Home
Lightolier Multi-Lyte MMA & MFA User's Manual
Contents
1. Step 9 Attach TRACK and TRACK ADAPTER to CHANNEL with PLASTIC WASHER and FLAT HEAD SCREWS provided with TRACK Step 10 Replace WIRE WAY COVER on top of CHANNEL Step 11 Measure exposed CHANNEL areas and cut SNAP IN COVER accordingly Step 12 Cover exposed CHANNEL areas with SNAP IN COVERS WAIRE WAY COVER t BROWN CONNECTORS DEAD END COVER n amp a l PLASTIC WASHER P 8 32 X3 4 FLAT HEAD SCREW Figure 14 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ ML Page 16 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte X L TT JOINER MOUNTING Step 1 Remove CHANNEL MOUNTING BRACKET ASSEMBLY from CABLE or STEM SET and discard Fig 14 CABLE SET m STEM SET CABLE GRIPPER Bee MOUNTING 5 BRACKET ASSEMBLY Figure 15 Step 2 Attach STEM or CABLE to JOINERS by screwing STEM or CABLE GRIPPER into Joiner BRASS FITTING and tighten securely S gt CABLE SET A I fl tl BRASS FITTING Figure 17 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108
2. 10 16cm Octagon By Others A Attach CROSSBAR to J BOX with 8 32 SCREWS provided with J BOX B Make sure J BOX is securely attached to building structure Step 2 Mark and Drill Hole A Mark off mounting distances from center of J BOX to next mounting center Maximum 9 274 32cm on continuous runs Fig 4 B And drill two 2 3 4 1 91cm holes Fig 5 30 76 20cm for 4 foot Individual Fixture a 60 152 40cm for 8 foot Individual Fixture 9 274 32cm Max for Continuous Runs 8 32 SCREW BY OTHERS CROSSBAR Xs J BOX BY OTHERS Figure 4 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 6 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CABLE MOUNT INSTALLATION CONT D Step 3 Secure CROSSBAR A Secure CROSSBAR at mounting center B Attach TOGGLE BOLTS By Others to CROSSBAR and slip TOGGLE WING NUTS By Others thru 3 4 1 91cm holes in ceiling securing CROSSBAR firmly to ceiling Step 4 Wiring A Make necessary power connections at J BOX per local code B Push connections back into J BOX Step 5 Secure CANOPY Slide CANOPY onto J BOX and fasten COLLAR with SET SCREW Fig 5 X i 3 4
3. Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ML Page 17 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte X L T JOINER MOUNTING CONT D Step 3 Refer to page 10 and 11 for Spline Connections and pages 3 through 6 for Stem Cable Mounting ATTENTION Maximum distance between suspension points is 9ft 274 32cm Maximum load on each 10 foot section is 80Ibs 36 29kg Note Each 4 foot module weighs a maximum of 20 pounds 9 07kg Each 8 foot module weighs a maximum of 40 pounds 18 14kg 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ML Page 18 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte PATTERNS All MALE SPLINES from CHANNELS must be removed to order to join them as patterns Note All X L T JOINERS come with MALE SPLINES 5ft CHANNEL STEM OR CABLE MOUNTING L JOINER X an yo CHANNEL fo e _ lias 5 6 167 64cm yo o O 0 O L 5 6 167 64cm iz a to Le o _o X X 5 6 167 64cm 10 6 320 04cm Note Maximum distance between mounting locations is
4. SCREW 2 HAIRLINE JOINT Figure 10 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ML Page 11 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CHANNEL CONNECTIONS amp WIRING CONT D Step 6 Connect THRU WIRES with color coded QUICK CONNECTORS Fig 11 ye WIRES HAIRLINE JOINT Figure 11 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 12 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte MODULE WIRE amp MOUNTING Step 1 Determine where MODULE is to be mounted Step 2 Remove WIRE WAY COVER from top of CHANNEL above MODULE mounting location and remove SNAP IN COVER from below Step 3 Feed SUPPLY WIRES from PARTS BAG up through 3 8 slotted hole on CHANNEL Step 4 Connect SUPPLY WIRES to thru wires using BROWN CONNECTORS from PARTS BAG according to color Note See Fig 12 below for proper spacing 2 5 08cm 3 7 62cm of connections PARTS BAG BROWN CONNECTORS a a amp e WIRE WAY COVE
