Home
Regency P33-LP4 User's Manual
Contents
1. air spaces with insulation Check Venting Sections for the maximum vertical rise of the venting system and the maximum horizontal offset limitations n 2 Set the gas appliance in its Diagram 3 The upper half of the flashing is desired location Drop a plumb un installed under the roofing material and not bob down from the ceiling to nailed down until the chimney is installed the position of the appliance This allows for small adjustments flue exit and mark the location 6 Continue to assemble pipe lengths where the vent will penetrate the ceiling Drill a small hole at this point Next Note Ifan offsetis necessary in the attic to avoid obstructions it is important to drop a plumb bob from the support the vent pipe every 3 feet to roofto the hole previously EE avoid excessive stress on the elbows drilled in the ceiling and and possible separation Wall straps mark the spot where the Diagram 1 are available for this purpose vent will penetrate the roof Galvanized pipe is desirable above the roofline 3 AFirestop spacer must be installed in the duetoits highercorrosion resistance Continue floor or ceiling of every level To install the to add pipe sections through the flashing until Firestop spacer in a flat ceiling or wall the height of the vent cap meets the minimum cut a 10 inch square hole Frame the hole heightrequirements specified in Dia 4 or local as shown in
2. WREGENCY www regency fire com P33 4 Zero Clearance Owners amp Direct Vent Gas Fireplace Installation Manual E 3 oe MODELS P33 NG4 Natural Gas P33 LP4 Propane FOR YOUR SAFETY What to do if you smell gas e Do not try to light any appliance e Do nottouch any electrical switch do not use any phone in your building e Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions e lf you cannot reach your gas supplier call the fire department WARNING If the information in these instructions are not followed exactly a fire or explosion may result causing property damage personal injury or loss of life FOR YOUR SAFETY Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance Installation and service must be performed by a qualified installer service agency or the gas supplier Tested by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Please keep these instructions for future reference 918 520a FPI FIREPLACE PRODUCTS INTERNATIONAL LTD 6988 Venture St Delta BC Canada V4G 1H4 03 05 08 To the New Owner Congratulations You are the owner of a state of the art Gas Fireplace by FPI FIREPLACE PRODUCTS INTERNATIONAL LTD The P33 4 has been designed to provide you with all the warm
3. 7207920o0cm 6 Final check Before leaving this unit with the customer the installer must ensure that the appliance is firing correctly and operation fully explained to customer This includes 1 Clocking the appliance to ensure the correct firing rate rate noted on label after burning appliance for 15 minutes 2 Ifrequired adjusting the primary airto ensure that the flame does not carbon First allow the unit to burn for 15 20 min to stabilize UNIT DIMENSIONS 23 584mm 33 838mm 31 1 2 800mm 33 838mm I4 4 12 3 4 324mm CAUTION Any alteration to the product that causes sooting or carboning that results in damage is not the responsibility of the manufacturer LOCATING YOUR FIREPLACE 1 When selecting a location for your fireplace ensure that the clearances outlined on this page are met 2 Provide adequate clearances for servicing 3 The appliance must be installed on a flat solid continuous surface e g wood metal concrete This may be the floor or raised up on a platform to enhance its visual impact If the appliance is going to be installed on carpeting combustible linoleum tile or other combustible material other than wood flooring the appliance must be installed on a metal or wood panel extending the full width and depth of the appliance 4 The P
4. Part 904 196 430 947 430 918 430 922 430 923 430 162 433 538 940 088 P 904 691 936 155 948 042 131 FLUSH FRONT amp LOUVERS Description Magnet 1 round Flush Glass Trim set Brushed Steel Option Flush Louvers set Gold Black Option Flush Louvers set Black Option Flush Louvers set Black Steel Option Flush Louver Assy Top Front Deflector Flush Louver Assy Bottom Flush Door Assembly Complete Glass Flush U Clip Glass Gasket Tadpole Spring Hinge Black Part 430 940 157 159 158 431 943 171 172 173 904 712 174 430 133 175 511 084 178 904 715 179 948 216 Description Finishing Trim Set Black Option Finishing Trim Left Finishing Trim Right Finishing Trim Top Double Screen Door Complete Option Door Frame Left Assembly Door Frame Right Assembly U Clip for Frame Door Handle Door Latch Door Support Frame Assembly Pushnut Fastener 3 16 Screw 8 x 1 2 Regency Logo Plate Not available as a replacement part SCREEN DOOR Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 49 PARTS LIST 106 107 108 110 112 117 118 120 123 125 126 129 131 Part 430 930 940 079 P 936 243 940 078 P 904 196 400 189 432 956 430 932 430 936 430 937 433 026 948 042 948 216 BAY FRONT amp LOUVERS Description Bay Front Complete Side Glass Gla
5. 6 Slide the thermodisc cover assembly into the bracket clip on the underside of the firebox Check that no wire will touch the hot surfaces Diagram 2 7 Attach the Fan control box to the Burner ON OFF control box Diagram 3 Electrical Receptacle A 6 gt J oT 9 e Er Tio D o G d Push Fan down on mounting pins Ground Lug Plug fan power cord into rear receptacle Diagram 1 40 Thermodisc Bracket Diagram 3 Use the clip amp hook on the side of the control boxes to join them together 8 Secure the two boxes together with one screw Secure the 2 boxes together with one screw 9 Position the control box assembly on the bottom louver and mark the position of the slot on the right side bracket mark the position of the right side slot 10 Remove the control box assembly and push the hold down clip onto the louver Bend the tab until it is at 90 to the louver EUM UN Push hold down clip onto inside louver and press tab until it is at 90 to louver 11 Attach the two control boxes to the bottom louver and tighten the 2 screws on the left side and 1 screw on the right side Secure right side with one screw 12 Secure the fan wires and power cord by attaching one of t
6. Check for gas leaks Check inlet and outlet pressures Check operation of flame control Check for proper flame appearance and glow on logs 29 INSTALLATION Installation of the DC Sparker 6 Connect one end of the supplied green 11 Install the supplied battery into the DC ground wire to the lug with the nut and Sparker Box by opening the battery for the P33 4 Unit Only washer from the kit compartment 1 Locate the Piezo Ignitor situated at the NOTE The battery in the DC Sparker side of valve Box will need to be replaced annually Ground wire from kit Battery Compartment 2 Remove the Piezo Ignitor by unscrewing 7 Install the 1 2 bushing to the heat the nut at the back of the mounting bii SD NO e hield bracket iu Ignitor 12 Mount the heat shield to the DC Sparker Wire Secure into place with the velcro which is provided in the kit Piezo Ignitor 3 Disconnect the ignitor wire from the 8 ied ds iid end of is PETNE an spark generator wires throug a and connecting Me Be the bushing on the heat shield 13 Find a location which is not too hot and is easy to reach for changing the battery DC Heat Shield Note It should be kept away from the chain Sparker Ignitor Wire 4 Connect the DC spark generator wires to the SIT Valve with the screw which is provided in the kit 9 Plug the DC spark generator wires to the DC Sparker 9 Locate the grou
7. Any item shown to be defective will be repaired or replaced at our discretion No labor coverage is included with these parts Conditions Any part or parts of this unit which in our judgement show evidence of such defects will be repaired or replaced at FPI s option through an accredited distributor or agent provided that the defective part be returned to the distributor or agent Transportation Prepaid if requested Porcelain Enamel Absolute perfection is either guaranteed nor commercially possible Any chips must be reported and inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the replaced component has been returned to FPI and evaluated for manufacturer defect The authorized selling dealer is responsible for all in field service work carried out on your Regency product FPI will not be liable for results or costs of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitted to FPI by authorized selling dealers It is essential that all submitted claims provide all of the necessary information including customer name purchase date serial type of unit problem and part or parts requested without this information the warr
8. Pipe Length Galvanized 12 Pipe Length Black 18 Pipe Length Galvanized 18 Pipe Length Black 24 Pipe Length Galvanized 24 Pipe Length Black 36 Pipe Length Galvanized 36 Pipe Length Black 48 Pipe Length Galvanized 48 Pipe Length Black 60 Pipe Length Galvanized 60 Pipe Length Black Adjustable Length 3 10 Galvanized Adjustable Length 3 10 Black 46DVA 06 46DVA 06B N A N A 46DVA 09 46DVA 09B 46DVA 12 46DVA 12B 46DVA 18 46DVA 18B 46DVA 24 46DVA 24B 46DVA 36 46DVA 36B 46DVA 48 46DVA 48B 46DVA 60 46DVA 60B N A N A Discontinued N A N A 4DT 6 4DT 6B N A N A 4DT 9 4DT 9B 4DT 12 4DT 12B 4DT 18 4DT 18B 4DT 24 4DT 24B 4DT 36 4DT 36B 4DT 48 4DT 48B N A N A N A N A N A N A SV4L6 SV4LB6 N A N A N A N A SV4L12 SV4LB12 SV4LA SV4LA SV4L24 SV4LB24 SV4L36 SV4LB36 SV4L48 SV4LB48 N A N A N A N A Disc See 46DV 08A N A 4DT AJ N A N A Disc See 46DV 08AB 911B 4DT AJB N A N A Disc See 46DV 16A 917 N A from FPI N A N A N A Disc See 46DV 16AB 917B N A N A SV4LBA24 Adjustable Length 11 14 Galvanized Adjustable Length 11 14 Black Adjustable Length 17 24 Galvanized Adjustable Length 177 24 Black Adjustable Length 7 Galvanized Adjustable Length 7 Black Extension Pipe 8 1 2 Galvanized Extension Pipe 8 1 2 Black Adjustable Length 12 Galvanized Adjustable Length 12 Black Extension Pipe 16 Gal
9. Switch Piezo Ignitor TO THTP Burner ON OFF 4 F T ra O _ S5 e n m eO To Thermocouple IN S T TA White To TH Rice epi un Nonam jus Remote Transmitter Optional Millivolt Optional 38 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION For PROPANE Units and Units Equipped with DC Spark Boxes For installation of the DC Spark Box refer to the LP Conversion instructions in this manual C A Q M E E Lockwasher T Star washer Ground 8 Ground Lug o m O mobile home E nm oft approved 2 o A Neutral e o ui Li 120VAC Ground y 60 Hz Y Pilot Lh ON OFF Assembly i H B Black Red u Fan Rotary Speed Minimum Convection ground wire Control Air Temp Switch DC Spark Ground Box Burner ON CLR ns Ps O TN OFF 4 Thermostat Io TH To Thermocouple IN Whit D tasers eee e Co TH M si e ON OFF M Mr uu ag Remote Receiver 2 2 or Thermostat Remote Transmitter Optional Millivolt Optional Caution Ensure that the wires do not to
10. and then lift out the burner grate assembly 6 Remove the rear log stand by removing the 2 screws 7 Disconnect the inlet gas line See diagram 2 8 Disconnect the 2 TP wires and the 2 TH wires from the valve 9 Removethe 10 Phillips head screws securing the valve tray assembly in place diagram 2 and then lift the entire assembly out diagram 3 screws 10 Undo the pilot tube from the valve with a 7 16 wrench 11 Undo the quick drop out thermocouple nut on the valve with a 9mm metric wrench 12 Remove the Piezo igniter wire and push button assembly 13 Undo the gas out flare nut with a 13 16 wrench 14 Undo the gas out flare fitting with an 11 16 wrench 15 Remove the 4 Phillips head screws from the sides of the valve bracket and remove valve Hint If you are using black pipe ensure that there is a union by the valve otherwise removal will be almost impossible Rear Log Stand Diagram 2 Rear Log Stand amp Valve Tray Assembly INSTALLING VALVE 1 Attach the valve to the valve bracket with the 4 m5x8 metric screws provided 2 Reconnect the gas out flare fitting with an 11 16 wrench 3 Reconnect the gas out flare nut with a 13 16 wrench 4 Install piezo ignitor push button assembly and reconnect wire 5 Reconnectthe quick drop outthermocouple nut with a 9mm wrench 6 Reconnect the pilot tube nut with a 7 16 wrench 7 Scrape off the old
11. parts and subsidized labour for three 3 years from the date of purchase and parts only thereafter Special Finishes One year on brushed nickel and antique copper full screens and doors You can expect some changes in color as the product ages with constant heating and cooling FPI warranties the product for any manufacturing defects on the original product However the manufacturers warranty does not cover changing colors and marks ie finger prints etc applied after the purchase of the product Damage from the use of abrasive cleaners is not covered by warranty Electrical and mechanical components such as blowers switches wiring thermodiscs FPI remote controls spill switches thermopiles thermocouples pilot assembly components and gas valves are covered for two years parts and one year subsidized labour from the date of purchase Blowers and valves replaced under warranty are considered repairs and continue as if new with appliance ie twelve 12 months from original purchase date of appliance with a minimum of three 3 months coverage from date of replacement FPI venting components are covered parts and subsidized labour for three 3 years from date of purchase Simpson Dura Vent venting components Direct Vent units are covered by Simpson Dura Vent Inc warranty Repair replacement parts purchased by the consumer from FPI after the original coverage has expired on the unit will carry a 90 day warranty valid with a receipt only
12. pipe length is 30 feet with min of 11 feet total vertical and max 7 feet total horizontal Please note min 1 foot between 90 elbows is 22 required Vertical Venting with Three 3 90 Elbows One 90 elbow Two 45 elbows V V1 With these options max total pipe length is 30 feet with min of 10 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90 elbows is 10 Mini required Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION VERTICAL TERMINATION WITH CO LINEAR FLEX SYSTEM THE APPLIANCE MUST NOT BE Masonry chimneys may take various contours which the flexible liner will accommodate However CONNECTED TO A CHIMNEY FLUE keep the flexible liner as straight as possible avoid unnecessary bending SERVING A SEPARATE SOLID FUEL BURNING APPLIANCE The Air Intake pipe must be attached to the inlet air collar of the termination cap This appliance is designed to be attached to two 3 76mm co linear aluminium flex running the full length of the chimney See the Venting Co linear DV Arrangements Vertical Terminations Section Vertical Termination for minimum and maximum heights Cap 946 529 ee Required Parts A maximum Part Description of two certified 946 529 Co linear DV Vertical joiner kits Termination C
