1. MO I MV MV MV MV G k i Site requirements 11 Utilities Consider the proximity to required utilities such as power water and network connections While the required utilities can be brought to nearly any selected site there is the potential for increased costs and decreased efficiency when the HP POD 240e NA is located farther from the utility sources For utility clearance information see Dimensions and required clearances on page 7 System utilities The site location must accommodate the following utilities e Water supply on page 12 Drain locations on page 13 e Power on page 13 Water supply An external source of water must be provided for saturating the evaporative media When the HP POD 240e NA begins operation the supplied water is used in conjunction with the evaporative media to provide the specified cooling The supply water must meet the following requirements 20 70 psi 138 483 kPa Between 1 C and 30 C Instant flow rate No lower than the rated flow of the fill solenoid valve 1 5 gpm maximum flow per Adiabatic unit maximum instantaneous No greater than 40 fH equal to 400 ppm of CaCO3 Type of water Demineralized is preferred Drinking potable water is acceptable and most likely IMPORTANT To connect the cooling system a 0 0127 meter 1 inch OD copper adapter is needed for water piping IMPORTANT If y
2. Regulatory or local permits Locations for the HP POD 240e NA and equipment When preparing a site plan identify where the HP POD 240e NA and equipment used to assemble it are going to be placed Discuss and plan the following items as applicable to the installation HP POD 240e NA location and order of assembly Generator and UPS units POD related switchgear Housekeeping pads for required electrical equipment Crane capacity location and reach Site plan requirements and actions 23 e General assembly equipment locations Lifting requirements A WARNING The only approved method for lifting any section of the HP POD 240e NA is the use of a spreader bar or harness Lifting any section of the HP POD 240e NA in any other way can cause damage to the HP POD 240e NA and void your warranty The harness and lifting connections must be perpendicular to the lifting blocks or connections Storage requirements If the site is not ready for assembly and operation determine a location for storage when creating the site plan A CAUTION The HP POD 240e NA must maintain 20 relative humidity to minimize condensation and oxidation within the HP POD 240e NA A CAUTION While being stored the HP POD 240e NA must be kept in a level position even if stored on a trailer Changes in ambient temperatures can cause condensation in a non operational HP POD 240e NA If the HP POD 240e NA is placed in storage or is in non operating mode for over 72 ho
3. 10 Grounding feel ees o soi pu e irt tates Ad bx dap dada e aen an D a eee ia taU n rk pb M e SNESE SEESE ESEESE n 10 5dprccqmerTc M 12 STI RRRRRRRRRREMEEEEMMMEMMEMMEMMMMMMMMMMMMMM 12 dele c O 13 senke ee iai e aosissck boldsa d s dn atta alaen en len dpa MEO PR E ER pp ER 16 Environmental control system cccccccccceseesecceecsseceeeesseeeeeeeseeeeeceseeeeseeseeeeeeseeseeescesaeeesessaseesesseaeeesenaaeeseaas 16 Connections to central facility infrastructure essssssssssssseeeeeeeeee ener ener enne nnne 16 Connection portals riore eee aee e jeans fe eben ied e pe rends 16 Demircelion ba oscesutiehi ie eeEI NISL T cuc pngyiaadSdudenandgaguiaa any Fon qeu ue 18 Fire KS 18 NL 19 Fire safety and access notifications sssssssssssse eene eene eere ener ener nennen nnns 19 Environmental ANNE se nae Rr Eon ea nerder Reni Enen S iR oi No UE duled Coque 21 See BI Me RIT T 21 WE um TE 21 Areas prone to lightning r e SUFgels LJ 21 RI Huerem e sed veg 21 Sile plan JO e and QUIS ae ebd eI DN OP DI EPUM I E ee 22 Completingia site SSS SSI TEUER ETT E TD TOI 22 HP Site Preparation Drawing Packages cncesinarsamecenneteausa ryan euer ERE S pUR Fuse UPgU IMP S SU ezrt RUBENS AP Ce FEED PRIM ESI RUE 22 Zoning and permit requirements Vard 22 Project c ordindhiOr s
4. 109F appropriate consideration must be made with respect to shock loading crane hydraulics and possible derating of the crane Areas prone to lightning or power surges The HP POD 240e NA structure and internal components are all bonded together A common grounding electrode conductor connection point is provided Proper bonding and grounding of the HP POD 240e NA minimizes the effects of a lightning strike A surge protection device is provided on the HP POD 240e NA input connection to protect the HP POD 240e NA electrical system from voltage transients If your site is in an area that is subject to frequent lightning strikes the HP POD 240e NA must be protected in accordance with NFPA 70 NA and IEC EMEA and APJ HP recommends that you contact a certified lightning protection consultant Seismic activity If your site is in an area that has frequent seismic activity HP recommends that you contact a seismic activity consultant If your site is in an area that has a high vibration level HP recommends that you contact a vibration isolation consultant You must specify the method of anchoring the HP POD 240e NA if necessary Environmental considerations 21 Site plan requirements and actions Completing a site assessment HP requires a detailed assessment before planning and preparing your site location for the HP POD 240e NA Consult with HP to schedule a site assessment A standard site assessment visit includes the following
5. Drawing Package on page 22 Site electrical system To be sure that there is a complete and safe integration of the HP POD solution within your facility HP requires that you complete the following actions for the installed electrical system before the installation of the HP POD solution e Short circuit analysis e Arc flash study e Circuit breaker coordination study These actions must be performed for all associated parts of the electrical power train The majority of the details and factors required to complete these studies are associated with the existing installed facility infrastructure A CAUTION Failure to complete these studies can cause serious issues with the electrical integration of the POD into your electrical system Electrical power system configuration A preliminary meeting with the HP POD Electrical Engineering team is necessary to discuss your decision concerning capacity limitations and the impacts of this decision on the electrical design When determining the final location of the power connections consider the following e Distance between the facility utilities and the location of the HP POD 240e NA e Distance between possible UPS or generator locations and the HP POD 240e NA e Requirements for routing electrical feeders underground or overhead The facility power connection must be installed in compliance with local electrical codes and regulations The HP reference electrical installation design is b