5. 1 91CM HOLE 2X CROSSBAR S POC ATRERA li 1 lt COLLAR ma 4 N CANOPY TOGGLE BOLT COLLAR CABLE BY OTHERS ce ANGER CABLE SCREW aa F K CHANNEL MOUNTING CHANNEL BRACKET ASSEMBLY Figure 5 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 7 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CHANNEL MOUNTING STEM amp WIRING Step 1 SUPPLY WIRES i CHANNEL CHANNEL MOUNTING BRACKET ASSEMBLY DETAIL A Cae Step 2 CHANNEL MOUNTING BRACKET ASSEMBLY Install CHANNEL MOUNTING BRACKET ASSEMBLY and slide it into CHANNEL DETAIL B BRASS FITTING ae A x CHANNEL MOUNTING BRACKET ASSEMBLY Figure 6 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ ML Page 8 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CHANNEL MOUNTING STEM amp WIRING CONT D Step 3 BROWN CONNECTOR Snap BROWN CONNECTOR from parts bag to 12ga THRU WIRE in CHANNEL i
6. 9 274 32cm Figure 18 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS
7. LIGHTOLIEI Lighting Systems S_ ML Page 4 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte STEM MOUNT INSTALLATION CONT D Step 6 Replace SAFETY CLIP A Replace SAFETY CLIP to MOUNTING BRACKET and make necessary power connections at J BOX Fig 3 B Match colors for proper wiring i e Black fixture lead to hot black supply lead White fixture lead to neutral white supply lead Green wire must be connected to ground terminal or ground lead inside J BOX Use wire nuts as per local code C Push connections back to J BOX Step 7 Secure CANOPY Snap CANOPY onto MOUNTING BRACKET flush with ceiling Fig 3 eae J BOX BY OTHERS p ae MOUNTING 1 i RE BALL ALIGNER 3 4 1 91CM HOLE BRACSEL Ff TOGGLE WING NUT X BY OTHERS 7 a BALL ALIGNER STEM iit TOGGLE WING BOLT 1 S CANOPY BY OTHERS STEM Figure 2 J BOX BY OTHERS T y MOUNTING BRACKET poe 8 32 SCREW i SAFETY CLIP BY OTHERS ae STEM Figure 3 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ ML Page 5 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CABLE MOUNT INSTALLATION Step 1 Install CROSSBAR to J BOX 4
8. csetncescccettcict itech ecu iae th ie cia ce tN ele iittala cae Here chgis dicate 5 CHANNEL MOUNTING STEM amp WIRING occa Genco scteos Seca ct ecemne nei Scaed deers Saeco ns raed set ent televesremenbsabaieles 7 CHANNEL MOUNTING CABLE amp WIRING s sssieseisesinsninsssinssnnssnisssnnsninssninsnirsninsnrnsnirnsnrenrirennrenrrenn 9 CHANNEL CONNECTIONS amp VIR IN Gs 2 Oe hess eterna ot tha tes cea tals ete 10 MODULE WIRE amp MOUNTING a tes Ses ca oho ect said oe iat assets eS ne ceeds 12 BASIC LYTESPAN TRACK MOUNTING cc cas51 22sec ak asa A cect dees abs cop dd veer oeuabeshvee ses Meme adagaulend 14 Pe LEJOINER MOUNTIN Girindra tarn a Olen th em etter tae 16 PATTERN anaur ensa uee EER hau sla aac ea Ns peace ele 18 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 3 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte STEM MOUNT INSTALLATION Step 1 Install MOUNTING BRACKET to J BOX 4 10 16cm Octagon By Others A Attach with two 2 8 32X1 SCREWS provided with J BOX B Make sure J BOX is securely attached to building structure C If installed on a sloped ceiling orient BALL ALIGNER slot opening up toward the crest of the ceiling Step 2 Mark and Drill Hole A Mark o
