Home
JELD-WEN THDJW181500181 Installation Guide
Contents
1. INSTALL PATIO DOOR 1 If installing a metal sill pan on concrete cut a piece of self adhesive flashing the length of the sill pan and adhere it to the entire bottom surface where the pan will sit on the concrete 2 If fasteners are required through the sill apply spray adhesive primer to the sill pan and surrounding area Follow spray adhesive manufacturers instructions for application methods 9 _ i s n 4 Cut two pieces of 7 For step down 3 Cut a piece of self adhesive flashing the length of the sill and apply over the entire sill pan For step down landings fold flashing down as shown For continuous slabs trim flush with rough opening self adhesive flashing 9 wide by the sill pan width 3 long q 4 Discard a For continuous i for slab landings E only cut out the inside corner b Adhere the pieces of flashing to the inside corners Stretch flashing as needed to cover corners and lay flat 5 Smooth gaps or bubbles beneath self adhesive flashing with a J roller remove and replace if necessary Step Down Continuous Slab Landing 6 Seal back corners of sill pan with sealant landings only cut plastic drain screen to length of sill 2 center and staple 1 2 below sill edge JELD WEN WINDOWS amp DOORS Warning To avoid injury use at least two people to install Adequately support the door until fully installed 1 For
2. 8 on center APPLY DRIP CAP IF APPLICABLE 1 Apply 1 4 bead of sealant to header as shown 2 Center drip cap on the header with 1 8 overhang on each end 3 Nail drip cap in place as shown SPRAY ADHESIVE PRIMER Apply spray adhesive per manufacturer s instructions protect door from overspray to nailing fin sheathing and building wrap around the patio door as shown ELDWEN INSTALLATION INSTRUCTIONS e for Vinyl Patio Doors with Integral Nailing Fin J11006 WINDOWS amp DOORS Gl SH PATIO DOOR CONTINUED APPLY THE SELF ADHESIVE FLASHING 3 Center and apply the header piece Note Keep the edge of the self adhesive flashing as close to the patio above the header door frame as possible 4 Press the flashing 1 If applicable center down with a J roller and apply the sill piece underneath the sill bottom 1 2 of the drain screen must remain visible Trim drain screen and or flashing as necessary the fit the specific wall condition 5 Do not allow gaps n or bubbles beneath Width of flash ee i u TERE self adhesive flashing remove and replace if necessary 2 Apply the side pieces at a point above the head jamb that is 1 less than the width of the flashing and proceed downward along the side jambs COMPLETE INSTALLATION 1 Seal the upper SUPPORT TRIM STEP DOWN LANDING ONLY corners of the patio door to flashing with a 1 4 bead of sealant Too
3. back edge and lightly crease a folding line across Measure k frame the sheet material width 5 For step down landings cut 1 2 in at this line on both sides of the sheet material JELD WEN WINDOWS amp DOORS EJ INSTALL SILL PAN CONTINUED INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin JI11006 INSTALL SILL PAN 1 Set the sill pan in the rough opening aligning the front edge for continuous slab or folded down edge for step down with the exterior of the rough opening 4 PREPARE STUD FRAMED WALL 2 Mark a line across the front and back of the sill pan 3 Apply three 3 8 beads of sealant between the lines 4 Place the sill pan in the rough opening Firmly press the sill pan into the sealant with a J roller PREPARE BUILDING WRAP Note Check with the building wrap manufacturer to verify the following steps will not void their product warranty 1 Trim building wrap flush with the rough opening 2 At the head cut building wrap at 45 and tape up as shown 3 Trim the sides of the building wrap sufficiently to allow the nailing fin to be mounted against the sheathing INSTALL JOBSITE FABRICATED SILL PAN Note The rest of the steps in this section only apply to a job site fabricated sill pan If installing a sill pan that you have purchased follow manufacturer s instructions for installation and skip to section 5
4. the left on the exterior or vice versa can be converted to open from the opposite side by following the instructions in our document SVC001 available at www jeld wen com Do not install the patio door until after completion of the reversing instructions and the fixed panel is on the desired side Please contact us with questions Email customerserviceagents jeld wen com Phone 800 JELD WEN 800 535 3936 Jw JELD WEN WINDOWS amp DOORS C4 ROUGH OPENINGS This installation guide specifically addresses sheathed wall and open stud construction FULLY SHEATHED WALL CONSTRUCTION The wall framing is covered by sheathing Sheathed This installation Wall assumes building wrap is properly installed over the sheathing and the door will be mounted with the nailing fin flush against the sheathing ES SAFETY AND HANDLING SAFETY Read and fully understand ALL manufacturers instructions before beginning Failure to follow proper installation instructions may result in the denial of warranty claims for operational or performance problems Do not work alone Two or more people are required Use safe lifting techniques Use caution when handling glass Broken or cracked glass can cause serious injury e Wear protective gear e g safety glasses gloves ear protection etc Operate hand power tools safely and follow manufacturer s operating instructions Use caution when working at elevated heights If dist
