1. Following the HP installation site visit analyze the data that is EE collected and prepare a report of findings HP must identify potential obstacles to installation and make recommendations for any additional testing or changes to the installation plan Customer responsibilities fom foer feil 1 Point of contact Provide HP with the name and telephone number of the designated point of information contact for the purposes of this service 2 Service listing Provide all information that is required under this service listing or reasonably information determined by HP to be necessary to deliver the service including but without limitation any documentation internal or external regarding prior plans or investigations used to identify the proposed installation site 3 Timely response Provide a timely response such as in a time period that does not adversely affect the HP scheduled performance of the service to all requests for information by HP 4 Access to subject Provide HP access to all subject areas and support areas including the areas and support proposed installation site and the mechanical or electrical infrastructure areas provided to support the HP POD 20c 5 Badge access Provide HP badge access or an escort for the duration of the site visit to facilitate required access to all necessary areas 6 Site engineering Customer site engineering personnel familiar with the proposed installation site per
2. Allow adequate time for planning scheduling obtaining permits design approval inspections and so on Installation prerequisites Before installing the HP POD 20c verify that the following prerequisites are met e All components are delivered to the facility e The HP POD 20c and power distribution components are in the final location e Facility power water and drainage are at the final location e Provisions for properly grounding the HP POD 20c are made e Required clearances exist including overhead e All trade personnel required for assembly are coordinated HP POD 20c site readiness checklist Before installing the HP POD 20c follow all steps listed in this guide the site plan and the following checklists Architectural environmental considerations Verify that the site location supplies sufficient locations for support Ensure that upon installation the POD can be leveled to less than or equal to 0 5 If edge or point loading is used ensure a center support can be accomplished using shims and so on to ensure that the POD can be properly leveled Shimming is around the perimeter in increments Use a surveyor s transit upon installation to check the POD leveling requirements Verity that the pad can support the total weight of the HP POD 20c solution by verifying that load calculations have been performed by your engineering team Ver et te so fee poner organda ooon UU Verify the HP POD 20c is not in the direc
3. HP Enterprise Servers http www hp com support EnterpriseServers Warranties HP Storage Products http www hp com support Storage Warranties HP Networking Products http www hp com support Networking Warranties Appendix C Regulatory compliance notices 33 Glossary APJ Asia Pacific Japan BMS building management system door A hinged portion of an enclosure that covers an opening ECS environmental control system EMEA Europe Middle East and Africa EPO emergency power off equipment A general term including fittings devices appliances luminaires apparatus machinery and the like used as a part of or in connection with a modular data center Source NEC IEC International Electrotechnical Commission ISO International Organization for Standardization labeled Equipment or materials to which has been attached a label symbol or other identifying mark of an organization that is acceptable to the authority having jurisdiction and concerned with product evaluation that maintains periodic inspection of production of labeled equipment or materials and by whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner listed Equipment materials or services included in a list published by an organization that is acceptable to the authority having jurisdiction and concerned with evaluation of products or services that maintains p
4. Before installing the HP POD 20c consult your local Authorities for applicable regulations and to review site specific location guidelines If needed obtain any necessary permits Additional considerations for safety and Electrical compliance are as follows e The HP POD 20c is Certified as an Information Technology Product to IEC EN 60950 Part 1 and Part 22 e The HP POD 20c is evaluated as a non inhabitable product that provides service access areas for customer authorized qualified and trained service personnel e The electrical connections of the HP POD 20c are evaluated as feeder connections for connection to an existing facility and are not suitable as service entrance for connection to the utility e The HP POD 20c is designed for stationary installation outdoors in a Pollution Degree 3 environment in restricted access locations with field wiring terminals provided for permanent supply connections e The HP POD 20c meets the following ratings ere speien Rated Overvoltage Category Ill Surge protection device Overview 5 Site Site Site Fire Feature Spedfication T 2 C to 54 C 35 6 F to 129 2 F Relative humidit O to 100 humidity e As part of the overall certification relevant sections of the International Building Code have been applied as part of the design and evaluation The current design supports wind loads up to 144 84 kph 90 mph assessment HP requires a detaile
