile  so channel lines up with tops of panels and the  set screws are facing out  The side of the  profile rests against cut angle of F 3  profile  The top end touches edge of   F 4 center profile and bottom end  touches top of G  1 gutter   Position both F 7 profiles       NOTE  VIEW FROM OUTSIDE       5 90 Use C 1 connector to secure each outside corner  Loosen set  screws on profiles and adjust position to fit holes in    1 connectors   Make sure all profiles line up flush against each other  Secure with bolts  Repeat on other side        5 9D Cheek inside corners to ensure B 7 connector is still in  proper position  IF it needs adjusting  repeat steps 5 5  and         through 5 90 until   each corner ls set              NOTE  VIEW FROM INSIDE     Assemble Back Wall    Make certaln the places are in the correct positions before assembling    A Carefully follow the order of assembly to ens
13.  two bolts        NOTE  VIEWS FROM INSIDE       68 60 Remove bungee cord and remove plastic film from both sides  ofone W 1 panel  With side marked     UY Resistant        gt   facing outside  install the next panel on the en  right at the back  Push panel inte roof  ridge channel until the other end  rests on gutter ledge and then  slide towards F 1 profile at    back  Repeat to install ap       W 1 panel      left     B GE From inside  fit one F 1 profile with  Position profile so set  screws face  inside and middle set screw 16 closer to top    Fit other end inte B 4 connector and secure  with one bolt  Repeat to install F 1 profile on opposite side     ES      wall   NOTE  VIEWS FROM INSIDE     E      B      n     Fanal          Connector QTY   Connector                     8 6F Hold two profiles together in place at ridge using one B 4 connector  Line  up center hole with long hex bolt in roof ridge  Place washer on long bolt    and secure all serews with three bolts                         B TA Continue workina from back to install section five   Femove plastic film from both sides of one W 1  panel  With side marked  UV Resistant          angle on left  F necessary  loosen the  previous B 4 connector and profile  and move them towards the back  of the greenhouse to make  more room      fit  panel    in place       NOTE  VIEW FROM OUTSIDE       6 76 Remove plastic film from both sides of one W 2 panel  It  will be  installed opposite the W 1 panel installed in 5  7    F
14.  wear work shoes  gloves and safety goggles when working    s Some of the parts have sharp edges and burs  Use extreme  caution when handling      Do not lean against or push the greenhouse during assembly      Take special care not to touch overhead power lines with the  aluminum  profiles      Do not attempt to assemble the greenhouse in windy or wet  conditions      Do not position your greenhouse in an area exposed to  excessive wind       IFusing power tools or a step ladder  always follow the  manufacturer s safety instructions      Hot items such as recently used grills  blow torches etc    must not be stored in the greenhouse       Store the polycarbonate panels in a cool dark place such as a  garage until you are ready to use them      Make sure the greenhouse complies with local building codes     General Order of Assembly    Step 1  Assemble Base  Step 2  Assemble Right Wall  Step 5  Assemble Back Wall  Step 4  Assemble Left Wall      Jt  Step     Assemble Front Wall and Gable  Step 6  Assemble Back Gable   Step T  Assemble Roof Ridge   Step 8  Assemble Roof   Step 8  Install Roof Vents   Step 10  Install Doors   Step 11  Secure to Platform      Work Gloves      Safety Goggles    Step Ladder      Tape Measure    Spirit Level    Toole Needed    20f44       Me    Wrench  include     Table of Contente  Introduction                 ae ae     General Order ur RET by  2  Construct Wood Platform    3  Ueied csse cy  Prepare Set SCTeWS unus F  Assemble Base              F 
15. RTANT  Double check the position and  amount of unused set screws in the base  You  should have 37 available for later assembly        1 5  Measure base diagonally from inside corner  Equal measurements ensure the base is square   Use a spirit  level to make sure the base is level     1 5B Leeate predrilled holes in base profiles     Use six 5 4 screws  one at each corner  and        in the center of each side to secure  to wood platform  You will secure the  greenhouse completely to the platform       step 11 1 when assembly is finished        Wey RSW CON           lila Right Wall      Make certaln the places are In the correct positions before me       Carefully follow the order of assembly to ensure