6. Equipment Part 1 General Requirements Issue 2007 03 27 Edition 2 UL 60950 Standard for Safety Information Technology Equipment Part 22 Equipment to be Installed Outdoors Issue 2007 04 23 Edition 1 NFPA 70 ETL Classified NFPA 70 National Electric Code 2008 Edition 2008 National Fire Protection Association NFPA 72 Designed to Comply National Fire Alarm code 2007 Edition 2006 National Fire With Protection Association NFPA 2001 Designed to Comply NFPA 2001 Standard on Clean Agent Fire Extinguishing Systems With 2008 Edition 2008 National Fire Protection Association IBC 2009 Designed to Comply 2009 International Building Code 2010 International Code With Council Inc Safety and NEC compliance The HP POD 240e NA is Listed to UL 69050 Part 1 and Part 22 as an Information Technology Product and Classified in accordance with the National Electric Code NFPA 70 The HP POD 240e NA is not habitable or suitable for human occupancy The HP POD 240e NA is Listed as a Product that provides Service Access Areas for periodic maintenance and service Access to these areas must be controlled and available for use only by owner authorized and qualified personnel who are trained in the maintenance and service of the HP POD 240e NA components For more information see HP POD 240e NA regulatory compliance on page 32 94 I IMPORTANT Before installing the HP POD 240e NA consult your local AHJ for applicab
7. a 1 Engagement plan Develop an engagement plan with specific requirements relating to the proposed installation site 2 Site visits Schedule site visits on mutually acceptable dates during normal HP business hours 3 Test equipment Document any test equipment that is required for installation or commissioning 4 Installation site Review and discuss the proposed installation site review e Physical examination of the proposed installation site e AL HP s discretion include physical measurements of the area 5 Indoor outdoor Determine if the HP POD 240e NA installation is indoors or installation outdoors 6 Site pad Inspect the proposed installation site to be sure that the customer is aware of the following requirements POD load pads are in the proper location Upon installation the POD structure must be leveled to 0 5 which can be checked at that time with a surveyor s transit Shimming is allowed at the load pads only Place shims in increments across the load pads to be sure that there is sufficient load transfer 7 Construction site Visually inspect the construction site and identify the location inspection to install the crane 8 Staging Be sure the following areas exist and are identified e Truck delivery e Staging e Waste removal 9 Clearances Inspect the proposed installation site to confirm the clearance requirements are met for installing and servicing the POD based on the HP POD 240e NA specif
8. A TUNI nero 34 Dobamen ation TOOL EE EEE EEE 37 E REE EEE EEE ENEEIER 38 Contents 4 Overview About this document This document outlines the site preparation requirements for an HP Performance Optimized Datacenter 240e NA You must provide a qualified architectural or consulting engineering team to generate site specific documents for each HP POD 240e NA installation including final site drawings Your site installation design must comply with all local and national regulations ordinances codes and the specifications listed in this document Safety and NEC compliance The HP POD 240e NA is Listed to UL 69050 Part 1 and Part 22 as an Information Technology Product and Classified in accordance with the National Electric Code NFPA 70 The HP POD 240e NA is not habitable or suitable for human occupancy The HP POD 240e NA is Listed as a Product that provides Service Access Areas for periodic maintenance and service Access to these areas must be controlled and available for use only by owner authorized and qualified personnel who are trained in the maintenance and service of the HP POD 240e NA components For more information see HP POD 240e NA regulatory compliance on page 32 4 I IMPORTANT Before installing the HP POD 240e NA consult your local AHJ for applicable regulations and to review site specific location guidelines If needed obtain any necessary permits Additional considerations for safety and NEC compliance are
9. D 240e NA is not in the direct path of any external heat loads such as generators or a building AHU Verify that the installation starting point has been identified and marked This is the location where the first HP POD 240e NA section is placed during installation Appendix B Preparing for delivery 28 Verify the average local temperatures and be sure that adequate environment protection is provided For example verify that cold weather protection is provided if necessary Verify that site altitude is less than 3 048 meters 10 000 feet When installing on an elevated surface e Verity that the maximum height requirements for the circuit breaker actuator meet the local and national electric code requirements of 200 cm 79 inch NEC 240 24 a e Verity that proper landings and catwalk are planned for electrical cabinet access Verify that the planning for the required egress includes routes for all HP POD 240e NA personnel doors cargo doors and service area doors including landings catwalk and stairs Verify that the local AHJ has been contacted all applicable codes and site specific location guidelines have been reviewed and all required permits are obtained I Verify that the site location has clearances Dimensions and required clearances on page 7 for HP POD 240e NA installation including any permanent structures such as fences walls vestibules and buildings ER re ea a identified to iainiain requir
10. HP Performance Optimized Datacenter 240e North America Adiabatic Site Preparation and Requirements Guide Abstract This guide is intended for the person who operates and maintains the HP Performance Optimized Datacenter 240e NA HP POD 240e NA Part Number 748898 001 November 2013 Edition 1 O Copyright 2013 Hewlett Packard Development Company L P The information contained herein is subject to change without notice The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services Nothing herein should be construed as constituting an additional warranty HP shall not be liable for technical or editorial errors or omissions contained herein Contents EE A A A T TREPIDUS 5 About EA 5 Safety ard NEC compliance cedo etaed ceret eese eri ier etes d eset a A e t derre arter delete 5 Siteassess MEN C 6 DHE PFE DAGON EE E E E EN A E ET 6 Site safety and SECUFIEY NR TRE see eaae redene N E E e EE S E EES E nen 6 LEE EE od RE RR pM E R A a eaii 6 eig EE 6 TE EEE H 7 ed 7 Weight see aS 7 Dimensions and required clearances sssssssssseeeeeeeee eee eene e eren r nnne eere nennen 7 Fulure expan jons irun EE 9 ere m 9 Cold disle cleelanee eco ia ROB IEEE EK RE X FEEXEEI ARE EM a FARE FURERR A RAUM GHEEEK nskebok uten