5. Means of delivery connections and pathways are documented 12 Capacity of Based on the review of customer provided site electrical documentation such as single line and as built drawings infrastructure examine equipment panels and monitoring system data as available HP must determine whether adequate capacity exists in the current electrical infrastructure to be used or if additional study is required Determine if the level of redundancy that is required as stated by the site engineering personnel can be provided by using the existing infrastructure This takes into consideration the proposed installation site of the HP POD 20c the potential HP POD 20c payload and the customer stated redundancy requirement Components can include generators UPSs and switch gear 13 Chilled water Determine the overall chilled water capacity available flow infrastructure rates and supply return temperature restrictions Determine if any site specific requirements mandate additional chilled water equipment such as heat exchangers or mixing apparatus Locate any existing or planned supply return headers 14 Access control Conduct interviews with the customer site engineering personnel to determine the level of access control that is required for the HP POD 20c and its infrastructure The proposed installation site is assessed for suitability in relation to the customer requirements Appendix A HP site assessment 27 fee spn rene ra
6. POD 20c must be in accordance with IEC 364 and any applicable national regional and local regulations Earthing grounding The earthing grounding electrode conductor connection bus pad is located on the electrode conductor outside of the HP POD 20c on the hot aisle side of the utility end of the POD and pad below the transformer cabinet The earthing grounding pad must be connected to the grounding electrode system or building steel in accordance with IEC 364 or equivalent regulation Grounding lugs Grounding lugs cannot be attached to any painted surface Grounding lugs must be compression type 2 hole lugs and UL listed specifically for grounding Earthing grounding The customer must provide an effective earthing grounding system with a ground rod rod system or ground or a ground well well iy IMPORTANT Before installing the HP POD 20c consult your local Authorities for applicable regulations and to review site specific location guidelines If needed obtain any necessary permits The following figure shows the earthing grounding electrode conductor connection that is located on the cold aisle of the HP POD 20c Site requirements 11 Front view shown Utilities Consider the proximity to required utilities such as power water and network connections While the required utilities can be brought to nearly any selected site there is the potential for increased costs and decreased efficiency when th
7. document outlines the site and preparation requirements for a 6 m 20 ft HP POD 20c as it is being released internationally The customer must provide a qualified architectural or consulting engineering team to generate site specific documents for each HP POD 20c installation including final site drawings The customer site installation design must comply with all national regional and local regulations ordinances codes and the specifications that are listed in this document This guide is part of the core documentation for the HP POD 20c The actual location of various components or included subsystems and their operation in your HP POD 20c might vary from what is described in this document For information specific to your HP POD 20c see the drawings that are included in the Operations and Maintenance Manual for the HP Performance Optimized Datacenter 20c or contact HP Safety and IEC compliance The HP POD 20c is examined tested and found to be in compliance with IEC EN 60950 Part 1 and Part 22 as an Information Technology Product For more information see HP POD 20c regulatory compliance on page 32 The HP POD 20c is not suitable for long term human occupancy The HP POD 20c is Listed as a Product that provides service access areas for periodic maintenance and service These areas must be used only by owner authorized and qualified personnel who are trained in the maintenance and service of the HP POD 20c components We IMPORTANT
8. notice 33 O other objects 25 overview 5 P permit requirements 22 piping materials 14 power infrastructure installation 14 power surges 21 pre delivery 29 preparing for assembly 29 project coordination 22 R regulatory compliance identification numbers 33 regulatory compliance notices 33 regulatory compliance HP POD 20c 5 32 S safety information 6 33 security 6 18 seismic activity 21 site assessment 6 22 26 site assessment checklist 26 site pad 8 Index 37 site planning considerations 23 site preparation 6 site preparation checklist 29 site requirements 8 22 storage locations 24 supported facility connections 16 system capacity 7 U utilities 12 V vestibule specifications 25 W warranty information 33 water supply 12 weight 8 Z zoning and permit requirements 22 Index 38