an easy installation   Wear proper safety gear Including werk shoes  gloves and goggles   Prepare required set screws as shown In stap 7 74          MOTE  Have the hex shaped indent facing up  Screw in until itis flush with bottom ofnut so  it slides easily into bolt tracks  After inserting into bolt track  screw in until it holds in place        21A Prepare twoF 7 corner profiles  Slide set screws into all three bolt tracks  t  on one end and inte two side bolt tracks on other end of comer m  t  profiles  Hand tighten each set screw to hold in place                  MOTE  Set screw in center bolt channel is used when in      optional    shelving units  Install F 7 profile with set screw near base needed        2 16 Prepare five    1 wall profiles  Slide set screws into both bo
16. Use extreme caution when handling  panels with cut edges  The corners are sharp         20 x 57                          A f  12  A      24    215           Wavy RET WIE OOP sofa    List of Parts  continued     Connectors QTY Hardware        US 1 2 3 4 5     Q 8 7 810 11    7 C 2 2   Step 7                      5 54 2 Step 7       S5B   2   Steps  Ca s2c   2   Steps   m         Step 8  Included Tools        D 4 127 Step 10           amp of 44 WAW USI CODI    Assemble Pase    Make certaln the pleces are In the correct positions before assembling     A Carefully follow the order of assembly to ensure an easy Installation   Wear proper safety gear Including work shoes  gloves and goggles                      1 1A We use a set screw and nut assembly       system for ease of installation  With      ETT  the hex shaped indent facing up    mM EN  screw S 2B threaded part into 5 2     AJ  Wh 6 3  nut until it  is flush with bottom QUA          of nut  When the assembly is flush     Fidos easily    it will slide easily in the bolt tracks      MOTE  The two pieces together is referred to in this manual as     set screw   Shown sliding into F 1 bolt track     IMPORTANT         end of the 5 2B threaded set screw has a hex shaped indent  The other end  forms a soft point  Make sure indented hex is always facing up when screwed into the 5 2   nut   This way if the set screw is installed too tightly to loosen by hand  you can use a hex key     1 1B After sliding inte bolt track  screw threa
17. all from the inside  Use the spacer with each panel and the four  remaining F  1 profiles  Repeat steps 2 5A through 2 3     24 Add the last  W 1 panel to complete the side  From the outside  fit    7 corner profile into  place and secure with two       connectors                  NOTE  VIEW FROM OUTSIDE          2 5A Prepare two G 1 gutter profiles by sliding four set screws into bottom  bolt  track  Hand tighten each end set screw to hold in place        2 5H Prepare one G 2 gutter profile with five set screws and the other G Z gutter profile with six set  screws  Slide set screws into bottom bolt track  Hand  tighten end set screw to hold in place            2 6  Warking from inside  place 5 1 and G 2 gutter profiles  fitting top edge of W 1 panels into  channels of gutters  Place one short G  1      pr at each end and the two longer  G 2 gutter profiles in the center  Seams           centered to bolt tracks in    1 profiles          MOTE  At front and back  edge of G 1 gutter  profile lines up flush with edge of F 7 corner profile     2 608 Place one set screw      the inside bolt track of the gutter NOTE  VIEW FROM INSIDE          at each end  Hand tighten both set screws to hold in place     MOTE  VIEWS FROM INSIDE     Sw COM 12 of 44          2 7    Thegutters are secured together using B 5 connectors and attached to  side profiles using       connectors on the outside of the greenhouse   The B 3 connector uses the set screw in the center hole of B 5  connectors at sea
18. before assembling     A Carefully follow the order of assembly to ensure an easy installation   Wear proper safety gear Including work shoes  gloves and goggles     Prepare required set screws as chown In stap 1 7      E           NOTE  Have the hex shaped indent facing up  Screw in until itis flush with bottom of nut so  it slides easily into bolt tracks  After inserting into bolt track  screw in until it holds in place        3  1A Prepare one F 7 corner profiles  Slide set screws into all three bolt tracks aii  on one end and inte two side belt tracks on other end of corner            a  profile  Hand tighten each set screw to hold in place            MOTE  Set screw in center bolt channel is used when installing optional  shelving units  Install F 7 profile with set screw near base until needed     4 1B Prepare five F 1 wall profiles  Slide set screws Into both bolt tracks on one end of profile and    ona bolt track on the other end  The single set screw will sit on the inside near  the base when Installed            Te        Hand tighten asch ast  4     H       screw to hold in place        42   Continue working from inside back left corner  Remove plastic film  from both sides of one W  1 panel  Fit  panel into channel in base and  corner profile  placing side marked   UV Resistant    facing outside     IMPORTANT  The panels expand and contract depending on the temperature        ensure proper placement  use the 23 inch spacer induded with the tools       4 2H Place 28
