Keston Frame & Header Kits Installation Manual

image

Contents

1. FRAME amp HEADER KIT INSTRUCTIONS Keston Heat 45 Keston Heat 55 Keston Heating PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 44 0 1482 443005 Fax 44 0 1482 467133 email info keston co uk web www keston co uk This kit is suitable for the following boilers Keston Heat 45 amp 55 CONTENTS 1 Introduction and General Description 2 General Description of Cascade System 3 Multiple Boiler System Components 4 Installation Drawings for Multiple Boiler Systems 5 Wall Mounted Installation Procedure 6 Frame Kit Installation Procedure 7 Header Kit Assembly 8 Electrical Connections 9 Commissioning and Testing Keston Heat Frame amp Header Kits 1 INTRODUCTION This technical data contains information for dimensioning amp assembly of a cascade system kit for the Keston Heat range of products Header and Frame kits are available in line from 2 to 6 boilers long GENERAL DESCRIPTION OF FRAME amp HEADER KITS A requirement to spread the total required heat output over several boilers can be accommodated by the use of the Keston Heat multiple boiler frame amp header kit options An optional sequencer kit can be specified to switch boilers in cascade on or off dependent on total heat demand H 10 OD T aw Keston Heat Frame amp Header Kits 2 GENERAL DESCRIPTION OF CASCADE SYSTEMS 2 1 FRAME AND HEADER KIT DESIGN OPTIONS The Keston Heat boi
2. e The frames must stand on a flat and level floor of suitable load bearing capacity e If using a frame kit UIN 355013 the header must be bolted to the frame before the hoses are connected to the boiler These Installations refer to perpendicular wall and floor If walls are not perpendicular it is recommended that a frame kit be used UIN 355013 The correct number of frames should be ordered 1 per boiler Allowances must be made for installation where skirting boards or other features are in place that may affect the nominal installation conditions Keston Heat Frame amp Header Kits 4 INSTALLATION DRAWINGS FOR MULTIPLE BOILER SYSTEMS 4 1 GENERAL The multiple boiler systems are available in two formats e 2to 6 boilers in a linear configuration mounted on a wall e 2to6 boilers in a linear configuration mounted on free standing frames The boiler side of the cascade systems is sized to give a water flow and return differential 20 C 4 2 SIDE BY SIDE FRAME KIT CONFIGURATION 4 2 1 INSTALLATION DRAWING WITH 2 45 or 55 BOILERS SIDE BY SIDE Side by side wall or frame mounting dimensions PLAN VIEW 1483 1 SYSTEM FLOW DN80 FLANGE CONN 1945 to top of frame 1919 to top of boiler SYSTEM RETURN DN80 FLANGE CONN FRONT VIEW 2 BSP Female Gas C tion Note 1 Mixing header and gas connections be located either on the LHS or RHS of the assembly to suit needs of each
3. Instructions 1 Cut the sides off the cardboard wall mounting template s found in the boiler packaging to create the 50mm side clearance required 4 Drill the required holes in the wall to fit the wall mounting plate plugs See boiler Installation Instructions for details 2 Mark the height on to the wall from the floor to the top of the boiler 1919mm Y 5 Screw the wall mounting plate s to the wall Floor Mounting Align centre line of template to centre line of boiler and drill holes for headers 3 Tape the template s to the wall ensuring the 50mm side clearance per boiler requirement is adhered to continued Keston Heat Frame amp Header Kits 14 5 1 WALL MOUNTED SIDE BY SIDE OPTION CONT D SIDE VIEW PLAN VIEW o H O GAS 590 8 KITS 402 DN100 KITS Careful consideration MUST be given to the installation tolerances If these are not adhered to hoses may become kinked or connections may not fit Bolt header to floor using template provided front fixings only Connect up hoses see page 15 Keston Heat Frame amp Header Kits 6 FRAME KIT INSTALLATION PROCEDURE 6 1 SIDE BY SIDE FRAME KIT MOUNTING PROCEDURE Place the frame kit sections in the required position and bolt them together at the top and bottom with the bolts nuts and washers provided 1 2 f additional stability is required remove the plastic foot covers and dri
