Home

PVI Industries PV500-2 User's Manual

image

Contents

1. GND MV FOR YOUR SAFETY pnk 28 v v RED HW a USE ONLY COPPER WIRE OF PROPER SIZING Hao amp FOR INCOMING SERVICE DAMAGE RESULTING En ONION FLUE DAMPER CABLE FROM USE OF ALUMINUM WIRING WILL BE EXCLUDED FROM COVERAGE UNDER THE L WARRANTY OF THIS UNIT AONT PILOT RED TEMPERATURE LIMITING DEVICE 3 BURNER Typical 24 Volt Control System COMBINATION GAS VALVE TERMINAL BLOCKS r CONTROL SWITCH NS Figure 2 3 AND FUSE PINK UPPER OPERATING THERMOSTAT LOWER OPERATING THERMOSTAT SPARK IGNITION CONTROL SND TERMINAL BLOCKS CONTROL SWITCH AND FU SPARK BLK IGNITION CONTROL V My PV i A GND fay C4 O 24v un w GK k YY IGNITION a TRANSFORMER CABLE a gage 120v C a G DEC RED WHT BES TEMPERATURE LIMITING DEVICE UPPER OPERATING
2. TEMPERATURE THERMOSTAT LIMITING DEVICE eNO d TRANS OPTIONAL FORMER Q HIGH PRESSURE SWITCH O O PINK Z oog g Bre 8 BURNER IGNITION f LOWER OPERATING WIRE HERMOSTAT COMBINATIO GAS VALVE PILOT GAS VALVE Figure 2 2 IGNITION PILOT i 3 BURNER Maiy PRESSURE MANUAL GAS VALVE REGULATORS VALVE Figure 2 4 PV500 2 06 10 2 Section 2 START UP PROCEDURES AND OPERATION 1 Some PVI atmospheric gas fired water heaters are designed to operate with a flue damper that is shipped with the water heater for installation in the field If your water heater was shipped with a flue damper it must be attached to the flue collector and interconnected to the ignition control module before proceeding with start up Flue Damper Installation a Set the flue damper over the flue collector opening and align the damper drive housing to the front of the heater b Secure the flue damper to the flue collector at three locations using the fasteners provided c Remove the damper drive housing cover feed the damper interconnect cable through the access hole and attach the female connector to the four pin receptacle Secure the access hole cover check to make sure the test switch is in the NORMAL position and reattach the damper driver housing cover CAUTION BE SURE THERE IS NO FOREIGN MATTER IN THE DAMPER HOUSING BEFORE ATTACHING THE DRAFT DIVERTER Draft Diverte
3. COMPRESSION FITTINGS ON THERMOSTAT BULBS AS CALIBRATION WILL BE CHANGED CAUTION TEMPERATURES HIGHER THAN 125 F INCREASE THE RISK OF SCALD INJURY Gas Train Safety Inspection CAUTION ALL VENTED GAS CONTROLS MUST BE VENTED TO THE OUTSIDE USING TUBING SIZED IN ACCORDANCE WITH THE FOLLOWING TABLE VENT LINE SIZING Fuel Line Size Vent Line Size Nominal Pipe Size Nominal Pipe Size Inches Inches Up to 1 1 2 3 4 2 1 21 2 11 4 3 11 4 4 2 5 2 6 21 2 8 3 Section 2 START UP PROCEDURES AND OPERATION con t CAUTION CONDUCT THE FOLLOWING GAS TRAIN LEAKAGE TESTS BEFORE START UP AT ANNUAL INTERVALS AND PRIOR TO INVESTIGATING THE CAUSE OF ANY REPORTED OCCURENCES OF DELAYED IGNITION 1 Using an appropriate bubble detection solution thoroughly coat all gas train pipe connections If any bubbles are detected the leaking connection must be tightened and tested to assure stoppage of the leak 2 Attach a manometer to measure gas pressure at the manual gas shutoff valve located just upstream of the gas train Adjust gas train inlet pressure to the specified value e g 14 W C and tightly close the gas train outlet manual shutoff valve 3 Reattach the manometer to the gas train outlet manual shutoff valve and record the measured gas pressure in inches of water column in W C Measure gas pressure again after 15 minutes If gas pressure has increased 00 5 W C or more the gas leak mu
4. valve if the pilot flame is extinguished while the burner is in operation WATER HEATER START UP NOTE The following test equipment is required Vent temperature gauge Manometer for checking gas pressure Draft gauge for checking draft in vent CO carbon monoxide tester CO carbon dioxide or Oz oxygen tester Drill and 1 4 drill bit for 1 4 hole drilled in vent approximately 12 above draft hood outlet oao NOTE Emergency shutoff can be made by turning off the fuel inlet shutoff valve CAUTION DO NOT START BURNER WITH COMBUSTION CHAMBER FULL OF GAS OR WITH VERY HOT COMBUSTION CHAMBER The following steps must be performed to assure that the water heater is operating safely and efficiently 1 Read the enclosed control manufacturer s