19. ded part    gt    farther inte nut so end touches the edge of the    E    profile and holds in place  Do not over tighten         will be difficult to loosen again to adjust   T       position to fit holes in connectors  Shown hand tightened in F  1 bolt track          NOTE  Screwing 5 28 threaded part farther into nut so it holds is referred to in this manual as  hand tighten     Loosen set screw  refers to unscrewing the 5 28 threaded part enough so set screw easily slides                  We recommend assembling all set screws before beginning  Each step shows quantity  needed separately  Connectors are secured with 5 2C bolt using set screws in later steps        1 2  Thebaseis made up of four P  1  four P 1B  one P 2A and one    26 profiles  Arrange profiles in  a rectangle as shown  Position P 2A and P 2B profiles at back sides of the greenhouse             IMPORTANT  Position  P 2A and    2   profiles  at back of greenhouse     WARNING  Use extreme caution when handling profiles P 1A  P 1B     2   and P 2E  The bottoms may have sharp edges near the drilled  holes  The cut edges on the comers of these profiles are sharp        7 of 44    1 3 Separate profiles to install set screws into inside and outside bolt tracks  Some of the set  screws will be secured in this step  Most are secured in later steps  They are difficult to install  after the base is assembled  Pay careful attention te ensure you have the correct number of set  screws in the correct bolt track in each p
20. front and back of greenhouse until each  end is flush with ends of front and back profiles     fs ee pure ES UI UTR    NING  Use two people to install roof ridge Place ladder in  inside of greenhouse  One person will stand on the ladder holding  the ridge until it is in the proper position and secured in place        T 2B Make sure end of roof ridge le  flush to profiles on front and back           7 3  Working from inside  secure roof ridge to front end wall Loosen set screws and adjust position  to fit holes in B 7 connector  Secure with two bolts     T 3B Fepeat step 7 54 to secure back                Working from outside  ensure all pieces are still flush and secure roof ridge to front  Loosen set  screws and adjust position to fit holes in C Z connector  Secure with three bolts     7 46 Repeat step 7 4 to secure back     ar  a       NOTE VIEWS FROM OUTSIDE      31 of 44 rey FUEL CODI          Assemble Roof                   E   3       i   m 4   3     8 A M i  IM    M PO  Hio     m i   HE iE E    H          i i   HIRE      i   lis IN a H   pede 2  21      F   H 8 i Wh        ni d            Ht 3j a Win Hin      4      HE   pA il Hi m  3 H           32 of 4    JRETWVE COM    8 2 The roof panels are installed in the sestlons shown  below  Use two and a step ladder to  assemble the roof  Place stap ladder inside  greenhouse  Have one person stand on  ladder inside and guide panel inte  channels      roof ridge and corner  profiles  The other person   rts the endof the  pane
21. gled edge facing up onto corner W 1 panel  F 6 profile fits    snugly between    7 corner profile and F 1 wall profiles  L3        4    N aa  BP       NOTE  VIEWS FROM INSIDE       5 3E From inside  line up F 5 profile as  shown  Make sure B 2 connector is  pointing towards door opening        5 3F Adjust set screws and place    2  connector on profiles as shown   Slide set screws      vertical openings    to center of opening      B 6 trim z      plate will fit properly    NOTE  VIEWS FROM INSIDE    VIEWS FROM INSIDE     6 36 Install B 6 trim plate and secure with three bolts           1    NOTE  VIEWS FROM INSIDE       Panel                 4A Working from inside front right corner  install F 1 profile next to W 1 panel   Place 23 inch spacer on base next to F 7 corner profile and slide F 1 profile    against spacer to ensure proper placement     IMPORTANT  The panels expand and contract depending on the temperature        ensure proper placement  use the 23 inch spacer included with the tools        two 5 20 bolts        MOTE  Panels will not fit completely to end of channels     There will      some space to allow for temperature changes   5 46 Continue working from inside right corner  place F 6 profile with  mitered end next to corner and angled edge facing up onto EJ    corner W 1 panel  F 6 profile fits snugly between p                F 7 corner profile and    1 wall profiles           From inside  line up F 5 profile             shown  Make sure B 2 connector is  poi