11. NEC HVAC heating ventilation and air conditioning IEC International Electrotechnical Commission Glossary 34 labeled Equipment or materials to which has been attached a label symbol or other identifying mark of an organization that is acceptable to the authority having jurisdiction and concerned with product evaluation that maintains periodic inspection of production of labeled equipment or materials and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner listed Equipment materials or services included in a list published by an organization that is acceptable to the authority having jurisdiction and concerned with evaluation of products or services that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services and whose listing states that either the equipment material or service meets appropriate designated standards potential of not more than 42 4 V DC or peak supplied by a primary battery or by an isolated secondary circuit and where the current capacity is limited by an overcurrent device such as a fuse or by the inherent capacity of the secondary transformer or power supply or a combination of a secondary winding and an impedance A circuit derived from a line voltage circuit by connecting a resistance in series with the supply circuit to limit the voltage and current is not identified as a lo
12. as follows e The HP POD 240e NA is Listed as an Information Technology Equipment Product to UL 60950 e The HP POD 240e NA is evaluated as a non inhabitable product that provides service access areas for customer authorized qualified and trained service personnel e The electrical connections of the HP POD 240e NA are evaluated as feeder connections for connection to an existing facility The electrical connections are not suitable as service entrance for connection to the utility e The HP POD 240e NA is designed for stationary installation outdoors in a Pollution Degree 3 environment in restricted access locations and with field wiring terminals provided for permanent supply connections e The HP POD 240e NA meets the ratings in the following table Rated Overvoltage Category Ill Surge protection device Class Class 2 C to 54 C 35 6 F to 129 2 F Relative humidit 0 to 100 humidity NEMA SR Overview 5 e As part of the overall certification relevant sections of the International Building Code have been applied as part of the design and evaluation The current design supports wind loads up to 90 mph Site assessment HP requires a detailed site assessment before planning and preparing your site location for the HP POD 240e NA Consult with HP to schedule a site assessment Site preparation Site preparation must be complete before the delivery of the POD for a timely installation and commissioning The si
13. ased on a maximum distance of 15 2 m 50 ft or a line of sight between the disconnect and the HP POD 240e NA You are required to discuss your decision concerning capacity limitations and the impacts of this decision on the electrical design with the POD Electrical Engineering Team A 1N electrical configuration can be achieved by providing all of the required electrical feeders from a common power source common switchboards and transformers A 2N electrical configuration can be achieved by feeding parallel power paths from independent power sources switchboards and transformers We IMPORTANT All 3 phase wye feeders for the HP POD 240e NA require that the neutrals and the equipment grounding conductors remain isolated Bonding of the two conductors is allowed at the power source only Site requirements 14 Transformers and switchboards The input power for the Critical IT Loads requires a source of 380 415V 3phase wye power If it does not already exist at the source you might have to obtain custom transformers to derive this power In addition to the overall loading and KVA size you must consider the Harmonic Content of the installation when specifying the K Factor of the transformers Alternatively you can use Harmonic Mitigating Transformers to passively cancel the harmonics generated by the IT equipment HP offers several power solutions that include automatic transfer switching UPS backup transformers and output distribution s
14. ation see Safety and Compliance Information for Server Storage Power Networking and Rack Products available at the HP website http www hp com support Safety Compliance EnterpriseProducts Turkey RoHS material content declaration T rkiye Cumhuriyeti EEE Y netmeligine Uygundur Ukraine RoHS material content declaration OonmagqHaHHa giunoBigae BHMOraM TexHiuHoro per aMeHTy MOJO OOMEXEHHA BHKOPHCTAHHA JEAKHX HeOe3rredHHX PEYOBHH B amp TEKTPHYHOMY Ta amp IeKTDOHHOMY 00 Ia IHaHHl 33TBep DKeHOT O rnocraHoBo o Ka inery Minictpis Vkpainn gia 3 rpyaus 2008 Ne 1057 Warranty information HP ProLiant and X86 Servers and Options http www hp com support ProLiantServers Warranties HP Enterprise Servers http www hp com support EnterpriseServers Warranties HP Storage Products http www hp com support Storage Warranties HP Networking Products http www hp com support Networking Warranties Regulatory compliance notices 33 Glossary AHJ authority having jurisdiction AHU air handler unit APJ Asia Pacific Japan BMS building management system door A hinged portion of an enclosure that covers an opening ECS environmental control system EMEA Europe Middle East and Africa EPO emergency power off equipment A general term including fittings devices appliances luminaries apparatus machinery and the like used as a part of or in connection with a modular data center Source
15. d and prepare a report of findings HP must identify potential obstacles to installation and make recommendations for any additional testing or changes to the installation plan Customer responsibilities km Oeipfon i 1 Point of contact Provide HP with the name and telephone number of the designated point of information contact for the purposes of this service 2 Service listing Provide all information that is required under this service listing or reasonably information determined by HP to be necessary to deliver the service including but without limitation any documentation internal or external regarding prior plans or investigations used to identify the proposed installation site 3 Timely response Provide a timely response such as in a time period that does not adversely affect the HP scheduled performance of the service to all requests for information by HP 4 Access to subject Provide HP access to all subject areas and support areas including the areas and support Proposed installation site and the mechanical or electrical infrastructure reds provided to support the HP POD 240e NA facilitate required access to all necessary areas 6 Site engineering Be sure that your site engineering personnel are familiar with the proposed personnel installation site The personnel that are responsible for the maintenance and support of the existing infrastructure must be available to answer questions 7 Documentation P