4. The Gas header consists of a custom manufactured 2 manifold This is located in a cradle incorporated within the header mounting skid 3 4 MIXING HEADER The mixing headers are insulated and are supplied with an auto air vent and drain point as standard 3 5 BOILER CONNECTION KITS RETURN 1 11 4 x 3 4 x 1 4 Tee 2 Close Taper Nipple 3 Safety Relief Valve 6 bar 4 Isolation Valve 5 11 4 x 1 2 x 1 4 Tee 6 Drain Off Cock 2 Connection Pipe Assembly 8 Non Return Valve 9 1 4 Taper Male to 1 4 Parallel Hex Adapter Boiler Flow Flexible Connection from Header Boiler Return Flexible Connection from Header EE re Items 1 2 3 4 5 amp 6 are supplied with the boiler AL 208973 Isolation Valve Kit Items 7 8 amp 9 are supplied with the Header Kit to M bos SS M I SS a Items 10 amp 11 are pre assembled to the water header Assemble fittings together as shown using appropriate sealing material Do not fit the safety relief valve item 3 at this stage When assemblies are complete fit to boiler flow and return stubs with suitable sealing material The safety valve item 3 can now be fitted using suitable sealing material 7 Ensure all isolation valves pressure relief valves and drain valves are fitted to allow unrestricted operation 3 6 FREE STANDING FRAMES If boilers in cascade are positioned in line the inst
5. a hydronic system This essentially creates linked stand alone flow circuits with their own flow rates and pressure drops Allowing for the modern high resistant high efficiency boilers to operate under their optimum conditions while the main heating circuit operates to its own controlled optimum requirements 2 4 OUTPUT CONTROL An optional sequencer kit is available to maximise the efficiency of a multiple boiler installation Instructions for installation and use are contained in the sequencer kit The sequencer kit facilitates control of up to five boilers in cascade 2 5 GAS SUPPLY The 45 55kW boilers are suitable for use with natural gas Connect the boilers to the gas mains in accordance with the applicable regulations The gas header connection is a 2 female thread with test points at each end It is the test point nearest the inlet of the group of appliances that becomes the appliance inlet pressure point Refer to the boiler Installation amp Servicing Instructions for general GAS SUPPLY details 2 6 ASSEMBLY The frames and headers must stand on a flat and level floor of suitable load bearing capacity 2 7 SAFE HANDLING This boiler may require 2 or more operatives to move it to its installation site remove it from its packaging base and during movement into its installation location Manoeuvring the boiler may include the use of a sack truck and involve lifting pushing and pulling Caution should be exercised during these o
6. particular system Note 2 Optional frame UIN355013 one req d per boiler Header Inline DN80 KIT 45 55kW UIN355014 with two Keston 45 55 boilers mounted onto optional Single frame inline Kit UIN355013 LH SIDE VIEW ALL DIMENSIONS ARE IN mm 8 Keston Heat Frame amp Header Kits 4 2 2 INSTALLATION DRAWING WITH 3 45 or 55 BOILERS SIDE BY SIDE 111 295 CRS E CRS a CRS CRS 295 CRS 144 Side by side wall or frame mounting dimensions 125 By 3 apps hg TE TE Ball PLAN VIEW 2033 1945 to top of frame SYSTEM FLOW DN80 FLANGE CONN 1919 to top of boiler SYSTEM RETURN DN80 FLANGE CONN 2 BSP Female FRONT VIEW Gas Connection Note 1 Mixing header and gas connections can be located either on the LHS RHS of the assembly to ALL DIMENSIONS ARE IN mm suit needs of each particular system Note 2 Optional frame UIN355013 one req d per boiler Header Inline DN80 KIT 45 55kW UIN3S55015 with three Keston 45 55 boilers mounted onto optional Single frame inline Kit UIN355013 Keston Heat Frame amp Header Kits 4 2 3 INSTALLATION DRAWING WITH 4 45 or 55 BOILERS SIDE BY SIDE 111 295 CRS 255 CRS 295 CRS 255 CRS 295 CRS 255 CRS 295 CRS 144 Side by side wall or frame mounting dimensions 125 1 r 1 4 50 BETWEEN BOILERS 500 PLAN VIEW 410 E ou M 7 SYS
7. TEM FLOW DN100 FLANGE CONN 1945 to top of frame 1919 to top of boiler poopy bor pen PN Se LENIN 110 d SNTOO FLANGE CONN I n A FRONT VIEW ILL 2 1 Gas Connection Note 1 Mixing header and gas connections can be LH SIDE VIEW located either on the LHS or RHS of the assembly to LL LLL suit needs of each particular system ALL DIMENSIONS ARE IN mm Note 2 Optional frame UIN355013 one req d per boiler Header Inline DN100 KIT 45 55kW UIN355016 with four Keston 45 55 boilers mounted onto optional Single frame inline Kit UIN355013 10 Keston Heat Frame amp Header Kits 4 2 4 INSTALLATION DRAWING WITH 5 45 or 55 BOILERS SIDE BY SIDE CRS 255 CRS 295 CRS 255 CRS 295 CRS 255 CRS 295 CRS 144 Side by side wall or 111 295 CRS 255 CRS 295 frame mounting dimensions ILE E us 3 EXE i 4 HT Te HIE ona D i i C _ _ a 50 BETWEEN i 50 BETWEEN BOILERS BOILERS PLAN VIEW 3130 DE e Perrys PTT rs 22220 ces i t 1945 to top of frame SYSTEM FLOW DN100 FLANGE CONN 1919 to top of boiler i H Till 8 MNM Ih JU 18 TD LlB aT 7 Hi r HB See j lt H FLANGE CONN he M Mo H Pe o OD COSS FRONT VIEW 2 BSP Female Gas Connection Note 1 Mixing header and gas connecti
