Home
        Remeha Avanta Plus HPKI_K Maintenance Schedule
         Contents
1. MAINTENANCE SCHEDULE GILLES HPKI K S 120 2000 kW    Switch off the system before starting any maintenance work   Pull out the mains plug and secure it to prevent reactivation        7  F  BH C Sy  TI  H Ll          GILLES  7       gt  www gilles at             Lubricate all bearings 4 x per  Empty the ash box   if a Ap up  year according to the lubrication  schedule       Clean the flue gas pipe incl  the connection   the lambda probe  flue gas sensor and the   Check the oil level in the  flue gas fan 2 x per year hydraulic aggregats  if   Attention flue gas sensor  available    C Clean the combustion chamber  the slots in  the grate bars and below the grate    every 4   6 weeks           Constantly check the system  pressure   boiler water pressure     D Unscrew and clean the ignition tube   2 x per year     Clean the negative pressure  conduction with compressed  E Clean flue gas draughts with a brush air but only towards of the   2 x per year  combustion chamber  F Empty out the condensed water at the    Find more detailed maintenance  pressure tank for cleaning information in the assembly and  G Clean the cyclone operating instructions on CD  H Clean the area underneath the grate    Clean the combustion    chamber sensor    Filling procedure for sweep collector     When the fuel level in the fuel store exceeds 0 5m above the collector plate  pull in the  collector arms using    manual mode     until they disappear completely under the  collector plate  Repeat this procedu
2. re after approx  1 0 m fuel level   around 10  seconds manual mode     For the execution of maintenance works arrange an appointment with our customer service  or contact your qualified chimney sweeper   competence partner     
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  Installation and user manual Speedster  Intelligent bluetooth speakers LED lights User Manual  125 Series Wi125 Receiver User Manual - Connor    en Operator`s Manual es Manual del Operario fr Manuel de l`opérateur    quadro modulare per media tensione a tenuta d`arco interno con ims  番号11 金抜設計書・図面[PDF:6MB]    Copyright © All rights reserved. 
   Failed to retrieve file