16. detection system unless specifically included in an executed SOW Capacities Each HP POD 240e NA is unique and the specific power and cooling capacities will vary for each POD that uses Adiabatic cooling For specific capacity information see your HP Performance Optimized Datacenter 240e NA Customized Supplement Overview 6 Site requirements Site pad The structural design of the HP POD 240e NA site pad must be based on the specific weight load of the complete POD solution with IT installed as well as any additional equipment During design calculations HP recommends that you provide structural support at the identified load pad locations of the HP POD 240e NA to be sure that the POD remains level When preparing the site pad be sure to adhere to the following requirements e POD load pads are in the proper location e Upon installation the POD structure must be leveled to lt 0 5 which can be checked atthat time with a surveyor s transit e Shimming is allowed at the load pads only Place shims in increments across the load pads to be sure of a sufficient load transfer a4 I IMPORTANT The HP POD 240e NA is designed for ground level installation If you install the HP POD 240e NA on an elevated surface verify that the minimum height requirements for circuit breaker actuators are considered per national regional local regulations and electrical codes The area in front of the outside panels must include a work platf
17. ed clearance Verify that there is adequate clearance around the HP POD BEN EE 240e NA for door operation installation and maintenance equipment Verify that the site location and site pads are marked for POD related infrastructure Verify that a truck and equipment staging area has been identified Verify planning for trucks for the HP POD 240e NA and other equipment Verify that locations are available and identified for all equipment that is required Verify the locations for crane ee off acs and operation during b materials and trash are identified 2 Verify that safety equipment is planned for and in place Verify the customer s interfaces of the HP POD 240e NA fire alarm security system and communications systems to site system The customer is responsible for all connections EE C UU add NE work related to them are disposed of properly 23 Verify that there is an available temporary or permanent load bank if required Verify that tie downs and other AHJ required facilities for HP POD 240e NA and power containers are completed at least one week prior to the arrival of HP provided equipment Water supply Appendix B Preparing for delivery 29 Verify that the HP POD 240e NA is not in a drainage path or flood prone area to prevent water from entering the HP POD 240e NA HP recommends setting the HP POD 240e NA on a raised site pad Adiabatic media water supply ltem Description Sign off Verify that
18. htning or power surges 21 assembly area 23 before you contact HP 31 BSMI notice 33 C capacities 6 cold aisle clearance 10 cold weather considerations 21 connection portals 16 contacting HP 31 D demarcation box 18 dimensions 7 drain location 13 electrical 13 environmental considerations 21 environmental control system ECS 16 environmental risks 21 F facility connections 16 fire and safety 19 fire box 18 fire detection 6 future expansions 9 G grounding requirements 10 H HP contact information 31 HP site preparation drawing package 22 J Japanese notice 33 L Locations for the HP POD 240e NA and equipment 23 M modifications FCC notice 33 O Other structures 24 overview 5 P power 13 pre delivery 28 preparing for assembly 28 project coordination 22 R regulatory compliance identification numbers 33 regulatory compliance notices 32 33 regulatory compliance HP POD 240e NA 32 S safety and NEC compliance 5 safety considerations 33 safety information 33 seismic activity 21 site assessment 22 25 site planning considerations 23 site preparation 6 site readiness checklist 28 site requirements 7 22 site safety and security 6 supported facility connections 16 Index 38 T Turkey RoHS material content declaration 33 U Ukraine RoHS material content declaration 33 utilities 12 utilities requirements 12 utilities system 12 W warranty 33 wate
19. ications Consider future planning for the space around the installation site 10 Support Evaluate the HP POD 240e NA installation site in relation to infrastructure the existing and planned support infrastructure location location Appendix A HP site assessment 25 es becis ree N A ii 11 Support Physically evaluate the delivery path that is required with the infrastructure for customer s site engineering personnel to identify any access requirements obstacles that might be encountered during the site visit 12 Site engineering Review and document the following items with the site review engineering personnel Delivery Staging Installation Utilities Commissioning requirements 13 Capacity of Review the electrical requirements of the HP POD 240e NA electrical with the customer and the customer s site engineering infrastructure personnel HP is not responsible for customer site infrastructure unless it is stated in the SOW 14 Adiabatic Determine pressure temperature instantaneous flow rate media water type and source of the proposed media water Be sure the site parameters are within or will be within specifications before installation 15 Access control Review site access and security procedures with the customer s site engineering personnel Be sure sufficient access is available to HP s installation team 16 Following the HP installation site visit analyze the data that is Recommendations collecte
20. its design approval inspections and so on Installation prerequisites Before installing the HP POD 240e NA verify that the following prerequisites are met e All components are delivered to the facility e The HP POD 240e NA and power distribution components are in the final location e Facility power water and drainage are at the final location e Provisions for properly grounding the HP POD 240e NA are made e Required clearances exist including overhead e All trade personnel required for assembly are coordinated HP POD 240e NA site readiness checklist Before installing the HP POD 240e NA follow all steps listed in this guide the site plan and the following checklists Architectural environmental considerations Be sure that the following installation requirements are met and understood by the customer POD load pads are in the proper location Upon installation the POD structure must be leveled to lt 0 5 which can be checked at that time with a surveyor s transit Shimming is only allowed at the load pads Place shims in increments across the load pads to be sure that there is sufficient load transfer 2 Verify that the installation pad is capable of supporting the total POD solutions weight 3 Verify that the HP POD 240e NA site has provisions for grounding or a grounding system 4 Verify that the site pad is physically marked with the locations of all HP POD 240e NA load pads 6 Verify that the HP PO