22. il needed   3 18 Prepare three    1 wall profiles  Slide set screws Into both bolt tracks on one end of profile and  one bolt track on the other end  The single set screw will  sit on the Inside near the base when Installed   Hand tighten each set screw to    hold in place        3 12 Prepare two F 6 profiles  Slide set screws 2 10 Prepare two F 10 profiles  Slide set screws  inte beth bolt tracks on each end of two inte beth bolt tracks on each end of two   F 6 mitered profiles  Hand tighten F 10 profiles  Hand tighten each set screw  each set  screw to hold in place     3 2  Working from inside  remove plastic film from both sides of one W 1 panel   Fit panel inte channel in base and corner profile  placing side marked   UV Rasitant  facing outside     IMPORTANT  The panels expand and contract depending on the temperature   To ensure proper placement  use the 23 inch spacer included withthe tools       3 2B Place 23 inch spacer on base next to    7 corner profile  Fit panel into  channel in    1 profile and slide    1 profile against spacer to ensure proper  placement  Position F 1 profiles      single set screw is next to base on inside     NOTE  Panels will not fit completely to end of channels   There will be some space to allow for temperature changes     i  pd                  3 20 FIE B 3 connector and secure  with two 5 2 bolts                    VIEWS ARE FROM IMSIDE       3 2D Continue building the end wall from the inside  Use the spacer with each panel and the tw
23. ks are secured with the set screws in  F 7 profiles on each side and the two set screws  in F 5 profile  Remove two bolts from center  B 2 connector on F 5 profile  Slide set  screws to Inside edge of hole          NOTE VIEW FROM OUTSIDE              ALL VIEWS FROM OUTSIDE     10 18 Loosen set screw in left F 7 profile and position to line up holes in D  1L as shown        i              IMPORTANT  Position 0 11 and D 1R door       tracks with lip      the bottom when installed     10 1   Loosen set screw in right F 7 profile and position to line up holes in D 1F   as shown  Loosely secure with bolts     c  Um  EM          EE    AL       N   DAR       10 2 From the inside  position set screw three inches from right and left    1 door  lt 2        frame profiles  Install B 5 connector      shown and secure each with a bolt  ALT       10 3A Working from the outside  apply the D 4 door sealant tape to the outside of F 1 profiles  that make up the door frame  This tape acts as insulation  Beginning directly below  D 1L and D 1F door tracks  smooth tape down to P 1A and P 1B base profile   make sure the tape is even  Cut each strip at the bottom     10 368 Wrap the top part of each of the B 3 door  guides with the D 4 door sealant tape          NOTE  VIEW FROM INSIDE       LaL   10 3C Wrap the bottom part of each of the D 5                       door guides with the D 4 door sealant tape    NOTE  VIEW FROM OUTSIDE                    104   Toinstall D 2L factory assembled door  rem
24. l from the outelda              Section 1  Back two W 1 panels  Section 2  Front two W 1 panels   Section 5  Next W 1 panel from back right  Section 4  Middle four W 1 panels   Section 5  Final W 1 panel and two W 2 panels             IMPORTANT  The panels expand and contract depending on the temperature  Under some conditions  the  panels may require slight force to install  Do not use excessive force or you may move profiles out of position   When you are having dificulty sliding the panels  use dish soap with water on the edges as a lubricant     MOTE  Use the induded five foot bungee cords for added support  They will help  hold the sides in position while assembling the roof  Remove as you install profiles     6 24 Working from the inside  install B 4 connector on every other side profile  on both sides of greenhouse  Secure each with one bolt        NOTE  VIEWS FROM INSIDE       8 2B Hook one end of bungee cord into top    hole in B 4 connector on each side          NOTE  VIEWS FROM INSIDE          33 of 44                              OOM                     6 3 4 Working from back right corner  remove plastic film from both sides of one  W 1 panel  With side marked  UY Resistant    facing outside  fit top end of  panel inte channel in K 1 roof ridge near corner  Push panel into roof  ridge channel until the other end reste on gutter ledge and then  slide towards F 7 corner profile  Repeat to install W 1 panel       back left corner            6 358 With two set screws
