Home

SKIL FM Series User's Manual

image

Contents

1. IT u Go 206 230 VC RAISE L HR LI 1 T STAT 2 f x 39v phe mos a ps yc nde tie together OD TET NOTES isis Duong 0 ses Indicates vire and or conponents supplied by others re 2 ii 090 g n 0 6 x iit TT Motor connection diagram To reverse rotation interchange any two leads 902 i l g 206 230 uc a 4RI LT u D O a AW pg gt i together 0 gt 6 6 18 MIE 3 2 au 2 We AN u x OO SURE ALL POWER IS OFF BEFORE ATTEMPTING WORK ON THIS EQUIPMENT CAUTION SERVICE WORK SHOULD BE PERFORMED ONLY BY TRAINED amp QUALIFIED PERSONNEL MECHANICAL EDGE O DOCK ADJUSTING INSTRUCTIONS Interior bar 1 Stand on the ground in front of the leveler Raise the leveler to to its vertical position Place fork truck forks under lip to hold lip ici out at nearly level position Never work directly under fork truck forks bolt g 2 To adjust the counterbalancing force use the pipe lever supplied with the dockleveler and 8 3 4 open end wrench or socket Place the open end of the pipe Torsion over the protrusion on the casting and rotate spring down We recommend one person to rotate the spring with the pipe handle to the desired strength
2. Copyright 2003 Vestil Manufacturing Company 69 Material Handling Problem Solvers Scissor Lift Table High Rise Lift Time is money Increased productivity gt equals greater profitability cost minimization and worker compatibility Ergonomic products will assist you with your production and safety goals Mobile Lift amp Tilt Work Stand Drum Carrier Rotator Ground Lift Tilter Vestil Manufacturing Company 40 Copyright 2004
3. 7 8 Cylinder Retaining Bolt n a EOD PP PE CYLP 2 WARNING LABEL IDENTIFICATION MAKE SURE ALL WARNING LABELS ARE IN PLACE Product safety signs or labels should be periodically inspected and cleaned by the product users as necessary to maintain good legibility for safe viewing distance ANSI 535 4 10 21 Contact manufacturer for replacement labels o FM SERIES ONLY ru seres FM MODEL SHOWN DECREASE COUNTER BALANCE REDUCIR EL CONTRA BALANCE DIMINUER LE CONTRE POIDS INCREASE CONTER BALANCE INCREMENTAR EL CONTRA BALANCE AUGMENTER LE CONTRE POIDS 244 CAUTION PRECAUCION PRUDENCE CONSULT OWNERS MANUAL BEFORE ADJUSTING SECURE AND HOLD LIP IN VERTICAL POSITION HOLD SQUARE TUBING SECURELY BEFORE LOOSENING LOCKING BOLTS WITH ANOTHER WRENCH ADJUST IN DESIRED DIRECTION THEN TIGHTEN LOCKING BOLTS ON FLATS OF INTERIOR ROUND BAR CHECK FOR LIFTING EFFORT AND REPEAT OPERATION IF NEEDED LIP AND PLATE SHOULD NOT FLOAT WHEN LIP IS EXTENDED DECREASE COUNTERBALANCE IF NEEDED GREASE HINGES OIL LINKAGE AND CHECK FOR WEAR MONTHLY T amp S EQUIPMENT CO ANGOLA IN CONSULTE EL MANUAL DEL PROPIETARIO ANTES DE AJUSTAR ASEGURE Y MANTENGA LA CEJA EN POSICION VERTICAL MANTENGA EL TUBO CUADRADO DE FORMA SEGURA AN TES DE SOLTAR LOS PERNOS CON OTRA LLAVE AJUSTE EN LA DIRECCION DESEADA ENTONCES APRIETE LOS PERNOS DE SEGURO EN LAS PARTES PLANAS DE LA BARRA INTERIOR COMPRUE
4. et avertissements Instructions de r ception Instructions de chargement Instructions de d semballage et de manutention Instructions de fonctionnement Instructions d installation Sh ma lectrique Instructions d ajustage des ressorts s ries FM INSTRUCTIONS DE S CURIT ET AVERTISSEMENTS Lire le manuel d utilisation compl tement avant de faire fonctionner l unit Ne jamais exc der la capacit maximale de chargement inscrite sur la plaque de l unit Charger l unit aussi uniform ment que possible Consulter l usine pour des capacit s de chargement in gales Ne jamais faire foncionner l unit sans la surveiller Garder mains et pieds l cart des aires de pincement Ne pas faire fonctionner moins que les blocs de S curit soient en place et bien enclench s Ne pas pincer le cylindre dans un tau ceci peut d former le baril Ne pas changer le r glage de la soupape de rel che de pression s ries PP et PE Ne pas continuer appuyer sur le bouton en haut si l unit ne monte pas s ries PE Ne pas continuer pomper sur la pompe manuelle si l unit ne monte pas s ries PP Retirer tout chargement avant de travailler sur l unit Couper le courant avant de travailler sur l unit s ries PE Ne pas utiliser de liquides de freins ou d huiles pour crics Utiliser de l huile hydraulique AW 32 ou quivalent s ries PP et PE Consulter l usine pour des ajouts
5. 1 Mettez vous surle sol devantle niveleur de qui Faites monter le niveleur dans une position verticale Fixer bien fermement dans cette psoition Maintenir en position la l vre en y attachant une chaine dans le trou de levage et puis l ancrant fourche ou un jambage de port 2 Pour ajuster la force quilibrante du contrepoids utiliser poign e de tube incluse avec le niveleur de quai et une cl tube surla protub rance du moulage ettourner vers le bas Nous vous recommandons qu une personne tourne le tube qui enroule le ressort la tension d sir e et qu une autre bloque les boulons de 3 4 pouce sur le flat frais 3 Quand la torsion n cessaire est trouv e retoiurner le niveleur sa position normale de fonctionnement V rifier les ajustements et s il ne soul ve toujours pas comme il faut r p ter les actions ci dessus pour augmenter ou d crou tre la torsion de soul vement du ressort Si le niveleur saute ou flotte quand lal vre est d ploy e il y a trop do torsion de soul vement R p ter les actions ci dessus pour d cro tre la torsion de soul vement Barre Int rieure Boulon de Verrouillage N gt Plaque de Ressort de M Torsion ontage Surfaces J Cr nel es Augmenter Tube D enveloppement du Ressort NOTE C est une occasion excellente pour mettre de la graisse sur les embouts de graissage Un pistolet graisseur ordinaire marche pour cela Il faut faire cela
6. FLATS OF INTERIOR ROUND BAR CHECK FOR LIFTING EFFORT AND REPEAT OPERATION IF NEEDED LIP AND PLATE SHOULD NOT FLOAT WHEN LIP IS EXTENDED DECREASE COUNTER BALANCE IF NEEDED GREASE HINGES OIL LINKAGE AND CHECK FOR WEAR MONTHLY T amp S EQUIPMENT CO ANGOLA IN CONSULTE EL MANUAL DEL PROPIETARIO ANTES DE AJUSTAR ASEGURE Y MANTENGA LA CEJA EN POSICION VERTICAL MANTENGA EL TUBO CUADRADO DE FORMA SEGURA AN TES DE SOLTAR LOS PERNOS CON OTRA LLAVE AJUSTE EN LA DIRECCION DESEADA ENTONCES APRIETE LOS PERNOS DE SEGURO EN LAS PARTES PLANAS DE LA BARRA INTERIOR COMPRUEBE EL ESFUERZO DE LEVANTAMIENTO Y REPITA LA OPERACION SI ES NECESARIO LA CEJA Y LA PLATAFORMA NO DEBEN FLOTAR CUANDO LA CEJA ESTA EXTENDIDA REDUZCA EL CONTRABALANCE SI ES NECESARIO ENGRASE LAS BISAGRAS FUGAS DE ACEITE Y REVISE POR DESGASTE MENSUALMENTE T amp S EQUIPMENT CO ANGOLA IN CONSULTER LE MANUEL D UTILISATON AVANT D AJUSTER ASSURER ET MAINTENIR LE REBORD EN POSITION VERTICALE BIEN TENIR LE TUBE CARR AVANT DE DESSERRER LES BOULONS DE VERROUILLAGE AVEC UNE AUTRE CL AJUSTER LA POSITION D SIR E PUIS SERRER LES BOULONS SUR LES SURFACES PLANES L INT RIEUR DE LA BARRE V RIFIER L EFFORT D LEVATION ET R P TER L OP RATION SI N CESSAIRE LE REBORD ET LA PLAQUE NE DEVRAIENT PAS FLOTTER LORSQUE LE REBORD EST TENDU R DUIRE LE CONTRE POIDS SI N CESSAIRE GRAISSER LES CHARNI RES HUILER LES JOINTURES ET V RIFIER L USURE MENSUELLE
7. and the side of the bumper blocks centered chalk line 1 2 inch longer than ramp plate to the ramp mounting the plate Install two anchors 12 inches back from the face of the dock on each side of bumper blocks 4 Using a SKIL ROTO Hammer No 736 or similar 12 Tighten the anchor bolts on the face of the dock tool cut a groove 3 8 deep x 2 wide x ramp then on top of dock length plus 1 2 inch on the outside of the line The 13 Weld and round off with grinder the lag bolts on the groove will start 10 from the dock face and end ramp plate 12 from dock face o A INSTALLATION OF EDGE O DOCK PE AND PP SERIES PE Series Control Box Hydraulic Power Unit GreaseFittings Fill with AW 32 hydraulic oil Hydraulic Hose Installation of PP Series 1 Installthe PP leveler and bumpers per the preceding instructions Install the cylinder with the supplied parts rod end up at bottom only Keep the cylinder closed piston retracted Mount the hand pump adjacent to the leveler on a post or wall Drill a hole thru the wall for hydraulic hose Attach the hydraulic line to the pump run to the cylinder and loosely attach to the cylinder Fill the pump reservoir with the oil Pump oil into line Continue pumping slowly until air ceases to escape from cylinder 2 69 D Tighten fitting cylinder continue pumping until cylinder extends enough to attach to top bracket Attach cylinder Installation of PE S
8. du cadre de butoir et ins rent le plot dans le plat arri re le plot est du c t droit 2 Retirent le traitement jusqu ce que le plat de leveler soit enti rement tendu et se penchant en arri e vers la rampe 3 Poussent le traitement en avant ceci fera tendre et tomber le plat de l vre sur le lit du bas de page 4 Retirent le traitement et le placnt dans le cadre de butoir 5 En chargeant et en d chargeant est complet retirez les cales et permettez au bas de page d carter Le bord o dock reviendra son position initiale Fonctionnement avec pompe maneulle S ries PP 1 Tourner la soupape sur la pompe dans le sens des aiguilles d une montre pour fermer la soupape de retour de fluide Lorsque l galiseur de quai s tend compl tement rel cher la pression afin de permettre au rabat de se poser sur la plate bande de la remorque Bien s assurer de laisser la soupape de retour de fuide ouverte pour permettre l galiseur de quai de flotter avec la remorque 2 Lorsque le chargement d chargement est termin retirer les cales et autoriser la remorque d marrer La bordure de quai retournera sa position d origine Fonctionnement lectrique S ries PE 1 Presser le bouton EN HAUT sur la boite de commande L galiseur de quai commencera s lever Lorsque le rabat de l galiseur de quai atteindra sa compl te extension il s abaissera pour se poser sur la plate bande de la remorqu
