Home

Redring CD-RW901SL User's Manual

image

Contents

1. HEATING D i ag ram ELEMENT HEATER L POWER PCB SOLENOID SOLENOID LOGIC PCB Inside Front Cover Operating Instructions General Product Description The SB is a wall mounted self calibrating and self filling boiling water heater It can be used for making cups of tea or coffee and even soups and hot snacks A special condenser traps steam and returns droplets to the tank minimising waste and saving energy The water temperature is set and automatically maintained by the SB and the unit is powered down with the Power button Water Is dispensed by rotating the front cover knob clockwise How to operate the SB O Make sure the electricity and water is turned on TEMPERATURE READY Refer to Fig 6 O Use the POWER button to switch the SB on and to power down The SB should be switched off at the mains if the water is not required e g at weekends holidays etc POWER light When the SB is on the POWER light will come on FULL light The FULL light comes on when the tank is full of water The SB fills up automatically and this can take up to 10 minutes if the tank is completely empty TEMPERATURE READY light The TEMPERATURE READY light comes on when the water is hot enough to use This can happen even when the tank is not completely full of water Please Note O The SB can take several minutes to reach the required temperature depending on usage and tank capacity O To avoid energy wastag
2. still getting the water up to the boil See Table 3 on page 10 for approximate heat up times This is normal The tank is still filling itself with water and the heater is still getting up to the boil See table 3 on page 10 for approximate heat up times To avoid energy wastage the SB is designed to automatically reduce the temperature by 10 C if the unit is not used for more than 60 minutes The SB will automatically go back to boiling when the water is used Ensure that the electricity supply is switched on at the isolator then press the POWER button The water in the tank has been drained out due to a high demand Wait for the FULL amp TEMPERATURE READY lights to come on again When the SB is first switched on it can take up to 18 minutes to reach the Boil setting See Table 3 on page 10 for approximate heat up times Check that a pipe has been fitted to the steam vent Contact your installer if this is missing Use the POWER button to power down the unit and not the main electrical isolator This will reduce the amount of steam produced A new SB needs to be flushed out before being first used We recommend that the initial tank of boiling water is fully drawn off and discarded Wait for the FULL amp TEMPERATURE READY lights to come on before using the unit Scale has built up inside the tank As with all water heaters scale will build up inside the water tank How quickly this build up occurs will d
3. THE REDRING SB BOILING WATER DISPENSER INSTALLATION amp OPERATING INSTRUCTIONS IMPORTANT READ AND SAVE THESE INSTRUCTIONS FOR THE BENEFIT OF THE USER Thank you for choosing a quality Redring product manufactured by Applied Energy Products Limited Peterborough U K Contents Installation Instructions Important notes What the installer will need Where to locate the SB Installing the water supply and steam vent pipes Installing the mains supply Removing the front cover Fixing the unit on the wall Connecting the water supply and steam vent pipes Connecting the mains cable Replacing the front cover Schematic wiring diagram Operating Instructions General product description How to operate the SB How to clean and descale your SB Trouble shooting guidance After Sales Service Guarantee Installation Instructions Important Notes All installation must be supervised by a qualified electrician and plumbing engineer Installation and wiring must conform to current IEE Regulations U K and the Water Regulations Act 1999 Local regulations may apply in other countries The steam vent connection MUST BE MADE as required in these instructions The product must be supplied by a 13 Amp fused double pole isolating switch with a minimum contact gap of 3mm in each pole Check that the mains supply matches the electrical rating on the product The rating plate is located on the bottom edge of the
4. ater supply pipe to the location of the inlet connection Fig 1 Check that the water supply position gives enough space under the unit for it to be used properly Flush through the water supply before making the final connection so that any debris is removed Note The inlet elbow contains a flow regulator THIS MUST BE USED IN THE INSTALLATION O Lay in 15mm drainage pipe to the location of the steam vent connection Fig 1 Connection is made using the push fit adaptor provided O The steam vent connection must be taken directly to the sink below if there is one or via a tundish to a suitable drain Note The steam vent outlet also acts as an overflow If a sink is used it must be able to withstand boiling water and have an overfill outlet Installing the mains supply If a mains supply is not already available O Install a 13 Amp fused double pole isolating switch with a minimum contact gap of 3mm in each pole adjacent to where the unit will be fixed Removing the front cover O Remove the screws from the bottom and top edge of the unit Fig 3 O Supportthe front cover and remove the flow knob Fig 4 O Pull the front cover away from the unit O Please note that there Is a flying lead and plug freely attached to the front cover REDRING _ SB Fig 5a Fixing the unit on the wall O Use the wall mounting bracket supplied and the two lower fixing holes O An extra top fixing point is available by tem