25. lt tracks on one end of profile and  one bolt track on the ether end  The sings set screw will sit on the inside of the greenhouse  near the base when installed            2 1C Hand tighten each set  screw to hold in place        2 2   Begin at front right corner  Remove plastic film from both sides of one W 1  panel  Fit panel inte channel in base  placing side marked    UV Resistant     facing outside  The panels will help hold the profiles up during assembly     2 2p PlaceF 7 corner profile on base  fitting panel into channel  Slide  set screws into base so they line up  Fit B 5 connector on each side     S          NOTE VIEWS ARE FROM OUTSIDE     2 34 Continue working from inside  Remove plastic film from both sides of one W 1 panel  Fit panel  inte channel in base and corner profile  placing side marked   UV Fesist ant    facing outside     IMPORTANT  The panels expand and contract depending on the temperature   To ensure proper placement  use the 23 inch spacer included withthe tools         2 3B Place Z3 inch spacer on base next to F 7 corner profile  Fit  panel into channel in F  1 profile and    slide F 1 profile against spacer to ensure proper placement  Position F 1 profiles so single set   screw is next to base on inside     NOTE  Panels will mot fit completely to end of channels   There will be some space to allow for temperature changes     2 30 Fit B 3 connector and secure with two S 2C bolts          NOTE  VIEW FROM INSIDE     2 30 Continue building the side w
26. me position  Loosen set screws on profiles  and adjust position to fit holes in    1 connectors  Fit B 1 connector to profiles as shown     BAB Secure each    1       NOTE  VIEW FROM OUTSIDE     28 of 44            56 5   Continue working from outside to install  panels a shown  Ramowe plastic film  from both sides of two W 3 and  two W 4 panels  Fit each  panel inte channel in  profiles  placing side  marked     UV Resistant       NOTE  VIEW FROM OUTSIDE     WARNING  The comers of W 3 and W 4 panels  are sharp  Use extreme caution when handling    NOTE  Panels will mot fit completely to end of channels   There will be some space to allow for temperature changes     6 64 From outside fit F 7 profiles into each side of back  Arrange the profile      channel lines up  with tops of panels and the set screws on each end are visible  Begin with either right or left  sida  Profile side fits against cut angle of F 3 profile  One  end touches top of gutter and the top end  touches edge of F 2 center profile   Position both F 7 profiles                 VIEW FROM OUTSIDE       6 68 Use C 1 connector to secure each  outelde corner  Loosen set screws on  profiles and adjust position to fit holes in       1 connectors  Make sure all profiles line up flush  against each other  Secure with three bolts  Repeat on other sida        B 6C Check inside corners to ensure B 7    connector is still in proper position   IF it needs adjusting  repeat steps 6 68    and 6 60 until each corner  6 set   
27. ms  Loosen and slide set screws to line up  with connectors making sure the seams line up and the  gutters remain straight     2 TB Begin at the three seams and arrange set screws so middle screw is  centered  Fit B 5 connector onto gutter and hold in place  using the two end bolts        27C Leosen set screws      side profiles and slide down  Fit wide part of B 3 connector onto set  screw  slide up inte place fitting gutter set screw at other end  Tighten set screws and       secure with bolts   NOTE  The bottom of B 3 connector extends pastthe edges of side and            comer profiles  B 3 connector sits over B 5 connector  Secure all with bolts           13 of 44             OR    Assemble Back Wall       Make certaln the places are In the correct positions before assembling   Carefully follow the order of assembly to ensure an easy Installation   Wear proper safety gear Including work shoes  gloves and goggles   Prepare required set screws as shown In step 1 7          MOTE  Have the hex shaped indent facing up  Screw in until itis flush with bottom of nut so  it slides easily into bolt tracks  After inserting into bolt track  screw in until it holds in place                   Prepare one F 7 corner profile  Slide set screws into all three bolt  tracks       one end and inte two side bolt  tracks on other end of corner              MOTE  Set screw      center bolt channel is used when installing optional  shelving units  Install F 7 profile with set screw near base unt