instruction sheet for start up procedure Allowing the pilot to ignite with the main burner gas valve turned to off position is required at initial start up The pilot flame can be visually checked for size and position Check inlet gas pressure It must not exceed 14 W C Press the control circuit switch on the front panel to on position The control system will open the pilot valve allowing the pilot to ignite Observe pilot flame If satisfactory open the main burner valve and main burner should ignite Pilot and main burner flames can be observed during adjustment and under operating conditions by using the stainless steel hand held inspection mirror that is enclos
5. PVI ATMOSPHERIC GAS WATER HEATERS TYPICAL CONSTRUCTION MANUFACTURED AFTER JANUARY 1 1994 A 1 J F wa B AA E lt lt oarn nS ea SSK TF ee eT ae U Figure 2 1 1 Vent stack 7 Control switch es and fuse s 2 Draft diverter hood 8 Gas valve 3 Flue damper on some models 9 Pilot line 4 Temperature limiting device 10 Drip leg set at 200 F 11 Gas supply line 5 Upper operating thermostat 12 Handhole cleanout set at 130 F 6 Operating thermostat set at 120 F Not furnished by PVI CAUTION TEMPERATURES HIGHER THAN 125 F INCREASE THE RISK OF SCALD INJURY IMPORTANT Clearances to unprotected combustible material must be 8 minimum at top sides and rear and 24 in front Clearances for servicing and inspection must be 18 minimum at sides and rear and 24 minimum in front PV500 2 06 10 1 Section 2 ELECTRICAL Typical 24 Volt Control System with Damper Wiring to the unit should conform to the National Electrical Code or the code legally authorized in your locality A fused disconnect switch should be used for AND FUs the water heater control 120V 1ph 60 Hz service in wiring is brought to the terminal block in the lower part UPPER OPERATING of the enclosure on the water heater See Figures 2 lee one 2 2 3 and 2 4 THERMOSTAT SPARK IGNITION CONTROL
6. burner disconnect the pilot gas line and replace pilot assembly on pilot bracket Replace in reverse order Do not bend or distort pilot bracket as this determines pilot flame position relative to burner orifices See Figure 2 7 Inspect individual burner jets for evidence of overheating Replace burner jets as necessary Examine the venting system at least quarterly for proper connections alignment and the presence of corrosion Any corroded vent section should be immediately replaced to prevent CO leakage Re check vent temperature step 6 page 5 and correct if necessary CAUTION THE RELIEF VALVE IS A PRIMARY SAFETY DEVICE The temperature and pressure relief valve should be removed and inspected at regular intervals to determine its condition for safe operation The openings inside the valve may become restricted by a buildup of scale and become inoperative If the valve does not open and close properly when tested it must be replaced with a like kind or one meeting the requirements stated on the rating tag located on the relief valve Spark ignition system operation should be checked as follows Flame failure Close downstream gas train shutoff valve and determine safety shutdown timing Flame signal Determine flame signal strength in accordance with step 7 on page 5 Section 2 MAINTENANCE AND SAFETY INSPECTIONS con t Taking the Water Heater Out of Service c Tag power switch es indicating that fuel is
7. e and allow water to flow through the tank until it runs clear Close the drain valve and turn the electrical switch back on Draining two or three gallons from the bottom of the tank on a weekly basis will also help prevent an accumulation of sediment Water impurities can consist of fine particles of soil or sand which will settle out and form a layer of sediment on the bottom of the tank A scale of lime will normally form in the tank during operation and will accumulate on the bottom of the tank Lime is formed from the natural chemicals in the water which precipitate out during the heating cycles Some water supplies contain more of these elements than others and the scale buildup will occur more rapidly Other factors affecting the scale buildup are the amount of hot water used and the water temperature As more hot water is used the more fresh water containing the scale forming elements is brought into the tank As the temperature of the water increases the rate of scale deposition will be increased Sediment and scale accumulations in the tank will greatly reduce the water heating ability of the heater by reducing effectiveness of heat transfer surfaces When heating energy from the burner cannot be effectively transferred to the water in the tank the metal can overheat causing it to lose structural strength Should a firetube leak for any reason consult the factory for instructions Inspect bottom tubesheet on a regular basis