13. Bottom Faceplate Bracket into the bottom ofthe unit secure Also remove the center screw it into the pins located on the inside of the fire box Once the bracket is in place tighten the screws into the hinges on the left and right b Slide the cut outs in the Top and Bottom Flange of the Full sides Screen Door Frame under the screw heads which were loosened in step 4a Once the Frame is in place tighten the screws to secure Also re secure the top center screw through the oblong hole Full Screen Door Bottom Faceplate Frame Bracket Pin location Faceplate Mountin Bracket Backside of Full Screen Door 3 Before attaching the Full Screen Door Frame remove the Screen Frame Shown Doors from the Full Screen Door Frame by fully opening the doors Cut Outs and lifting up off of the hinges See important note in step 10 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 35 INSTALLATION NOTE Should the finished wall protrude beyond the face of the unit 8 Re install Glass Door Refer to the manual for instructions you can accommodate up to 1 2 depth 9 Slide the Top Grill into the louver brackets located on the inside top Simply push in the Full Screen Door Frame until it aligns against of the firebox Push in place the finished wall Secure Top Flange of Full Screen Door Frame as described in step 4 b For the Bottom Flange of the Full Screen Door Frame push the bottom of the F
14. Diagram 2 Hook top of door onto top flange Flush Door Diagram 1 AY Flush Incorrect D i Gasket Gasket J Glass doubled Correct up filling Door Glass Gasket gap Installation Diagram 2 Use the hook to pull the spring out until you can put the hook into the slot on the bottom door bracket Repeat for 2nd spring See diagram 3 Pull hook forward and up into slot on door bracket Diagram 3 To remove the flush door reverse the above steps OPTIONAL FLUSH TRIM Attach the round magnets to the back of the top trim piece and to the bottom trim piece then attach trim to the top and bottom of Flush door View from Rear 32 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION FLUSH LOUVERS 1 Install the top louver by sliding the two bracket clips into the brackets located underneath the top of the firebox 2 Installthe bottom louver by folding the louver down and then sliding the Bottom Louver bracket down onto the 2 pins on the base of the unit Diagram1 Secure with 1 screw Diagram 2 Louver Mounting ira crew DI D Bottom Louver Bracket A Diagram 1 Diagram 2 Top Louver Bracket Note Top and bottom louvers are different Louver Mounting Bracket 3 Open the bottom louver Pull the Burner ON OFF control box from inside the bottom of the fireplace and position the slots in the bracket o
15. Gas Fireplace 17 INSTALLATION The P33 4 is approved for a maximum 40 ft straight vertical with rigid pipe vent systems for Propane and Natural Gas The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum two 45 elbows allowed e Vent must be supported at offsets e Firestops are required at each floor level and whenever passing through a wall e Maintain clearances to combustibles Vertical Height Feet Horizontal Feet Maximum 40 ft 12 2m Minimum 8 6 2 6m Minimum 9 6 2 9m U v VY 18 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION RIGID PIPE VENTING ARRANGEMENTS Horizontal Terminations REGENCY DIRECT VENT SYSTEM FLEX Propane amp Natural Gas This diagram shows all allowable combinations of vertical runs with horizontal terminations using one 45 and one 90 elbow two 45 elbows equal one 90 elbow Note Must use optional rigid pipe adaptor Part 510 994 when using rigid pipe vent systems Refer Rigid Pipe Venting Systems Section Horizontal Feet 4 6 T D L B C D o L c o gt p lt A vent guard should be used whenever the p termination is lower than the specified minimum 27 or as per local codes Note Regency Direct Vent System Flex
16. Nut 8 32 Hex Plug Nylon 0 750 Hole Black for H25 only Bushing Split Plastic 0 500 in Screw 8 32 x 3 4 Pan Head Screw 8 x 1 2 Type B Black Oxide Spark Generator Battery Holder Spark Generator Switch C W Wire Battery Size AA Energizer En91 Clip Wire Holder Wire Fan To Power Cord Ground 30 in Velcro Hook Black d Remove the 2 screws holding the Burner Assembly to the firebox base Push the Burner Assembly to the left and lift out Remove the 2 screws push Burner Assembly to the left and lift out 4 2 H25 1 Only a Lift off the Cast Top and remove the glass front refer to Glass Replacement section in the H25 1 manual and carefully remove the logs and lava rock refer to Log Installation section in manual b Remove burner by removing the 2 screws on each side and then lifting the burner tray out 5 Note Use a magnetic type screwdriver if possible 3 Pull off the pilot cap to expose the pilot orifice Unscrew the pilot orifice with the Allen key and replace with the LPG pilot orifice in the kit and replace pilot cap Remove burner orifice with a 1 2 wrench and discard Use another wrench to hold on to the elbow behind the orifice Installation of the LPG Conversion Kit 1 Shut off the gas supply 2 P33 4 Only a Remove the louvers and bay door if it is installed b Open the flush door and remove the door c Remove the logs embers and
17. appliance when installed must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code ANSI NFPA 70 or the Canadian Electrical Code CSA C22 1 This Regency Mobile Manufactured Home Listed Nailing Strip appliance comes factory equipped with a means to secure the unit This Regency Mobile Manufactured Home listed appliance comes equipped with a dedicated 8 ground lug to which an 18 gauge copper wire from the steel chassis ground must be attached P Ye wo m This appliance may be installed in an aftermarket permanently located manufactured mobile home where not prohibited by local codes duis GUIION This appliance is only use with the type of gas indicated on the rating plate This appliance is not convertible for use with other gases unless a certified kit is used e 8 Mobile Home Ground tcm o NATIONAL REE ACE We recommend that our products be INSTITUTE installed and serviced by professionals S 4 who are certified in the U S by the A National Fireplace Institute NFI ONE REGENCY ONE TREE or in Canada by Wood 0 Energy Technical Wood Energy For each Regency sold Technical Training we plant a tree CERTIFIED Training WETT AmericanForests org 2 Regency P33 4 Zero Clearance Di
18. brick panels if used A TURA Ee Lee x ovd Burner Orifice 6 Reinstall new burner orifice LPG stamped 54 and tighten a OS Nm det i Pilot assembly is now accessible for steps 4 to 9 28 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 12 Using the Allen wrench as shown in Fig 4 rotate the screw clockwise until snug do not overtighten Turn control knob to the OFF position Remove the black protection cap by hand from the high low knob Fig 1 WARNING Do not overtighten the screw Recommended to grip the wrench by the short side Insert a 5 32 or 4mm Allen wrench into the hexagonal key way of the screw Fig 2 rotate it counter clockwise until it is free and extract it 13 Verify that if the conversion is from NG to LPG the screw must be re assembled with the red o ring visible Red o ring visible LPG Configuration 14 Re assemble the black protection cap 10 Check that the screw is clean and if necessary remove dirt 11 Flip the screw Fig 3 WARNING Also check that the pilot and main burner injectors are appropriate for the gas type Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 15 16 17 18 19 20 21 INSTALLATION Reverse step 2 Attach the label This unit has been converted to LPG near or on top of the serial decal Replace yellow NG label with red LPG label
19. gasket from the floor of the firebox and from the valve tray assembly 8 Install anew gasket and reinstall the valve tray assembly Note Failure to install a new gasket may severely affect the appliance performance 9 Reinstall the 10 hold down screws 10 Hook up the 2 TP and 2 TH wires to the appropriate connections on the valve 11 Reinstall the front log stand 12 Install Burner grate assembly 13 Hook up the gas line and check for gas leaks with a soap and water solution or a gas leak detector Do not use open flame for leak testing 14 Fire up the unit temporarily 15 Check the manifold pressure 16 Reinstall the logs and brick panels as needed 17 Close the door and replace the louvers 18 Fire up the unit again and check for proper flame appearance and glow on logs Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 45 PARTS LIST MAIN ASSEMBLY Part Description Part Description Part Description 1 948 247 Door Handle 432 901 Brick Panel Set Standard Brown 946 556 Optional Heat Wave Duct Kit 2 Thermodisc Bracket 432 902 Brick Panel Set Standard Red 89 946 004 Junction Box 432 903 Brick Panel Set Herringbone 90 946 000 Round Duct Adaptor 7 910 428 Duplex Receptacle Brown 91 946 002 Round to Oval Adaptor 8 910 429 Box Receptacle 92 946 001 Oval Duct Adaptor 9 910 430 Cover Receptacle 33 Brick Panel Rear 93 946 007 Angle Bracket 10 904 687 Clamp Connec
20. shield by removing the 4 screws 4 Install bottom louver by sliding the two bracket clips into the brackets located underneath the bay door Secure with 1 screw into each Bottom Louver Mounting Bracket as per diagram below Use the bottom hole in the bracket 5 Slide the valve extension knobs onto the valve knobs Match the correct ext Knob with the valve knob Flush Louver Top Heat Shield 2 Install the bay louver top heat shield and secure with 4 screws Shut Off Ext Knob 6 Open the bottom louver Pull the Burner ON OFF control box from inside the bottom of the fireplace and position the slots in the bracket over the 2 screws on the left side of the bottom louver Push down to lock into place Tighten the screws Burner ON OFF control box Bay Louver Top Heat Shield 3 Install top louver by sliding the two bracket clips into the brackets located on top of the bay door See below The fitted louver leaves a small gap between faceplate bottom and louver top Top Louver Louver Bracket 34 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION FULL SCREEN DOORS 1 Before beginning the installation remove the Glass Door from the 4 a Before attaching the Full Screen Door Frame to the unit unit Refer to the manual for instructions loosen the left and right side 8 Self Tapping Philips screws located on the inside top of the outer frame of the appliance 2 Slide the
21. wiring diagram your warranty careful not to damage wire Use table below to determine the maximum wire length The remote control kit comes with a hand held Note We recommend a maximum of 15 transmitter a receiver and a wall mounting of wire but if you wish to go with a plate longer run use the Thermostat Wire Note Preferable if the thermostat is Table installed on an interior wall 1 Choose a convenient location on the wall to install the receiver and the receptacle 2 Connect the wire to the wall switch and Regency offers an optional programmable box protection from extreme heat is very install into the receptacle box Also attach thermostat but any 250 750 millivolt rated non important Run wires from the fireplace to wires to the valve as shown below anticipator type thermostat that is CSA ULC or that location Use Thermostat Wire Table UL approved may be used CAUTION 2 Connectthe two wires to the gas valve See CAUTION diagram below Do not wire millivolt wall switch wire to 120V wire Do not wire millivolt CAUTION Do not wire millivolt wall thermostat wires to 120V wire remote control wires to 120V wire Thermostat Wire Table 3 Install3AAAalkaline batteries in transmitter CON and 4 AA alkaline batteries in the receiver remote control Ac 4 c or thermostat ITE MW Recommended Maximum Lead Length Install the receiver and its cover in the wa
22. 0 2 Revise 10 8 3 by adding the following additional requirements a For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in part for residential purposes including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven 7 feet above finished grade in the area of the venting including but not limited to decks and porches the following requirements shall be satisfied 1 INSTALLATION OF CARBON MONOXIDE DETECTORS At the time of installation of the side wall horizontal vented gas fueled equipment the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back up is installed on the floor level where the gas equipment is to be installed In addition the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling building or structure served by the side wall horizontal vented gas fueled equipment It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors a In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic the hard wired carbon monoxide detector with alarm and battery ba
23. 30 762mm is only approved for horizontal Minimum i Height terminations Requirement e Maintain clearances to combustibles e Horizontal vent must be supported every 3 feet e Firestops are required at each floor level and whenever passing through a wall Minimum Minimum Simpson Dura Vent Center Line Flex Kit Center Line Horizontal Feet Horizontal Feet 0 IMPORTANT If using any Cabinet Mantels with Part 510956 510958 510962 510964 and 510834 the wall thimble must be secured first and venting must be attached to unit before sliding into final position lt gt Max 24 0 6m Also Rigid Vent venting cannot be used with any of the mantels noted above See Price Pages for alternative options Vertical Height Feet T O o C D O L 9 E gt Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 19 INSTALLATION Horizontal Venting with Two 2 90 Elbows Horizontal Venting with Three 3 90 Elbows One 90 elbow Two 45 elbows One 90 elbow Two 45 elbows H H1 With these options maximum Option H V H H1 H2 With these options total pipe length is 30 feet eps maximum total pipe 4 Max vertical and maximum 8 feet total vertical and Ole MOM ZONA Mi maximum 9 feet total TE Jio mot eae Pissss Got 5 Min 7 i E 5 Max 9 Min minimum 1 foot S Min required E Max 9 Min LIES Horizontal Venting wit