9. lead to black thru wire White lead to White thru wire and ground to ground Step 5 Secure CHANNEL MOUNTING BRACKET ASSEMBLY Fasten CHANNEL MOUNTING BRACKET ASSEMBLY with SCREW DETAIL B Step 6 Secure Cable Attach CABLE GRIPPER into BRASS FITTING on CHANNEL MOUNTING BRACKET DETAIL C BRASS FITTING CABLE GRIPPER if gigs IRAY SCREW INE ee G o tots J po i ee SCREW me ZO i ai Yo POWER ca CHANNEL MOUNTING _ CORD WIRES BRACKET ASSEMBLY DETAIL C Da eee Se gt N BROWN CONNECTORS Figure 8 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 10 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CHANNEL CONNECTIONS amp WIRING Step 1 Fish thru wires not shown under FEMALE and MALE SPLINES Step 2 Slide CHANNELS together without pinching wires Fig 9 SCREW 1 sew SCREW 2 To FEMALE SPLINE a CHANNEL ALUMINUM EXTRUSION Figure 9 Step 3 Secure MALE SPLINE to mating channel by SCREW 1 10 24x3 8 provided Step 4 Remove SCREW 3 and tighten SCREW 2 8 32x1 2 to create a HAIRLINE JOINT Step 5 Secure joint with SCREW 3 10 24x3 8 Fig 10 THRU WIRES SCREW 1 SCREW 3
10. LIGHTOLIEI Lighting Systems S_ ML Page 1 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE PROCEEDING RETAIN THESE INSTRUCTIONS FOR MAINTENANCE REFERENCE This fixture is intended for installation in accordance with the National Electrical Code and local regulations To assure full compliance with local codes and regulations check with your local electrical inspector before installation To prevent electrical shock turn off electricity at electrical panel before proceeding DO NOT INSTALL THIS SYSTEM IN A WET OR DAMP LOCATION DO NOT ENERGIZE ANYTHING OTHER THAN THE FIXTURES IN THE SYSTEM DO NOT OVERLOAD FEED CABLE 10 AMP MAX FOR SJT 18 3 AND 7 AMP MAX FOR SJT 18 4 amp 18 5 CONTRACTOR IS RESPONSIBLE FOR ADEQUATELY REINFORCING CEILING TO SUPPORT FIXTURE WEIGHT MMD amp MFD Note MMC amp MFC MME amp MFE MMB amp MFB 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ ML Page 2 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte TABLE OF CONTENTS STEM MOUNT INSTALLATION cs crete cla chee cctelta epeuste tis cuca Casa te doch ace wae eet cla 3 CABLE MOUNT INSTALLATION
11. R pee ee THUMB SCREW SUPPLY WIRES E CHANNEL t SNAP IN COVER HOOK BRACKETS MODULE LIGHTING FIXTURE QUICK CONNECTORRS Figure 12 COEN COVER 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIER Lighting Systems S_ ML Page 13 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte MODULE WIRE amp MOUNTING CONT D Step 5 For individual fixtures make connections with WIRE NUTS provided Step 6 Raise MODULE near and connect MODULE with color coded QUICK CONNECTORS Step 7 Raise MODULE up to CHANNEL and without pinching wires slide LOCKING CLIPS into HOOK BRACKET Secure with THUMB SCREWS Step 8 Replace WIRE WAY COVER on top of CHANNEL Step 9 Measure exposed CHANNEL areas and cut SNAP IN COVER accordingly Step 10 Cover exposed CHANNEL areas with SNAP IN COVERS 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 14 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte MULTI LYTE TRACK MOUNTING Step 1 Determin
12. e where TRACK is to be mounted Step 2 Remove WIRE WAY COVER from CHANNEL above TRACK mounting location and SNAP IN COVERS below Step 3 Unscrew COVER from LIVE END Step 4 Pass SUPPLY LEADS from PARTS BAG into LIVE END Step 5 Strip and form SUPPLY LEADS to fit in LIVE END Fasten leads to SCREW TERMINALS GROUND LEAD to GREEN GROUND SCREW WHITE LEAD to terminal marked Neut and BLACK LEAD to remaining terminal as described in the Track Power Feed Instruction Sheets Fig 13 Step 6 Replace COVER to LIVE END Step 7 Feed opposite end of SUPPLY LEADS up thru any of the 