Home
Trex WBFGATEDBLKIT Installation Guide
Contents
1. 1 2 down from top of gate and 1 3 4 from the edge of gate to hit the inner steel frame using 1 self drilling screw A B Attach lower D ring to the latch side of the panel 2 up from bottom of gate and 1 3 4 from the edge of gate using 1 self drilling screw A Slide a Steel Post Stiffener into each hinge post Open side of insert should face away from gate opening B Set posts into post holes that are 30 deep or to m frost line by 12 wide C Lengthen the turnbuckle as long as possible before proceeding by twisting the center ring Attach the turnbuckle to the upper D ring using the S hook C Opening measuring from inside edge of post to inside edge of post for Trex Double Gate using 2 large gate panels should be 130 1 2 Inside faces should be plumb and parallel Check for level D Loop one end of the cable through the lower eye i D bolt of the turnbuckle Attach a cable clamp and Opening for double gate using two small panels C tighten nuts as tight as possible should be 91 1 2 For custom size double gates oar the opening is 2 3 4 larger than the combined 4 430 1 2 E Loop the other end of the cable through the lower D ring and attach the other cable clamp Pull the cable as tight as possible before tightening panel widths o J the nuts Note If Hinge P
2. 8 wide x 18 deep below the drop rod fill it with concrete and insert an 8 long 3 4 pvc pipe in the concrete for the drop rod to slide into after the concrete has cured 24 STEP 5 MAKE ANY FINAL ADJUSTMENTS TO THE GATE HINGES AS NEEDED A To adjust a sagging gate or to shift panel in the opening loosen the hinge nuts with an 11 16 wrench B Loosen or tighten the nuts in the direction shown below Lift or push panel to slide the hinge C Attach gate handles to the active gate panel using 2 1 supplied self drilling screws Handles should be attached 1 3 4 from the edge of the gate panel The height must be staggered front and back as shown C Retighten the hinge nuts Shift panel left Shift panel right Raise latch side Lower latch side Top wO Hinge Bottom Bottom Bottom wO Hinge wA O Hinge i es E i wA O Hinge gt gt 2013 TFSC D Due to weather and temperature changes periodic hinge adjustment may be necessary to assure proper latch connection
3. THE LATCH AND HANDLES A Attach the latch to the non active panel approximately 36 from the ground using 6 1 1 2 supplied self drilling screws The catch is to be placed in the direction of the gate swing The catch may face up or down depending on the direction of gate swing B Using the 4 1 1 2 supplied self drilling screws attach the striker to the active gate panel lining the striker rod up with the catch on the post latch amp O Nee Swing direction STEP 4 MOUNT THE DROP ROD TO THE NON ACTIVE PANEL Attach the drop rod brackets to the back side of the non active gate panel Reverse the drop rod brackets depending on which side of the gate the lt gt LY drop rod is to be mounted Measuring from the horizontal tab see below attach the lower bracket 3 from the bottom of the gate panel using 3 2 self drilling screws on the inside edge of the gate panel and 1 1 self drilling screw on the face of the gate panel Repeat this process for the upper bracket attaching it 14 from the bottom of the panel Attach the drop rod hanger 24 from the bottom of the gate panel and 2 to the center of the screw holes from the edge of the gate panel Mark the location on the ground where the drop hits If your gate is over a concrete pad drill an 8 deep hole using a 3 4 masonry bit for the drop rod to slide into when the gate is closed For gates over dirt dig a hole
4. TREX SECLUSIONS DOUBLE TREX SECLUSIONS DOUBLE GATE INSTALLATION GUIDE GATE INSTALLATION GUIDE OPTIONAL ANTI SAG CABLE KIT SECLUSIONS DOUBLE GATE COMPONENTS A Seclusions 5x5 fence post For large gate panels it may be neccssary to use an anti sag cable to eliminate the sag of a gate panel Anti sag cable kits can be purchased through your local Trex Distributor B Seclusions fence gate panels 2 B1 Active panel B2 Non active panel ANTI SAG CABLE KIT COMPONENTS C Steel post stiffener 2 D Seclusions fence hinge 4 A Black vinyl wrapped steel cable E Seclusions fence latch B Cable clamp 2 F Seclusions striker C S hook G Seclusions gate handle 2 D D rings 2 H Seclusions drop rod assembly E 1 Self drilling screws 2 2 self drilling screws 6 F Turnbuckle J 1 1 2 self drilling screws 40 K 1 self drilling screws 16 BACK SIDE OF B2 BEFORE YOU BEGIN Read all instructions before installation Follow Trex Seclusions Installation Instructions to lay out fence and dig holes ATTACHING THE CABLE KIT STEP 1 SET THE GATE POSTS Note To make installation easier prop the gate to the desired level using a block of wood under the latch Note Due to concrete cure times set the gate posts side edge of the gate panel gaie p A 2 3 days before gate is installed a ee A Attach upper D ring to the hinge side of the C panel 5
5. ost is not connected to a fence panel 30 it may be necessary to use a Heavy Steel Post B F Remove any slack by tightening the turnbuckle Stiffener or to fill the post with concrete for additional twisting the center ring of the turnbuckle strength a HINGE SIDE LATCH SIDE 12 2013 TFSC TREX SECLUSIONS DOUBLE GATE INSTALLATION GUIDE STEP 2 INSTALL THE GATE PANEL TREX SECLUSIONS DOUBLE GATE INSTALLATION GUIDE A Attach the hinges to the gate panel approximately 6 from the top and bottom of the gate using a 3 8 nut driver and the 4 1 1 2 supplied self drilling screws Pre drilling with e a 3 16 drill bit will make installation easier a o Note Install hinges on the side of the gate that you want the gate to swing toward B Place the gate panel in the opening Adjust the gate to be level and to the desired height by placing blocks under gate panel Allow ample clearance for full swing of gate C Using 4 1 1 2 supplied self drilling screws attach each BiSa hinge to the steel inserted gate post Pre drilling with a l 3 16 drill bit will ease installation D Open the panel and attach the inside corner of the bracket to the gate post E Repeat the process to hang the other gate panel F Adjust hinges using the method described in Step 5 to create an even 7 8 gap between the panels and so the tops of the panels are even STEP 3 ATTACH
Download Pdf Manuals
Related Search
Related Contents
MS-Tech MS-N540-SYS power supply unit EOS SP2 - Dental Emergence H27.2月 User's Guide VisiLine cameras (USB3 Vision™) Attachment B Monitor Dell S2340T - Dell Support Online Drinking Water Notifications 2.4GHz Digital Wireless Video Door Phone User Manual COOL WORKS LITE 取扱説明書 MANUAL DE INSTRUCCIONES Copyright © All rights reserved.
Failed to retrieve file