9. CONTROL VOLTAGE 24 VOLT AC CORRIENTE 115 Volt 1 Fase 60 HZ VOLTAJE DE CONTROL 24 VOLT CA ALIMENTATION LECTRIQUE 115 Volt 1 Phase 60 HZ 206 VOLTAGE DE CONTR LE 24 VOLT AC GARANTIA LIMITADA GARANTIA LIMITADA DE UN ANO El fabricate garantiza al comprador original contra defectos de material y de mano de obra en circunstancias de uso normal durante un aho a partir de la fecha de compra sin exceder 15 meses despues de la fecha de fabricaci n Cualquier parte que el fabricante decida es defectuosa en material mano de obra y sea devuelta a la f brica previo envio flete pagado ser exclusivamente reparada reemplazada a nuestra opci n El coste de trabajo de reparaciones modificaciones de partes de garantia no est cubierto a no ser que sea reparado en la misma f brica Cualquier modificaci n del producto sin la escrita autorizaci n previa del fabricante puede anular la garantia Esta garantia limitada le da al comprador ciertos derechos legales que varian de estado a estado RESPONSABILIDAD LIMITADA Hasta cierto punto permitido por la ley el fabricante renuncia a la responsabilidad por da os accidentales La responsabilidad del fabricante en todos los casos es limitada y no debe exceder el precio de compra Mal uso modificaciones podrian anular la garantia RENUNCIA DE GARANTIA Nuestra compafiia ha hecho un esfuerzo en ilustrar y describir los productos con precisi n sin embargo estos d
10. and laws as enacted in the State of Indiana DISPOSITION Our company will make a good faith effort for prompt correction or other adjustment with respect to any product which proves to be defective within the Limited Warranty Warranty claims must be made in writing within said year SERVICE RECORD DATE OF SERVICE DATE OF SERVICE WORK DONE BY WORK DONE BY SERVICE PERFORMED SERVICE PERFORMED DATE OF SERVICE DATE OF SERVICE WORK DONE BY WORK DONE BY SERVICE PERFORMED SERVICE PERFORMED DATEOF SERVICE DATE OF SERVICE WORK DONE BY WORK DONE BY SERVICE PERFORMED SERVICE PERFORMED Vestil Manufacturing Corporation 2999 North Wayne St Angola IN 46703 Ph 260 665 7586 Fax 260 665 1339 www vestil com E mail sales vestil com Soluciones de Carga de And n Contenido Avertencias e instrucciones de seguridad Instrucciones de recibo Instrucciones de carga Instrucciones de desempaque y de manejo Instrucciones de uso Instrucciones de instalaci n Esquema el ctrico Instrucciones de ajuste del muelle serie FM ADVERTENCIAS E INSTRUCCIONES DE SEGURIDAD Lea el manual del propietario completamente antes de usar la unidad Nunca exceda la capacidad de carga inscrita la placa Carge la unidad lo m s uniforme posible Consulte con el fabricante para cargas no uniformes Nunca opere la unidad a no ser que
11. corriente para permitir que el cilindro s haga el tabajo de elevar el plato del and n Una caja hidr ulicos contiene los componentes de control hidr ulicos y est atornillada directamente a la bomba de marcha Los componentes hidr ulica contiene los componentes de control hidr ulicos de la unidad el ctrica est n tasados para trabajar con una presi n de 3 000 psi Partes importantes de la unidad el ctrica son El motor el ctrico Los motores est n disponibles para operaciones de simple o tri fase suministros de AX ambos son capaces de voltaje dual La caja de marcha Su eje est sujeto direcamente al eje del motor el ctrico La v lvula de chequeo Su prop sito es prevenir la contracorriente de flujo a trav s de la bomba a v lvula de relieve de presi n Su trabajo es el de abrir un paso para que el flujo vuelva hacia el dep sito en caso de que la presi n de flujo en la bomba exceda 1 500 psi Ya que el sistema no puede tener m s de 1 500 psi a v lvula de chequeo de operaci n piloto Esta es una v lvula de cartucho de operaci n hidr ulica Se cierra para permitir que el aceite fluya hacia el cilindro s cuando el sistema est bajo presi n entonces se abre permitiendo que el nivel del labio descienda cuando la presi n del sistema baja depu s de que el motor se apage El control de flujo de presi n compensada Este regula la corriente de flujo del cilindro s hacia el dep sito cuando la v lvula de oper
12. proper supply all RAISE button is pressed legs and control voltage for an open anywhere in the control circuit Visually check for loose wiring or pushbutton components Motor runs properly but the deck doesn t Verify the motor shaft rotates CCW move or the lip doesn t extend Motor and Ensure that the reservoir is full and that its fill pump not noisy hole plug has been replaced by a breather plug Check for items resting on the leveler Install a pressure gauge to check hydraulic System pressure If it doesn t build to 1 500 psi consult the factory for a replacement pump Leveler raises but won t lower or lowers Remove check and clean the pilot operated only slowly check valve Remove check and clean the pilot operated check valve and the flow control valve Check for any binding of the mechanical parts hinge etc SS O POWER UNIT ASSEMBLY PE 8 H3H1V3Hg8 020 S 1 66 JAYA 38019 OL 6 66 600 10 66 JOHLNOO anne 6 MOT Q103INVIN 55 0 900 S1 66 431134 gt 9 N8 LLO lt gt me d y S00 Ev1 L0 110 91 66 YI3H9 GOO LEO LO H3NIVHIS 9 N8 SLO 9 pg op HAHHVd ONIH O ONIH O SOHS L X 91 8 SIHS 1109 ONINIVL3H X 81 91 S 1104 SNINIVI3H Q 1O3INVIA c 0 S L LO SOLOW 918419313 EDGE O DOCK F
13. purpose is to prevent the backflow of fluid through the pump The pressure relief valve Its job is to open a path for fluid to flow back to the reservoir in the event that the fluid pressure built up by the pump exceeds 1 500 psi Thus the system cannot see more than 1 500 psi The pilot operated check valve This is a hydraulically operated cartridge valve It closes to allow oil flow to the cylinder s when the system is under pressure then opens to allow the levelers lip to fall when the system pressure drops after the motor turns off The pressure compensated flow control This regulates the fluid flow from the cylinder s back to the reservoir when the pilot operated valve opens It allows for the adjustment of the lip fall rate The hydraulic lift cylinders s The hydraulic fluid The system uses HO150 hydraulic fluid Any anti wear hydraulic fluid with an SUS viscosity of 150 200 at 100 F SAE viscosity grade of 32 such as AW 32 or Dextron transmission fluid are acceptable When the leveler is to be extended the operator presses the RAISE pushbutton The motor turns and in turning it spins the hydraulic gear pump Oil is drawn from the reservoir and into the pump System pressure builds and causes the pilot operated check valve to close Once the lip extends out the operator releases the pushbutton The check valve prevents oil from from returning to the reservoir through the pump When the pressure in the hydraulic system dr
14. than 50 ramps and ramp support angles as shown below must be employed Ramp Plate Ramp Plate p diuo 12 L x 2 H P j E 1 i i L L 48 High Dock ova 46 High Dock Linkage Installation Instructions FOR MECHANICAL EDGE O DOCK Remove the cotter pin from the clevis pin Remove the clevis pin from the linkage arms 3 Move the lip plate down until the hole in the mounting bracket is aligned with the holes in the link arms 4 Insert the clevis pin through the aligned holes and fasten with the cotter pin N gt 2 COTTER PIN MOUNTING BRACKET CLEVIS PIN INSTALLATION OF EDGE O DOCK FM SERIES Weld On Installation dock edge steel is 6 or greater 1 Remove all material protrusions from the face of the dock 2 Center the ramp in the doorway and tack weld at each end Be certain the mounting plate does not extend above the edge of dock 3 Continuously weld the mounting plate to the steel dock edge 4 Weld bumper blocks on each side of ramp Weld continuously across tops and down both sides Bolt And Weld On Installation dock edge steel is less than 6 1 Remove all material protrusions from the face of the dock 2 Center the ramp in the doorway and tack weld at the end Be certain the mounting plate does not extend above the edge of the dock Continuous weld 3 Continuously weld the mounting plate t
15. 001419313 unalonW BORDURE DE QUAI S RIES FM IDENTIFICATION DES PI CES POUR BORDURE DE QUAI S RIES KITNO ARTICLENO DESCRIPTION NO D ING NIEUR DE PI CES AD 3 Vis a t te hexagonale 15 8 mm 11 UNC x 63 5 mm 11313 EOD BOLT1 4 C D E 1 Vis t te hexagonale 12 7 mm 13 UNC x 25 mm 13205 EOD BLT2 1 C E 11 Ressort de torsion 07 146 009 EOD TS 1 12 Bloc pare choc 30 048 001 EOD BB 2 Syst me de protection soudure requise 07 024 002 EOD TG 2 13 14 pingle de chape 1 2 dia x 2 3 8 long 07 112 007 EOD CP2 15 Bras d extension de l vre 07 016 018 EOD LEA 4 16 Traitement 07 025 004 EOD HDL 1 17 En plastique poign e 07 025 005 EOD PG 1 1 9 Link Arm 3 knob on end 07 016 021 EOD LEA 3 1 A Kit de remplacement pour pare choc articles 1 3 07 154 001 EOD KIT A 1 B Kit de remplacement de transmission articles 4 7 02 EOD KIT B 1 C Kit de remplacement de ressorts articles 8 10 11 07 154 004 EOD KIT C 1 D Kit de quincaillerie articles 2 4 7 10 07 154 003 EOD KIT D E Kit M canique articles 4 11 07 154 005 EOD KIT E 1 F Kit de contre poids 07 154 006 EOD KIT F BORDURE DE QUAI S RIES ET PE 9 S RIES PE SEULEMENT fe N 3 S RIES PP SEULEMENT IDENTIFICATION DES PI CES POUR BORDURE DE QUAI SERIES PP ET PE ARTICLENO DESCRIPTION ING NIEURNO PI CE NO de commande PE CONBOX PE CONBOX Unit lectrique PE
16. BE EL ESFUERZO DE LEVANTAMIENTO Y REPITA LA OPERACION SI ES NECESARIO LA CEJA Y LA PLATAFORMA NO DEBEN FLOTAR CUANDO LA CEJA ESTA EXTENDIDA REDUZCA EL CONTRABALANCE SI ES NECESARIO ENGRASE LAS BISAGRAS FUGAS DE ACEITE Y REVISE POR DESGASTE MENSUALMENTE T amp S EQUIPMENT CO ANGOLA IN CONSULTER LE MANUEL DU PROPI TAIRE AVANT D AJUSTER ASSURER ET MAINTENIR LE REBORD EN POSITION VERTICALE BIEN TENIR LE TUBE CARR AVANT DE DESSERRER LES BOULONS DE VERROUILLAGE AVEC UNE AUTRE CL AJUSTER LA POSITION D SIR E PUIS SERRER LES BOULONS SUR LES SURFACES PLANES L INT RIEUR DE LA BARRE V RIFIER L EFFORT D LEVATION ET R P TER L OP RATION SI N CESSAIRE LE REBORD ET LA PLAQUE NE DEVRAIENT PAS FLOTTER LORSQUE LE REBORD EST TENDU R DUIRE LE CONTRE POIDS SI N CESSAIRE GRAISSER LES CHARNI RES HUILER LES JOINTURES ET V RIFIER L USURE MENSUELLEMENT T amp S EQUIPMENT CO ANGOLA IN 245 PP amp PE SERIES ONLY LOCATED ON HAND PUMP OR POWER UNIT PE SERIES ONLY LOCATED ON POWER UNIT POWER SUPPLY 115 Volt 1 Phase 60 HZ CONTROL VOLTAGE 24 VOLT AC CORRIENTE 115 Volt 1 Fase 60 HZ VOLTAJE DE CONTROL 24 VOLT CA ALIMENTATION LECTRIQUE 115 Volt 1 Phase 60 HZ VOLTAGE DE CONTR LE 24 VOLT AC HYDRAULIC OIL OR EQUIVALENT ACEITE HIDR ULICO EQUIVALENTE HUILE OU QUIVALENT 206 LIMITED WARRANTY ONE YEAR LIMITED WARRANTY The manufacturer warrants for the original purchaser ag