8. ed in the information packet that was shipped with this water heater If the spark ignition fails to ignite the pilot flame refer to the control manufacturer s manual supplied with the unit 2 Check gas pressure at the gas valve with a manometer See Figure 2 5 Most gas valves have pressure taps for this purpose Adjust gas pressure to the value shown on rating plate of the water heater 3 Drill 1 4 diameter hole in vent about 12 above draft diverter Insert draft gauge in drilled 1 4 hole Draft in vent should be 02 06 W C Section 2 4 After 20 to 30 minutes of operation or when water in the tank is above 120 F insert CO carbon monoxide tester in flue damper opening under the draft diverter 125 gallon models or in the flue collector opening 250 gallon models CO reading must be less than 02 or 200 ppm Insert CO carbon dioxide tester in the flue damper opening under the draft diverter 125 gallon models or in the flue collector opening 250 gallon models and take reading CO should be 6 to 8 NOTE Monitoring CO and CO readings in vent after the draft diverter will give erroneous readings These measurements must be taken as flue gases exit the heater flue collector under the draft diverter as dilution with ambient air from the draft diverter occurs in the vent Insert temperature gauge in 1 4 hole and read vent temperature Temperature should be at least 300 F but less than the ro
9. off and tank is empty Extended shutdown of the appliance and restarting instructions are as follows d To restart refill tank with water and turn fuel a Turn off all power and fuel supplies and power switch es on Reset all controls and conduct start up of the appliance as b Drain and flush tank as previously discussed discussed on preceding pages PILOT LOCATION amp REMOVAL SPARK IGNITION SYSTEMS PILOT BRACKET BURNER a REMOVE 2 BOLTS TO REMOVE PILOT BRACKET IGNITION WIRE PILOT GAS LINE SENSOR WIRE Figure 2 7 PV500 2 06 10 7 Section 2
10. om temperature plus 400 F when the water temperature is approximately 130 F Connect micro amp meter as shown in Figure 2 6 and check micro amps A minimum of two micro amps is required for proper operation Record the following information for future use A Inlet gas pressure W C B Gas pressure manifold step 2 W C C Vent draft step 3 W C should be minimum of 1 in W C D CO reading step 4 less than 02 E CO reading step 5 6 8 F Vent gas temperature step 6 Gross E Less Ambient F Net F G Micro amps reading step 7 PV500 2 06 10 COMBINATION GAS VALVE PRESSURE REGULATOR ADJUSTMENT ON PILOT OFF CONTROL PRESSURE TAP MAIN GAS INLET Figure 2 5 MICRO AMP METER HOOK UP SPARK IGNITION TRANSFORMER TRANSFORMER amp LIMITS MICRO AMP METER IGNITION CABLE ayq daa PILOT LINE GROUND BLACK LEAD Figure 2 6 Section 2 MAINTENANCE AND SAFETY INSPECTIONS To Minimize Scale Accumulation in Tank 1 A preventative maintenance program should be established to assure a long trouble free life of the water heater The tank should be flushed at two or three month intervals depending on water conditions in your location To flush turn off the electrical disconnect switch to prevent the burner from operating Open the drain valv