3 8 0 95cm slotted hole on CHANNEL LIVE END WHITE LEAD GROUND LEAD PARTS BAG CREEN ORC REW BROWN CONNECTORS BLACK LEAD HOT gm EE Ee SCREW TERMINALS aoo STRIP _ S gt 1 16 1411CM NOT NECESSARY TO WRAP 18GA SUPPLY LEADS C BLACK AND WHITE LEADS AROUND SCREWS Figure 13 631 Airport Road Fall River MA 02720 e 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 15 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte MULTI LYTE TRACK MOUNTING CONT D Step 8 Connect SUPPLY LEADS to THRU WIRES using BROWN CONNECTORS from PARTS BAG according to color Note See Fig 14 for proper connection spacing
13. ff mounting distances from center of J BOX to next mounting center Maximum 9 274 32cm on continuous runs Fig 1 B Drill two 2 3 4 1 91cm holes at same 45 angle as the two 2 8 32 SCREWS on the first MOUNTING BRACKET Fig 1 amp 2 Step 3 Secure MOUNTING BRACKET A Secure MOUNTING BRACKET at mounting center B Attach TOGGLE BOLTS BY OTHERS to MOUNTING BRACKET and slip TOGGLE WING NUTS BY OTHERS thru 3 4 1 91cm holes in ceiling securing MOUNTING BRACKET firmly to ceiling Fig 2 IMPORTANT Opening of all MOUNTING BRACKETS must be aligned in same direction Fig 1 Step 4 STEM Shortening A Consult factory for custom STEM lengths Step 5 Remove SAFETY CLIP A Remove SAFETY CLIP from MOUNTING BRACKET opening and slide STEM thru opening Fig 1 B BALL ALIGNER GROOVE must align and engage with MOUNTING BRACKET TAB 30 76 20cm for 4 foot Individual Fixture 60 152 40cm for 8 foot Individual Fixture o 459 9 274 32cm Max for Continuous Runs 4507 MOUNTING BRACKET Pa N S 5 s 8 32 SCREW _ ee BY OTHERS gt MOUNTING MS eee BRACKET TAB SAFETY CLIP X te SAFETY CLIP i BALL ALIGNER GROOVE vg GROOVE a IONER LEADS Figure 1 631 Airport Road Fall River MA 02720 508 679 8131 e Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS
14. nsert SUPPLY WIRE into second slot in BROWN CONNECTOR and crimp connection with pliers Fig 7 Step 4 Repeat Steps Above as Necessary Step 5 Secure STEM Attach STEM into BRASS FITTING DETAIL B THRU WIRE SUPPLY WIRE BY OTHERS mE BROWN CONNECTOR THRU WIRE LEADS BALLAST OR TRACK Figure 7 631 Airport Road Fall River MA 02720 e 508 679 8131 Fax 508 674 4710 We reserve the right to change details of design materials and finish www lightolier com 2008 Philips Group D1108 Lightolier is a Philips group brand PHILIPS LIGHTOLIEI Lighting Systems S_ ML Page 9 of 18 Instruction Sheet for Assembly and Installation of Multi Lyte CHANNEL MOUNTING CABLE amp WIRING Step 1 Slide Through POWER CORD Slide POWER CORD WIRES through CHANNEL MOUNTING BRACKET DETAIL C Step 2 Channel Mounting Bracket Assembly A Install CHANNEL MOUNTING BRACKET ASSEMBLY and slide bracket into CHANNEL Fig 8 B Before connecting SUPPLY WIRES to THRU WIRES with BROWN CONNECTORS see DETAIL A for proper spacing of 2 5 08cm to 3 7 62cm required Step 3 BROWN CONNECTOR A Snap BROWN CONNECTOR from parts bag to 12ga THRU WIRE in CHANNEL B Insert POWER CORD WIRE into second slot in BROWN CONNECTOR and crimp connection with pliers Fig 7 Step 4 Connect Wires A Finish connection with BROWN CONNECTOR flap and do the same for all three wires according to color DETAIL C B Black
Download Pdf Manuals
Related Search
Related Contents
取付・取扱説明書 デジタルコードレスホン DC_100Iw/100I 取扱説明書 NTT東日本用 Mode d'emploi Network Computing Devices JRC 1500 MKII User's Manual Votre supplément à l`intérieur ! GECOL Flexible rápido Manual de Usuario Teletramitación Renovación de Autorización de Sinus A 300 Bedienungsanleitung Vielen Dank für den Kauf von ARTURIA BRASS ! Copyright © All rights reserved.
Failed to retrieve file