17. H 12 FA Se 3 4 HP D d u E 4 o amp 2 gt lt co w gt ae Indicates wire and or conponents supplied by others Motor connection diagron Must vire for clockwise rotation facing lend end shom b ee 15 uc PUR 6 9 awan 0 Go 206 230 0 18 L MR RASE u 6 ay 39v Co Medi CALO tie together 018 3 PH 3 1 6 2 3 83 1 3 9 R 2 H 30 MIN 4A LT gest 2 j 24 VAC 40 VA Indicates vire and or conponents suppl ied by others Motor connection diagram To reverse rotation interchange any two leads tie together u 68 9 OO u 0 OO 0 AVISO LAS REPARACIONES SOLO DEBEN DE SER EFECTUADAS POR PERSONAL CALIFICADO gt rte QUE LA CORRIENTE EST APAGADA ANTES DE TRABAJAR EL ESTE EQUIPO INSTRUCCIONES DE AJUSTE DE CANTO DE AND N MEC NICO 1 Situese en el piso delante del nivel Levante el nivel a la posici n vertical nclelo fijamente en esta posici n asegure la barra en posici n fijando la cadena a trav s del agujero y anclando a la transpaleta al tope de la puerta 2 Paraajustarlafuerz
18. M SERIES PARTS IDENTIFICATION EDGE O DOCK FM SERIES KIT CODE ITEM NO DESCRIPTION ENGINEERNO PARTNO QTY A 1 Rubber bumper 29 005 001 EOD RB A D 2 Washer 5 8 33015 EOD WSR 4 A D 3 Bolt 5 8 11 UNC x 2 1 2 11313 EOD BOLT1 4 4 C DE 1 Bolt 1 2 13 UNC x 1 13205 EOD BLT2 1 C E 11 Torsion spring 07 146 009 EOD TS 1 Bumper block 30 048 001 EOD BB 2 Toe guard welding required 07 024 002 EOD TG 2 4 2 13 14 Pin 1 2 dia x 2 long 07 112 007 EOD CP2 1 5 1 Lip Extension Arm 07 016 018 EOD LEA 4 16 Handle 07 025 004 EOD HDL 1 17 Grip 07 025 005 EOD PG 1 18 Link Arm 2 block welded on 07 516 009 EOD LEA 2 1 9 Link Arm 3 knob on end 07 016 021 EOD LEA 3 1 Replacement bumper kit items 1 3 07 154 001 EOD KIT A 1 Replacement linkage kit items 4 7 07 154 002 EOD KIT B 1 Replacement spring kit items 8 10 11 07 154 004 EOD KIT C 1 Hardware kit items 2 4 7 10 07 154 003 EOD KIT D 1 Mechanical Kit items 4 11 07 154 005 EOD KIT E 1 Counter Balance Kit 07 154 006 EOD KIT F 1 EDGE O DOCK PP AND PE SERIES PP SERIES ONLY PARTS IDENTIFICATION EDGE O DOCK PP AND PE SERIES ITEM NO DESCRIPTION ENGINEER NO PART NO 1 Control box PE CONBOX PE CONBOX 2 Power unit PE MOPU PE MOPU 3 Handpump PP HDPUMP PP HDPUMP Extension spring 15146001 EOD ES 1 4 5 Hydraulic cylinder 1 dia x 14 06021001 EOD HC 6 PP Hose Kit 06 623 007 EOD PP HK 1 PE Hose Kit 06 623 006 EOD PE HK 1
19. MENT T amp S EQUIPMENT CO ANGOLA IN 245 S RIES PP amp PE SEULEMENT SITUE SUR LA POMPE MANUELLE OU SUR ELECTRIQUE HYDRAULIC OIL OR EQUIVALENT ACEITE HIDR ULICO O EQUIVALENTE HUILE HYDRAULIQUE OU QUIVALENT S RIES PP amp PE SEULEMENT SITUE SUR L UNITE ELECTRIQUE POWER SUPPLY 115 Volt 1 Phase 60 HZ CONTROL VOLTAGE 24 VOLT AC CORRIENTE 115 Volt 1 Fase 60 HZ VOLTAJE DE CONTROL 24 VOLT CA ALIMENTATION LECTRIQUE 115 Volt 1 Phase 60 HZ VOLTAGE DE CONTR LE 24 VOLT AC GARANTIE LIMIT E GARANTIE LIMIT E UN AN T amp S Equipment Co garantit l acheteur original contre des d fauts de mat riel et de main d oeuvre sous usage normal un an partir de la date d achat Ne doit pas exc der 15 mois apr s la date de fabrication Toute pi ce d termin e d fectueuse par T amp S Equipment Co en mat riel ou main d oeuvre et retourn e l usine frais d envoi pr pay s sera en tant que rem de exclusif r par e ou remplac e l option de T amp S Equipment Les c ut de main d uvre pour des r parations sous garantie et ou des modifications ne sont pas couverts moins d tre effectu s dans une des facilit s du fabricant Cette garantie limit e donne l acheteur des droits l gaux sp cifiques qui varient d un tat l autre LIMITATION DE RESPONSABILIT Jusqu la mesure permise sous la loi applicable la responsabilit de T amp S Equipment Co pour des domm
20. MOPU PE MOPU Pompe manuelle PP HDPUMP PP HDPUMP 1 EOD ES EOD HC Kit de tuyaux PP 06 623 007 EOD PP HK 1 Ressort d extension 15146001 Cylindre hydraulique 25 de diam x 355 06021001 Kit de tuyaux 06 623 006 EOD PE HK Boulon de maintien du cylindre EOD PP PE CYLP Avis Pour des infos concernant des commandes d autres pi ces pri re de se reporter aux pages pr c dentes p 31 7 IDENTIFICATION DES TIQUETTES D AVERTISSEMENT S ASSURER QUE TOUTES LES TIQUETTES D AVERTISSEMENT SOIENT EN PLACE Les tiquettes ou signaux de s curit devraient tre p riodiquement inspect s et nettoy s comme il convient par les utilisateurs du produit afin de maintenir une bonne lisibilit et afin que les signaux et les tiquettes soient visibles une bonne distance de s curit Contacter l usine pour des tiquettes de remplacement ANSI 535 4 10 21 o S RIES FM SEULEMENT S RIES FM SEULEMENT DECREASE COUNTER BALANCE REDUCIR EL CONTRA BALANCE DIMINUER LE CONTRE POIDS INCREASE CONTER BALANCE INCREMENTAR EL CONTRA BALANCE AUGMENTER LE CONTRE POIDS 244 MOD LE FM MONTR CAUTION PRECAUCION PRUDENCE CONSULT OWNERS MANUAL BEFORE ADJUSTING SECURE AND HOLD LIP IN VERTICAL POSI TION HOLD SQUARE TUBING SECURELY BE FORE LOOSENING LOCKING BOLTS WITH AN OTHER WRENCH ADJUST IN DESIRED DIREC TION THEN TIGHTEN LOCKING BOLTS ON
21. PCI N NO INGENIERO 2 CTD A 1 Tope de goma 29 005 001 EOD RB 2 A D 2 Arandela 15 8 mm 33015 EOD WSR 4 B D E 4 Pasador redondo 12 7 mm dia x 50 mm 06 112 003 EOD RP1 4 C D E 10 Tornillo de hex 12 7 mm 13 UNC x 25 mm 13205 EOD BLT2 1 11 Muelle de torsi n 07 146 009 EOD TS 1 1 Bloque del tope 30 048 001 EOD BB 2 2 13 Protecci n de los pies soldadura requerida 07 024 002 EOD TG 2 14 Pasador 1 2 dia x 2 3 8 largo 07 112 007 EOD CP2 1 15 Borde del brazo de extension 07 016 018 EOD LEA 4 16 Manivela 07 025 004 EOD HDL 1 17 Agarradero de plastico 07 025 005 EOD PG 1 8 Juego de reemplazo del tope partida 1 3 07 154 001 EOD KIT A 1 Juego de reemplazo del enlace partida 4 7 07 154 002 EOD KIT B 1 Juego de reemplazo del muelle partida 8 10 11 07 154 004 EOD KIT C 1 Juego de ferreteria partida 2 4 7 10 07 154 003 EOD KIT D 1 Juego mec nico partida 4 11 07 154 005 EOD KIT E 1 Juego del contra balance 07 154 006 EOD KIT F 1 CANTO DE AND N SERIE PP Y PE N r SOLO SERIE PP J NO JUEGO 1 2 3 4 5 6 7 IDENTIFICACION DE PARTES CANTO DE ANDEN SERIE PP Y PE DESCRIPCI N NO DE INGENIERO Caja de control PE CONBOX Unidad el ctrica PE MOPU Bomba manual PP HDPUMP Muelle de extensi n 15146001 Cilindro hidr ulico 25 mm dia x 355 mm 06021001 Juego de la manga PP 06 623 007 Juego de la manga PE 06 623 006 NO PARTE PE CONBOX PE MOPU
22. PP HDPUMP EOD ES EOD HC EOD PP HK 1 EOD PE HK 1 8 Tornillo de retenci n del cilindro n a EOD PP PE CYLP 2 Nota Para informaci n en pedidos de otras partes porfavor refierase a la p gina anterior p 19 IDENTIFICACI N DE LAS ETIQUETAS DE AVISO ASEGURESE DE QUE TODAS LAS ETIQUETAS DE AVISO ESTAN EN SU LUGAR Las se as o etiquetas de seguridad de los productos deben de ser inspeccionadas y lipiadas periodicamente por el usuario como sea necesario para mantener una buena legibilidad a una distancia de seguridad ANSI 535 4 10 21 Contacte al fabricante para etiquetas de reemplazo O SOLO LAS SERIES FM CONSULT OWNERS MANUAL BEFORE ADJUSTING SECURE AND HOLD LIP IN VERTICAL POSI TION HOLD SQUARE TUBING SECURELY BE FORE LOOSENING LOCKING BOLTS WITH AN OTHER WRENCH ADJUST IN DESIRED DIREC TION THEN TIGHTEN LOCKING BOLTS ON FLATS OF INTERIOR ROUND BAR CHECK FOR LIFTING EFFORT AND REPEAT OPERATION IF NEEDED LIP AND PLATE SHOULD NOT FLOAT WHEN LIP IS EXTENDED DECREASE COUNTER BALANCE IF NEEDED GREASE HINGES OIL LINKAGE AND CHECK FOR WEAR MONTHLY T amp S EQUIPMENT CO ANGOLA IN SOLO LAS SERIES PP amp PE LOCALIZADO EN LA BOMBA MANUAL O UNIDAD ELECTRICA Q soos SERIES FM MODELO FM DIBUJADO DECREASE COUNTER BALANCE REDUCIR EL CONTRA BALANCE DIMINUER LE CONTRE POIDS INCREASE CONTER BALANCE INCREMENTAR EL CONTRA BALANCE AUGMENTER LE CONTRE POIDS 244 CON
23. SULTE EL MANUAL DEL PROPIETARIO ANTES DE AJUSTAR ASEGURE Y MANTENGA LA CEJA EN POSICION VERTICAL MANTENGA EL TUBO CUADRADO DE FORMA SEGURA AN TES DE SOLTAR LOS PERNOS CON OTRA LLAVE AJUSTE EN LA DIRECCION DESEADA ENTONCES APRIETE LOS PERNOS DE SEGURO EN LAS PARTES PLANAS DE LA BARRA INTERIOR COMPRUEBE EL ESFUERZO DE LEVANTAMIENTO Y REPITA LA OPERACION SI ES NECESARIO LA CEJA Y LA PLATAFORMA NO DEBEN FLOTAR CUANDO LA CEJA ESTA EXTENDIDA REDUZCA EL CONTRABALANCE SI ES NECESARIO ENGRASE LAS BISAGRAS FUGAS DE ACEITE Y REVISE POR DESGASTE MENSUALMENTE T amp S EQUIPMENT CO ANGOLA IN CAUTION PRECAUCION APRUDENCE CONSULTER LE MANUEL DU PROPI TAIRE AVANT D AJUSTER ASSURER ET MAINTENIR LE REBORD EN POSITION VERTICALE BIEN TENIR LE TUBE CARR AVANT DE DESSERRER LES BOULONS DE VERROUILLAGE AVEC UNE AUTRE CL AJUSTER LA POSITION D SIR E PUIS SERRER LES BOULONS SUR LES SURFACES PLANES L INT RIEUR DE LA BARRE V RIFIER L EFFORT D LEVATION ET R P TER L OP RATION SI N CESSAIRE LE REBORD ET LA PLAQUE NE DEVRAIENT PAS FLOTTER LORSQUE LE REBORD EST TENDU R DUIRE LE CONTRE POIDS SI N CESSAIRE GRAISSER LES CHARNI RES HUILER LES JOINTURES ET V RIFIER L USURE MENSUELLEMENT T amp S EQUIPMENT CO ANGOLA IN 245 SOLO LAS SERIES PE HYDRAULIC OIL OR EQUIVALENT ACEITE HIDR ULICO EQUIVALENTE HUILE OU QUIVALENT LOCALIZADO EN LA UNIDAD EL CTRICA POWER SUPPLY 115 Volt 1 Phase 60 HZ
24. Vestil Manufacturing Corporation 2999 North Wayne St Angola IN 46703 Ph 260 665 7586 Fax 260 665 1339 www vestil com E mail sales vestil com Loading Dock Solutions Contents Warnings and Safety Instructions Receiving Instructions Loading Instructions Unpacking and Handling Instructions Operating Instructions Installation Instructions Electrical Schematic Power Unit Exploded Parts Drawing WARNINGS amp SAFETY INSTRUCTIONS Read owner s manual completely before operating unit Read and understand the owner s manual before using or servicing the leveler The lip plate should be secured outward before any work is preformed on the leveler Ensure that the safety and warning labels stay in place and are legible See the labels page in this manual The Edge O Dock leveler must be securely welded and anchored to the dock face See the installation instructions Do not use the leveler if any damage or unusual noise is observed Always watch the leveler carefully when it is in operation Be sure nothing is on the top of the leveler before operating it Do not perform any modifications to the leveler without the manufacturer s approval Failure to receive authorization for changes to the equipment could void the warranty Maintenance and repairs are to be performed only by personnel qualified to perform the required work Do not use brake fluid or jack oils in the hydraulic system If oil is needed use an antiwear hydraul