21. ity programs are properly administered Site plan requirements and actions 22 Interface directly with the HP installation project manager to be sure clear lines of communication exist during the installation and commissioning processes Site planning A comprehensive site plan assists with the site design MEP and helps you to be sure that you use the best possible HP POD 240e NA installation process When creating a site plan consider the following information e HP POD 240e NA site requirements detailed in this document Site requirements on page 7 e HP POD 240e NA site preparation drawing package HP Site Preparation Drawing Package on page 22 e HP POD 240e NA readiness checklist HP POD 240e NA site readiness checklist on page 28 e HP POD 240e NA installation Installation equipment staging on page 23 The HP team can assist you by answering questions and by helping to guide you throughout the process Installation HP POD 240e NA installation includes the following Installation equipment staging on page 23 Locations for the HP POD 240e NA and equipment on page 23 HP POD 240e NA lifting requirements Lifting requirements on page 24 HP POD 240e NA storage requirements Storage requirements on page 24 Other structures on page 24 Installation equipment staging Staging for the following items must be identified and considered Truck and component staging Installation equipment staging Site traffic
22. le regulations and to review site specific location guidelines If needed obtain any necessary permits Additional considerations for safety and NEC compliance are as follows e The HP POD 240e NA is Listed as an Information Technology Equipment Product to UL 60950 e The HP POD 240e NA is evaluated as a non inhabitable product that provides service access areas for customer authorized qualified and trained service personnel e The electrical connections of the HP POD 240e NA are evaluated as feeder connections for connection to an existing facility The electrical connections are not suitable as service entrance for connection to the utility Regulatory compliance notices 32 The HP POD 240e NA is designed for stationary installation outdoors in a Pollution Degree 3 environment in restricted access locations and with field wiring terminals provided for permanent supply connections e The HP POD 240e NA meets the ratings in the following table Ram eum O Category Rated Overvoltage Category Ill Protection Surge protection device Class Class Ambient temperature 2 C to 54 C 35 6 F to 129 2 F Relative humidity 0 to 100 humidity e As part of the overall certification relevant sections of the International Building Code have been applied as part of the design and evaluation The current design supports wind loads up to 90 mph Safety and regulatory compliance For safety environmental and regulatory inform
23. ligent Provisioning User Guide on the HP website http www hp com go ilo docs Onboard Administrator SHOW ALL report for HP BladeSystem products only For more information on obtaining the Onboard Administrator SHOW ALL report see the HP website http www hp com go OAlog Technical support registration number if applicable Product serial number Product model name and number Product identification number Applicable error messages Add on boards or hardware Third party hardware or software Operating system type and revision level HP contact information For United States and worldwide contact information see the Contact HP website http www hp com go assistance In the United States To contact HP by phone call 1 800 334 5144 For continuous quality improvement calls may be recorded or monitored If you have purchased a Care Pack service upgrade see the Support amp Drivers website http www8 hp com us en support drivers html If the problem cannot be resolved at the website call 1 800 633 3600 For more information about Care Packs see the HP website http pro ag sama houston hp com services cache 10950 0 0 225 121 html Contacting HP 31 Regulatory compliance notices HP POD 240e NA regulatory compliance The HP POD 240e NA complies with the following regulatory standards Certification level Standard title UL 60950 ETL Listed e UL 60950 Standard for Safety Information Technology
24. nnections HP can make these connections when specifically contracted to deliver these services and a SOW has been drafted reviewed and signed for delivery services You must provide an independent connection for each system listed in the following table Alarm Description Smoke is detected in the HP POD 240e NA A door of the POD has been opened EPO The EPO system is activated by manually pressing the EPO button or by a thermal event and the HP POD 240e NA is shut down Supported facility connections 19 The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP Performance Optimized Datacenter 240e NA Site Drawing Package Supported facility connections 20 Environmental considerations Environmental risks e Avoid placing the HP POD 240e NA directly along a drainage path or in an area prone to flooding e Verify that the HP POD 240e NA is properly grounded in accordance with NFPA 70 and local and regional regulations IEC for EMEA and APJ Cold weather The HP POD 240e NA requires a water supply and several water drains Extreme cold weather might cause damage to the supply and drain lines Evaluate the following for additional cold weather protection e Regional location of HP POD 240e NA e Exposure of supply and drain lines to extreme cold temperature Extreme cold weather can affect crane and lifting operations When temperatures drop below 12 22 C
25. nt from all grounding surfaces Failure to do so results in an ineffective ground Site requirements 10 The following is a list of component requirements for grounding and bonding e Grounding of the HP POD 240e NA must comply with the requirements of Article 250 of the NEC NFPA 70 2011 NA JPN and with local and regional regulations IEC for EMEA and AP e Bonding of the piping systems and any exposed structural steel installed to support the HP POD 240e NA must be in accordance with NEC NA and with local and regional regulations IEC for EMEA and APJ Grounding electrode The grounding electrode conductor connection bus pad is located on the outside of conductor pad the HP POD 240e NA on the cold aisle adjacent to the power cabinet The grounding pad must be connected to the grounding electrode system or building steel in accordance with Article 250 of the NEC or equivalent regional regulations Grounding lugs cannot be attached to any painted surface Grounding lugs must be compression type 2 hole lugs and UL listed specifically for grounding IMPORTANT Before installing the HP POD 240e NA consult your local AHJ for applicable regulations and to review site specific location guidelines If needed obtain any necessary permits The grounding electrode conductor connections are located on IT sections A and B of the HP POD 240e NA The following figure shows the location for both of the IT sections Side view shown