28. nting towards door opening       NOTE  VIEW FROM INSIDE     NOTE  VIEW FROM INSIDE    5AF Install B 6 trim plate and secure with    three bolts   5 46 Adjust set screws and place B 2 connector on    profiles as shown  Slide set  screws In vertical m  openings to center of opening so B 6 trim    plate will fit properly                       BS TWW  CON 23 of 44             5 5                              is 6514  high from the base       avold adjusting the placement  after assembly  prepare door frame using the exact measurements  listed in these steps     5 54 Prepare one F 4 profile  Slide two set screws into bolt track          5 5G Place one end of F 4 profile against F 5 profile on flat level surface   Center F 4 profile to F 5 profile and adjust set screws to fit B 2  connector  Secure with three bolts           a    Smm  LJ   5 amp 0mmil    22                     IMPORTANT  F 4 profile is centered to F 5 profile and secured on both sides with B 2 connector     5 5D Turn profiles over and place      flat surface   Slide two set screws into bolt tracks of F 4  and F 5 profiles  Repeat step           to place and secure B 2 connector    NOTE  The inside has two extra set   screws on the ends of F 5 profile                             Working from inside  remove plastic film from both sides  of two W 3 panels  Fit each panel inte  channels      profiles  placing side  marked     UV Resistant     facing outside        set screws on ends of F 5 profile  and adjust position 
29. o  remaining    1 profiles  Repeat steps 3 2A through 3 ZC        3 3 Add the last W 1 panel to complete the back  From the outside  fit F 7 corner profile into  place and secure with two       connectors            Ju        gt                   VIEWS ARE FROM OUTSIDE          3 4  Thetwo sete of F 6 and F 10 profiles fit      top of W  1 panels  Line up  bottom bolt channels with top edge of F 1 and F 7 vertical profiles   Profiles will            3 44 Working from inside right corner  place  F 6 profile with mitered end next  te corner and angled edge  facing up onto corner W  1  panel  F  amp  profile fits snugly  between F 7 corner profile  and    1 wall profiles          3 46 Continue along back wall  Place first F  10 profile  on next W 1 panel  Make sure profile fits snugly  between the two    1 wall profiles     3 40 Place second F 10 profile on  next W   and ensure    it fits snugly                       3 4D Place second F 6 profile with mitered end next  to corner and angled edge facing up onte  corner W 1 panel  F 6 profile fits snugly  between F 7 corner profile and  F 1 wall profiles      NOTE  ALL VIEWS FROM INSIDE       From inside  loosen set screws on profiles and adjust position to fit holes in B 1 connectors   Fit B 1 connector to profiles as shown                3 58 Secure each B 1 connector  with three belts     NOTE  ALL VIEWS FROM INSIDE       PSI COM 15 of 44       Assemble Left Wall              Make certaln the places are in the correct positions 
30. ove the bolt attaching left door  track D  1L to F 7 profile  With the wheels facing the inside  line up so they  roll inte the left door track  As you roll the door along the track  make  certain it slides inside the B 5 door guide installed in step 10 2   Continue to rell door until it stops next to the bolt at  the center  Secure using the bolt you removed                  10 40 Make sure the doors hana  properly  slide easily and look p  straight  IF you need to adjust  54  either one or both  loosen   the center bolts to either  ralse or lower each door as  needed  Secure the center  bolts when finished     10 54 Lining up holes in door  install the D 5 door knobs  using the Included screws     MOTE  VIEW FROM OUTSIDE     10 56 From the inside  place the D 5 door guide bracket      inte the channel in the base profile lining holes in bracket with                    Use  two 5 3 screws to secure  Repeat to install one bracket on each door          NOTE  VIEW FROM INSIDE       43 of 44                 to Flatform    Make certain the placas are in the correct positions before assembling    A Carefully follow the order of assembly to ensure an easy installation   Wear proper safety gear including work shoes  gloves and goggles   Prepare needed set screws as shown In step 1 14      NOTE  Have the hex shaped indent facing up  Screw in until itis flush with bottom of nut so  it slides easily into bolt tracks  After inserting into bolt track  screw in until it holds in place    