25. a o durante descarga an telo en el RECIBO DE ENVIO Quite todo el material de empaquetado y las correas inspeccione por dafios SI HAY DANOS EVIDENTES ARCHIVE UNA RECLAMACI N CON EL TRANSPORITISTA IMMEDIATAMENTE Tambien compruebe el tama o el tipo de electricidad etc comprobar que la unidad que tiene es la correcta para el trabajo NUMERO DE MODELO Y CAPACIDAD El n mero de modelo el n mero de serie capacidad estan inscritos en la placa Porfavor recuerde incluir estos numeros en cualquier correspondencia con su proveidor o con la f brica CANTO DE ANDEN SERIE FM PP PE INSTRUCCIONES DE CARGA La capacidad de carga que ha sido inscrita en la placa de su unidad designa la capacidad neta asumiendo que la carga este centrada Esta capacidad no se debe exceder nunca ya que podrian ocurrir dafios permanentes INSTRUCCIONES DE DESEMPAQUE Y MANEJO PRECAUCION Lea las instrucciones completamente antes de ajustar Siga las instrucciones con cuidado Use una llave inglesa para que no resbale Las recomendaciones de desempaque y de manejo se muestran a continuaci n La altura recomendada del and n es de 127 cm El grado del servicio es de 12 7 cm a 12 7 cm Vara del Cami n Cadena Grapa Autocerrante Mantenga las Manos y los dedos fuera del Area de Engranaje INSTRUCCIONES DE USO l Retroceda el remolque lentamente contra los parachoques de
26. a de contrabalance use el mango de tubo suministrado con el nivelador de and n y una llave abierta de 3 4 o socket Ponga el extremo abierto del tubo sobre la protrusi n de la rueda y gir hacia abajo Recomendamos que una persona gir el tubo con el mango de tubo hasta la posici n deseada y una segunda persona aprite los tornillos de 3 4 hacia milled planos 3 Cuandolaelevaci n requerida detorsi n seha conseguido vuelva el nivelador a la posici n normal de operaci n Compruebe los ajustes hechos y si no se eleva adecuadamente repita los pasos anteriores para incrementar o disminuir el muelle de torsi n de elevaci n Sielnivelador brinca o flota cuando el labio se extiende hay demasiada torisi n de elevaci n Repita los pasos anteriores para reducir la torsi n de elevaci n NOTA Este es una excelente ocasi n para lubricarlos zerks grasos en las bisagras Una pistola estandard de engrase servir para esto Esto debe de ser hecho regularmente para la f cil operaci n y mantenimiento recomendamos mensualmente Muelle de torsi n Disminuir Tornillo de cierre J Incrementar Barra interior Plato montante Molinillo plano Tubo de rosca roz vuom LA OPERACI N DE LA UNIDAD EL CTRICA PE El nivelador de borde de and n el ctrico hidr ulico utiliza un motor el ctrico directamente acoplado a una bomba hidr ulica de tipo marcha para producir la presi n de flujo necesaria y
27. a posici n original Operaci n El ctrica Serie PE 1 Apriete el bot n UP arriba en la caja de control El nivel se empezar a elevar Cuando el borde del nivel alcance la extensi n m xima se empezar a bajar para asentarse en la base del remolque 2 Cuando la carga descarga se haya completado remueva los topes y deje que el remolque se aparte El Canto De And n regresar a la posici n original Pedido de partes extra o de reemplazo Nuestra compa ia est orgullosa de utilizar en nuestro equipo las partes disponibles m s buenas No nos hacemos responsables si el equipo no funciona correctamente si se han usado partes de reemplazo sin aprobar Para pedir partes extras o de reemplazo para su equipo contacte el Servicio del Cliente delaf brica Entodala correspondencia con la f brica porfavor incluya el n mero de serie que est inscrito en la placa del equipo Solo use los n meros de partes provistos en este Manual del Propietario Cuando pida partes para las unidades el ctricas AC porfavor indique la fase y el voltaje del motor que el equipo utiliza INSTRUCCIONSES DE INSTALACI N LEA TODAS LAS INSTRUCCIONES ANTES DE SEGUIR CONSTRUCCI N DEL CANTO DE AND N El procedimiento de instalaci n del Canto De And n es una funci n entre el Canto De And n y la altura diferencial El borde recomendado para instalar el Canto De And n es un buen canal de seis pulgadas Con un canal de seis pulgadas en el ca
28. aci n piloto se abre Esto permite el ajuste de velocidad de caida del labio El cilindro s hidr ulico de elevaci n El flujo hidr ulico El sistema usa flujo hidr ulico HO150 Cualquier flujo hidr ulico de anti gasto com una viscosidad SUS de 150 200 a 100 F SAE viscosidad de grado 32 tal como AW 32 o flujo de transimisi n Dextron son aceptables Cuando el nivel se tenga que extender el operario aprieta el bot n de elevar RAISE El motor gira al mismo tiempo hace girar la bomba hidr ulica de la marchas El aceite sale del dep sito hacia la bomba La presi n del sistema se eleva y causa que la v lvula de chequeo de operaci n piloto se cierre Una vez el labio de ha extendido el operario deja de apretar el bot n La v lvula de chequeo previene que el aceite regrese al dep sito a trav s de la bomba Cuando la presi n del sistema hidr ulico desciende lo suficiente la v lvula de chequeso de operaci n piloto se abre para permitir que el aceite del cilindro s regrese al dep sito a trav s de la v lvula de control de flujo de presi n compensada que regula la velocidad de descenso del labio En caso de que el labio no se eleve ser necesario desmontar la v lvula de chequeo de operaci n piloto para poder inspeccionarla ya limpiarla tal como se explica a continuaci n Asegure el plato del labio en la posici n extendida para permitir el asseso a la unidad el ctrica Desconecte y cierre el suministro el ctrico de
29. ages cons cutifs et fortuits est express ment d ni e La responsabilit de T amp S Equipment Co est limit e et n exc dera pas le prix d achat pay D N GATION DE LA GARANTIE T amp S Equipment Co a apport un effort assidu illustrer et d crire les produits montr s avec pr cision toutefois de telles illustrations et descriptions sont pour le seul but d identification et n expriment ni impliquent garantie que les produits correspondent n cessairement aux illustrations ou aux descriptions Les clauses de la garantie seront analys es et mises en vigueur en accord avec le CODE COMMERCIAL UNIFORME et les lois promulgu es dans l tat d Indiana INCLINATION T amp S equipment fera un grand effort de confiance pour une rapide correction ou autre ajustement avec respect pour tout produit se prouvant tre d fectueux lors de la garantie limit e Les r clamations de garantie doivent tre faites par crit dans les limites de la date dite RAPPORT DE SERVICE DATE DE SERVICE DATE DE SERVICE TRAVAIL EFFECTU PAR SERVICE EX CUT TRAVAIL EFFECTU PAR SERVICE EX CUT DATE DE SERVICE TRAVAIL EFFECTU PAR SERVICE EX CUT DATE DE SERVICE TRAVAIL EFFECTU PAR SERVICE EX CUT DATE DE SERVICE TRAVAIL EFFECTU PAR SERVICE EX CUT DATE DE SERVICE TRAVAIL EFFECTU PAR SERVICE EX CUT
30. ainst defects in materials and workmanship under normal use one year after date of purchase Not to exceed 15 months after date of manufacture Any part which is determined by the manufacturer to be defective in material or workmanship and returned to the factory shipping costs prepaid will be as the exclusive remedy repaired or replaced at our option Labor costs for warranty repairs and or modifications are not covered unless done at manufacturer s facilities Any modifications performed without written approval of the manufacturer may void warranty This limited warranty gives purchaser specific legal rights which vary from state to state LIMITATION OF LIABILITY To the extent allowable under applicable law the manufacturer s liability for consequential and incidental damages is expressly disclaimed The manufacturer s liability in any event is limited to and shall not exceed the purchase price paid Misuse or modification may void warranty WARRANTY DISCLAIMER Our company has made a diligent effort to illustrate and describe the products shown accurately however such illustrations and descriptions are for the sole purpose of identification and do not express or imply a warranty that the products are merchantable or fit for a particular purpose or that the products will necessarily conform to the illustrations or descriptions The provisions of the warranty shall be construed and enforced in accordance with the UNIFORM COMMERCIAL CODE
31. air s arr te de s chapper du cylindre 6 Serrer les installations sur le cylindre et continuer pomper jusqu ce que le cylindre s tende assez pour tre attach au support sup rieur Attacher le cylindre SH MA LECTRIQUE 18 Ow 1 PH 12 FLA NOTES E YA IP 32 QUIT Ae Indicates wire and or conponents supplied by others lt i Re ET 4 o para MEI o 4 o 3 w gt Motor connection diogron Must wire for clackvise rotation facing lend end E shom C eel 15 uc E 69 6 AA du u GO 206 230 VC MR RAISE Xl da 39v purae F res tie together OD RE amnes gt TIP 30 MN OM NOTES 1019 FESSES 1 T gt s B gt wath 0 Indicates vire and or conponents supplied by others Motor connection diagram To reverse rotation interchange any two leads 9 9 gt gt i 5 together u 6 9 AO OO ca 1 S ASSURER QUE TOUT COURANT SOIT COUP AVANT DE TRAVAILLER SUR CET QUIPEMENT PRUDENCE TOUTE R PARATION NE DEVRAIT TRE EFFECTU E QUE PAR UN PERSONNEL FORM ET QUALIFI INSTRUCTIONS POUR REGLAGE DU NIVELEUR DE QUAI M CANIQUE EDGE O DOCK