26. orm Weight requirements We IMPORTANT The provided weights are estimates of the minimum and maximum weights The total weight of the HP POD 240e NA is based on the IT equipment and optional components that are purchased and installed on the POD and might vary The HP POD 240e NA must be installed on a surface that is capable of supporting the following weights e HP POD 240e NA with 12 AHUs approximately 66 859 kg 147 400 Ib e HP POD 240e NA with 12 AHUs and IT equipment installed maximum 138 309 kg 304 920 Ib Dimensions and required clearances The selected site for the HP POD 240e NA must be large enough to install service maintain and potentially upgrade the unit and the payload The following two examples show site clearance considerations e Ifthe HP POD 240e NA is to be installed in a warehouse be sure that the warehouse doors are large enough to accommodate each section of the HP POD 240e NA e Ifthe HP POD 240e NA is to be installed outdoors be sure that adequate clearance exists for all buildings utility lines or other site structures such as gates and headers Site requirements 7 Every site must have sufficient clearance for assembly maintenance and service including such handling devices as a forklift scissor lift boom lift or crane Be sure to provide adequate space around the HP POD 240e NA for airflow and cooling purposes IMPORTANT Shaded areas indicate required clearances Top view clearances
27. our water is out of range of these requirements consult a water quality expert In addition to the previous requirements follow these guidelines e Do not treat the water with softeners Softeners might produce foam which affects the operation of the unit Site requirements 12 e Do not use well water industrial water water from cooling circuits or water contaminated by any chemicals or bacteria e Do not add disinfectants or anticorrosive compounds to the water which are potential irritants e HP highly recommends installing a filter to be sure that water is free of particles Drain locations The following figure shows the drain locations on the HP POD 240e NA Side view shown 1111 11401441 eee ee i Callout Component Description Quantity per Total quantity side per HP POD 240e NA Pls pe 5 o 0 drain adiabatic media drip tray E E NN 240e NA Y IMPORTANT Consult with your AHJ to determine the appropriate drainage system routing Power Site requirements 13 4 I IMPORTANT To provide power to the HP POD 240e NA external transformers and switchboards might be required This equipment must be designed and installed to adhere with local state and national codes and installed by contractors with licensing required by the local jurisdiction city township and state For all site preparation drawings see the HP Site Preparation
28. part number AS993A For more information about racks and network cabling see the HP Performance Optimized Datacenter Networking Guide Cold aisle clearance The maximum protrusion of any installed IT component directly impacts the available cold aisle clearance for removal and replacement of other IT components Maximum component depth must follow the clear aisle distance calculations The following figure shows how to calculate this distance 100 33cm 39 5 The maximum rack face to cold aisle wall distance is 39 5 inches In the figure X represents any protrusion into the cold aisle starting from the rack face of the installed IT component for example the bezel Y represents cold aisle clearance The cold aisle clearance dictates the maximum depth D of any installed IT component To find the maximum cold aisle clearance calculate 100 33 cm 39 5 in X Y I IMPORTANT As the value for X increases the value for Y decreases which also decreases the maximum depth allowed for an installed component Grounding requirements The HP POD 240e NA structure and internal components are all bonded together A common grounding electrode conductor connection point is provided on the utility end of the IT sections A WARNING To avoid the risk of personal injury or electric shock the HP POD 240e NA must be properly grounded earthed in accordance with national regional and local regulations A CAUTION Remove pai
29. pesus tesne eaS e aena de EN SEEE EEE A E EE S SEERE 22 STEG le aa EEE E E EN EE E 23 Installatie Nieren ise S T DO 23 Appendix Ar HP elie S T Gen 25 HP POD 2408 NA site assessment eee DM QEAATRE CI EUH UIS an DO os NIS EUN 25 App ndix B Preparing ba aci oe ee 28 Prexdelivery fe AS 28 Contents 3 Installation prerequisites ccccccsssscccsesscceccessseeseeseseesecseseeeceessaeescesseesesseseesecseaeeseeeeseesesseseeseseesaees 28 HP POD 240e NA site readiness checklist eene ener ene 28 dee s cand RENEE me EE SEERE EEE EE ENE ee cre ee rer 31 Before you contact HP un t dete Rei ee E bldene REL Ee dede EVE add esca bd pene d e eade pv ERR OS 31 HP contactintormaliorn 52 ita ctore eec dee e te rea d do dae De SR E IVA vt Ra NE CE ud av Ae E edad en Ebo 31 Regulatory compliance ME co eraat ttes ener tore tes tema tos ctt MR PHHNREHRDHHERE MD UH EM PH ABE HEP MM NEE 32 HP POD 240e NA regulatory Compliance snus coii sinet tr rto tih p E Er R ERREUR Marne rEb a REFERRE Era RET FERE LER EE CREE EG RKR Rn 32 Safety and NEC compliance eene nnne nennen nennen nennen ener ene 32 Safety arid regulatory compliGlice iie e iiie Eve rrr ker HERR AREA pr EFE RERER EA IE ELE akk EE FRE EFRR REX XDE ER Maria 33 Turkey RoHS material content declaration nennen nennen ener enne nne 33 Ukraine RoHS material content declaration sssssssseee eee 33 Warranty information REEEEEEMEEEEEEEMMMMMMMMMMMMM 33 ET NE AA PAA VAATA A ATAA PAAA
30. r supply 12 weight requirements 7 Z zoning and permit requirements 22 Index 39