5. ck Logic board assembly Power PCB assembly Solenoid valve Float switch Cable pack Control knob Outlet Spout Scale Trap Outlet valve Inlet elbow assembly includes flow regulator 11 aaa Guarantee We Applied Energy Products Ltd guarantee that should this SB unit prove to be defective by reason of faulty workmanship or material within 24 months outside of U K please contact your local distributor of the date of purchase or commencement of hire we will replace or repair the defective parts FREE OF CHARGE on the condition that a The appliance has been correctly installed and used only on the supply circuit or voltage stamped on the rating plate b The appliance has been used in accordance with these instructions and has not been tampered with or otherwise subject to misuse neglect or accident The appliance has not been taken apart modified or repaired except by a person authorised by us EVIDENCE of the date of purchase in the form of an invoice receipt or hire purchase document is included with the appliance if returned under guarantee SCALE PREVENTION Formation of scale occurs with hot water heaters operating at high temperatures in hard water areas We strongly recommend the use of in line resin filters to protect the heater The manufacturers guarantee does not extend to cover this natural phenomenon E E E Aaa atte This Guarantee does not affect your statutory rights Ful
6. d to be descaled This is done by removing the front cover and top condenser assembly and using a suitable kettle descaler Ensure unit is thoroughly flushed through after descaling Trouble shooting SELF HELP See Table 1 If the SB is unsatisfactory then make the following checks before calling out the contractor Any one of these adjustments could restore the performance Table 1 a TEMPERATURE READY light is not on b TEMPERATURE READY light is on but the FULL light is off c The FULL light is on but the TEMPERATURE READY light is off d The POWER light is on but the TEMPERATURE READY and FULL lights are both off e TEMPERATURE READY f All the lights are out and the POWER button does not work light ison but the water is not boiling g The water flowing from the outlet is sometimes only a trickle The SB takes a long time to reach the selected temperature Steam and very hot water sometimes dribbles out of the vent hole at the back of the SB The water tastes different Solid particles are visible in the water This is normal The water has not reached the set temperature See Table 3 on page 10 for approximate heat up times This is normal Some water has been taken out of the tank so it is no longer full but the water temperature is still hot enough to use The tank will automatically fill up This is normal The tank has automatically filled itself and the heater is
7. e the SB will automatically reduce the temperature by 10 C if the unit is not used for more than 60 minutes The SB will automatically go back to boiling when the water is used O When the SB is switched on at the local isolator and the POWER button is pressed it will start by self calibrating This can take up to 20 minutes to complete and includes automatically boiling the water for 30 seconds When first installed it is recommended that the initial tank of boiling water is fully drawn off and discarded Allow the tank to re fill and the TEMPERATURE READY light to come on before using the SB Dispensing water from the SB Place your cup under the red spout at the bottom of the unit O Turn the knob clockwise to fill your cup Fig 7b O Turn the knob anti clockwise to OFF Fig 7a WARNING SCALDING HOT WATER can be dispensed from the SB Never wash your hands directly from the unit Some plastic cups can distort if they are filled with boiling water so causing a danger of scalding How to clean and descale your SB O Before cleaning or descaling switch off the electricity at the isolating switch O itis recommended that the SB surfaces are cleaned with a soft cloth Do not use abrasive or solvent cleaning fluids DESCALING A qualified electrician should carry out the descaling ENSURE THE MAINS ELECTRICITY SUPPLY IS ISOLATED If scale comes out with the hot water then the SB may nee
8. epend on the hardness of the water and the usage of the SB Descale the SB heater tank This should be carried out by a qualified electrician We recommend the use of in line resin filters to protect the heater Professional Service see table 2 If the SELF HELP checks do not cover the symptom you should seek professional help The following additional checklist is provided for the benefit of the qualified engineer WARNING SWITCH OFF THE ELECTRICITY AT THE ISOLATING SWITCH BEFORE REMOVING THE COVER TO MAKE CHECKS Table 2 a Unit fails to heat the water Check that the water supply is on and that its pressure is between 0 7 Bar 69kPa 10 psi and 10 0 Bar 940 kPa 140 psi Check circuit through solenoid coil Check circuit through the heating element Check circuit through float switch If defective then replace b All the lights are out and the Ensure that the electricity supply is switched on at the isolator POWER button does not work Engure that the flying lead to the front cover is connected properly see Fig 5a and Fig 5b Check the supply to the PCB If supply OK then change PCB c Water flows continuously Check that the float switch operates correctly and switches the from the steam vent pipe water solenoid on and off d The water tank takes more Check that the water supply is on and that its pressure is than 20 minutes to fill with between 0 7 Bar 69kPa 10 psi and 10 0 Bar 940kPa 140 psi