32. and a second person to tighten the 3 4 bolts onto the milled flats Milled flats Spring winding tube 3 When the required lifting torsion is reached return to leveler to normal operating position Check the adjustments made and if not lifting properly repeat the previous steps to either increase or decrease spring lifting torsion If the leveler is bouncing or floating when the lip is extended there is too much lifting torsion Repeat the previous steps in reverse to reduce lifting torsion NOTE This is an excellent time to lubricate the grease zerks on the hinges standard grease gun will service these This must be done regularly for ease of operation and maintenance as we recommend monthly uu THE POWER UNIT S OPERATION PE The electric hydraulic edge o dock leveler utilizes an electric motor directly coupled to a gear type hydraulic pump to produce the needed fluid pressure and flow to allow the cylinder s to perform the work of lifting the dockplate A hydraulic manifold houses the hydraulic control components and is bolted directly onto the gear pump The power unit s hydraulic components are all rated for 3 000 psi working pressure Important parts of power unit included The electric motor Motors are available for operaton single or three phase AC supplies all are dual voltage capable The gear pump Its shaft is coupled directly to the shaft of the electric motor The check valve Its
33. ato montante en posici n Suelde con continuidad a traves de la parte superior Astille y afile Taladre agujeros en el and n a trav s de las perforaciones del plato montante Dependiendo de las condiciones del cemento hasta 8 agujeros podrian ser necesarios Instale las anclas y tornillos No apriete Instale los bloques parachoques a cada lado del plato montante de la rampa Suelde el bloque al plato montante de la rampa Instale dos anclas a cada lado del bloque parachoque Apriete los tornillos del ancla a la cara del and n y a la parte superior del and n Suelde y redondee con afilador los tornillos del plato de la rampa oe i INSTALACI N DEL CANTO DE ANDEN SERIES PE Y PP INSTALACI N DE LA SERIE PE 1 2 7 con aceite hidr ulico AW 32 control serie Unidad el ctrica hidr ulica engrasados Manga Hidr ulica Cilindro Hidr ulico Instale el nivel PE y los parachoques con las instrucciones anteriores Instale el cilindro con las partes provistas extremo de varilla hacia arriba Remueva el tap n del dep sito e instale un ventilador de respiraci n Monte la caja de control en la pared en el interior del edificio a una altura conveniente al mismo lado que la bomba motor Taladre un agujero a trav s de la pared para un conductor de 12 7 mm Lleve el conductor desde la bomba del motor hidr ulico debajo del parachoque a trav s del agujer
34. e 2 Lorsque le chargement d chargement est termin retirer les cales et autoriser la remorque d marrer La bordure de quai retournera sa position d origine Pour Commander des Pi ces de Remplacement ou Suppl mentaires Notre compagnie est fi re d utiliser les meilleures pi ces disponibles pour notre quipement Nous ne sommes pas responsable pour de mauvais fonctionnements d quipment r sultant de l utilisation de pi ces de remplacement non approuv es Pour commander des pi ces de remplacement ou des pi ces suppl mentaires contacter le service client le de l usine Sur chaque correspondance avec l usine pri re d inclure le num ro de s rie qui est inscrit sur la plaque de la pi ce d quipement N utiliser que les num ros fournis dans ce manuel Lors d une commande de pi ces pour des unit s courant continu pri re d indiquer la phase du moteur ainsi que le voltage sur lequel l quipement fonctionne INSTRUCTIONS D INSTALLATION LIRE TOUTES LES INSTRUCTIONS AVANT DE CONTINUER CONSTRUCTION POUR BORDURE DE QUAI La proc dure pour l installation de l galisateur de niveau Bordure de quai est une fonction de la construction de la bordure du quai et de la hauteur diff rentielle La bordure de quai recommend e pour installer une unit Bordure De Quai doit pr senter une cannelure de 15 cm Avec une cannelure de 15 cm ancr e dans la bordure du quai l installateur peut souder la rampe et les b
35. e and voltage that the equipment is operating on QQ O INSTALLATION INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE PROCEEDING Dock Edge Construction The procedure for the installation of the Edge O Dock dockleveler varies with the dock edge construction and the height differential The recommended dock edge for installing an Edge O Dock unitis a well anchored six inch channel With asixinch channel embedded in to the dock edge the installer can weld the ramp and bumper blocks securely into position The ramp and blocks cannot be welded into position if the dock edge steel is less than six inches For installations with less than six inches of steel edging a combination of anchor bolts and welding is required If the dock has no steel edging a steel plate must be anchored to the floor to provide a surface to weld the ramp to in order to maintain the capacity of the leveler Failure to follow the proper installation procedure will decrease capacity of dockleveler Recommended dock edge for new construction The recommended dock edge for new construction is a well anchored 6 inch channel 8 2 Ib minimum Concrete J anchors shall be 11 2 inches wide with a length of 6 inches plus 11 2 inches bent at 90 degrees on the end Minimum material 6 Channel thickness shall be 1 4 inch One anchor shall be installed every 12 inches Height Differential The optimum dock height in most cases is 50 On dock heights significantly different
36. eries 1 Install the PE leveler and bumpers per preceding instructions Install the cylinder with the supplied parts rod end up Remove the shipping plug in the reservoir and install the breather vent Mount the control box on the inside wall of the building at convenient height Drill a hole through the wall for 1 2 conduit Run the conduit from the hydraulic pump motor below the bumper and up through the hole previously drilled 5 Follow standard electrical procedures and all applicable codes when installing the control box to the hydraulic unit See electrical the schematic on page 6 6 Check the operation of the leveler Push the RAISE button and hold it in until the cylinder is fully extended Release the button and the leveler should descend to a work position If the leveler fails to operate check the electrical connections to verify proper connections power source on and fuses installed and functioning Operate at least 6 full cycles 7 Grease all hinge fittings at the time of installation and every 3 months thereafter ELECTRICAL SCHEMATIC 18 0 LISAN 1 PH 12 FLA NOTES Fr un YA IP D QUIT a A AA Indicates wire and or components supplied by others pu Ben 4 o It 12 C p D o 4 1 o 2 w gt Motor connection diogron Must wire for clackvise rotation facing lend end shom ee 00 115 uc PUR 0
37. eur x 30 cm longueur x 5 cm hauteur longueur x 10 cm hauteur r f i i i D L L gt V om Quai de 122 cm de EE Quai de 117 cm hauteur de hauteur INSTALLATION DE BORDURE DE QUAI S RIES FM Installation Avec Soudure la plaque d acier de la bordure de quai est de 15 cm ou sup rieure Installation Avec Boulons et Soudures la plaque d acier est inf rieure 15 cm Soudure Continue Plaque de montage Installation Avec Boulons pourdes quais sans bordures d acier 1 Retirer tout mat riau et saillie de la fa ade du quai 2 Pour des installations des cartons ou des pal ettes sont gliss s le long du sol du batiment dans le camion la plaque d approche doit tre renfonc e dans une cannelure au sol 3 Pourinstallerla cannelure localiser et marquer le centre du quai ou la rampe doit tre mont e Marquer une ligne centr e la craie de 12 mm plus longue que la plaque de la rampe 304 mm en retrait de la face duquai 4 Utiliser un marteau piqueur skil roto no 736 ou un outil similaire creuser une cannelure de 9 mm de profondeur x 5 cm largeur x la longueur de la rampe 1 27 cm sur l ext rieur de la ligne La cannelure comencera 25 4 cm 1 Retirertousles mat riaux ou saillies de la fa ade du quai Centrerla rampe l embrasure de la porte etappliquer une soudure chaque extr mit S assurer que le plateau de montage ne s tende pas au del de la bordure du quai 3 So
38. hoc et vers le haut travers le trou pr c demment perc 5 Suivre les proc dures lectriques standard et les codes pour brancher la bo te de commande l unit hydraulique voir le sh ma lectrique 6 V rifier le fonctionnement de l galisateur Appuyer sur le bouton EN HAUT et laisser appuy jusqu ce que le cylindre soit compl tement tendu L cher le bouton et l galisateur devrait descendre sa position de travail Si l galisateur malfonctione v rifier que les branchements lectriques soient bien effectu s que la source lectrique soit en marche et que les fusibles soient install s et fonctionnent Faire marcher pendant au moins 6 cycles complets 7 Graisser toutes les installations charni res au moments de l installation et tous les 3 mois INSTALLATION POUR S RIES PP 1 Installer l galisateur de niveau PP selon les instructions pr c dentes 2 Installer le cylindre avec les pi ces fournies extr mit de la tige vers le haut en bas seulement Laisser le cylindre ferm piston r tract 3 Monter la pompe manuelle au mur ou au montant de fa on ce qu elle soit adjacente l galiseur Percer un trou au mur pour le tuyau hydraulique 4 Joindre la ligne hydraulique la pompe la tirer jusqu au cylindre et l attacher au cylindre d une fa on l che 5 Remplir le r servoir de la pompe avec de l huile Pomper l huile dans la ligne Continuer pomper lentement jusqu ce que l
39. ibujos y descripciones son solo para el prop sito de identificaci n y no expresan implican que el producto es comercial apto para uso particular que el producto se parezca a los dibujos descripciones Las provisiones de la garantia deben de ser interpretadas y reforzadas en acuerdo con el CODIGO COMERCIAL UNIFORME y las leyes decretadas en el Estado de Indiana DISPOSICI N Nuestra har un esfuerzo de buena voluntad para corregir rapidamente ajustar cualquier producto que sea defectuoso dentro de la garantia limitada Reclamaciones de garantia deben de ser escritas durante el dicho ano REGISTRO DE REPARACI N FECHA DE REPARACI N FECHA DE TRABAJO COMPLETO EN TRABAJO COMPLETO EN REPARACI N HECHA POR FECHA DE REPARACI N TRABAJO COMPLETO EN REPARACI N HECHA POR FECHA DE REPARACI N TRABAJO COMPLETO REPARACI N HECHA POR REPARACI N HECHA POR FECHA DE REPARACI N TRABAJO COMPLETO REPARACI N HECHA POR FECHA DE REPARACI N TRABAJO COMPLETO REPARACI N HECHA POR Vestil Manufacturing Corporation 2999 North Wayne St Angola IN 46703 Ph 260 665 7586 Fax 260 665 1339 www vestil com E mail sales vestil com Solutions pour quai de chargement Table des Mati res Instructions de s curit