31. rovide HP with copies of all available mechanical and electrical system design documentation including as built drawings and electrical single line drawings As appropriate to the specific location provide HP with campus maps building drawings floor plans and other relevant prints to assist in the documentation and evaluation of the proposed installation site Appendix A HP site assessment 26 tem Description 0 8 Network Provide HP information regarding the planned network infrastructure infrastructure connection points and pathways information 9 Permission for Grant HP permission to take photographs or supply photographs to HP for photographs report illustration purposes 10 Project logistics Arrange site specific project logistics at the time of scheduling Failure to provide necessary authorizations can limit the effectiveness of the service and can at the discretion of HP impact scheduling or result in the postponement of the service 11 Business visas Provide assistance in instances where a temporary business visa is required for HP personnel to visit the site This assistance typically takes the form of preparing a letter of invitation In some cases a formal request must be made by the local company for which the work is taking place if applicable Appendix A HP site assessment 27 Appendix B Preparing for delivery Pre delivery tasks Allow adequate time for planning scheduling obtaining perm
32. shown es 1643 m 53 10 3 4 m 136m 51 2 1 04m 3 5 8 53m 28 End view clearances shown 953 m 3 3 6 82 m 22 41 2 4 02m 13 2 1 4 6 46m 27 2 1 4 Site requirements 8 Side view clearances shown 1 58 m 5 21 4 1219 m 40 exea su ipt ec on t t s 2s e e t op e s TI 6 82 m 22 41 2 For additional dimensions see the HP Site Preparation Drawing Package on page 22 Future expansions When selecting a site location consider future space and accessibility requirements Adequate space around the HP POD 240e NA is necessary for airflow and cooling purposes Keep the specified areas clear For specific space requirements see the HP POD 240e NA dimensions and required clearances Racks The standard HP installed rack is a 50U rack The HP POD 240e NA has 22 IT racks per IT section for a total of 44 IT racks During maintenance if you remove filler panels for maintenance purposes you must replace them Cold aisle to hotaisle separation must be maintained Site requirements 9 A CAUTION If any racks contain empty RU space use the HP POD 240e NA filler panels to maintain the efficiency of the HP POD 240e NA thermal system Filler panels are available from HP in 10 pack quantities part number AQ682A and 100 pack quantities
33. tasks e Selecting an appropriate site for the HP POD 240e NA Assessing the proposed site for o o o o o Measurements for clearances Infrastructure for the final solution Access to utilities Site pad Installation considerations including locations for delivery trucks large installation equipment such as cranes and storage Electrical infrastructure Facility network and access control systems e Developing an engagement plan and verifying your contacts e Discussing future development and growth plans For a complete site assessment checklist see Appendix A HP site assessment on page 25 HP Site Preparation Drawing Package After receiving a signed purchase agreement HP provides detailed engineering drawings These drawings contain information to assist you and your MEP team to prepare the site for POD installation If there are areas of special interest HP can work directly with your MEP team to provide additional assistance Zoning and permit requirements You are responsible for compliance of the overall installation in accordance with all local and national regulations ordinances codes and the product specifications Project coordination Your Project Manager must perform the following tasks e Coordinate with all trades before installation to be sure that trade conflicts are resolved e Coordinate the installation and integration of all systems e Be sure that the site safety and secur
34. te must meet all pad and power requirements Site safety and security Your site must have its own standard safety and security requirements HP Program Managers will work with you to verify adherence to the appropriate precautions HP is not responsible for determining or enforcing safety or security requirements You must conduct all health and safety evaluations of the HP POD 240e NA HP is available to help you be sure that you have successfully conducted these evaluations Fire detection The fire detection system is supplied as a component of the HP POD 240e NA and is Manufacturer Designed specifically for this HP product in compliance with national standards HP does not certify that the fire detection system that is installed in the HP POD 240e NA meets all local and jurisdictional requirements The customer is responsible for the following actions e Verifying that the POD fire detection system meets local codes including specific local requirements for initial and periodic inspections e Arranging for and receiving all required local permits including initial commissioning as well as standard and repair maintenance e General maintenance of the fire detection system must be completed by an authorized technician For more information see the HP Performance Optimized Datacenter 240e NA Maintenance and Service guide Any additional local requirements are not covered as part of the installation and deployment services of the fire
35. the HP POD 240e NA are made through the demarcation box e ECS communication e Access control communication e Phone End view shown You must make the connections between the facility and the HP POD 240e NA For configuration and installation instructions consult with HP Fire box The communication connections between the site fire system and the HP POD 240e NA are made through the fire box Supported facility connections 18 Front view shown You must make the connections between the facility and the HP POD 240e NA For configuration and installation instructions consult with HP Access control The HP POD 240e NA is equipped with standard key lock hardware for each personnel entry door and external electrical cabinet Each personnel entry door includes a door access contact that can be connected to your facility access control system Additional options for controlled access include the following e Electronic card reader 12digit access control code keypad e Magnetic lock on each personnel access door and dynamic hot aisle door Fire safety and access notifications Dry contacts are provided to allow the connection between the HP POD 240e NA and your facility If the HP POD 240e NA is connected to your facility systems then the alarm conditions of the HP POD 240e NA can be detected by the facility systems It is your responsibility to facilitate these co