24. 33 4 can be installed in a recessed position or framed out into the room as in A B C D See Diagram 1 below 5 This appliance is Listed for bedroom installations when used with a Listed Millivolt Thermostat Some areas may have further requirements check local codes before installation 6 The P33 4 Direct Vent Gas Fireplace is approved for alcove installations which meet the clearances listed on the Clearances Section 7 We recommend that you plan your installation on paper using exact measurements for clearances and floor protection before actually installing this appliance Have a qualified inspector dealer or installer review your plans before installation Note For vent terminations see Exterior Vent Termination Locations Section Diagram 1 A Flat on Wall B Flat on Wall Corner C Recessed into Wall Alcove Heat Wave DUCT SYSTEM OPTION kit 4946 556 The HeatWave Air Duct Kit increases the effectiveness of your fireplace by dispersing warm air from the fireplace to remote locations in the same room or other rooms in your home Up to two kits may be installed on the fireplace Please Note Only 1 HeatWave kit may be operated atone time This includes the internal blower option as well Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION CLEARANCES The clearances listed below are Minimum distances unless otherwise stated A major cause of chimney
25. CE BE KEPT CLEAN DUE TO HIGH TEMPERATURES THE APPLIANCE SHOULD BE LOCATED OUT OF TRAFFIC AND AWAY FROM FURNITURE AND DRAPERIES WARNING FAILURE TO INSTALL THIS APPLIANCE CORRECTLY WILL VOID YOUR WARRANTY AND MAY CAUSE A SERIOUS HOUSE FIRE CHILDREN AND ADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATURES ESPECIALLY THE FIREPLACE GLASS AND SHOULD STAY AWAY TO AVOID BURNS OR CLOTHING IGNITION YOUNG CHILDREN SHOULD BE CAREFULLY SUPERVISED WHEN THEY ARE IN THE SAME ROOM AS THE APPLIANCE CLOTHING OR OTHER FLAMMABLE MATERIALSHOULD NOT BE PLACED ON OR NEAR THE APPLIANCE GENERAL SAFETY INFORMATION The appliance installation must conform with local codes or in the absence of local codes with the current Canadian or National Gas Codes CAN1 B149 or ANSI 2223 1 Installation Codes 1 2 The appliance when installed must be electrically grounded in accordance with local codes orin the absence of local codes with the current National Electrical Code ANSI NFPA 70 or CSA C22 1 Canadian Electrical Code 3 See general construction and assembly instructions The appliance and vent should be enclosed 4 This appliance must be connected to the specified vent and termination cap to the outside ofthe building envelope Never vent to another room or inside a building Make sure that the vent is fitted as per Venting instructions 5 Inspect the venting syste
26. Diagram 2 and install the codes Note that for steep roof pitches the firestop vertical height must be increased A poor draft or down drafting can result from high wind conditions near big trees or adjoining im roof lines in these cases increasing the ie vent height may solve the problem 7 Ensure ventis vertical and secure the base of the flashing to the roof with roofing rails slide storm collar over the pipe section and Diagram 2 seal with a mastic firestop spacer Diagram 4 Minimum Vent Heigh Roof Pitch 2 flat to 7 12 over 7 12 to 8 12 over 8 12 to 9 12 over 9 12 to 10 12 over 10 12 to 11 12 over 11 12 to 12 12 over 12 12 to 14 12 over 14 12 to 16 12 over 16 12 to 18 12 over 18 12 to 20 12 over 20 12 to 21 12 8 Install the vertical termination cap by twist locking it Note Any closets or storage spaces which the vent passes through must be enclosed GAS LINE INSTALLATION The gas line is brought through the right side of the appliance The gas valve is situated on the right hand side of the unit and the gas inlet is on the right hand side of the valve The gas line connection may be made of rigid pipe copper pipe or an approved flex connector If you are using rigid pipe ensure that the valve can be removed for servicing Since some municipalities have additional local codes it is always best to consult with your local authorities and the CAN CGA B149 installation code Fo
27. S Rd ern mM ERE de UE 42 Aeration Adjustment eeeeeeeeee eese 42 Normal Operating Sounds of Gas Appliances 43 MAINTENANCE Maintenance Instructions euesssssse 43 General Vent Maintenance 43 Gold Plated or Brass Louvers trim 43 LOG Replacement citi sitewide a er tu Na vada vox d ae 43 Thermopile Thermocouple 44 lass Gasket se bete NIEVE in Ete isis 44 DOOMGIAS P 44 Ierovirig Valve sesona e breit Da a aud aav ava vau 45 Installing Valve 45 PARTS LIST Wall ASSeImbly ss nn uae nous venis RIRES 46 Burner amp Log Assembly 48 Flush Front amp Louvers eeeeeeeeeeeeeee 49 Bay Front amp Louvers 50 WARRANTY Warralaby csse pu Ne E EE 51 3 SAFETY LABEL SAFETY LABEL This is a copy of the label that accompanies each P33 4 Zero Clearance Direct Vent Gas Fireplace epeue ne enbuqeJ epeuey ui ape epeued 9g eyeq p 1 Jeuoneuio93u sjonpoug oeoejdaurJ Idd pej ees A 1edoud si 400p ay Jeu YIOYD eseaj d TVAS HOOG 867 816 uondo sse 5 Aeg ay ylim pesn eq ISNW S18An07 Keg ay ululQGL 9 18U109 episu JOUIOD 9epiS nQ 0 JeuruuJe JU8A JO e2ueJe9 9 uunuulul A eza ovo Hed degonsy SU JO esn eu eJinbaJ suoneuriuuJe jJejuozuoH suononujsu pojreje
28. To Be Vented in the most current edition of NFPA 54 as adopted by the Board and 2 Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling building or structure used in whole or in part for residential purposes c MANUFACTURER REQUIREMENTS GAS EQUIPMENT VENTING SYSTEM PROVIDED When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment the instructions provided by the manufacturer for installation of the equipment and the venting system shall include 1 Detailed instructions for the installation of the venting system design or the venting system components and 2 A complete parts list for the venting system design or venting system d MANUFACTURER REQUIREMENTS GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases but identifies special venting systems the following requirements shall be satisfied by the manufacturer 1 The referenced special venting system instructions shall be included with the appliance or equipment installation instructions and 2 The special venting systems shall be Product Approved by the Board and the instructions for that system shall include a parts list and detailed installation instructi
29. Twist lock procedure Fourindentations located on the female ends of pipes and fittings are designed to slide straight onto the male ends of adjacent pipes and fittings by orienting the four pipe indentations so they match and slide in to the four entry slots on the male ends Dia 1 Push the pipe sections completely together then twist lock one section clockwise approximately one quarter turn until the two sections are fully locked The female locking lugs will not be visible from the outside on the Black Pipe or fittings They may be located by examining the inside of the female ends N Female 7 Locking LL es Lugs Male Locking Lugs Diagram 1 pe ee For best results and optimum performance with each approved venting system it is highly recommended to apply Mill Pac sealant supplied to every in ner pipe connection Failure to do so may result in drafting or performance issues not covered under warranty Silicone red RTV is optional 5 b Horizontal runs of vent must be supported every three feet Wall straps are available for this purpose Mark the wall for a 10 x 10 square hole The center of the square hole should line up with the centerline of the horizontal pipe Cut and frame the 10 inch square hole in the exterior wall where the vent will be terminated If the wall being penetrated is constructed of non combustible material i e masonry bloc
30. aded area in the diagrams show the allowable vertical terminations 24 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION UNIT INSTALLATION WITH HORIZONTAL TERMINATION Install the vent system according to the manufacturer s instructions included with the components 1 2 3 4 Set the unit in its desired location Check to determine if wall studs or roof rafters are in the way when the venting system is attached If this is the case you may want to adjust the location of the unit Rough in the gas preferably on the right side of the unit and the electrical junction block is on the left side on the left Direct Vent pipe and fittings are designed with special twist lock connections to connect the venting system to the appliance flue outlet A twist lock appliance adaptor is an available option that must be used in conjunction with the Simpson Dura Vent Direct Vent GS system Puta bead of silicone inside the outer section of the adapter and a bead of Fireplace Mate on the inner collar Slip the adapter over the existing inner and outer flue collar and fasten to the outer collar only with the 3 supplied screws drilling pilot holes will make this easier Level the fireplace and fasten it to the framing using nails or screws through the nailing strips Assemble the desired combination of pipe and elbows to the appliance adaptor and twist lock for a solid connection Note NOTE a
31. al www mtlfab com Security Secure Vent www securitychimneys com 24 610mm 20 5 8 524mm 29 1 8 740mm 29 737mm 37 1 2 953mm 48 1219mm 37 7 16 951mm 45 15 16 1167mm NOTE Horizontal runs of vent must be level or have a 1 4 inch rise for every 1 foot of run towards the termination Never allow the vent to run downward This could cause high temperatures and may present a possible fire hazard j 6 152mm 12 1 4 311mm 20 3 4 527mm i 36 16 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION RIGID PIPE VENTING ARRANGEMENTS Vertical Terminations Propane amp Natural Gas The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations using one 90 elbow with rigid pipe vent systems for Propane and Natural Gas Horizontal Feet 12 Horizontal Feet 4 6 m e X _ a O D st T E D gt E CN eo KR CN E 2 x 49 E 2 D P Max 10 3m o i5 centerline to centerline CO N tO E co E l 5 E E c i gt Min 12 305mm e Vent must be supported at offsets e Firestops are required at each floor level and whenever passing through a wall e Maintain clearances to combustibles Note Must use optional rigid pipe adapter when using rigid vent systems Part 510 994 Regency P33 4 Zero Clearance Direct Vent
32. al Terminations 24 Unit Installation with Horizontal Termination 25 Unit Installation with Vertical Termination 26 Gas Ling InstallatlOriz iie o n e iei pea ore terit sue 26 Pilot Adjustment 27 High Elevation ses Errore spen ze uasa ovale 27 Gas Pipe Pressure Testing 27 SLE Valve Description 27 Conversion Kit 434 969 from NG to LP 28 Optional Brick Panels exo REL a 31 Log Set Installation 31 Standard FIUS DOOR ics uoti et ta unes 32 Optional FIUSW THM eui sn o i he Ee emen eec 32 IOUS EOUVeTS at iusco tinc ns en se cts 33 Double Screen Door 33 Optional Bay DOO cometen stu novos eas 33 Optional Bay Trim dnia 33 Bay LOUVO S ain INE EN t el E e UE 34 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace Full Screen Doors a a 35 Optional Wall Thermostat essess 37 Optional Remote Control 37 Optional Wall Switch 37 Wiring DIAQFAINS alesse huit det na tutae oe eee cha ena 38 Installing the Optional Fan 40 OPERATING INSTRUCTIONS Copy of the Lighting Plate Instructions 41 Operating Instructions eseeeseseeesees 42 Lighting Procedure m E E D 42 Shutdown Procedure 42 PIS RIT R
33. ance with the outside vent terminal location before cutting hole as both dimensions must be met 10 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION EXTERIOR VENT TERMINATION LOCATIONS f men m Vent Termination Air Supply Outlet Area where terminal is not permitted A Clearance above grade veranda porch deck or balcony min 12 30cm B Clearance to window or door that may be opened 12 30cm 9 23cm C Clearance to permanently closed window min 12 30cm D Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 24 60cm from the centerline of the terminal min 18 46cm check with local code E Clearance to unventilated soffit min 15 38cm F Clearance to outside corner with AstroCap Termination Cap min 6 15cm with Dura Vent Termination Cap 12 30cm G Clearance to inside corner with AstroCap Termination Cap min 6 15cm with Dura Vent Termination Cap 12 30cm H Not to be installed above a meter regulator assembly within 3 90cm horizontally from the centerline of the regulator J Clearance to service regulator vent outlet min 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 30cm 9 23cm L Cleara
34. anty will be invalid Exclusions This limited Lifetime Warranty does not extend to or include paint door or glass gasketing or trim At no time will FPI be liable for any consequential damages which exceed the purchase price of the unit FPI has no obligation to enhance or modify any unit once manufactured ie as products evolve field modifications or upgrades will not be performed FPI will not be liable for travel costs for service work Installation and environmental problems are not the responsibility of the manufacturer and therefore are not covered under the terms of this warranty policy Embers rockwool gaskets door handles and paint are not covered under the terms of this warranty policy Any unit which shows signs of neglect or misuse is not covered under the terms of this warranty policy The warranty will not extend to any part which has been tampered with or altered in any way or in our judgment has been subject to misuse improper installation negligence or accident spillage or downdrafts caused by environmental or geographical conditions inadequate ventilation excessive offsets negative air pressure caused by mechanical systems such as furnaces fans clothes dryer etc Freight damage to stoves and replacement parts is not covered by warranty and is subject to a claim against the freight carrier by the dealer FPI will not be liable for acts of God or acts of terrorism which cause malfunction of the appliance Performa