40. ic fluid with an SUS viscosity of 150 200 at 100 F SAE viscosity grade 32 or Dexron transmission fluid Use only replacement parts either supplied or approved by the manufacturer Revised 06 04 07 126 101 A company dedicated to solving loading dock and material handling problems since 1955 OWNER S MANUAL EDGE O DOCK MODEL FM PP PE Spring Adjusting Instructions FM Series PE Hydraulic amp Troubleshooting Guide Exploded Parts Drawing FM Series Parts List FM Series Exploded Parts Drawing PP amp PE Parts List Warning Label Identification Limited Warranty Service Record RECEIVING INSTRUCTIONS Every unit is thoroughly tested and inspected prior to shipment However it is possible that the unit may incur damage during transit If you see damage when unloading make a note of it on the BILL OF LADING Remove all packing and strapping material inspect for damage IF DAMAGE IS EVIDENT FILE A CLAIM WITH THE CARRIER IMMEDIATELY Also check the unit size type of power unit etc to see that the unit is correct for the intended application MODEL NUMBER AND CAPACITIES The model number serial number and capacities are inscribed on the nameplate Please remember to include these numbers in any correspondence with your dealer or the factory EDGE O DOCK FM PP PE SERIES LOADING INSTRUCTIONS The load capacity rating as inscribed on the nameplate of your unit designates its net capacit
41. ito est lleno y de que el tap n del and n no se mueve o el lablo no se extiende agujero de relleno ha sido reemplazado por un tap n de respiro motor la bomba no hacen ruido Compruebe por qrticulos que reposen en el nivelador Instale un calibrador de presi n para comprobar la presi n del sistema hidr ulico Si no se eleva a 1 500 psi consulte con el fabricante para reemplazo de la bomba nivelador se eleva pero no desciende o Desmonte compruebe y limpie la v lvula de chequeo de desciende solo muy lentamente operaci n piloto Desmonte compruebe y limpie la v lvula de chequeo de operaci n piloto y la v lvula de control de flujo 69 Compruebe por torceduras de partes mec nicas ejes etc ENSAMBLE DE LA BOMBA PE 020 91 66 344319 30 VINATVA V OlOld 6 VIVO 66 600 10 66 orrnia SLO Z9 66 lOulNOO 1 30 BLNG 119 f 4 lt S00 bL LO anog j 3a GOO LEO LO LAN 8 5 OH3avulds3u 028 810 ONIH O YANYWd ONIH O 6 0 28 9 V TIINNV 0 SOHS ut X 91 8 WaINOG SOHS X 81 91 S 1 1 1 OTIINHOL NOION3 13H 30 OTIINHOL CEO GEL LO 021919979 YOLOW CANTO DE ANDEN SERIE FM IDENTIFICACI N DE PARTES DEL CANTO DE AND N SERIE JUEGO NO ARTICULO DESCRI
42. l Canto De And n Apage el motor y ponga el freno de emergencia del cami n Ponga los topes de las ruedas Topes de las ruedas no incluidos por los requisitos de OSHA para prevenir que el remolque se mueva Siga las instrucciones abajo seg n el modelo de Canto De And n que tenga Operaci n Mec nica Serie FM 1 Desmonte la manivela de la parte derecha de la caja e insertela en el agujero del plato trasero el agujero este en el lado derecho 2 Estire la manivela hacia atras hasta que el plato este totalmente extendido y se caiga en la plataforma del trailer 3 Empuje la manivela hacia delante esto hara que el borde del plato se extienda y caiga en la plataforma del trailer 4 Demonte la manivela y coloquela en la caja 5 Cuando la carga y descarga este completa quite los topes y permita que el trailer se separe El borde de reqressara a la posicion original Operaci n de Bombeo Manual Serie PP 1 Para cerrar la v lvula de regreso gire la v lvula de la bomba hacia la derecha Levante el nivel con la bomba manual Cuando el nivel est libre de la base del remolque y se extienda completamente libere la presi n para dejar que el borde se asiente en la base del remolque Asegurese de dejar la v lvula de regreso abierta para dejar que el nivel flote con el remolque 2 Cuando la carga descarga se haya completado remueva los topes y deje que el remolque se aparte EI Canto De And n regresar a l
43. l nivelador Desmonte el cartucho de la v lvula de la cavidad marcada POCV Inspeccione los contaminantes de la v lvula o la cavidad de la v lvula Limpie la v lvula en minerales o petr leo si es posible Sople la v lvula con una pistola de aire comprimido Vuelva a poner la v lvula y cicle el nivelador varias veces Guia de localizaci n de averias para la serie PE Solo personal calificado entrenado para entendender aparatos mec nicos y sus asociados circuitos el ctricos e hidr ulicos deben intentar localizar aver as y hacer reparaciones en este equipo Se debe tomar cuidado para identificar todos los potenciales riesgos y complacer con los procedimientos de seguridad necesarios antes de empezar las reparaciones Consulte con el fabricante si tiene problemas de instalaci n o cualquier otro problema no explicado a continuaci n Antes de trabajar en la unidad el ctrica siempre asegure el plato del labio hacia afuera y desconecte la electricidad PROBLEMA CAUSA POSIBLE ACCION CORRECTIVA elevador no funciona El motor no funciona Use un multimetro para comprobar para suministro correcto cuando el bot n de elevar todas las patas y para cntrol de voltaje para una abertura en RAISE se aprieta cualquier lugar del control del circuito Compruebe visualmente cables sueltos o componentes del bot n Verifique que el eje del motor gira CCW motor funciona correctamente pero el Asegurese de que el dep s
44. locs pare chocs solidemment en position La rampe et les blocs ne peuvent tre soud s en position si l acier de la bordure du quai mesure moins de 15 cm Pour des installations de moins de 15 cm d acier en bordure une combinaison de boulons d ancrage et de soudure est recommand e Si le quai n a aucune bordure d acier une plaque d acier doit tre soud e au sol afin de fournir une partie qui pourra tre soud e la rampe de fa on ce que la capacit de l galisateur de niveau soit maintenue Tout manquement l une des instructions d installation suivantes peut diminuer la capacit de l galisateur de niveau Bordure de quai recommand e pour nouvelle construction La bordure de quai recommand e pour une nouvelle construction doit pr senter une cannelure de 15 cm bien ancr e minimum ou 3 7 kg min les chevilles en J pour ciment devraient messurer 38 mm de largeur et 15 cm de longueur plus 38 mm courb 90 degr s l extr mit L paisseur minimale du mat riau doit tre de 6 mm Une cheville doit tre install e chaque 30 cm 15 cm Cannelure HAUTEUR DIFF RENTIELLE La hauteur de quai optimale est dans la plupart des cas de 127 cm Sur des quais dont la hauteur est consid rablement diff rente de 127 cm des rampes ainsi que des angles supports pour rampe comme montr ci dessous doivent tre utilis s Plaque de rampe Plaque de rampe 244 cm largeur x 61 cm 244 cm larg
45. ntinuellement Enlever les clats et meuler comme il convient 9 Percer des trous dans le quai travers les trous de la plaque de montage 8 trous peuvent tre requis selon la condition du ciment 10 Installer les chevilles et les boulons Ne pas serrer 11 Installer les blocs pare chocs de chaque c t de la plaque de montage de la rampe Souder la partie sup rieure des blocs pare chocs la plaque de la rampe et le c t du bloc pare choc la plaque de montage de la rampe Installer eux chevilles de chaque c t des blocs pare chocs 12 Serrer les boulons des chevilles sur la fa ade du quai puis sur le dessus du quai 13 Souder et fignoler les boulons de chevilles avec une meuleuse sur la plaque de la rampe INSTALLATION DES SERIES PE ET PP Boite de commande pour s ries PE Unit lectrique Hydraulique Jis R cipients Remplir avec de l AW 32 Tuyau Hydraulique Cylindre Hydraulique INSTALLATION POUR S RIES PE 1 Installer l galisateur de niveau PE selon les instructions pr c dentes 2 Installer le cylindre avec les pi ces fournies 3 Retirer le bouchon d exp dition du r servoir et installer le conduit d chappement 4 Monter la boite de commande sur le mur int rieur du batiment une hauteur convenable du m me c t que la pompe le moteur Percer un trou dans le mur pour un conduit de 12 7 mm Tirer le conduit du moteur de la pompe hydraulique au dessous du pare c
46. nto del muelle el instalador puede soldar la rampa y los topes de seguridad en posici n La rampa y los topes no pueden ser soldados en posici n si el canto del and n de aluminio es menor de seis pulgadas Para instalaciones de borde de aluminio menor de seis pulgadas se recomienda una combinaci n de tornillos de anclaje y soldadura Si el and n no tiene un extremo de aluminio un plato de aluminio debe de ser fijado al piso para proveer una pieza para poder soldar la rampa de esta manera la capacidad del nivel se matendr Mal uso de alguna de las siguientes instalaciones podria dismimuir la capacidad del nivel Borde de and n recomendado para construcci n nueva El borde recommendado para instalar el Canto De And n es un buen canal de 15 cm 3 7 kg minimio Las anclas J de hormig n deben de ser de 38 mm de ancho con una longitud de 6 pulgadas m s 38 mm en el extremo con una doblez de 90 grados El espesor minimo del material debe de ser 6 mm Cada 30 cm se debe instalar un ancla 15 cm Canal ALTURA DIFERENCIAL La altura optima del and n en la mayoria de los casos es de 127 cm En andenes con una altura muy diferente a 127 cm una rampa y un ngulo de soporte deben de ser utilizados como se demuestra a continuaci n Plato de rampa Plato de rampa 244 cm w x 30 cm 244 w x 61 cm Ix5cmF x10cmh E 122 cm Altura del and n 117 cm Altura del and n Instrucci