5. the opening If damaged apply new building wrap in shiplap manner Verify the rough opening framing is structurally sound Contact your local waste management entities for proper disposal or recycling of products being removed EJ INSTALL SILL PAN Verify the rough opening is square The A and B measurements should be the same Maximum allowable deviation from square is 1 4 The sill can be prepared using one of two methods We recommend 6 For continuous SureSill Sloped Sill Pan available from SureSill at www suresill com slab cut across the Fold sides and back up building supply stores and some manufacturing locations As an folding line alternative a sill pan can be fabricated on site by following the 7 Fold the three back instructions below If installing a SureSill sill pan follow SuresSill s sides up to make a instructions for installation and skip to section 4 PREPARE 3 sided box and STUD FRAMED WALL for step down JOBSITE FABRICATED SILL PAN landings fold the Peoldcatnae Fold ene front flap down forward flap down 1 Cut a piece of sheet material to the Lenatai h ing sill plus 1 length shown pid of rough opening sill plus 2 Lightly crease folding ZN lines 1 2 in from the Frame two short sides and a Rameau one long side of continuous slab 3 Measure the width Folding Line of the frame and add 9 16 4 Take this distance from the
6. F INJURY OCCURS IMMEDIATELY SEEK MEDICAL ATTENTION e Polyurethane low expansion Window and Door foam We recommend OSI QUAD Foam or equivalent e 4 6 or 9 as required by local code and window configuration wide self adhesive flashing We recommend OSI Butyl Flash Tape or equivalent e Spray adhesive primer for self adhesive flashing Such as Loctite 300 or equivalent e For step down landings only Plastic drain screen with crisscross or woven pattern sold in 6 widths to protect rain gutters and 3 8 staples The drain screen provides a path for air to dry any incidental moisture in the rough opening e Drip cap material if not supplied required only for side by side mulled units that extends the length of the frame plus 1 8 overhang on each end NEEDED TOOLS e Hacksaw used only for SureSill e Level 4 ft minimum sill pan recommended e Cutting shears used only for e J roller fabricated sill pan e Caulking gun Drill with bits e Construction stapler e Tape measure e Utility knife Jw ELDWEN INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin J11006 WINDOWS amp DOORS a REMOVE PACKAGING AND INSPECT WINDOW REMOVE PACKAGING e Splits cracks holes missing sections or other damage to the nailing fin longer than 6 and or within 1 2 of patio door frame e For side by side mulled units only a drip cap may be pre installed If INSPECT PATIO DOOR not pre instal
7. JELD WEN WINDOWS amp DOORS INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin JII006 A IMPORTANT INFORMATION AND GLOSSARY Not all patio door types may be installed into every wall condition in all areas Consult your local building code official for applicable building codes and regulations Local building code requirements supersede recommended installation instructions Please Note Any patio door installation such that the sill is higher than 35 feet above ground level or into a wall condition not specifically addressed in these instructions must be designed by an architect or structural engineer Failure to install square level and plumb and on a flat surface without peak and valleys could result in denial of warranty claims for operational or performance problems Note to Installer Provide a copy of these instructions to the building owner By installing this product you acknowledge the terms and conditions of the limited warranty as part of the terms of the sale GLOSSARY Backer Rod backing material A material e g foam rod placed into a joint primarily to control the depth of the sealant Continuous Air Seal Backer rod and sealant or low expansion foam applied to the interior gap between the product and the building in a continuous fashion which serves to block air flow between the interior and exterior of the building envelope Mulled Unit Two or more door units structural