35. ap maybe used 948 305 3 Flex 35 ft per length 946 563 Co Axial to Co Linear Adapter Kit which contains the following 8948 305 Co linear Flex Adapter 35 lft Outer Pipe Inner Pipe Adapter 510 994 Rigid Pipe Adaptor 945 45 Elbow Alternate Approved Caps 980 Vertical Termination Cap 991 High Wind Cap 923GK 3 Co linear Adapter with flashing with FPI Cabinet and or Flat Wall Mantles may a be used in these applications ensuring that clearances to combustibles are er Air Intake maintained Pipe SU ST Co Linear x FI Rigid Pipe Adapter ST Nes CR TN withixit ma 946 563 InneriPipe ST Adapter m with Kit f 946 563 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 23 INSTALLATION VENTING ARRANGEMENTS VERTICAL TERMINATIONS with Co linear Flex System for both Residential amp Manufactured Homes into Masonry Fireplaces 30 30 30 LL 3 NEN TS 1 o D x 9 7 d o 8 o 2 2 5 z E E E 8 O Gi o D Y JE D 7 ET D N o a 8 T e o E s T 5 8 O 5 Oo 5 t y cun B S o gt gt c eo o x o x O E E E E i238 x ES ei E E S E a PET h N f A Ai 9 7 CON CON Horizontal Distance Feet Horizontal Distance Feet Horizontal Distance Feet The sh
36. artment clean by brushing and vacuuming at least once a year When cleaning the logs use a soft clean paint brush as the logs are fragile and easily damaged 2 Clean appliance and door with a damp cloth never when unit is hot Never use an abrasive cleaner The glass should be cleaned with a gas fireplace glass cleaner The glass should be cleaned when it starts looking cloudy 3 The heater is finished in a heat resistant paint and should only be refinished with heat resistant paint Regency uses StoveBright Paint Metallic Black 6309 4 Make a periodic check of burner for proper position and condition Visually check the flame of the burner periodically making sure the flames are steady not lifting or floating If there is a problem call a qualified service person 5 The appliance and venting system must be inspected before use and atleast annually by a qualified field service person to ensure that the flow of combustion and ventilation air is not obstructed Note Never operate the appliance without the glass properly secured in place 6 Donotuse this appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance andto replace nay part ofthe control system and any gas control which has been under water 7T Verify operation after servicing GENERAL VENT MAINTENANCE Conduct an inspection of the venting system semi annually Recommended areasto inspe
37. by step instructions for replacement WARNING Do not operate the appliance with the glass panels removed cracked or broken Replacement of the glass panels should be done by a licensed or qualified service person Caution Wear gloves when removing damaged or broken glass 44 Flush Glass Replacement Remove the flush door front Remove the 4 glass clips from each corner Slide in the new replacement glass Push the 4 glass clips back onto the frame The glass must have gasketing around it Flush Door Glass 1 2 3 5 6 Bay Glass Replacement Remove the door from the unit and place on a soft surface to prevent scratching Remove the nuts holding the glass clips in place and remove Replace the glass The glass must have gasketing around it Reverse the previous steps replace the glass clips and fasten with the nuts but do not over tighten as this can break the glass Replace door on the Fireplace and check the seal Regency P33 4 Zero Clearance Direct Vent Gas Fireplace MAINTENANCE REMOVING VALVE 1 Shut off the gas supply 2 Remove the louvers and bay door if it is on 3 Open the flush door and remove the door 4 Remove the logs 5 Remove the burner grate assembly by removing the two Phillips head screws and then lift the burner assembly out Diagram 1 Remove the left and right screws
38. ck up may be installed on the next adjacent floor level b In the event that the requirements of this subdivision can not be met at the time of completion of installation the owner shall have a period of thirty 30 days to comply with the above requirements provided however that during said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed 2 APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified 3 SIGNAGE A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless upon inspection the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5 08 2 a 1 through 4 b EXEMPTIONS The following equipment is exempt from 248 CMR 5 08 2 a 1 through 4 1 The equipment listed in Chapter 10 entitled Equipment Not Required
39. ct as follows 1 Checkthe Venting System for corrosion in areas that are exposed to the elements These will appear as rust spots or streaks andin extreme cases holes These compo nents should be replaced immediately 2 Remove the Cap and shine a flashlight down the Vent Remove any bird nests or other foreign material 3 Check for evidences of excessive condensation such as water droplets forming in the inner liner and subsequently dripping out the joints Continuous condensation can cause corrosion of Caps pipe and fittings It may be caused by having excessive lateral runs too many elbows and exterior portions ofthe system being exposed to cold weather 4 Inspect joints to verify that no pipe sections or fittings have been disturbed and consequently loosened Also check mechanical supports such as Wall Straps or plumbers tape for rigidity GOLD PLATED or BRASS LOUVERS TRIM The 24 carat gold plated or brass finish on the louvers and trim requires little maintenance and need only be cleaned with a damp cloth DO NOT use abrasive materials or chemical cleaners as they may harm the finish and void the warranty Clean any fingerprints off before turning the unit on LOG REPLACEMENT Theunitshould never be used with broken logs Turn off the gas valve and allow the unitto cool before opening door and carefully remove the logs The pilot light generates enough heat to burn someone If for any reason a l
40. digit numbers i e 250 are molded into the rear of each log Log Kit 431 930 contains the following pieces A 250 Rear Log B 254 Middle Cross Log C 253 Front Left Cross Log D 251 Rear Left Log E 252 Front Right Cross Log F Embers 902 156 G Vermiculite 902 179 H Rock Wool 902 153 l Platinum Embers 946 669 supplied with packaged manual NOTE If you will be installing the optional Brick Panels install the Brick Panels prior to installing the logs 1 Carefully remove the logs from the box and unwrap them The logs are fragile handle with care do not force into position 2 Sprinkle the vermiculite and embers around the firebox base Vermiculite Vermiculite Vermiculite 3 Place the Log 250 on the rear log support pins with the flat side to the back T E 3 o T E ri z LA r Lx LH Ei ww em a ds SEM d uc EE 0 1 ET od ra roam eo E 1 EN a e n ae LP lt a a T d m XE Deus unes ig ur P M LEN Sole CRE C 253 B 254 E 252 4 Place Log 254 on the front right side of the burner Push the back of the log against the 2 brackets with the notch on the bottom right side of the log fitting into the right side of the grate Notch parn LE oer LM a jae 2507 5 Position Log 253 across the cutouts in Logs 250 and 254 with the notch on the left side of the log fitting into the 2nd grate tab Cuto
41. ed or the film will bake on and become very difficult to remove Use a non abrasive cleaner and NEVER clean the glass while it is hot AERATION ADJUSTMENT The air shutter can be adjusted by moving the adjusting wire up or down The wire is accessed through the bottom louver opening Open the air shutter for a blue flame or close for a yellower flame The burner aeration is factory set but may need adjusting due to either the local gas supply or altitude Minimum Air Shutter Opening 3 16 Natural Gas 3 8 Propane CAUTION Carbon will be produced if air shutter is closed too much Air shutter Adjustment Wire push to close or pull to open aeration cap Closed Tall yellow Open Short blue Note Any damage due to carboning resulting from improperly setting theaeration controls is NOT covered under warranty Note Aeration Adjustment should only be performed by an authorized Regency Installer at the time of installation or service Regency P33 4 Zero Clearance Direct Vent Gas Fireplace MAINTENANCE NORMAL OPERATING SOUNDS OF GAS APPLIANCES It is possible that you will hear some sounds from your gas appliance This is perfectly normal due to the fact that there are various gauges and types of steel used within your appliance Listed below are some examples All are normal operating sounds and should not be considered as defects in your appliance Blower Regency gas appliances use hig
42. ent Gas Fireplace PARTS LIST ON OFF SWITCH ASSEMBLY EN d FAN SWITCH ASSEMBLY E DOORS amp LOUVERS PLEASE ee REFER SEPARATE SECTION Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 47 PARTS LIST Part 53 430 055 54 910 421 55 910 422 56 910 190 433 574 P 433 576 P 57 910 478 58 59 60 66 910 038 910 039 904 568 904 163 936 170 67 68 W840470 79 433 525 82 433 024 83 85 431 930 86 430 097 87 433 018 Not available as a replacement part 48 BURNER amp LOG ASSEMBLY Description Gasket Valve Access Plate NG LP Pilot ON OFF Extension Knob Flame HI LOW Extension Knob Piezo Ignitor and Nut Valve Assy Natural Gas Valve Assy Propane S I T Valve NG LP Valve Bracket Firebox Base Valve Tray Pilot Assy 3 way flame S I T NG Pilot Assy 3 way flame S I T LP Orifice 44 Natural Gas Orifice 54 Propane Orifice Gasket Pilot Holder Pilot Assembly Gasket Burner Assy NG LP Burner Grate Assembly NG LP Rear Log Support Bracket NG LP Log Set Air Deflector Left Air Deflector Right A Regency P33 4 Zero Clearance Direct Vent Gas Fireplace PARTS LIST 117 131 133 134 135 137 139 140
43. ent assembly by applying Mill Pac to the 4 100mm inner collar of the termination and slipping the 4 100mm liner over it at least 1 3 8 35mm Fasten with the 3screws drilling pilot holes will make this easier Apply Mill Pac or high temperature silicone to the 6 7 8 175mm flex pipe and slip it over the 6 7 8 outer collar of the vent terminal at least 1 3 8 35mm and fasten with the 3 screws Separate the 2 halves of the wall thimble and securely fasten the one with the tabs to the outside wall making sure that the tabs are on top and bottom Fasten the other thimble half to the inside wall The thimble halves slip inside each other and can be adjusted for 2x4 or 2 x 6 walls The liners must slip over the collars a minimum of 1 3 8 5 6 7 connection Screws If this is an outside corner the minimum distance between the vent and the outside corner is 6 15cm with AstroCap termination cap or 12 30cm with Dura Vent termination cap See F in the diagram in Exterior Vent Trmination Locations Section Max 24 610mm Minimum and Maximum Vent Clearances Slip the assembled liner and termination assembly through the thimble making sure the termination cap faces up there are markings on the cap that show which way is up This will position the termination cap with proper down slope for draining water Fasten the cap to the outer wall with the 4 supplied screws Pull the centre 4 100mm liner and
44. h Two 2 90 Elbows One 90 elbow Two 45 elbows m maximum total pipe pA 1 Max Max 1 Min Min 3 Max Max ias NS rs il vertical and maximum 8 ee M Please note minimum Risse MU 20 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION Horizontal Venting with Three 3 90 Elbows One 90 elbow Two 45 elbows 2 Min 4 Min th 20 ft a minimum of 12 feet maximum 9 eet ta D 5 Min Min 4 Max Max 8 Min Min TMax Max Pre mare minimum 1 foot Vertical Venting with Two 2 90 Elbows Vertical Venting with Two 2 90 Elbows One 90 elbow Two 45 elbows One 90 elbow Two 45 elbows m Ap maximum total pipe total pipe length is 30 feet length is a Las ui with minimum of 6 feet total Fa i RA minimum of 6 feet tota vertical and maximum 6 feet vertical and maximum 8 total horizontal C 3 Min 6 Max 4 Min feet total horizontal 3 Min 6 Max 4 Min pi Please note minimum 1 Mi Mi ease note minimum foot between 90 elbows is 1 foot between 90 r For additional vertical venting with 2 x 90 elbows refer to Rigid Pipe Venting Arrangements Section Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 21 INSTALLATION Vertical Venting with Three 3 90 Elbows One 90 elbow Two 45 elbows With these options max total
45. h tech blowers to push heated air farther into the room It is not unusual for the fan to make a whirring sound when ON This sound will increase or decrease in volume depending on the speed setting of your fan speed control Burner Tray The burner tray is positioned directly under the burner tube s and logs and is made ofa different gauge material from the rest of the firebox and body Therefore the varying thicknesses of steel will expand and contract at slightly different rates which can cause ticking and cracking sounds You should also be aware that as there are temperature changes within the unit these sounds will likely re occur Again this is normal for steel fireboxes Blower Thermodisc When this thermally activated switch turns ON it will create a small clicking sound This is the switch contacts closing and is normal Pilot Flame While the pilot flame is on it can make a very slight whisper sound Gas Control Valve As the gas control valve turns ON and OFF a dull clicking sound may be audible this is normal operation of a gas regulator or valve Unit Body Firebox Different types and thicknesses of steel will expand and contract at different rates resulting in some cracking and ticking sounds will be heard throughout the cycling process MAINTENANCE INSTRUCTIONS 1 Alwaysturn offthe gas valve before cleaning For relighting refer to lighting instructions Keep the burner and control comp
46. he adhesive backed wire holder clips Part 2910 199 onto the Fireplace base Use the second clip to bundle up the wires approximately 4 from the control box Ensure that there is no interference with the wires when the louver is closed and that no wire will touch the hot metal surfaces or sharp edges 13 Plug the fan power cord into the rear end of the receptacle box to provide the maximum clearance from the louvers TO REMOVE THE FAN 1 Shut the power off 2 Reverse the above instructions Note The bearings are lubricated for life Do not lubricate them Make sure you vacuum the fan area on a regular basis IMPORTANT These fans collect a lot of dust from within your home Ensure you maintain these fan motors on a regular basis by vacuuming out the fan blades and housing using a soft brush nozzle Regency P33 4 Zero Clearance Direct Vent Gas Fireplace OPERATING INSTRUCTIONS COPY OF THE LIGHTING PLATE INSTRUCTIONS FOR YOUR SAFETY READ BEFORE LIGHTING This appliance must be installed in accordance with local codes if any if none follow the National Fuel Gas Code ANSI Z223 1 NFPA 54 or Natural Gas and Propane Installation Codes CSA B149 1 Australia AG601 New Zealand NZS 5261 WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life Improper installation adjustment alteration service or maintenance can cause injury o