9. ever Check operation of the water solenoid and that water flows into the tank at a rate between 0 3 Litres min and 1 Litre min Check circuit through the solenoid coil SB heat up times Table 3 CONDITION APPROXIMATE HEAT UP TIME WHAT ELSE HAPPENS 2 5 Litre SB 4 Litre SB SB is switched on at the local 12 minutes 18 minutes POWER light comes on isolator and the unit is empty 4 mins filling 5 mins filling then FULL light comes on of water 8 mins heating 13 mins heating then TEMPERATURE READY light comes on POWER button Is pressed then steam comes out of the vent for 30 seconds SB is switched on at the local 8 minutes 13 minutes POWER and FULL lights isolator and the unit is already both come on full of cold water then TEMPERATURE READY light comes on POWER button is pressed then Steam comes out of the vent for 30 seconds 10 APPLIED ENERGY PRODUCTS AFTER SALES SERVICE We offer a technical service on the telephone to contractors and other customers seeking advice RING 08709 000430 Some parts can be supplied using a credit card RING 08709 000420 Remember to quote the model of SB and have a note of the Catalogue number as stated on the rating plate along the bottom edge of the unit SPARE PARTS Panno PatDeso pton OOO 95719601 95719613 95719614 95719615 95719616 95719617 95719618 95719608 95719609 95719619 95719611 95719620 Element assembly Terminal blo
10. l details of terms and conditions of guarantee are available on request from REDRING Applied Energy Products Ltd Morley Way Peterborough PE2 9JJ U K Telephone 44 0 1733 456789 Fax 44 0 1733 310606 Website www applied energy com Technical Advisory Hotline 08709 000430 571 2278 01 Rev B
11. porarily removing the condenser assembly Connecting the water supply and vent pipes When the unit Is fixed to the wall make the final water supply and steam vent connections and secure the pipe work O Switch the water supply back on Connecting the mains cable O Ensure the mains supply is isolated Connect the mains cable from the SB to the 13 Amp fused isolating switch Ensure the cable clamps are firmly secured and the cable ends are tightened into the terminal block Note The supply cable must be a minimum of 1 0mm three core multi strand PVC insulated mains cable The terminal block will not accept cable diameters above 1 5mm Check that the mains supply matches the electrical rating on the product The rating plate is located on the bottom edge of the unit IMPORTANT Connect the supply cable complying with BS6500 to this appliance in accordance with the following code GREEN AND YELLOW EARTH connect to terminal marked BLUE NEUTRAL connect to terminal marked N BROWN LIVE connect to terminal marked L WARNING THIS APPLIANCE AND ALL METAL PIPE WORK CONNECTED TO IT MUST BE EARTHED Replacing the front cover O Support the cover and re attach the flying lead to the unit See Fig 5a and Fig 5b Replace the front cover and secure using the top and bottom fixing screws O Carefully replace the knob ensuring correct alignment of the D shaft O Reconnect the mains supply Schematic Wiring
12. unit THIS APPLIANCE AND ALL METAL PIPE WORK CONNECTED TO IT MUST BE EARTHED If you have any queries about installing this product or after it has been installed please contact Applied Energy Products Customer Services Ring 08709 000430 Customers outside the U K should contact their local Redring distributor This product will need to be descaled regularly The frequency of descaling will depend on the hardness of the water supply 2 What the installer will need O A13 Amp fused double pole isolating switch with a minimum contact gap of 3mm in each pole O Suitable length of 1 0mm three core multi strand PVC insulated mains cable that complies with BS6500 O Suitable lengths of 15mm copper pipe Where to locate the SB We recommend that the unit is installed on a suitable wall at shoulder height and over a sink Adjacent to the 13 Amp 240 V double pole fused isolating switch Available mains cold water supply and drainage facility Do not install the SB within reach of a person using a bath or shower Do not obstruct the ventilation channel in the backplate Installing the water supply and steam vent pipes Ventilation Channel ge ed DS A Fig 1 Inlet Steam Vent The unit must be connected to cold mains fed drinking water only Pressure range between 0 7 Bar 69kPa 10psi and 10 0 Bar 940kPa 140psi Do not connect to a storage tank O Isolate the water supply O Lay in 15mm w

Download Pdf Manuals

image

Related Search

Related Contents

FM/AM Compact Disc Player    Apostila de AutoCad 2002 Avançado  Samsung S22C350H Uporabniški priročnik  Samsung C24B750X User Manual  Neolt Electric Trim 130  LASER RGB 450mW PL - LASER RGB RO - LASER  

Copyright © All rights reserved.
Failed to retrieve file