8. continuous slab landings only score and remove nailing fin at sill 2 If installing a pre formed sill pan follow manufacturer s instructions and skip this step If installing a job site fabricated sill pan run a continuous 3 8 bead of sealant along the sill pan back dam When the frame is installed make sure the frame makes solid contact with the sealant Add more sealant if necessary 3 Run a continuous 3 8 bead of sealant around the interior side of the nail fin on the side jambs and head On the sill leave at least a 2 gap every 8 where it will contact the rough opening 4 Tilt patio door into the rough opening Adequately support the door until fully installed 5 Fasten patio door between 3 and 4 from one upper corner SHIM THE JAMBS Note Secure all shims with sealant 1 From the interior shim the operating panel side jamb 4 from the corners and at the strike plate Align shims so that strike plate screws installed later will each penetrate a shim 2 Shim the stationary panel side jamb 4 from the corners and at center Gi FLASH PATIO DOOR PREPARE FLASHING Cut pieces of self adhesive flashing to length as follows Min sizes or other specified One header piece 10 longer than the 14 longer than the 20 longer than the header header header for continuous slab for continuous slab for continuous slab landing
9. edule given in the drawings for the product instead of the anchoring schedule in this document Newer construction methods have led to an increase in air and water tightness in buildings This frequently leads to negative air pressure inside the house which can draw water through very small openings Our installation method seals the patio door in a weather tight manner and uses a sill pan to capture and drain incidental storm water from under the patio door Weep Hole weep channel The visible exit or entry part of a water drainage system used to drain water out of a door frame Please allow sufficient time to properly prepare the rough opening install the patio door and ensure its proper operation First Time 1 hr Experienced 34 hr Professional Y2 hr Estimated Install Time for New Construction LANDINGS These instructions cover two patio door sill conditions the step down landing and the continuous slab landing The installation methods vary slightly between landing types Step Down Landing Continuous Slab Landing REVERSE PATIO DOOR HANDING Only pre installed 6 8 and 6 10 Builders sliding patio doors without blinds between the glass that have weep holes on the top and bottom are reversible or specially designed to be converted to be opened either from the left or the right Patio doors that are set up for left hand operation door opens from
10. l into a fillet shape 2 Release the building wrap from above the header previously taped up and overlap the header flashing Seal the ends with self adhesive flashing or building wrap tape 3 For continuous slab landings apply a 1 4 bead of sealant around the sill where it meets the slab Leave gaps at the weep holes as shown On the exterior install support trim underneath the sill where it extends past the landing Position trim snugly against the underside of the door frame INSTALL BUMPER WHERE APPLICABLE For Builders vinyl series doors install Builders the bumper in the elo lysis stationary panel side jamb at vertical center using the 1 self tapping screw provided 4 Ensure sealant on back dam of the sill pan fully seals to the inside face of the door frame sill Apply more sealant as necessary to ensure an airtight seal INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin JI11006 JELD WEN WINDOWS amp DOORS COMPLETE INSTALLATION CONTINUED PATIO DOOR ADJUSTMENT Roller Adjustment Note Adjusting door too high may allow water and air leakage Adjust rollers just high enough to clear sill track and still roll smoothly 1 Builders doors have an adjustment screw on each lower end of the operating panel s Premium doors have access holes on the face of each lower end of the operating panel s Remove sma
11. led see Needed Materials list above for details e Included parts See Provided Materials above Remove shipping materials such as corner covers shipping blocks or pads e Cosmetic damage e Product squareness diagonal measurements must be within If any of the above conditions represent a concern or if you expect 1 4 difference environmental conditions to exceed the patio door s performance e Correct product size color grid pattern handing glazing energy reais do deat the patio door Contact your dealer or distributor efficiency requirements etc or recommendations PA INSPECT ROUGH OPENING e Verify the width and e Verify the rough opening is level and plumb C The maximum height of the patio Verify Square Level and Plumb allowable deviation is 1 8 door are each X 1 2 3 4 smaller than the rough opening width e The rough opening sill must not be crowned or sagged D but rather level or sloped positive slope to the exterior e The exterior face of the rough opening must be in a single plane E height Mulled with less than 1 8 twist from corner to corner units should be e Minimum double studs should be used at all wood framed 3 4 smaller rough openings e The header must be supported by trimmer studs FOR RETROFIT INSTALLATIONS After removing the old patio door remove sufficient cladding siding stucco etc to expose enough intact building wrap to properly seal the patio door to