8. aller has the option to either wall mount the boilers or mount boilers on optional frame kits available If mounting in line product on frames optional frame kit UIN 355013 must be specified in the correct quantity one frame kit for each boiler installed in cascade 3 7 INSTALLATION AREA AND DIMENSIONS Care must be taken to ensure adequate access for boiler cascade system installation and servicing A minimum of 450mm must be provided from the front of the installed boilers in cascade to facilitate boiler servicing Consideration to connecting heating flow and return pipework gas supply and condensate drainage must be given Routing of the condensate drain must be made to allow a minimum fall of 1 in 20 away from the installed boilers in cascade throughout its length Adequate room above the boilers must be provided to install and service the boiler flue system Further information with respect to flue and condensate drain connection is provided in the installation and servicing instructions provided within the boilers packaging carton 6 Keston Heat Frame amp Header Kits IMPORTANT POINTS Before commencing installation If Wall mounting Ensure wall is capable of supporting the weight of boilers to be mounted Mark drill points of header using floor mounting template e Mark height on to the wall from the floor to the top of the boiler e Ensure floor is flat and level and is of suitable load bearing capacity If Frame mounting
9. compression fittings provided 7 4 PRESSURE RELIEF VALVE CONNECTION 7 5 CONDENSATE TRAP FITTING 1 Ensure each boiler pressure relief connection is piped to a 1 Fit the condensate trap to the boiler and pipe to drain safe discharge point following the recommendations contained in the boiler Installation instructions Keston Heat Frame amp Header Kits 8 ELECTRICAL CONNECTIONS Refer to the Installer Wiring Connection section in the boiler Installation Instructions for wiring details 9 COMMISSIONING AND TESTING Electrical and gas safety checks must be carried out on completion of installation as with individual boiler commissioning Keston Heat Frame amp Header Kits 19 Keston Heating PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 44 0 1482 443005 Fax 44 0 1482 467133 www keston co uk June 2013 UIN 209785 A01 Keston pursues a policy of continuing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice
10. lers are suitable for use in a multiple boiler configuration The multiple boiler system is available as a wall or frame mounted side by side configuration with the use of the relevant frame header kits This gives opportunity to choose the optimum footprint size or wall space for a given output The table below states options available and gives the minimum number of appliances required the appropriate floor space amp the kit product number N B The kits do not include the boilers Side by side kits do not include the support frame as the boilers can be wall mounted but a frame kit is available if wall space etc does not facilitate boiler neader wall mounting Flue configuration for the appliance is C53 and C13 only see appliance manual FRAME AND HEADER KIT SYSTEM DESIGN OPTIONS Total Output Side By Side Option Side by Side Header Kit Required Kw Number Of Boilers Output Footprint Size Product No Required WxD mm Side By Side 90 j 2x45 1500x560 355014 165 o ooo ooo In line frame kit MEE 395013 Header Low Loss DN80Kit 355019 Keston Heat Frame amp Header Kits 2 2 MULTIPLE BOILER INSTALLATIONS For installing 2 to 6 boilers the product range includes water and gas headers capable of assembly using threaded socket compression and flange connections 2 3 HYDRAULIC ISOLATION MIXING HEADER HEADER KITS INCLUDE A LOW LOSS MIXING HEADER A low loss header allows flow separation within