47. o previamente taladrado Siga los procedimientos y c digos standard de electricidad para conectar la caja de control a la unidad hidr ulica vea el esquema el ctrico Compruebe la operaci n del nivel Apriete el bot n UP Arriba y agu ntelo hasta que el cilindro se extienda completamente Libere el bot n y el nivel deber descender a la posici n de trabajo Si el nivel no funciona compruebe las conexiones el ctricas para verificar que est n correctamente conectadas la electricidad en la posici n ON y los fusibles instalados y funcionando Opere como minimo 6 ciclos enteros Engrase las bisagras al momento de instalar y cada 3 meses INSTALACI N DE LA SERIE PP 1 2 Instale el nivel PE y los parachoques con las instrucciones anteriores Instale el cilindro con las partes provistas extremo de varilla hacia arriba en solo la parte inferior Mantenga el cilindro cerrado el pist n recogido Monte la bomba manual contigua a un poste pared Taladre un agujero a traves de la pared para la manga hidr ulica Fije la linea hidr ulica a la bomba lleve al cilindro y fije al cilindro sin apretar Llene el dep sito con aceite Bombee el aceite a la linea Continue bombeando lentamente hasta que el aire cese de escaparse del cilindro Apriete las bisagras al cilindro y continue bombeando hasta que elcilindro se extienda y llegue al soporte superior Fije el cilindro ESQUEMA EL CTRICO ld 0 c USAHA 1 P
48. o the steel dock edge 4 Weld bumper blocks on each side of ramp Weld continuously across top and down both sides 5 Install lag bolt 5 8 x 5 the outside Mounting plate inside flanges of each bumper block 6 Install at least two lag screws 3 4 x 5 along the bottom of the mounting plate Install four if the concrete is flaky or steel is not rigid Bolt On Installation for docks without steel edges 5 Position the beveled and turned down edge of approach plate in the groove with opposite edge Approach flush with the dock edge plate 6 Anchor the plate floor with four 5 8 x 5 lag bolts Do not tighten yet 7 Center the mounting plate of leveler against the approach plate anchored to floor Tack weld the mounting plate in place 8 Continuously weld across the top Chip and grind as required 1 Remove all material and protrusions from the face of 9 Drill holes into the dock the through the holes in the dock mounting plate Depending on the cement condition 2 In installations where cartons or pallets are slid up to 8 may be required along the building floor into the truck the approach 10 Install anchors and bolts Do not tighten plate must be recessed into a groove in the floor 11 Install bumper blocks on each side of ramp 3 To install the groove locate and mark the center of mounting plate Weld the top of the bumper blocks the dock where ramp is to be mounted Make a to the ramp plate
49. obresalientes del and n Centre la rampa en la entrada y suelde a cada extremo Asegurese que el plato montante no sobresalga por encima del canto del and n Suelde el plato montante con continuidad al borde de aluminio del and n Suelde los bloques parachoques a cada lado de la rampa Suelde con continuidad a trav s de la parte superior e inferior en ambos lados Remueva todo el material y sobresalientes del muelle Centre la rampa en la entrada y suelde a cada extremo Asegurese que el plato montante no sobresalga por encima del canto del and n Suelde el plato montante con continuidad al borde de aluminio del and n Suelde los bloques parachoques a cada lado de la rampa Suelde con continuidad a trav s de la parte superior e inferior en ambos lados Instale un tornillo de 15 mm x 12 7 cm fuera y dentro del reborde de cada bloque parachoque Instale como m nimo dos tornillos autorodantes de 19 mm x 12 7 cm a lo largo de la parte inferior del plato montante Instale cuatro si el hormig n est escamoso el aluminio no es rigido empezar 25 cm desde el frente del and n y terminar 12 7 cm del frente del and n Ponga el bisel y gire el borde del plato de aproximaci n hacia la ranura con el borde opuesto contra el canto del and n Ancle el plato al piso con cuatro tornillos de 15 8 mm x 12 7 cm No apriete todavia Centre el plato montante del nivel contra el plato de aproximaci n anclado en el suelo Suelde el pl
50. ones de Instalaci n del Enlace PARA EL CANTO DE AND N MEC NICO Desmonte el pasador de la clavija Desmonte la clavija del soporte de enlace Mueva el labio hacia abajo hasta que el agujero de la repisa este en linea con los agujeros del soporte de enlace Inserte la clavija a traves de los agujeros en linea y apriete con el pasador N gt wi w PASADOR REPISA 5 INSTALACI N DEL CANTO DE ANDEN SERIE INSTALACI N CON SOLDADURA el borde de aluminio del and n es de 15 cm mayor Soldadura Continua INSTALACI N CON TORNILLOS el borde de aluminio del and n es menor de 15 cm Soldadura Continua Plato Montante Plato de Aproximaci n 1 Remueva todo el material y sobresalientes del and n En instalaciones donde cajas transpaletas se deslizan Sobre el piso del edificio hasta el cami n el plato de aproximaci n debe de ser insertado dentro de una ranura en el piso 3 Para crear la ranura localice y marque el centro del and n donde se va a montar al rampa Marque con una tiza una line centrada 1 27 cm pulgada m s larga que el plato de la rampa 30 cm m s atras del frente del and n 4 Usando un martillo tipo SKIL ROTO no 736 una herramienta similar corte una ranura de 9 mm de profundidad x 5 cm de ancho x longitud de la rampa m s 1 27 cm pulgada del exterior de la linea la ranura o 10 11 12 13 Remueva todo el material y s
51. ops sufficiently the pilot operated check valve opens to allow the oil in the cylinder s to return back to the reservoir through the pressure compenated flow control valve which will regulate the rate at which the lip lowers In the event that the lip won t raise it will be necessary to remove the pilot operated check valve for inspection and cleaning as follows Secure the lip plate in the extended position to allow access to the power unit Disconnect and lock out the leveler s power supply Remove the cartridge valve from the cavity marked POCV Inspect for contaminants in the valve or the valve cavity Wash the valve in mineral spirits or kerosene if possible Blow off the valve with a compressed air gun Replace the valve and cycle the leveler several times Troubleshooting Guide for PE Series Only qualified individuals trained to understand mechanical devices and their associated electrical and hydraulic circuits should attempt troubleshooting and repair of this equipment Care should be taken to identify all potential hazards and comply with applicable safety procedures before beginning work Consult the factory for problems at time of installation or for any problems not addressed below Before working on the power unit always secure the lip plate outward and disconnect the power supply PROBLEM POSSIBLE CAUSE CORRECTIVE ACTION Lever doesn t cycle when the Motor doesn t run Use a multimeter to check for
52. ou des modifications de l quipement original N utiliser que des pi ces de remplacement fournies ou appouv es par le fabricant S assurer que toutes les tiquettes d avertissement Soient en place p 39 Revis 06 04 07 126 101 Une compagnie d vou e r souare les probl mes ergonomiques et de prise en charge de mat riel depuis 1955 MANUEL D UTILISATION BORDURE DE QUAI MOD LE PP PE Sh ma des pi ces d tach es pour bordure de qua s ries FM Liste des pi ces Sh ma des pi ces d tach es pour bordure de quai s ries PP PE Liste des pi ces Identification des etiquettes d avertissement Garantie Limit e Rapport de service INSTRUCTIONS DE RECEPTION Chaque unit est minutieusement test e et inspect e avant exp dition Toutefois il est possible que l unit soit endommag e pendant le transport Si un dommage est constat lors du d chargement le noter sur LA FACTURE DE CHARGEMENT Retirer tout le mat riel d empaquetage et les sangles et inspecter l unit de nouveau pour constater tout dommage SI LE DOMMAGE EST VIDENT REMPLIR IMM DIATEMENT UNE PLAINTE AVEC LE TRANSPORTEUR De plus contr ler la taille de l unit le type de courant de l unit etc Pour s assurer que celle ci soit correcte pour l utilisation d sir e NUMERO DE MODELE ET CAPACITES Les capacit s le num ro de mod le et le num ro de s rie sont inscrits sur la plaque du fabricant Pri re d insc
53. ou s il y des fils de surplus Le moteur fonctionne mais le pont V rifier si l arbre du moteur tourne au sens inverse des aiguilles d une montre ne se l ve pas ou la l vre ne s tend Assurer que le r servoir est plein et que son bouchon d orifice de remplissage a pas Le moteur et la pompe ne font t remplac par un vent pas beaucoup de bruit Regarder s il y a des choses pos es sur le niveleur e Monter un manom tre m tallique pour v rifier la tension du syst me hydraulique S il ne monte pas 1500 livres par pouce carr consulter l usine pour une pompe de rechange Le niveleur monte mais ne descend D monter examiner et nettoyer la soupape de s ret pilote pas ou ne descend que lentement D monter examiner et nettoyer la soupape de s ret pilote et le r gulateur de d bit Examiner toutes les parties m caniques pour pincement ou frottement par example le bras de battant POMPE PE 020 S L 66 3dvdnos unOd 3 10 lld 6 4N31937109 66 600 10 66 us 6 unaivinoau 913199711002 9 N8 LLO 4 NIY O S00 t1 L0 dWOd 13dV19 GOO LEO LO INId3H9 8 H3H1V3Hg8 9 N8 S19 ONIH O o2pg ope ONIH O ONIH O SOHS uf x 9L 8 1 4 NOLLVXI SIA SOHS 1 X 91 91 9 1 0 15 1 NOILVXIA SIA c 0 S L 1O 3
54. que Il ferme pour permettre l coulement d huile aux cylindres quand le syst me est sous pression et puis s ouvre pour permettre la l vre du niveleur de descendre quand la pression du syst me baisse quand le moteur est coup Un r gulateur de d bit compens de pression Il r gle l coulement de fluide des cylindres au r servoir quand la soupape de s ret pilote s ouvre Ceci permet d ajuster la vitesse de la tomb e de la l vre Les cylindres pour relevage hydraulique Le fluide hydraulique Le syst me utilise un fluide hydraulique HO150 toute huile antiusure hydraulique avec une viscosit SSU de 150 200 100 degr Fahrenheit viscosit SAE de 32 comme un liquide hydraulique AW 32 ou Dexron est convenable Quand la l vre va tre tendue l op rateur presse le bouton monter Le moteur tourne et en tournant il tourne la pompe engrenages hydraulique De l huile est tir e du r servoir et entre dans la pompe La tension du syst me monte et la soupape de s ret pilote se ferme Quand la l vre est d ploy e l op rateur l che le bouton Le clapet antiretour emp che l huile de retourner au r servoir par la pompe Quand la tension du syst me hydraulique baisse suffisamment la soupape de s ret pilote rouvre pour permettre l huile dans les cylindres de retourner au r servoir par le r gulateur de d bit compens de pression ce que contr le la vitesse de la tomb e de la l vre Si la l vre ne