47. ian or gas supplier 5 Turn gas control knob counterclock wise to ON 6 Use rocker switch to operate main burner FOR ALL PROPANE UNITS AND UNITS EQUIPPED WITH ELECTRIC SPARK BOXES 1 Push in gas control knob slightly and turn to PILOT position 2 Push in control knob all the way and hold in until the pilot lights up Continue to hold the control knob in for about 20 seconds after the pilot is lit Release knob s 3 Push in gas control knob slightly and turn to ON position Gas Inlet 4 Turn ON the flame switch TO TURN OFF GAS APPLIANCE 1 Turn off the flame switch 2 Push in the gas control knob slightly and turn clockwise to OFF Do not force 3 Turn off all electric power to the appliance if service is to be performed You may shut off the pilot during prolonged non use periods to conserve fuel Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 41 OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS 1 Read and understand these instructions before operating this appliance 2 Check to see that all wiring is correct and enclosed to prevent possible shock 3 Check to ensure there are no gas leaks 4 Make sure the glass in the door frame is properly positioned Never operate the appliance with the glass removed 5 Verify that the venting and cap are unobstructed 6 Ensure that the brick panels are installed 7 Verify log placement If the pilot canno
48. imney Flashing Brass Trim for Wall Thimble Ceiling Support DISC 3951 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 15 INSTALLATION 4 x 6 5 8 Rigid Pipe Cross Reference Chart Cont Components from different Manufacturers may not be mixed Not All Rigid Pipe components are available directly from FPI Simpson American Metal Simpson Direct r Gs Selkirk Products Metal Fab Security Direct Vent Pro k Direct Temp roducts Sure Seal Secure Vent Discontinued Attic Insulation Shield 12 46DVA IS N A from FPI N A N A 4DAIS12 N A SVARSA Attic Insulation Shield Cold Climates 36 N A N A N A 4DAIS36 N A N A Basic Horizontal Termination Kit A DISC 4DT HKA 4DHTK2 4DHTKA Horizontal Termination Kit B cane arenes 4DT HKB 4DHTK1 4DHTKB Vertical Termination Kit DISC 4DT VKC 4DVTK 4DVTK Description Amerivent Direct High Wind Vertical Cap 46DVA VCH N A N A High Wind Horizontal Cap 46DVA HC N A N A Horizontal Square Termination Cap Disc See 46DVA HC 4DT HHC SV4CHC 1 Vertical Termination Cap 46DVA VC 4DT HVC SV4CGV 1 Storm Collar 46DVA SC 4DT SC SV4FC Adjustable Flashing 0 12 6 12 46DVA F6 943 4DT AF6 4DF 4DF SV4FA Adjustable Flashing 6 12 12 12 46DVA F 12 943S 4DT AF12 4DF12 4DF 12 SV4FB Vinyl Siding Standoff 46DVA VSS 950 4DT VS N A 4DVS SV4VS Vinyl Siding Shield Plate N A N A 4DT VSP N A N A SV4VS Snorkel Termination 14 46DVA SNK14 982 4DT ST14 4D12S 4DST14 SV4STC14 Snorkel Terminatio
49. izontal Feet AstroCap can be replaced with 0 the FPI Riser Vent Termination Cap or the Dura Vent Snorkel Termination Cap LL C D o o O I I S t X D gt 12 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION 1 INSTALLATION PROCEDURES for Regency Direct Vent System Flex Locate the unit in the framing rough in the gas preferably on the right side of the unit and the electrical Junction block is on the left side on the left Locate the centerline of the termination and mark wall accordingly Cut a 10 254mm hole in the wall inside dimension Note To make the installation more Note Note 2 3 4 aesthetically pleasing we recommend framing out a square to mount the terminal to d guste W wall gt Strips A 2 1 2 64mm horizontal top and 1 1 2 38mm horizontal sides amp bottom clearance around the liner must be maintained except that only 1 25mm clearance is needed at the termination end We recommend framing a 10 254mm x 10 254mm inside dimensions hole to give structural rigidity for mounting the termination If installing termination on a siding covered wall furring strips must be used to ensure that the termination is not recessed into the siding Level the fireplace and fasten it to the framing using nails or screws through the nailing strips Assemble the v
50. k or concrete a 7 178mm diameter 7 1 2 191mm dia for flex hole is acceptable Note a The horizontal run of vent must be level or have a 1 4 inch rise for every 1 foot of run towards the termination Never allow the vent to run downward This could cause high temperatures and may present the possibility of a fire b The location of the horizontal vent termination on an exterior wall must meet all local and national building codes and must not be blocked or obstructed See Exterior Vent Terminal Locations Section c Snorkel Terminations For installations requiring a vertical rise on the exterior of the building 14 inch and 36 inch tall Snorkel Terminations and the Riser Vent as shown in Dia 2 amp 2a are available Follow the same installation procedures as used for standard Horizontal Termination NEVER install the snorkel upside down Mis Dura Vent Snorkel Min 12 305mm Diagram 2 As specified in CGA B149 Installation Code Local codes or regulations may require different clearances Riser Vent Diagram 2a Termination Below Grade Snorkel Installation If the Snorkel Termination must be installed below grade i e basement application proper drainage must be provided to prevent water from entering the Snorkel Termination Refer to Dura Vent Installation instructions for details Do not attempt to enclose the S
51. ll rm r Two Wire When Using Wall Switch the remote receiver to remote mS Thermostat CP 2 System mode The remote control is now ready for operation To thermopile Wire Size Max Length 14 GA 16 G 18 GA 20 Ft 20 GA 12 Ft 22 GA 9 Ft Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 37 INSTALLATION WIRING DIAGRAMS This heater does not require a 120V A C supply for operation In case of a power failure the burner switch and the optional remote control thermostat will continue to operate However a 120V A C power supply is needed for the fan blower operation Do not cut the ground terminal off under any circumstances NOTE Even if the fan is not purchased with the unit it is still a good idea to bring power to the receptacle box provided with the unit in case the fan is installed at a later date For NATURAL GAS Units and Units LOM Equipped with DC Spark Boxes Lockwasher x Star washer Ground 8 Ground Lug o m a mobile home t 4n 9 E approved o E FO ud V Live irem 120V AC Ground Eni d ade ON OFF Assembly 01 19 z Black Red J dej j oT i in Rotary Speed Minimum Convection ground wire E LL Control Air Temp
52. lot Adjustment 4 Thermocouple Connection option 5 Outlet Pressure Tap 6 Inlet Pressure Tap 7T Pilot Outlet 8 Main Gas Outlet 9 Alternative TC Connection Point P33 NG4 System Data Conversion Kit 434 969 For 0 to 2000 feet altitude Burner Inlet Orifice Sizes 44 Max Input Rating 22 500 Btu h Min Input Rating 12 500 Btu h For 2000 to 4500 feet altitude Burner Inlet Orifice Sizes 45 Max Input Rating 21 000 Btu h Min Input Rating 10 500 Btu h Supply Pressure min 5 0 w c Manifold Pressure High 3 8 0 2 w c P33 LP4 System Data For 0 to 4500 feet altitude Burner Inlet Orifice Sizes 54 21 500 Btu h 10 500 Btu h Max Input Rating Min Input Rating Supply Pressure min 12 0 w c Manifold Pressure High 11 0 2 w c S I T VALVE DESCRIPTION GAS PIPE PRESSURE TESTING The appliance must be isolated from the gas supply piping system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to orless than 1 2 psig 3 45 kPa Disconnect piping from valve at pressures over 1 2 psig The manifold pressure is controlled by a regulator built into the gas control and should be checked at the pressure test point Note To properly check gas pressure both inletand manifold pressures should be checked using the valve pressure ports on the valve 1 Make sure the valve is i
53. m annually for blockage and any signs of deterioration 6 Venting terminals shall not be recessed into a wall or siding 7 esaet Any safety glass removed for servicing must be replaced prior to operating the appliance 8 To prevent injury do not allow anyone who is unfamiliar with the operation to use the fireplace 9 Wearglovesandsafetyglassesforprotection while doing required maintenance 10 Be aware of electrical wiring locations in walls and ceilings when cutting holes for termination 11 Under no circumstances should this appliance be modified Parts that have to be removed for servicing should be replaced prior to operating this appliance 12 Installation and any repairs to this appliance should be done by a qualified service person A professional service person should be called to inspect this appliance annually Make it a practice to have all of your gas appliances checked annually 13 Do not slam shut or strike the glass door 14 Under no circumstances should any solid fuels wood paper cardboard coal etc be used in this appliance 15 The appliance area must be kept clear and free of combustible materials gases and other flammable vapours and liquids Emissions from burning wood or gas could contain chemicals known to the State of California to cause cancer birth defects or other reproductive harm MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS 1 Ens
54. n 36 N A 981 4DT ST36 4D36S 4DST36 SV4STC36 Restrictor Disk 46DVA RD Extended Vertical Termination Cap 46DVA VCE Chimney Conversion Kit A 46DVA KCA Chimney Conversion Kit B 46DVA KCB Chimney Conversion Kit C 46DVA KCC Chimney Conversion Kit Masonry 46DVA KMC Mansonry Chimney Conversion Kit includes Cap Adapter 18 x18 Flashing Wall Firestop 46DVA WFS Colinear Flex Connectors 46DVA ADF 46DVA KCT 946 506 P Vent Guard Optional for AstropCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adapter Must use with all Rigid Piping 946 208 P Vent Guard Optional for Riser Vent Terminal 640 530 P Riser Vent Terminal 946 523 P AstroCap Horizontal Cap 946 206 Vinyl Siding Standoff for AstroCap NOTE When using Metal Fab Sure Seal Rigid Piping please note that either the Adaptor 4DDA or 90 Starter Elbow 4D90A must be used in conjunction with FPI Rigid Pipe Adaptor 510 994 Offset Pipe Selection Use this table to determine offset pipe lengths 4 x 6 5 8 Venting Pipe Length Run X Rise Y 4 7 8 124mm 13 3 8 340mm 152mm 8 203mm 16 1 2 419mm 9 229mm 10 1 8 257mm 18 5 8 473mm For specific instructions or details on particular venting components please visit the following websites Simpson Direct Vent Pro www duravent com Selkirk Direct Temp www selkirkcorp com x American Metal Products Amerivent Direct www americanmetalproducts com Metal Fab Sure Se
55. n the OFF position 2 Loosen the IN and or OUT pressure tap s turning counterclockwise with a 1 8 wide flat screwdriver 3 Attach manometer to IN and or OUT pressure tap s using a 5 16 ID hose 4 Light the pilot and turn the valve to ON position 5 The pressure check should be carried out with the unit burning and the setting should be within the limits specified on the safety label 6 When finished reading manometer turn offthe gas valve disconnect the hose and tighten the screw clockwise with a 1 8 flat screwdriver Note Screw should be snug but do not over tighten Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 27 INSTALLATION CONVERSION KIT 434 969 FROM NG TO LP For P33 4 H25 1 Using SIT 820 NOVA Gas Valve THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER IF INDOUBT DO NOT DO THIS CONVERSION Each Kit contains one LPG Conversion Kit and one DC Sparker Kit LPG Conversion Kit Contains Qty Part 904 163 918 590 908 528 904 529 910 037 918 480 Description Burner Orifice 54 Decal Converted to LPG Red LPG label 5 32 Allen Key LPG Injector Pilot Orifice Instruction Sheet DC Sparker Kit Contains Qty Part 1 820 475 820 476 904 153 904 330 904 438 904 531 904 543 904 553 910 073 910 074 910 078 910 199 910 903 904 781 Description Bracket DC Sparker Bracket DC Sparker Washer 8 External Star
56. nce problems due to operator error will not be covered by this warranty policy Products made or provided by other manufacturers and used in conjunction with the operation of this appliance without prior authorization from FPI may nullify your warranty on this product Any alteration to the unit which causes sooting or carboning that results in damage to the interior exterior facia is not the responsibility of FPI Subsidy according to job scale as predetermined by FPI Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 51 Regency fireplace products are designed with reliability and simplicity in mind In addition our internal Quality Assurance CY thoroughly before it leaves our Aes door Fireplace Products International 7 Ltd is pleased to extend this Limited Lifetime Warranty to the original purchaser of a Regency Product Register your Regency online at http www regency fire com Installer Please complete the following information Dealer Name amp Address Installer Phone Date Installed Serial No LI BR PAM and Panorama are trademarks of FPI Fireplace Products International Ltd Xs Cor Bien ewe FPI Fireplace B International Ltd All rights reserved
57. nce to a mechanical air supply inlet min 72 1 8m 3 91cm above if within 10 3m horizontally M Clearance above paved sidewalk or a paved driveway located on public property min 84 2 1m N Clearance under veranda porch deck or balcony min 12 30cm Note A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings Only permitted if veranda porch deck or balcony is fully open on a minimum of two sides beneath the floor If the vent termination is accessible a certified guard shall be installed As specified in CGA B149 Installation Code Note Local codes or regulations may require different clearances In accordance with the current ANSI Z223 1 NFPA 54 Natioinal Fuel Gas Code Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 11 INSTALLATION REGENCY DIRECT VENT FLEX SYSTEM Horizontal Terminations Only This venting system in combination with the P33 4 Direct Vent Gas Fireplace have been tested and listed as a direct vent heater system by Warnock Hersey The location of the termination cap must conform to the requirements in the Exterior Vent Terminal Locations Section Regency Direct Vent Flex Termination Kit Part 946 513 includes all the parts needed to install the P33 4 with a maximum run of 2 feet If installing the P33 with a continuous vent length of more than 2 ft 6m to a maximum