11. r Installation The draft diverter provided is designed to mount on top of the flue damper Set the draft diverter on top of the flue damper and secure in three locations using the fasteners provided Venting Type B galvanized vent pipe of the same diameter as the draft diverter outlet must be installed to route combustion products either to existing overhead breeching or to an appropriate outside location 1 The control manufacturer s installation and service manual and start up procedures for the control system on your water heater are shipped with the unit Study the information carefully and follow the manufacturer s recommendations 2 Fill the water heater tank with water Open the relief valve or a nearby hot water faucet to allow air in the tank to escape Be sure all connections into the tank are tight as leaks at tank fittings will damage the insulation PV500 2 06 10 3 Remove the control box cover to access the control thermostats and other electrical devices needed to operate the water heater The thermostats are labeled as to their function The temperature limiting device is set at 200 F The thermostats are factory set at 130 F the upper operating thermostat and 120 the operating thermostat Adjustment may be made by turning the thermostat dial to the desired temperature CAUTION BE SURE TO REATTACH THE CONTROL BOX COVER TO HELP PREVENT UNAUTHORIZED ACCESS TO CONTROLS CAUTION DO NOT OVERTIGHTEN
12. st be isolated to one or more of the operating gas valves for example a solenoid actuated gas shutoff valve After any leaking valve is replaced the reassembled gas train must be leak tested again before start up is attempted NOTE All gas valves removed because of suspected leakage must be returned to PVI Customer Service for disposition Spark Ignition Systems These systems use 120 VAC power from an external source and are equipped with transformers to reduce the voltage to 24 volts to actuate the gas valve At start up or during operation when the thermostat calls for heat the spark ignition system performs the following basic steps 1 Opens the flue damper 2 Activates a high voltage transformer to supply a sparking action to the pilot 3 Opens the pilot gas valve The pilot gas ignites from the sparking 4 A sensor located in the pilot flame signals the control module to open the main burner gas valve The pilot flame ignites the main burner gas An adequate pilot flame must be present before the main burner gas valve can open 5 When the water temperature reaches the operating thermostat setting the control circuit opens which closes both the pilot and main burner gas valves terminating burner operation PV500 2 06 10 6 The flue damper is closed NOTE The spark ignition system provides additional safety functions to close the pilot valve if the pilot flame is not established and to close the main burner
13. to determine if insulation may have pulled away from the tubesheet Repair or replace as required NOTE Condensate coming from the tubes on a cold start is normal and does not indicate a leaking tube The tank may have a handhole for inspection and cleaning use The handhole cover should be periodically removed and the tank inspected for scale buildup If scale is present it can be loosened with a high pressure stream of water The smaller pieces can be flushed through the drain and the larger pieces removed by hand through the handhole The frequency of inspections should be determined by the rate of scale buildup We recommend 30 60 day intervals PV500 2 06 10 Periodic Inspection of Operational Components Periodic inspections and check out of the burner ignition system control system and gas valve operation should be made and recorded for future reference Pilot assemblies should be checked by a qualified serviceman using control manufacturer s instructions Wiring connections on the ignition high voltage wire and flame sensor wire must be tight Clearance between these wires and metal parts of the water heater or burner must be maintained to avoid possible shorting out Positions of the electrode flame sensor and pilot flames are very important and have been set by the manufacturer If they are loose or if ceramic insulators are cracked or broken replace the pilot assembly To replace remove pilot bracket from bottom of

Download Pdf Manuals

image

Related Search

Related Contents

Voir la documentation  HーTACHー  L-54g Wireless  Flex Integral FC und FCV Benutzerhandbuch  Sony CDP-CE335 5-Disc CD Changer  User Manual Handling Instructions Battery Pack 8LP5200V22  Conceptronic CNBCOOLPAD2F notebook cooling pad  HOJA DE INSTRUCCION 66975  Samsung Amerikaanse Koelkast (510 Liter)  株式会社ナカヨ通信機 - 株式会社アレクソン  

Copyright © All rights reserved.
Failed to retrieve file