11. ll the floor Then bolt the frame to the floor using suitable bots and fixings bolts not supplied Keston Heat Frame amp Header Kits 15 6 2 BOILER MOUNTING 1 As appropriate mount the boilers onto either the wall plates or the side by side frame kit 2 Ensure the two boiler bottom fixing brackets are screwed to the frame or wall 7 HEADER KIT ASSEMBLY 7 1 FITTING MIXING HEADER AND BLANKING FLANGES 1 Fit the mixing header and blanking flanges in the chosen positions with the bolts washers and seals supplied Note Mixing header can be located either LHS or RHS of the headers Mixing Header 8 m Blanking Flange 16 Keston Heat Frame amp Header Kits 7 2 FITTING HEADER KIT ASSEMBLY 1 Slide the header kit assembly between the frame legs but do not screw the header kit to the frame at this stage 2 Screw the header legs to the frame feet with the bolts nuts amp washers provided Tighten nuts after the flexible hoses have been fitted to the boiler Keston Heat Frame amp Header Kits 3 Fit the two flexible header connections to the boiler flow and return connections ensuring the sealing washers are fitted 17 7 3 FITTING GAS CONNECTION 1 Fit the gas isolation valve assembly supplied with the boiler to the boiler gas connection ensuring the sealing washer is fitted 2 Fit the copper gas pipe provided in the header kit to the isolating valve and the header gas connection using 22mm
12. ons can be located either on the LHS or RHS of the assembly to LH SIDE VIEW suit needs of each particular system Pistoia sec Jm Note 2 Optional frame UIN355013 one req d per boiler Header Inline DN100 KIT 45 55kW UIN355017 with five Keston 45 55 boilers mounted onto optional Single frame inline Kit UIN355013 Keston Heat Frame amp Header Kits 11 4 2 5 INSTALLATION DRAWING WITH 6 45 or 55 BOILERS SIDE BY SIDE Side by side wall or frame mounting dimensions 125 50 BETWEEN 50 BETWEEN 50 ES 50 BETWEEN BOIL i BOIL PLAN VIEW RS p 3680 1945 to top of frame 1919 to top of boiler gt gt SYSTEM FLOW DN100 FLANGE CONN d L uu uu i H W b o illi O lt 1 SYSTEM RETURN N DN100 FLANGE CONN 2 BSP Female FRONT VIEW Gas Connection Note 1 Mixing header and gas connections can be LH SIDE VIEW located either on the LHS or RHS of the assembly to suit needs of each particular system ALL DIMENSIONS ARE IN mm Note 2 Optional frame UIN355013 one req d per boiler Header Inline DN100 KIT 45 55kW UIN355018 with six Keston 45 55 boilers mounted onto optional Single frame inline Kit UIN355013 12 Keston Heat Frame amp Header Kits 5 WALL MOUNTED INSTALLATION PROCEDURE 5 1 WALL MOUNTED SIDE BY SIDE OPTION Ensure wall is capable of supporting the weight of boilers to be mounted Note boiler weights can found in the boiler Installation
13. perations Operatives should be knowledgeable in handling techniques when performing these tasks and the following precautions should be considered e Grip the boiler at the base e Be physically capable Use personal protective equipment as appropriate e g gloves safety footwear During all manoeuvres and handling actions every attempt should be made to ensure the following unless unavoidable and or the weight is light Keep back straight Avoid twisting at the waist Avoid upper body top heavy bending Always grip with the palm of the hand Use designated hand holds Keep load as close to the body as possible Always use assistance if required 3 MULTIPLE BOILER SYSTEM COMPONENTS 3 1 GENERAL The multiple boiler systems consist of the following components e Frame kit Optional only with In line kits e Boiler gas header Boiler flow and return headers supported on mounting skid Low loss mixing header e Hardware packs includes essential connection and valve components 3 2 MAIN WATER HEADERS The main water headers consist of insulated water flow insulated water return headers custom sized for all boilers It is possible to extend the system to a maximum of 6 boilers in a linear configuration Each header kit provides water flow and return headers sized either DN80 or DN100 dependent on total maximum combined heating output required Keston Heat Frame amp Header Kits 5 3 3 GAS HEADER

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書 - 低価格販売専門店  Side-by-Side Refrigerator Use & Care Guide for Dispensing and  LCD パネル TYPEⅠ  RC1400 Lecteur MP4 portable  AOE/ARES Notes - SASA North District  取扱説明書 - The Simple  Samsung Tab 3 Lite Wifi คู่มือการใช้งาน  MGS 1200 B - Meister Werkzeuge  KUDA 095660 holder    

Copyright © All rights reserved.
Failed to retrieve file