31. plete  IF you have never assembled a greenhouse before  make  ita weekend project  We recommend you take your time and read these instructions carefully to avold mistakes     MOTE  These instructions include helpful hints and important information needed to safely assemble and properly  maintain the greenhouse  Please read these instructions completely before you begin     Before Starting Assembly     1  Make sure you have all the necessary parte     Compare the contents of the five cartons with the List  of Parts  If any parts are missing or damaged or W you  have any questions  please contact Customer Service by phone at  B77  373 5076 or by email at  customersenioagirisww com before beginning assembly    2  Lay the parte out In one staging area     The List of Parte has the corresponding step number referenced to each part so you can easily prepare for  each step  We recommend placing all parts in one staging area  Lay out parte by size and shape  Use the List  of Farts to identify the part numbers for profiles and panels  We have not labeled the parts with stickers to  avoid removing them during assembly    5  Select a Location   When selecting a site for your greenhouse  a flat level surface i5 essential and if possible  with proper water  drainage and easy access to power and water necessary for greenhouse gardening  Choose a sunny  level  position away from overhanging trees and power lines and protected from the wind as much as possible   Tha location should      away
32. rofile  The profiles have different amounts of screws on  the inside and outside bolt tracks  The chart and illustration below show the set screw placement     NOTE  Instructions identify twelve set screws necessary for securing to ground in step 11          IMPORTANT  When assembling base  make sure the profiles are straight and flush against each other  Secure  profiles together  and ensure corners are square  The diagonal measurements on inside corners should be equal   Secure corners to desired foundation until assembly is completed  We recommend using a two by four platform        IMPORTANT  Position    2   and P 2B  profiles at back of greenhouse     Set            Placement Code       Set sorews used Insteps 1 44 and 1 48  8 Set screws used Insteps 2 through 10    Set sorews used instep 11       1 44 Make certain side profiles are straight and flush  Adjust position of set screws  in inner bolt track at front of profile to fit holes in B 5 connector  Center  connector over seam for maximum hold  Secure using five bolts  Kepeat  on outer bolt track te install five remaining B 5 connectors at     back and sides  AS TT       IMPORTANT  One B 5 connector is installed on inside front     Remaining B 5 connectors are installed on outside back  and sides  B 8 comer connectors are installed an inside         and are flush  Adjust position ofsete screws      inner bolt track to fit  holes in B  amp  connector   Secure with four bolts  Repeat until each corner is secure     IMPO
33. rom outside  position panel with extended ledge profile at outside top    Install panel at slight angle sliding all the way inte profile   Fit other end inte opposite profile  F necessary apply slight  pressure to bend panel and snap into place     8      Remove plastic film from both sides of second W 2 panel and  repeat step  amp  7B to install in second section from back left     8 85 Have one person stand outside the greenhouse to observe the position of the  roof ridge while the other person installs the two B 9 braces  The set screws  should be in the correct position  but Hf the roof is not completely straight   loosen the set screws and adjust the brace to raise or lower the roof line   Secure each with two bolts              NOTE VIEWS FROM INSIDE                 The G 4 and G 4E trim plates snap into G 1 and G 2 gutter profiles to hold roof panels in place   Working from outside  begin at front corner  Position G 4 trim plate over gutter and use handle  of screw driver to tap into place  Use three trim plates on each side  Make sure the seams of the  trim plates are flush with each other and to the C 1 connectors at the front  There may bea  slight gap at the rear C 1 connector depending on weather conditions     Install Roof Vente    Make certaln the places are      the correct positions before assembling           Carefully follow the order of assembly to ensure      easy Installation   Wear proper safety gear Including work shoes  gloves and goggles      o o O   