12. ll vinyl plugs from each hole if present 2 Open operating panel enough to expose a 1 4 gap between the panel and frame jamb Verify the gap is even along entire height of panel to frame If uneven adjust by referring to the following steps Builders Patio Door Premium Patio Door Note Builders roller adjustment screws are in close proximity to the attachment screw Adjust only the lower screw as shown loosening the attachment screw will detach the roller from the operating panel 3 Using a 2 Philips head screwdriver turn the adjustment screw clockwise to raise the panel and counterclockwise to lower the panel 4 Adjust as needed until interlocks grid patterns and jambs line up 5 Test the operating panel for proper operation 6 Re apply the small vinyl caps over the roller adjustment screw holes if applicable Builders Roller Lower panel Attachment screw Adjustment screw Lock Adjustment Note If the strike plate was not previously installed line up the screw holes with the dimples in the operating panel side jamb and drive screws through the two slotted screw holes If the lock does not properly engage the strike plate Loosen the strike plate screws and move up or down until the latch engages properly If the door does not lock or is loose when locked e Turn the latch adjustment screw s in 1 2 turn increments clockwi
13. ly joined together Pilot Hole A drilled hole that is no larger than the body of the screw minus the threads Score Make a cut mark in the same location multiple times Shiplap The layering method in which each layer overlaps the layer below it so that water runs down the outside Sill Pan A flashing component installed in the sill of the rough opening underneath the door Sill pans have upturned walls along the interior edge and at both ends creating a three sided box This component serves as a collection device to drain incidental water to the exterior of the building and should be properly sealed to the opening The best sill pan design has a positive slope to the exterior and offers continuous support to the door s sill Thank you for selecting JELD WEN products Attached are JELD WEN s recommended installation instructions for Vinyl Patio Doors with nailing fin Read these instructions thoroughly before beginning They are designed to work in most existing applications however existing conditions may require changes to these instructions If changes are needed they are made at the installer s risk For installations other than indicated in these instructions contact a building professional Areas such as Florida and the Texas TDI region have different anchoring requirements based on product certification For information on specific products visit www floridabuilding org or www tdi texas gov and follow the anchoring sch
14. r ordered ina color matched product if desired Backer rod 1 8 larger than the widest portion of the gap used in conjunction with sealant bead N INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin JI11006 OPEN STUD CONSTRUCTION If self adhesive flashing is to be applied so that Open Stud it is wider than the with Backing framing of the wall it may be necessary to cover the wall with backing support sufficient to support the entire width of the flashing This backing support should be a non water degradable thin max 1 8 thick sheet material such as vinyl sheeting Completely surround the rough opening with the backing support as shown Backing support must be applied before building wrap MATERIALS AND PATIO DOOR HANDLING e Make sure the operating panel is secured prior to installation e Heed material manufacturers handling and application instructions e Protect adhesive surfaces from dirt moisture direct sunlight and folding over onto themselves e Handle in vertical position do not drag e Do not put stress on joints corners or frames e Store patio door in dry well ventilated area in vertical leaning position to allow air circulation do not stack horizontally e Protect from exposure to direct sunlight during storage e Install only into vertical walls and when conditions and sheathing are dry e Only use recommended sealants on vinyl products I