58. nd lug at the receptical 10 Connect the ground wire to the DC box left of the unit Sparker mounting bracket 30 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION OPTIONAL BRICK PANELS 1 Undo the bottom 2 door latches and open and remove glass door Remove logs 2 Attach the 2 Rear Brick Retaining clips to the rear wall Loosen the screws in the top and rear wall of the firebox and slide the retaining clips into position tight against the firebox top and then tighten the screws Firebox Top V Rear Brick Top Brick ini li Retaining Sip 4 Sa SS Top Fu Brick Panel Firebox f L Back Back gt Brick Panel f Note The logs must not be in the unit 3 Insert the back brick panel by carefully slipping it between the back wall of the firebox and the rear log bracket Back Panel 4 Put the side panels in next Slide them in from the front and push them flat up against the wall Be very careful not to scratch them on the firebox hardware Left Right Side Side Panel Panel 5 Slide the Top Brick Panel into position and slide the Top Brick Retaining clips so that they hold the Top Brick Panel in place and tighten down the screws Top Panel LOG SET INSTALLATION D 251 LESE TE Read the instructions below carefully and refer to the diagrams If logs are broken do not use the unit until they are replaced Broken logs can interfere with the pilot operation The 3
59. nejJ ejsul sJeJnjoejnueuJ eui u e9uep4o99e Ul pej ejsur eq 1snuJ eouei dde siu uonoeuuoo Pnp jnoUM eBueuosip J9811p 10 A uO ulejs S jU8A Aoueey 10 uejs S S5 1ueA eunq uosduuls peijsi esf ONLLN3A ELlugmucHd BaF ta Bald ASNHSTAY ALLANOILA 31139 SH3A3T1N3 SVd AN 1T38V 1 SIHL SAOWSY LON OG 9GG 9 6 11H e eAgeeH uondo 0 6 0 Hed MopurM Aeg jeuondo 7 L6 zer Wed uey S193JH JIE UJIM SN 10 JOU SI J9jeou oo2ejdaui seb pojuoaA SIUL epeue ui pJepuejs epnihlv jndui wnuwixey u mg 00G OL yndul WNUWIUIN SING vS OZIS BOO MO ainssoid PIOJIUEN Id 00G 0 u mg OOS LZ opmhie w ZE L 0 uojas wnwxew enbipoje 149 MA 0 9 uojes WNWIUIL enbuojije Wqeq MA ZO Jnajoelul ep JnepueJc esseq jueueddeuoo p eunjnqn e e uoisseJd 99 9 o jueuieddeuoo p eun nqn e e uoissaJg unuJiuiu uonejueuui e p uoissaJg vd T YEEd 2I9P0ON 313Od 33113 YNOd NONOD 3NVdO3d NV LNVNNOILONOS Tl33iVddV apne 24 1 019 Id 008 0002 Jnejoefui ep JnepueJc SNA GSr Z uoJes uunuiiuiu enbiporeo 1qeq m MS Y N 00S 0l uoJes unuuixeuu enbuoji eo 1142 MA 19 u mg 000 LZ epninie je eun Id 0002 0 uoJes uunuiixeuu enbiLioijeo 1qeq MA 6S 9 Y N 00S cc ed Z9 ed pl ed 66 Model Modele P33 LP4 ubb yy einsseJd pjojiue A CL e1nsseJd Ajddns unuuiui O Vd l d PPOW ANVdOUd epnil v OZIS BOUO indui WNUWIUI NA yndul uunuuixe N epnilv indui uunuJirxe N indui uunuulul Jnejoefui ep J
60. nepuejJc SNA vv 9ZIS 91H10 esseq jueujeddeuoe p auningn ej e uoissalg Ed ZZ OM ub b MO eunsseJd PIOJIUEN eo o o jueujeddeuoe p ainingny ej e uoisseig Ed S6 OM 48 uiu sunsseud pjojue A LUNUUIUILU uonejueujep uoissegg Ed SC OM 9 e1nsseJd Ajddns unuului VON d 9I9polN 3 13Od 3413 4NOd NONOD SV9 TWYENLVN NV LNVNNOILONOS 1114VddVY YON d I9PON SV9 IVYNLVN A 1VS LSYI4d YSLIV S3INOH ITION GAYNLOVANNVW NI GATIVLSNI 38 AVIA c98S8S0 9Z7t ON Hodey c00c VWSO C00C 88 LEZ ISNV m 9 LEN ZL T VOO NVO 0 pejse em Re V S N pue vavNvo 1nod e91n492 10J peryn4e2 YSLVAH SOV 143411 SVD GALNAA P9 JSr Model Modele P33 NG4 0 0 L O A oSIJOH HOOLLIBAA gasfitter licensed in the Commonwealth of Massachusetts For the State of Massachusetts flexible connectors shall not exceed 36 inches in length ances individual manual shut off must be a For the State of Massachusetts installation and repair must be done by a plumber or For the State of Massachusetts the appli t handle type valve The State of Massachusetts requires the installation of a carbon monoxide alarm in accordance with NFPA 720 and a CO alarm with battery back up in the same room where the gas appliance is installed Regency P33 4 Zero Clearance Direct Vent Gas Fireplace REQUIREMENTS MA Code CO Detector for the State of Massachusetts only 5 08 Modifications to NFPA 54 Chapter 1
61. ng other than vinyl furring strips may be used instead of the vinyl siding standoff to create a level surface to mount the vent terminal The Terminal must not be recessed into siding Ceiling Vinyl Standoff Siding Optional xl Horizontal D Wall Thimble TerminationiCap 1946 523 P If a Vinyl Siding Standoff is required it must PipelLength lt AdjPipeiLength be used with vinyl siding measure to outside S44 Ect 4 5 8 surface of wall without siding and add 2 Horizontal 946 523 P ES Alternate S24 Length Horizontal SAN Z Termination Standoff Optional e Caps 2 d i Wall Thimble Qu Alternate d V Adj Pipe Length Horizontal 114 5 8 Riser Vent Terminal Part 640 530 P igid Pipe Adapter 510 994 Alternate Snorkel Termination Cap Part 982 14 Part 981 36 la 7 184mm gt max Wall thickness with 6 152mm vent length i Flat Wall Installation d Max Wall Vent Length Thickness inches Required inches En 10 1 4 4 gt 13 1 4 12 Has 12 1 4 15 7 e 11 14 5 8 Adj Pipe RUD 18 1 4 25 1 4 11 14 5 8 Adj Pipe 33374 603mm WARNING Do not combine venting components from different venting systems However use of the the AstroCap and FPI Riser is acceptable with all systems This product has been evaluated by In
62. norkel within the wall or any other type of enclosure 6 The arrow on the vent cap should be pointing up Insure that the 1 1 2 clearances to combustible materials are maintained Dia 3 Install the termination cap AstroCap or Dura Vent Horizontal Termination Cap may be used 4 Siding apply sealant bolt Horizontal to all four sides Top to Vinyl Standoff Ld Ae lt 4 screws Vinyl siding standoff Wall Thimble Diagram 3 The four wood screws provided should be replaced with appropriate fasteners for stucco brick concrete or other types of sidings Note If installing termination on a siding covered wall avinyl siding standoff or furring strips must be used to ensure that the termination is not recessed into the siding 7 Before connecting the horizontal run of vent pipe to the vent termination slide the Wall Thimble Part 620 926 over the vent pipe Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 25 INSTALLATION 8 Slide the appliance and vent assembly 4 Assemble the desired lengths of pipe and towards the wall carefully inserting the elbows Ensure that all pipes and elbow vent pipe into the vent cap assembly It is connections are in the fully twist locked important that the vent pipe extends into the position and sealed vent cap s
63. of 10 ft 3 0m use Kit 946 515 4 ft or 946 516 10 ft or see Rigid Pipe Venting Systems Section for alternate venting arrangements 1 6 7 8 dia flexible liner 2 ft length 2 4 dia flexible liner 2 ft length Wall Thimble 2 pc 3 spring spacers 3 ue a 4 thimble 2 anada only 5 AstroCap termination cap 1 6 screws 12 AstroCap 7 tube of Mill Pac 1 4 102mm Termination Cap 8 plated screws 8 dia flue pipe 4 a zi Part 946 523 P 9 screws 8 x 1 1 2 drill point lt p V stainless steel 4 Gy Ve T WE lt spring otes spacer 1 Liner sections should be continuous P See Figure 1 below without any joints or seams 6 7 Ig for Alternate Caps 2 OnlyFlexpipe purchased from Regency 173mm may be used for Flex installations dia Flue pipe IMPORTANT NT ETES 510956 510988 510962 510964 and a os 510956 510958 5 5 an 12 Ze 510834 the wall thimble must be secured first Z bari and venting must be attached to unit before Ca aps sliding into final position y N Alternate Also Rigid Vent venting cannot be used with Horizontal any of the mantels noted above See Price Riser Vent Pages for alternative options Terminal Part 640 530 P Alternate Snorkel Termination Cap MINIMUM MINIMUM P E ied RIGID PIPE CENTER LINE FLEX KIT CENTER LINE Figure 1 Wherever necessary due to external location of cap the Horizontal Feet Hor
64. of metal studs covered with a non combustible board Mantel Clearances with Flush or Bay Glass 12 10 8 6 4 2 0 Drywall ip 12 305mm A 10 7 1 2 191mm a 0 3 1 2 88mm 6 11 279mm E ME ES Oc 4 9 229mm 2 7 178mm 0 Y P L A 29 737mm to floor Top of Unit Side View This drawing is to scale at 1 6 one inch 6 inches Mantel can be installed anywhere in shaded area or higher using the above scale Note Ensure the paint that is used on the mantel and the facing is heat resistant or the paint may discolour MANTEL LEG CLEARANCES Combustible mantel leg clearances as per diagram below 7 1 2 Side Wall D z D A EE S 3 Maximum E E 1 1 2 projection at 2 ORE arc minimum clearance 2 ume com CI IP Heat Wave me Allowable mantel leg The HeatWave Duct Kit has different clearance and framing requirements check the HeatWave manual for details projection Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION FRAMING AND FINISHING 1 Determine the total thickness of facing material e g drywall plus ceramic tiles to Rear Termination allow the finished surface to be flush with the front of the unit Total facing thickness For Rigid Vent can vary from 1 2 13mm to 1 1 4 32mm thick Rigid Vent Minimum Clearances p To
65. og should need replacement you must use the proper replacement log The position of these logs must be as shown in the diagrams under Log Installation Note Improper positioning of logs may create carbon build up and will severely alterthe unit s performance which is not covered under warranty Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 43 MAINTENANCE THERMOPILE THERMOCOUPLE 1 Open the bottom louvers 2 Loosen the thermocouple or thermopile with a 7 16 wrench 3 Disconnect thermocouple by loosening nut from the valve with a 9mm wrench Disconnect thermopile by loosening 2 screws marked TP on the valve 4 Drop the thermocouple or thermopile down from the bracket and pull it out of the unit 5 Reinstall the new ones in reverse order GLASS GASKET If the glass gasket requires replacement use 5 8 flat glass gasket for the Bay Front Part 936 243 and a tadpole glass gasket for the Flush Front Part 936 155 DOOR GLASS Your Regency fireplace is supplied with high temperature 5 mm Neoceram ceramic glass that will withstand the highest heat that your unit will produce f your glass requires cleaning we recommend using an approved glass cleaner available at all authorized dealers Do not use abrasive materials Do not clean the glass when hot Inthe eventthat you break your glass by impact purchase your replacement from an authorized Regency dealer only and follow our step
66. ons e A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment all venting instructions all parts lists for venting instructions and or all venting design instructions shall remain with the appliance or equipment at the completion of the installation Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 5 INSTALLATION IMPORTANT MESSAGE SAVE THESE INSTRUCTIONS The P33 NG4 or P33 LP4 Direct Vent Fireplace must be installed in accordance with these instructions Carefully read all the instructions in this manual first Consult the authority having jurisdiction to determine the need for a permit prior to starting the installation It is the responsibility of the installer to ensure this fireplace is installed in compliance with manufacturer s instructions and all applicable codes BEFORE YOU START Safe installation and operation of this appliance requires common sense however we are required by the Canadian Safety Standards and ANSI Standards to make you aware of the following INSTALLATION AND REPAIR SHOULD BE DONE BY A QUALIFIED SERVICE PERSON THE APPLIANCE SHOULD BE INSPECTED BEFORE USE AND AT LEAST ANNUALLY BY A PROFESSIONAL SERVICE PERSON MORE FREQUENT CLEANING MAY BE REQUIRED DUE TO EXCESSIVE LINT FROM CARPETING BEDDING MATERIAL ETC IT IS IMPERATIVE THAT CONTROL COMPARTMENTS BURNERS AND CIRCULATING AIR PASSAGEWAYS OF THE APPLIAN
67. outer 6 7 8 175mm liner out enough to slip over the flue collars of the fireplace Apply Mill Pac over the fireplace inner collar and slip the 4 100mm liner down over it and attach with 3 supplied screws 4 102mm dia flue pipe with spring spacer DHD 3 per V v e 175mm dia air intake 8 Do the same with the 6 7 8 175mm liner 9 Apply a bead of silicone between the thimble and termination and around the outer edge of the terminal at the wall in order to keep the water out IMPORTANT Do notlocate termination hood where excessive snow or ice buildup may occur Be sure to check vent termination area after snow falls and clear to prevent accidental blockage of venting system When using snow blowers make sure snow is not directed towards vent termination area 2 x 4 or 2 x 0 21mm x 102mm or 21mm x 152mm Termination Cap J Screws 4 per connection Wall Thimble 2 pieces 10 254mm Outer Diameter Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 13 INSTALLATION RIGID PIPE VENTING SYSTEMS Horizontal or Vertical Terminations The minimum components required for a basic Vertical horizontal termination are Terminal meee Flashing AstroCap Horizontal Termination Cap 45 Elbow Rigid Pipe Adaptor Wall Thimble Length of pipe to suit wall thickness see chart Storm lI c Firestop For sidi
68. p Header Install Side Nailing Strips and Top Facing Support before unitis slipped into position 10 254mm dia Hole through yall for Dura Vent See Unit Assembly Prior to Installation Section FA Top Facin POI 16 1 2 min Speed 845mm 419mm Drywall 3 76mm or other 4 Standoff For Flex Vent Pa facing p On 4 3 16 1 2 102mm 76mm 419mm Opening for gas Minimum connection ay FA ao AN F 12 3 4 min 845mm 324mm 2 Frame in the enclosure for the unit with framing material For Both Rigid amp Flex Flex Vent MEN Minimum Clearances Vertical Termination or Vertical Rise with Horizontal Termination Top Header T For Both Rigid amp Flex 10 254mm dia Hole through Drywall wall for Flex p 7 33 1 4 845mm 53 1 4 1353mm NOTE If this is an outside corner the minimum distance between the vent and the outside corner is 6 15cm with AstroCap termination cap or 12 30cm with Rigid Vent termination cap For Example Dura Vent 19 1 2 min 495mm A 33 1 4 F 3 For exterior walls insulate the enclosure to On the