34. s Screwdiver  Power Drill  recommended     Make sure each corner ls square and then secure one corner with wood screws   Move to the diagonal corner  make sure It is square and then secure with wood    screws       you continue to secure the 2x4 wood platform  continue to make  certain the corners are square and the frame is level                 Secure wood platform every two feet with wood screws  Make certain to tighten screws into the wood platform  until they are flush with the surface     MOTE  The illustrations throughout the manual are shown without a foundation                  BS TWW  CON Sof 44    List of Parte WARNING  Profiles with cut edges and or drilled holes    are sharp  Use extreme caution when handling     The greenhouse ls shipped      five cartons  These cartons are heavy  Use care when lifting them   Some parte have sharp edges  Use extreme caution when handling   Wear proper safety gear Including work shoes  gloves and safety goggles     Keep children and pete away until assembly ls complete   Finish assembling the roof In one session  Do not leave the roof unattended urrtil It      completely assembled   Place all like parte together      a staging area  Prepare for each step according to Instructions In this manual          If any parts are missing or damaged  contact Riverstone Customer Service before beginning assembly     Customer Service   877  373 3078 or email  customarservicegrisww com  QTY    Stepa       List of Parts  continued     WARNING  
35. se  To avoid adjusting the placement after assembly   prepare door frame using the exact measurements listed in these steps     5 1 4 Prepare two F 5 profiles  516 Fit B 2 connector onto profile and position so bottom  Slide three set screws 1 of connector measures       from bottom of profile   inte bolt track and Secure each with two bolts   position as shown                  5 2B Prepare two F 6 profiles  Slide set screws into both bolt tracks on mitered end of profile and  ona bolt track on the other end         single set screw will sit on the Inside when Installed  Hand    tighten each set screw to hold in place                         Working from inside front left corner  remove plastic film from both sides  of one W  1 panel  Fit  panel inte channel in base and corner profile   placing side marked     UV Fesistant    facing outside     IMPORTANT  The panels expand and contract depending on the temperature   To ensure proper placement  use the 23 inch spacer included with the tools   6 368 Place 2  inch spacer on base next to    7 corner profile  Fit panel into  channel in F 1 profile and slide    1 profile against spacer to ensure    proper placement   MOTE  Panels will nat fit completely to end of channels   There will be some space to allow for temperature changes     5 30 Fit B 3 connector and secure with two  amp  2C bolts          c  NOTE VIEW FROM INSIDE     5 3D Continue working from inside left corner  place F 6 profile with mitered end next to corner and  an
36. ure an easy installation   Wear proper safety gear including work shoes  gloves and goggles   Prepare needed set screws as chown In step 1 1        MOTE  Have the hex shaped indent facing up  Screw in until itis flush with bottom of mut so  it slides easily into bolt tracks  After inserting into bolt track  screw in until it holds in place        61A Prepare two F 7 corner profiles  Slide set screws Into the same bolt track         on each  end of profile  Tighten each set screw to hold in place        6 16 Prepare one F 2 profile  Slide set screws Into both bolt tracks on each end of profile   Tighten each set screw to hold in place        1          T  nu L    A    Te  5 1C Prepare two F 3 profiles  Slide set screws Inte both bolt tracks on straight end of  F 3 profiles  Tighten each set  screw to hold in place               WARNING  The cut edge of F 3 profile is  sharp  Use extreme caution when handling           6 2 From insides  add connector B 7 to each corner  Secure each with two belts               IMPORTANT  Bolt track of F 6 front profile is  lower than bolt track of G 1 gutter profile       NOTE  VIEWS FROM INSIDE       6 3 4 Continue working from inside  Line up F 2 and F 3 profiles with F 1 profiles as shown  Loosen  set screws and adjust position to fit holes         1 connectors  Make sure profiles are straight     6 38 Secure with bolt in each  B 1 connector        NOTE  VIEW FROM INSIDE    Gl 5 2      6 4 4 Work from outside to add    1 connectors in the sa
    