55. r guli rement nous remmandons mensuellement pour faciliter l utilisation et l entretien LE FONCTIONNEMENT DE L ALIMENTATION DU GROUPE MOTEUR PE Le niveuleur de quai lectrique et hydraulique Edge O Dock utilise un moteur lectrique directement branch engrenage hydraulique pour produire la pression du fluide et i coulement n cessaire de permettre les cylindres d accomplir le travail de lever plaque de quai Un distributeur hydraulique contient les organes de commande hydraulique et il est directement boulonn sur la pompe engrenages Tous les organes de commande hydraulique de l unit ont t valu s pour une pression de service de 3 000 livres par pounce carr Les parties importantes de l alimentation sont Le moteur lectrique Des moteurs sont disponibles pour fonctionner aliment par un courant monnohas ou triphas CA tous sont capables de marcher avec tension double fonction La pompe engrenage Son arbre est directement attel l arbre du moteur lectrique Le clapet antiretour Son but est d arr ter le reflux de fluide de passer par la pompe Le clapet de d charge Son travail est d ouvrir un passage pour que le fluide puisse refluer au r servoir si la pression du fluide accumul e par la pompe d passe 1500 livres pat pouce carr Et done le syst me ne verra plus que 1500 livres par pouce carr Une soupape de s ret pilote C est un appareil cartouches hydrauli
56. rire ces chiffres surchaque correspondance avec votre revendeur ou avec l usine BORDURE DE QUAI MODELE FM PE INSTRUCTIONS DE CHARGEMENT Le taux de capacit de chargement tel qu indiqu sur la plaque de votre unit d signe sa capacit nette en assumant que la charge soit centr e Cette capacit ne doit jamais tre exc d e car des dommages permanents pourraient en r sulter INSTRUCTIONS DE D SEMBALLAGE ET DE MANUTENTION PRUDENCE Lire les instructions compl tement avant d ajuster Suivre les instructions soigneusement Utiliser une cl plate pas une cl molette car celle ci pourrait glisser Le d semballage ainsi que la manutention recommand s sont montr s ci dessous La bordure de quai recommand est de 127 cm L ventail de service est de 12 7 mm 12 7 mm Bras du Porte Palette Chaine Attache verrouillage automatique AVERTISSEMENT CARTER MAINS ET PIEDS DES PARTIES 5 INSTRUCTIONS DE FONCTIONNEMENT Reculer la remorque lentement contre les pare chocs de la bordure de quai Arr ter le moteur et activer le frein main du camion Positionner les cales roues par quelqu un d autre requises par OSHA pour viter un mouvement de la remorque Suivre les instructions ci dessous selon le mod le de bordure de quai possed Fonctionnement M canique S ries FM 1 Retirent le traitement du bon c t
57. rn to its original position Hand Pump Operation Series PP 1 Rotate the valve on the pump clockwise to close the fluid return valve Raise the dockleveler with the hand pump When the dockleveler clears the trailer bed and fully extends open the return valve to allow the lip to settle on the trailer bed Be sure to leave the fluid return valve open to allow the dockleveler to float with the trailer 2 When loading unloading is complete remove the chocks and allow the trailer to pull away The Edge O Dock will return to its original position Electric Operation Series PE 1 Push RAISE button on control box The dockleveler will begin to rise When the dockleveler lip reaches full extension release the button It will lower and settle on the trailer bed 2 When loading unloading is complete remove the chocks and allow the trailer to pull away The Edge O Dock will return to its original position Ordering Replacement or Extra Parts Our company takes pride in using the finest available parts for our equipment We are not responsible for equipment failure resulting from the use of unapproved replacement parts Toorderreplacementor extra parts for your equipment contact Customer Service at the factory In any correspondence with thefactory please include the Serial Number whichis inscribed on the nameplate of the piece of equipment Use only the part numbers provided in this Owner s Manual Please indicate the motor phas
58. se rel ve pas il sera n cessaire d enlever la soupape de s ret pilote pour l inspecter et le nettoyer comme ceci e Figer la plaque de la l vre dans la position tendue pour accesser l alimentation e D connecter et neutraliser ll alimentation du niveleur Enlever la soupape cartouches du trou marqu POCV Inspecter les contaminateurs dans la soupape ou dans la cavit de la soupape Laver la soupape avec de l essence min rale ou avec du p trole lampant si possible Souffler la soupape avec un canon air comprim Remplacer la soupape et mettre le niveleur en cycle plusieurs fois Guide de Depannage Seulement un personnel instruit dans les m canismes et leurs circuits associ s lectriques et hydrauliques doivent entreprendre le d pannage et la r paration de cet quipement Perenez bien soin d identifier tous les dangers potentiels et observr toutes les proc dures de s ret applicables avant de com mencer ce travail Consulter l usine pour des probl mes au temps d installation ou pour tout probl me pas mentionn ci dessous PROBL MES CAUSES POSSIBLES ACTION Le levier ne se met Le moteur ne fonctionne pas Utiliser un multim tre pour v rifier alimentation convenable toutes les pas en cycle quand colonnes et la tension d asservissement Pour une ouverture n importe o dans le bouton RAISE le circuit de commande est d prim V rifier visuellement le composants bouton poussoir
59. uderle plateau de montage l acier de la bordure de quai continuellement 4 Souderles blocs pare chocs de chaque c t de la rampe Souder continuellement au dessus et au dessous des deux c t s _ Retirer tous les mat riaux ou saillies de la fa ade du quai 2 Centrerlarampe l embrasure dela porte et appliquer une soudure chaque extr mit S assurer que le plateau de montage ne s tende pas au del de la bordure du quai 3 Souderle plateau de montage l acier de la bordure de quai continuellement 4 Souder les blocs pare chocs de chaque c t de la rampe Soudercontinuellement au dessus et au dessous des deux c t s 5 Installer un boulon de 15 mm x 12 7 cm l int rieur et l ext rieur du rebord de chaque bloc pare choc 6 Installer au moins deux boulons de 19 mm x 12 7 cm le long des parties inf rieures du plateau de montage En installer quatre si le ciment est floconneux ou si l acier n est pas rigide de la fa ade du quai et s arr tera 30 48 cm de la fa ade du quai 5 Positionner la bordure bisot e et rabattue de la plaque d approche dans la cannelure de fa on ce que la bordure oppos e soit au m me niveau que la bordure du quai 6 Ancrer la plaque au sol avec 4 boulons de 15 8 mm x 12 7 cm Ne pas serrer 7 Centrer la plaque de montage de l galisateur de niveau avec la plaque de montage ancr e au sol Seller et souder la plaque de montage sa place 8 Souder le dessus co
60. usted la este vigilando Mantenga las manos y los pies alejados de las areas de enganche No use la unidad a no ser que las barras de seguridad esten en su lugar No agarre el cilindro ya que la cesta se podria torcer e No cambie la v lvula de escape de presi n series PP y PE No continue apretando el bot n UP si la unidad se eleva serie PE continue bombeando la bomba de mano si la unidad no se eleva series PP Quite el peso antes de usar la unidad e Desconecte la electricidad antes de reparar la unidad serie PE e No use liquidos de freno Use aceite hidr ulico AW 32 o equivalente series PP y PE Consulte con la f brica si se hacen modificaciones al equipo original Use solo partes de reemplazo provistas o aprobadas por el fabricante e Asegurese de que todas las etiquetas de seguridad estan en su lugar p 25 14 Revisado 06 04 07 126 101 Una compa ia dedicada a resolver problemas ergon micos y de manejo del material desde 1955 MANUAL DEL PROPIETARIO CANTO DE ANDEN SERIE FM PP PE Canto de and n serie FM Dibujos explosivos de partes Lista de partes Canto de and n serie PP y PE Dibujos explosivos de partes Lista de partes Identificaci n de las etiquetas de aviso Garantia limitada INSTRUCCIONES DE RECIBO Cada unidad est inspeccionada a fondo y probada antes del envio Aun asi es posible que la unidad se da e durante el envio Si ve algun d
61. y This capacity must never be exceeded as permanent damage or personel injury may result UNPACKING AND HANDLING INSTRUCTIONS CAUTION Read instructions completely before adjusting e Follow instructions carefully e Use end wrench not crescent wrench as crescent may slip Recommended unpacking and handling is shown below Recommended dock height is 50 Service range is 5 to 5 Fork Truck Chain Self locking KEEP HANDS AND FINGERS OUT OF HINGE AREA OPERATING INSTRUCTIONS l Back trailer slowly against Edge O Dock bumpers Turn off the engine and set the emergency brake on truck Position wheel chocks by others per OSHA requirements to prevent trailer movement 11 Follow the instructions below according to the model of Edge O Dock you have Mechanical Operation Series FM 1 Remove the lever from right side of bumper box and insert it into the socket of the back plate the socket is on right hand side 2 Pull the handle back until the leveler plate is fully extended and leaning back towards the ramp 3 Push the handle forward to allow the lip plate to extend and fall on the bed of the trailer Do not operate without a truck place as the operator could be thrown over the dock edge by the lever 4 Remove the lever and place it in the bumper box 5 When loading and unloading is complete remove chocks and allow trailer to pull away The Edge O Dock will retu

Download Pdf Manuals

image

Related Search

Related Contents

Ref. Chacon  Manuel d`utilisation du memoscan U581 software de  National Instruments PCI/PXI-783xR User's Manual  Valueline VLVB34090B10  Issue 1 – 2009 - Language Technology Division  CCS3000 USER MANUAL - Horizon Infrastructure    Sony KV-BZ21 Flat Panel Television User Manual  Samsung SGH-J610 Manuel de l'utilisateur  USER`S MANUAL - Welcome to your new web site!  

Copyright © All rights reserved.
Failed to retrieve file