15. s 3 longer landings 5 longer landings 8 longer than the sides than the sides than the sides or for step down or for step down or for step down landings 3 the landings 5 the landings 8 the height of the step height of the step height of the step 6 longer than the 10 longer than the 16 longer than the sill and 1 narrower sill and 1 narrower sill and 1 narrower than the height of than the height of than the height of the step the step the step Two side pieces For step down landings only one sill piece 5 INSTALL PATIO DOOR INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin J11006 3 Shim the head jamb 4 from the corners of each panel 4 Confirm the patio door for square level and plumb Test for proper operation remove and reinstall if necessary SECURE PATIO DOOR Note Fastener heads must be flush Do not dent nailing fin Always use pre punched holes or pre drill with a 3 16 bit Patio doors will be fastened according to performance rating This rating is located on the gold AAMA label fixed somewhere on the frame generally in the head jamb Look for something like this example R PG20 3645X2426 144X96 SD If this label is missing use the PG35 and above fastener pattern below Fasten through nailing fin holes as follows e PG20 4 from the corners and every 12 on center e PG35 and above 4 from each corner and every
16. se to loosen or counterclockwise to tighten Premium doors have a double latch and two adjustment screws Builders Patio Door Lock hook adjustment screw Premium Patio Door Lock hook adjustment screw Lock hook adjustment screw ELDWEN INSTALLATION INSTRUCTIONS e for Vinyl Patio Doors with Integral Nailing Fin JI1006 WINDOWS amp DOORS 7 A CONTINUED FINISH INSTALLATION CONTINUOUS AIR SEAL 1 Drive two Create a continuous air seal on the interior between the rough opening 10 x 2 1 2 BuildersikatiojpDoo and the door frame with backer rod and sealant or low expansion foam screws included Allow the foam to fully cure and cut flush with a sharp knife Make sure in hardware pack the foam cuts cleanly and doesn t tear through the operi AFTER INSTALLATION screw holes in the strike plate 2 Remove the pre installed screws from the strike plate and replace them 2 Seal any gaps or with the remaining openings at end of 10 x 2 1 2 screws Replacement horizontal mull joints from the hardware mae with sealant pack This will increase security by attaching the patio door to the structure Pre installed 1 Install exterior wall surface per manufactures guidelines 3 Leave an expansion contraction gap of approximately 3 8 between door frame and final exterior wall surface siding stucco etc For a finished look and additional protection seal this gap on
17. the sides Rough with backer rod and eae sealant If sealant is applied above Pre installed M the drip cap ensure screw the sealant bead aw is discontinuous to allow for drainage 4 Protect recently installed units from damage from Sealant joint Replacement j screw plaster paint etc by covering the unit with plastic Please visit jeld wen com for warranty and care and maintenance information Thank you for choosing JELD WEN WINDOWS amp DOORS 2014 JELD WEN inc This publication and its contents are owned by JELD WEN inc and are protected under the U S Copyright Act and other intellectual property laws All trademarks service marks logos and the like whether registered or unregistered are owned or controlled by JELD WEN inc or others Unauthorized use or duplication of JELD WEN intellectual property is prohibited JELD WEN reserves the right to change product specifications without notice Please check our website jeld wen com for current information 07 14 Jy
18. urbing existing paint take proper precautions if lead paint is suspected commonly used before 1979 Your regional EPA www epa gov lead or Consumer Product Safety Commission offices provide information regarding regulations and lead protection EI MATERIALS AND TOOLS PROVIDED MATERIALS 4 10 x 2 1 2 screws to secure the strike plate NEEDED MATERIALS Note Follow all material manufacturers instructions for proper use and compatibility When using flashing spray adhesive primer sealant and foam products we recommend using the same manufacturer and verifying compatibility It is the End User s responsibility to determine if dissimilar materials are compatible to the substrates in the application Sill area e 1 3 4 galvanized roofing nails or 8 x 1 1 4 pan head or washer head stainless steel recommended screws Fasteners must penetrate at least 1 into framing or as required by local code Non compressible or water degradable shims Sill pan It is best practice to use a pre formed rigid positively sloped pvc pan that provides continuous support We recommend using SureSill Sloped Sill Pan manufactured by SureSill Ltd An alternative would be a non sloped pre formed sill pan or one that can be fabricated on site from metal or vinyl sheet material with the proper tools Sealant We recommend OSI QUAD Max Sealant or equivalent This can be used in any application and can be painted o
Download Pdf Manuals
Related Search
Related Contents
Genius BV 200 取扱説明書 2 1 3 4 5 Suncast DBW7000 Instructions / Assembly KOHLER K-9623-2BZ Installation Guide Brodit ProClip 854879 HL1000v - bahag.com 資料5 メンテナンスマニュアルに関する実証項目の検討について Lab 2: Getting familiar with LabVIEW: Part II PDFファイル Copyright © All rights reserved.
Failed to retrieve file