69. q 10 jenue Jy uononJjsu ees WWE6YL 6S 1u819H ut WWELZL a8 UIPIAA UIN uuy 9 deg Xew SI9AN0O7 YSN 9 Aeg 10 so2ueJeo 9A09 WWL6L G 2 8 1uoJJ Aeg 10 usn J yym Hulsey 9pIS wou 92ueJeo9 2 IeM P S wwz 2 UII Y dOL WO4 se2ueJeo 2 o3ue N yun Jo Jea4 pue woyoq sepis doy UIOJJ So qnsnquuoo 0 92UEJE9 2 0 Butla sae qsnquo9 xneuoje y eq unuiuiy JUsWebebeq Sso qnsnquio oj so2ueJeo uinuuluiy eus ep ON ON JEuegs Li there is a difference the label on the unit is the improved Check the label on the unit and if correct one We have printed a copy of the contents here for your review The safety label is located on the front inside base of the unit visible when the bottom louver is open NOTE Regency units are constantly being JON piJos UJIM BSN 10 JON ZH09 WELL OWASLL Alddns 8919813 BWOH AIGOW HW OVZZ VSO NVO Ui pue vLOS VdJN ISNV seniunuuo pue SAIS suonejrejsu OWOH painjoesnuep JO eUD LS 9114 104 PJEPURIS 3ueJno eu 10 0gze Hed HAD pz eni pyepuels Ajejes pue uononajsuo SWOH peunjoejnue N pue suomnonjJjsul uone elsul sJeJnjoejnueuiJ eui UIIM BOURPJONIE Ul pe e1sul eq jsnuJ eouei ddy uejs S JUSA JOSJIG siu UONE E1SU SUWOH peunjoejnue N 104 epeueo ui epLg L NYS Uana eui Jo YSN OU Ul L EZEZ ISNV 1u84no eui MoJ OJ Jou JI Aue JI sepoo eoo uy pue suoronJsul uo
70. r USA installations follow local codes and or the current National Fuel Gas Code ANSI 2223 1 When using copper or flex connectors use only approved fittings Always provide a union so that gas lines can be easily disconnected for servicing Flare nuts for copper lines and flex connectors are usually considered to meet this requirement Important Always check for gas leaks with a soap and water solution or gas leak detector Do not use open flame for leak testing 26 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION PILOT ADJUSTMENT Periodically check the pilot flames Correct flame pattern has three strong blue flames 1 flowing around the thermopile 1 around the thermocouple and 1 flowing across the burner it does not have to be touching the burner Note If you have an incorrect flame pattern contact your FPI dealer for further instructions Pilot Ignitor Thermocouple Thermopile 0000000W 0000000 OO OO OOO OO Burner Incorrect flame pattern will have small probably yellow flames not coming into proper contact with the rear burner or thermopile or thermocouple Pilot Ignitor Thermocoup Thermopile OOO0O0O0O000000O0 oo0 OO OO OOO O O Burner HIGH ELEVATION This unit is approved in Canada for altitude to 4500 ft CAN CGA 2 17 M91 For Natural Gas installations above 4500 ft follow current CAN CGA B149 1 1 Gas on off knob 2 Manual high low adjustment 3 Pi
71. r property damage Refer to the owner s information manual provided with this appliance For assistance or additional information consult a qualified installer service agency or gas supplier A This appliance has a pilot which must be lighted by hand When lighting the pilot follow these instructions exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch do not use any phone in your building Immediately call your gas supplier from a neighbours phone Follow the gas supplier s instructions f you cannot reach your gas supplier call the fire department C Use only your hand to push in or turn the gas control knob Never use tools If the knob will not push in or turn by hand don t try to repair it call a qualified service technician Force or attempted repair may result in a fire or explosion D Do not use this appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water E This appliance needs fresh air for safe operation and must be installed so there are provisions for adequate combustion and ventilation air CAUTION Hot while in operation Do not touch Se
72. rame until it aligns with the wall Use the inner cut outs to secure the base of the Frame using the 2 x 8 Self Tapping Phillips 5 Install the Hinges to the Hinge Brackets on the left and right side of screws provided the Bottom Faceplate Bracket seen in step 2 secure using 2 x 8 Self Tapping Philips screws per hinge ls y oe 10 Install the Left and Right Side Screen Doors in the fully open position 6 Place the Bottom Frame near the hinges and flip down the hinges by placing over top of the hinges on the Full Screen Door Frame from the Bottom Face Plate Secure the hinges in place to the Bottom Frame using 2x 8 Self Tapping Phillips screws per hinge NOTE Failure to install the doors in the fully open position could result in paint damage to the surface of the door Hinge Location Bottom Grill 7 Mount the Burner ON OFF Control Box to the left side of the Bottom Grill using 2 x 8 1 4 Philips Head Screws Left Side T f of Bottom E Grill Burner ON OFF Control Box 11 Close screen doors 36 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION Optional Optional Optional WALL THERMOSTAT REMOTE CONTROL WALL SWITCH Use the Regency Remote Control Kit approved 1 Run the supplied 15 of wire through the A wall thermostat may be installed if desired for this unit Use of other systems may void right or left side gas inlet opening Be connect the wires as per the
73. rect Vent Gas Fireplace TABLE OF CONTENTS SAFETY LABEL Copy of Safety Label uote tei obediens 4 REQUIREMENTS MA Code CO Detector eeeeeeeeeeeeeeeeee 5 INSTALLATION Important Message eeeceeeeeeeenneennnnn nnn 6 Before You Start 6 General Safety Information 6 Manufactured Mobile Home Additional Requirements 6 Installation Checklist 7 Locating Your Fireplace 7 WIC PIMC SIONS Mee T Duct System Option 7 Combustible Mantels ccccccccccseeeseseeeeeeeeeeeseees 8 Mantel Leg Clearances eeeeeeeeeeeeeeeeee 8 Clearances Poste nt en nn ete ees tee 8 Framing and Finishing 9 Unit Assembly Prior to Installation 10 Venting Introduction 10 Exterior Vent Termination Locations 11 Regency Direct Vent Flex System 12 Installation Procedures 13 Rigid Pipe Venting Systems 14 4 x 6 5 8 Rigid Pipe Cross Reference Chart 15 Rigid Pipe Venting Arrangements 17 Vertical Termination with Co Linear Flex System 23 Venting Arrangements Vertic
74. related fires is failure to maintain required clearances air space to combustible materials It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions Clearance to Combustibles from Back 0 Omm Side 0 0mm Floor 0 Omm NOTE The minimum floor clearance must be maintained from the top surface of the carpeting tile etc Minimum Clearance from Top of Unit to Mantel min 7 177mm Ceiling 30 762mm from top of unit Side Wall Clearance Bay or Flush Front 7 1 2 191mm Minimum Vent Clearances 2 1 2 64mm Horizontal Top 1 1 2 38mm Horizontal Side 1 1 2 38mm Horizontal Bottom UOS vM M 1 1 4 32mm Vertical Vent Clearance Rigid Vent 1 1 2 38mm Vertical Vent Clearance Flex Vent Alcove Clearances Max Depth 36 914mm Min Width 48 1219mm Min Height 59 1499mm see mantel clearance instructions WARNING Fire hazard is an extreme risk if these clearances are not adhered to Min 30 762mm to Ceiling Min 7 1 2 E 2 191mm c 29 737mm Top of Unit Clearances for Bay or Flush Front COMBUSTIBLE MANTELS Because of the extreme heat this fireplace emits the mantel clearances are critical Combustible mantel clearances from top of unit are shown in the diagram below Note Anon combustible mantel may be installed at a lower height if the framing is made
75. rmostat or remote control to turn on the unit Shut Off Pilot Hi Lo Adjustment 6 Rotate the flame height regulator to adjust the flame height higher or lower SHUTDOWN PROCEDURE 1 Use the wall switch thermostat or remote control to turn off the main burner 2 Turn the main gas control clockwise to the OFF position to turn off the pilot 3 Turn off all electric power to appliance if service is to be performed FIRST FIRE The first fire in your fireplace is part of the paint curing process To ensure that the paint is properly cured it is recommended that you burn your fireplace for at least four 4 hours the first time you use it with the fan on When first operated the unit will release an odour caused by the curing of the paint the burning off of any oils remaining from manufacturing Smoke detectors in the house may go off at this time Open a few windows to ventilate the room for a couple of hours The glass panel may require cleaning after the unit has cooled down DO NOT ATTEMPT TO CLEAN THE GLASS WHILE IT IS HOT Note When the glass is cold and the appliance is lit it may cause condensation and fog the glass This condensation is normal and will disappear in a few minutes as the glass heats up DO NOT BURN THE APPLIANCE WITHOUT THE GLASS FRONT IN PLACE During the first few fires a white film may develop on the glass front as part of the curing process The glass should be clean
76. same degree as the rest of the house 4 3 12 3 4 apply vapour barrier and drywall as per 102mmy76mm 324mm local installation codes Do not insulate Opening for gas Minimum the fireplace itself connection 4 The top of the unit must not be closer than SAIT 30 762mm to the ceiling 6 Use steel studs for framing where the 1 1 2 38mm clearance from the vent 33 1 4 845mm 5 Combustible material may be brought up to to combustible material cannot be 53 1 4 1353mm the top and sides of the unit and be covered maintained with ceramic tiles bricks rock or other suitable combustible finishing materials NOTE If this is an outside corner the minimum distance between the vent and the Note Theunitdoesnothavetobecompletely outside corner is 6 15cm with AstroCap enclosed in a chase The clearance on Heat Wave termination cap or 12 30cm with Rigid Vent top ofthe unitis 0 to the standoffs so The HeatWave Duct Kit has different termination cap For example Dura Vent combustible building materials can be clearance and framing requirements laid directly n top of the standoffs check the HeatWave manual for details You must maintain clearance from the vent to combustible materials for flex or for Rigid Vent Refer to Clearances Section Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 9 INSTALLATION UNIT ASSEMBLY PRIOR TO INSTALLATION The Top Facing Support
77. ss Gasket Center Glass Bay Door Frame Bay Brick Panel Spacer Magnet 1 round Louver Hold Down Glass Retainer Bay Door Trim set Gold Bay Door Trim each Black Bay Louvers set Gold Black Bay Louvers set Black Bay Louvers set Steel Black Bay Louver Assy Top Bay Door Deflector Bay Louver Assy Bottom Hinge Regency Logo Plate Not available as a replacement part d e N 50 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace WARRANTY WREGENCY Regency Fireplace Products are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team carefully inspects each unit thoroughly before it leaves our facility FPI Fireplace Products International Ltd is pleased to extend this limited lifetime warranty to the original purchaser of a Excalibur Product This warranty is not transferable The Warranty Limited Lifetime The combustion chamber heat exchanger burner tubes pans logs brick panels and gold plating against defective manufacture only are covered under the Limited Lifetime Warranty for five 5 years for parts and subsidized labour and parts only thereafter Glass is covered for lifetime against thermal breakage only parts and subsidized labour for five 5 years and parts only thereafter from date of purchase External casting surrounds and grills are covered against cracks and warps resulting from manufacturer defects
78. t Adjust support to desired facing material thickness Top Facing Support Screw hole for Top Facing Support Screw hole Es for Side Nailing Strip Top Facing Support Side lt Nailing 7 Strip For a facing material depth of 1 1 4 32mm the top facing support must be reversed Top Facing Support is reversed VENTING INTRODUCTION The P33 4 uses the balanced flue technology Co Axial system The inner liner vents products of combustion to the outside while the outer liner draws outside combustion air into the combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney There are 5 vent systems approved for use with the P33 4 the Regency Direct Vent Flex System for Horizontal Terminations only and the Simpson Dura Vent Selkirk Direct Temp Amerivent Direct Vent and Security Secure Vent Systems for Horizontal and Vertical Terminations see following Venting Sections for more details Note These flue pipes must not be connected to any other appliance The gas appliance and vent system must be vented directly to the outside of the building and never be attached to a chimney serving a separate solid fuel or gas burning appliance Each direct vent gas appliance must use it s own separate vent system Common vent systems are prohibited See Rigid Pipe Venting System for more details and exceptions NOTE Ensure compli
79. t be seen when lighting the unit the logs have been incorrectly positioned 8 The unit should never be turned off and on again without a minimum of a 60 second wait LIGHTING PROCEDURE IMPORTANT To ignite or reignite the pilot you must first release the ten sion springs below the door Only when the pilot holds without pressure being applied to the control knob reapply the tension springs to the door The unit must not be operated with the tension springs unattached NOTE For all propane units and units equipped with electric spark boxes see Copy of Lighting Plate Instruc tions section for more details IMPORTANT Gas on off knob cannot be turned from PILOT to OFF unless it is partially depressed 1 Turn burner OFF using ON OFF switch 2 Turn gas control knob so indicator points to OFF position and allow 5 minutes for any gas in the combustion chamber to escape 3 Turn gas control knob counterclockwise so indicator points to the PILOT position Depress the gas control knob fully Depress the igniter button several times until the pilot lights After approximately one minute release the gas control knob The pilot flame 42 should continue to burn If the pilot does not remain lit repeat operation allowing a longer period before releasing gas control knob 4 When the pilot stays lit turn the gas knob further counterclockwise to the ON position 5 Use the wall switch the