36. the water pressure is between 20 70 psi 138 483 kPa and that water temperature is between 1 C to 30 C 34 F to 86 F Verify that the water instant flow rate is no lower than the rated flow of the fill solenoid valve 1 5 gpm maximum flow per adiabatic unit maximum instantaneous 4 Verify that demineralized water preferred or drinking potable water is used Verify that the following requirements are complete e Short circuit analysis e Arc flash study e Circuit breaker coordination studies Verify that the power installation work is completed according to the approved conduit routing drawings that show the exact routes plan view sections and elevations construction is planned and available A Verify adequate site power on page 13 per HP POD 240e a NA requirements 1 Verify the utility connection including the main utility transformers and metering equipment 2 Verify the third party commissioning services that might be required by the owner Verify that the HP Project Team activities are coordinated with other site construction activities Appendix B Preparing for delivery 30 Contacting HP Before you contact HP Be sure to have the following information available before you call HP Active Health System log HP ProLiant Gen8 or later products Download and have available an Active Health System log for 3 days before the failure was detected For more information see the HP iLO 4 User Guide or HP Intel
37. ty to facilitate these connections HP can make these connections when specifically contracted to deliver these services and a SOW has been drafted reviewed and signed for delivery services Available POD connections include the following e HP POD 240e NA Environmental Control System o Operational status o Power consumption o Environmental status e Life safety systems o EPO o Fire detection e Site communication o Phone o Access control e Networking IT connections Connection portals The networking and connection portals are located on both ends of the HP POD 240e NA Each IT section has eight portals located on the cargo end of the POD and each of the differently sized portals are used for different connections Supported facility connections 16 End view shown Connedion portal Connection point Quantity per IT Total quantity per diameter m o oo HP peo 240e NA 7 62 cm 3 7 62 cm 3 inch 7 62 cm 3 inch Networking connection for all IT 3 81 cm 1 5 inch Communication connection for ECS EPO Fire alarm Phone On the front end of the POD there are seven 7 62 cm 3 inch portals that you can use for data connections End view shown Supported facility connections 17 IMPORTANT The connection portal location and configuration might look different depending on the HP POD 240e NA model Demarcation box The following communication connections between your facility and
38. urs HP recommends using one of the following methods to minimize condensation and oxidation within the HP POD 240e NA e Desiccant unit Desiccant material e Heater with a fan Air conditioner with a heater strip Consult with HP Services to determine the most effective method Other structures If you provide a vestibule or other structure that will be installed at the HP POD 240e NA site you must maintain the following specifications e Flashing must be installed on the exterior of the HP POD 240e NA in the location where the other structure will be attached to protect the HP POD 240e NA and be sure that there is a waterproof barrier e Access catwalks and landings might be required to maintain the required egress from the HP POD 240e NA HVAC service area Access catwalks and landings might be required to maintain the required access to the HP POD 240e NA electrical panels Site plan requirements and actions 24 Appendix A HP site assessment HP POD 240e NA site assessment checklist During a survey of the readiness of a proposed customer site for the HP POD 240e NA the site is inspected for the following Accessibility of machinery for the transportation and installation of the HP POD 240e NA e Assessment of the suitability of the site infrastructure for installing the HP POD 240e NA and for supporting infrastructure preparation and serviceability requirements HP responsibilities m ems OOOO Tee
39. w voltage limited energy circuit or has been tested and found suitable for a specified purpose The means for identifying listed equipment might vary for each organization concerned with product evaluation some of which do not recognize equipment as listed unless it is also labeled Use of the system employed by the listing organization allows the authority having jurisdiction to identify a listed product MEP mechanical electrical and plumbing NA North American overcurrent protection A device designed to open a circuit when the current through it exceeds a predetermined value The ampere rating of the device is selected for a circuit to terminate a condition where the current exceeds the rating of conductors and equipment due to overloads short circuits and faults to ground PPE personal protective equipment SOW statement of work structure Enclosure of sufficient size to enable entry of personnel UL Underwriters Laboratory Glossary 35 UPS uninterruptible power system VESDA very early smoke detection apparatus Glossary 36 Documentation feedback HP is committed to providing documentation that meets your needs To help us improve the documentation send any errors suggestions or comments to Documentation Feedback mailto docsfeedbackGhp com Include the document title and part number version number or the URL when submitting your feedback Index 37 Index A areas prone to lig
40. witchboards to supply your power needs On site connections might include e Main facility power to the primary side of the transformer e Transformer to the switchboard e Switchboard assembly to the HP POD 240e NA For connection information see the HP Site Preparation Drawing Package on page 22 Site requirements 15 Supported facility connections Environmental control system The ECS developed for the HP EcoPOD is a stand alone control system that requires no external connections with an external site system BMS public or private Internet sites cloud or wireless system to properly control the POD operation The ECS includes Modbus TCP IP connections through which a variety of data can be retrieved These capabilities enable you to connect at your expense with the stand alone ECS system to monitor the operating parameters of the POD It is your responsibility or your representative s or agent s responsibility to integrate this communication capability into any existing BMS or monitoring system A CAUTION To be sure that alarm conditions can be identified and resolved HP recommends that you remotely monitor all alarm conditions Failure to monitor the alarm conditions can cause delays in appropriate action during an alarm condition Connections to central facility infrastructure The HP POD 240e NA is designed to function as a standalone unit and provides various connection points to your facility It is your responsibili
Download Pdf Manuals
Related Search
Related Contents
Echostar 21 User's Manual AX302304 AX402306 / AX412306 AX71230 FR BaByliss ST225E hair straightener ム右側面 ム 左側面 ー本機は公道を走行する場合には` 旋回体を別送し NOM SYNOPSIS DESCRIPTION OPTIONS Samsung SF-350 Plain Paper Inkjet Fax Mad Catz Xbox 360 MC2 MicroCon Aplicación de la computación al cálculo de las propiedades Comfort I Bedienungsanleitung - Migros Copyright © All rights reserved.