80. tertek for using a Rigid Pipe Adaptor in conjunction with Duravent Direct Vent GS Selkirk Direct Temp Ameri Vent Direct venting and Security Secure Vent systems Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing of components When using Rigid Vent other than Simpson Dura Vent 3 screws must be used to secure rigid pipe to adaptor The FPI AstroCap and FPI Riser Vent terminal are certified for installations using FPI venting systems as well as Simpson Dura Vent Direct Vent GS American Metal Products Ameri Vent Direct Vent Security Secure Vent Selkirk Direct Temp AstroCap is a proprietary trademark of FPI Fireplace Products International Ltd Dura Vent and Direct Vent GS are registered and or proprietary tradema rks of Simpson Dura Vent Co Inc 14 Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION 4 X 6 5 8 RIGID PIPE CROSS REFERENCE CHART Components from different Manufacturers may not be mixed Not All Rigid Pipe components are available directly from FPI Simpson American Metal Direct Vent GS Selkirk Products Amerivent Direct Metal Fab Security Sure Seal Secure Vent Simpson Direct Vent Pro Description Direct Temp 6 Pipe Length Galvanized 6 Pipe Length Black T Pipe Length Galvanized 7 Pipe Length Black 9 Pipe Length Galvanized 9 Pipe Length Black 12
81. th and charm of a wood fireplace at the flick of a switch The P33 4 has been approved by Warnock Hersey for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to follow Please take a moment now to acquaint yourself with these instructions and the many features of your Regency Fireplace INFORMATION FOR MOBILE MANUFACTURED HOMES AFTER FIRST SALE This Regency product has been tested and listed by Warnock Hersey as a Direct Vent Wall Furnace to the following standards VENTED GAS FIREPLACE HEATERS ANSI Z21 88 2002 CSA 2 33 2002 and GAS FIRED APPLIANCES FOR USE AT HIGH ALTITUDES CAN CGA 2 17 M91 This Direct Vent System Appliance must be installed in accordance with the manufacturer s installation instructions and the Manu factured Home Construction and Safety Standard Title 24 CFR Part 3280 or the current Standard of Fire Safety Criteria for Manufactured Home Installations Sites and Communities ANSI NFPA 501A and with CAN CSA Z240 MH Mobile Home Standard in Canada This appliance installation must comply with the manufacturer s installation instructions and local codes if any In the absence of local codes follow the current National Fuel Gas Code ANSI Z223 1 and the current National Electrical Code ANSI NFPA 70 in the U S A and the current CAN CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22 1 in Canada The
82. the Side Nailing Strips and the 2 Top Standoffs must be correctly positioned and attached to the top before the unit is put into position Top Standoff Assembly The top standoffs are shipped in a flat position and must be pulled up and bent into the correct shape 1 Remove the standoffs from on top of the firebox by undoing the screws 2 Takeeach standoffand bend into the correct shape Bend up at the bend lines until the screw holes in the standoff and the pre punched screw holes on the firebox top line up 3 Attach the standoffs securely to the top with 4 screws per standoff Note Secure the standoffs to the holes closest to the edge of the firebox top i Top Standoff Top Standoff flat shipping position Top Facing Support amp Side Nailing Strips Determine the total thickness of facing material e g drywall plus ceramic tiles to allow the finished surface to be flush with the front of the unit Total facing thickness can vary from 1 2 13mm to 1 1 4 32mm thick The Top Facing Support amp Side Nailing Strips can be mounted in various positions depending on the thickness of the facing material 1 Mount Top Facing Support using the 3 supplied screws into the three pre punched screw holes on the top front ofthe unit Adjust support to desired facing material depth 2 Mount Side Nailing Strip using the 3 supplied screws into the three pre punched screw holes at the front sides of the uni
83. tor 34 Brick Panel Left Side 94 946 517 P Fan Assembly HeatWave 13 948 045 12 Jack Chain 35 Brick Panel Right Side Option 14 948 115 Door Extension Spring 36 Brick Panel Top 95 946 006 Grill Plate White 37 430 056 Brick Clip Top 96 946 005 Wall Adaptor Plate White 16 Thermodisc Top 38 430 057 Brick Clip Bottom 97 910 417 Knob White T Thermodisc Box Base 98 910 366 Switch Cover Plate White 19 430 129 Receptacle Box Mount 432 917 Fan Assembly 120 Volts 99 910 412 Fan Speed Controller Optional 100 910 367 Box Plastic Switch 20 430 031 Top Nailing Strip 42 910 331 P Fan Motor 120 Volts Receptacle 21 430 032 Side Nailing Strip 432 966 Fan Switch Assy 120 Volts 102 946 010 Flexible Air Duct 22 433 017 Firebox Baffle 43 910 813 Power Cord 120 Volts 946 038 Insulation 6 dia x 24 23 433 011F Top Standoff 46 910 330 Fan Speed Control 104 690 022F Cover Plate 24 511 044 Standoff Side 47 904 586 Knob Speed Control 790 091 Standoff Rear 49 910 142 Thermodisc Fan Auto 510 994 Rigid Pipe Adaptor 26 Louver Hold Down ON OFF 918 520 Manual 27 Outer Flue Collar 50 904 713 U Clip at Louver 434 969 Conversion Kit NG to LP 28 Inner Flue Collar Assembly 432 967 Burner On Off Switch Assy 30 Gasket Flue Collar 63 910 241 Switch Burner On Off Not available as a replacement part 91 Flue Mounting Plate 910 899 Wire Harness Valve to Burner 46 Regency P33 4 Zero Clearance Direct V
84. uch any hot surfaces and are Openings for away from sharp edges electrical connections 120 V Power IN Millivolt Wires CAUTION Labelallwires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous a 4 1 2 operation 38mm 4 NE NE us 35 gt Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 39 INSTALLATION INSTALLING THE OPTIONAL FAN 120 Volt AC power is needed for the fan switch and blower The fan can be hard wired if desired The receptacle box should be installed on the left hand side of the unit by a qualified electrician The neutral wider slot of the polarized receptacle should be at the top Unit must be grounded at all times Do not cut the ground terminal off under any circumstances 1 Shut the power off 2 Remove the standard flush door and the optional bay door if installed Open the bottom louver door 3 Loosen the 2 screws holding the Burner ON OFF switch and bracket to the bottom louver and lift the assembly out 4 Turn the fan base on its side with the base facing towards you and then slide the fan in towards the rear of the unit Turn the fan upright and slip it over the two mounting studs Take care notto damage the insulation on the fan base Ensure that the fan blades do not rub against the valve tubing Diagram 1 5 Connect fan ground cable to ground lug Refer to wiring diagram
85. ufficient distance so as to result in a minimum pipe overlap of 1 1 4 inches Female Secure the connection between the vent pipe NT mr and the vent cap 3 sheet metal screws i Mill Pac J gt J Silicone B 9 Install wall thimble in the center of the TS n 10 square and attach with wood screws Lugs Diagram 4 TOTUM Let usc NOTE For best results and optimum performance with each approved venting me a A system it is highly recommended to apply Mill Pac sealant supplied to every in wood screws ner pipe connection Failure to do so may result in drafting or performance issues not L covered under warranty Silicone red RTV is optional Cut a hole in the roof centered on the small drilled hole placed in the roof in Step 2 The hole should be of sufficient size to meet UNIT INSTALLATION the minimum requirements for clearance to combustibles of 1 1 2 Slip the flashing WITH VE RTICAL under the shingles shingles should overlap TE RMINATION half the flashing as per Diagram 3 1 Maintain the 1 1 2 clearances air spaces to combustibles when passing through ceilings walls roofs enclosures attic rafter or other nearby combustible surfaces Do not pack SAY Diagram 4
86. ure that structural members are not cut or weakened during installation 2 Ensure proper grounding using the 8 ground lug provided Refer to Wiring Diagram Section Regency P33 4 Zero Clearance Direct Vent Gas Fireplace INSTALLATION INSTALLATION CHECKLIST 1 Locate appliance a Room location Refer to Locating Your Fireplace Section b Clearances to Combustibles Refer to Clearances Section c Mantle Clearances Refer to Combustible Mantels Section d Framing amp Finishing Requirements Refer to Framing amp Finishing Section e Venting Requirements Refer to Venting Sections 2 Assemble Top Facing Support and Side Nailing Strips Refer to Unit Assembly Prior to Installation Section NOTE Must be done before installing unit into fireplace 3 Install vent Refer to Venting Sections 4 Make gas and electrical connections Test the pilot Must be as per diagram Refer to Gas Line Installation and Pilot Adjustment Section Convert to Propane if desired Refer to Conversion Kit from NG to LPG Section 5 Install standard and optional features Refer to the following sections Optional Brick Panels Log Set Installation Standard Flush Door Optional Flush Trim Double Screen Door Optional Bay Door Optional Bay Trim Flush Louvers Bay Louvers Full Screen Doors Optional Wall Themostat Optional Remote Control Optional Wall Switch Installing the Optional Fan 33 7ms
87. uts Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 31 INSTALLATION 6 Place the bottom left front edge of Log 251 against the left edge of the burner tray and rest the log on the cutout on Log 253 Cutout 7 Position Log 252 across the cutouts in Logs 254 and 253 The notch in the bottom right end fitting against the 5th grate tab 8 Pull off ember size pieces of rock wool and gently place them on the front of the burner tray in the places shown in the photo below Do not compress the rock wool leave it loose Separate platinum embers and place them on the front of the burner on and around the rock wool CIT T req He NUS e E MESE E 1 even Saut AD A Roe Rura Ed a S PY EO OMET Place rock wool in these 2 locations on the burner tray 9 Test fire to ensure proper light off make sure flame flows smoothly from one end of burner to the other If there is any flame hesitation check that area for any blockage of the burner ports 10 Install flush glass and bay glass if used as per instructions in this manual STANDARD FLUSH DOOR The standard flush door comes with a black frame To install the frame simply hook the top door flange onto the top of the unit and swing the door towards the unit diagram 1 Be careful that the glass gasket does not roll up there must be a gap between the gasket and the door lip to ensure that the door sits securely on the unit See
88. vanized Extension Pipe 16 Black 45 Elbow Galvanized 45 Elbow Black 45 Elbow Swivel Galvanized 45 Elbow Swivel Black 90 Elbow Galvanized 90 Elbow Black 90 Elbow Swivel Galvanized 90 Elbow Swivel Black 90 Starter Elbow Swivel Galvanized Adaptor Ceiling Support Cathedral Support Box Wall Support Band Offset Support Wall Thimble Black Wall Thimble Support Box Ceiling Support Firestop Spacer Trim Plate Black N A N A 46DVA 08A 46DVA 08AB N A N A 46DVA 16A 46DVA 16AB 46DVA E45 46DVA E45B Disc See 46DVA E45 Disc See 46DVA E45B 46DVA E90 46DVA E90B Disc See 46DVA E90 Disc See 46DVA E90B N A N A N A 46DVA CS 46DVA WS 46DVA ES N A from FPI 46DVA WT 46DVA DC 46DVA FS N A N A N A N A N A N A N A N A 949 N A from FPI 941 988 989 N A from FPI 942 N A 963 N A N A N A N A N A N A N A N A 4DT EL45 4DT EL45B N A N A 4DT EL90S 4DT EL90SB N A N A N A N A 4DT CS 4DT CSS 4DT WS B 4DT OS 4DT WT N A 4DT FS 4DT TP 4D7A 4D7AB N A N A 4D12A 4D12AB N A N A 4D45L 4D45LB N A N A 4D90LS 4D90LBS N A N A N A N A N A N A 4D45L 4D45LB N A N A 4D90L 4D90LB 4D90A 4DDA N A N A N A N A SV4LA12 SV4LBA12 N A N A N A N A SV4E45 SV4EB45 N A SVAEBR9O 1 SVAE90 1 SV4EB90 1 N A N A SV4SD SV4CSB SV4BM SV4SU SV4RSM SV4PF SV4BF SV4LA Masonry Ch
89. ver the 2 screws on the left side of the bottom louver Push down to lock into place Tighten the screws Screws on louver bracket Burner ON OFF control box Burner ON OFF control box attached to bottom flush louver DOUBLE SCREEN DOOR 1 Pull out the top louver 2 Center the screen door and hook over the flush door 3 Open the screen door s and secure the screen door to the flush door front with 2 clips on the bottom left and right side Clip installed on right side OPTIONAL BAY DOOR The Bay louvers MUST be used with the Bay glass option The optional Bay door is an overlay on the flush front The standard flush door and glass must remain on the unit 1 Hook the top of the bay door over the flush door flange and swing the bottom against the bottom flange of the flush door 2 Secure tothe flush door bottom bracket with 2 screws provided Bay door flange Shut Off Hi Lo Ext Knob Ext Knob Note If any maintenance etc must be done in the firebox first remove the Bay louvers and door OPTIONAL BAY TRIM Attach the 4 supplied magnets each to the back of the top and bottom trim pieces space out evenly and attach trim to the top and bot tom of Bay door Bay door flange Bay door Ak Regency P33 4 Zero Clearance Direct Vent Gas Fireplace 33 INSTALLATION BAY LOUVERS 1 Remove flush louver top heat
90. vere Burns may result Due to high surface temperatures keep children clothing and furniture gasoline and other liquids having flammable vapors away Keep burner and control compartment clean See installation and operating instructions accompanying appliance LIGHTING INSTRUCTIONS STOP Read the safety information above on this label FOR UNITS NOT EQUIPPED WITH ELECTRIC SPARK BOXES 1 Push in gas control knob slightly and turn clockwise w to OFF Knob cannot be turned from PILOT to OFF unless knob is pushed in slightly Do not force PILOT BURNER OFF VEILLEUSE i TY Fe id THERMOPILE frrr s Gas Inlet ELEMENT ue UE THERMO ELECTRIQUE 2 Wait five 5 minutes to clear out any gas If you then smell gas STOP Follow step B in the Safety Information above on this label If you don t smell gas go to the next step 3 Turn knob on gas control counterclockwise to PILOT 4 Push in control knob all the way and hold in Continually push and release the black button on spark igniter until pilot lights Continue to hold the control knob in for about 1 2 minute after the pilot is lit Release knob and it will pop back up Pilot should remain lit If it goes out repeat steps 1 to 4 If knob does not pop up when released stop and immediately call your service technician or gas supplier If the pilot will not stay lit after several tries turn the gas control knob to OFF and call your service technic
Download Pdf Manuals
Related Search
Related Contents
慶】 ーnnD evaluation des risques remote drill rig テンプメーターステ− 取扱説明書 Les Ménines de Velázquez : l`unité retrouvée ? - ORBi Capture One PRO Online Help MYMO MANUEL D`UTILISATION Smart Migrationshandbuch Innovator 2007 磁気バレル研磨装置 Copyright © All rights reserved.
Failed to retrieve file