9. parallel power paths from independent power sources switchboards and transformers iy IMPORTANT The required neutral must be provided as part of the 380 415VAC Y direct connection to the HP POD 20c 2 IMPORTANT All 3 Phase Wye feeders for the HP POD 20c require that the neutrals and the equipment grounding conductors remain isolated Bonding of the two conductors is allowed at the power source only Site requirements 15 Supported facility connections Environmental control system The ECS developed for the HP water cooled POD is a stand alone control system that requires no external connections with an external site system BMS public or private Internet sites cloud or wireless system to properly control the POD operation The ECS includes Modbus TCP IP connections through which a variety of data can be retrieved These capabilities enable you to connect at your expense with the stand alone ECS system to monitor the operating parameters of the POD It is your responsibility or your representative s or agent s responsibility to integrate this communication capability into any existing BMS or monitoring system Z CAUTION To ensure that alarm conditions can be identified and resolved HP recommends that you remotely monitor all alarm conditions Failure to monitor the alarm conditions can cause delays in appropriate action during an alarm condition Additional POD connections The HP POD 20c provides various connection poi
10. temperatures Extreme cold weather can affect crane and lifting operations When temperatures drop below 12 2 C 10 F appropriate consideration must be made with respect to shock loading crane hydraulics and possible de rating of the crane Areas prone to lightning or power surges The HP POD 20c structure and internal components are all bonded together A common Grounding Electrode Conductor Connection point is provided Proper bonding and grounding of the HP POD 20c minimizes the effects of a lightning strike A surge protection device is provided on the HP POD 20c input connection to protect the HP POD 20c electrical system from voltage transients If your site is in an area that is subject to frequent lightning strikes the HP POD 20c must be protected in accordance with NFPA 70 NA and IEC EMEA and APJ HP recommends that you contact a certified lightning protection consultant Seismic activity If your site is in an area that has frequent seismic activity HP recommends that you contact a seismic activity consultant If your site is in an area that has high vibration level HP recommends that you contact a vibration isolation consultant You must specify the method of anchoring the HP POD 20c if necessary Environmental considerations 21 Site plan requirements and actions Completing a site assessment HP requires a detailed site assessment prior to planning and preparing the customer site location for the HP POD 20c Consu
11. 6 70m 22 Top view for multiple POD installation minimum clearances shown 1 52 m 60 Adequate space around the HP POD 20c is necessary for minimum door clearance These minimum clearances provide room for door opening only Consider additional space as necessary for your site Future expansions When selecting a site location consider future space and accessibility requirements Adequate space around the HP POD 20c is necessary for locating additional equipment within close proximity such as generators and UPS devices When installing additional equipment within close proximity to the HP POD 20c consult with HP for site locations For specific space requirements see Dimensions and clearances on page 8 Site requirements 10 Grounding requirements The HP POD 20c structure and internal components are all bonded together A common grounding electrode conductor connection point is provided on the utility end cold aisle Z WARNING To avoid the risk of personal injury or electric shock the HP POD 20c must be properly grounded earthed in accordance with national regional and local regulations The following is a list of component requirements for grounding and bonding e Grounding of the HP POD 20c must comply with the requirements of IEC 364 and any applicable national regional and local regulations e Bonding of the piping systems and any exposed structural steel installed to support the HP
12. HP Performance Optimized Datacenter 20c Site Preparation and Requirements Guide International Abstract This document provides site preparation guidance and requirements for the HP Performance Optimized Datacenter 20c HP POD 20c Part Number 703547 001 March 2013 Edition 1 Copyright 2013 Hewlett Packard Development Company L P The information contained herein is subject to change without notice The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services Nothing herein should be construed as constituting an additional warranty HP shall not be liable for technical or editorial errors or omissions contained herein Contents EE ENE EEE 5 About thisdocUmeNnt EN Sa 5 Safety and IEC compliance ccccccsccccsssccssssecsseeceseeeceneseceseeeeeeeeseneseseseeceeeeceeeesseeeeseeesesesecsseecesaeeseaeeseaeeeesaes 5 NESSET 6 NE PENN 6 Site safety and security cccccceccccesscecsseceeseeeceseeecsseeeeseeeeeeeeceseeessseeseseeeceseeessseeesseeecsseseseseeesseescsseeesssesesseeeesaas 6 Fire detection and suppression ccscccsessceesssecesececsseeeeeeeceseeeeeseeceseeeseseeeseeeceeeecseeesseeeessesecssecesseeeseteseseees 6 GT DJ RE EEE T ET RE EN 7 HP POD 206 capacity limitations aasjasvevd242drer ee 7 Electrical power capacities critical IT power cccceccccccssscecssecessececsseceseeeesseeecsseceseeecsseeessseeeseteseseeeegs 7 Mechan
13. adequate site power exists per the HP POD 20c requirements General ven paap ad Verify the utility connection to the HP POD 20c and any required metering equipment Verify the third party commissioning services that might be required by the owner aa Verity that the HP Project Team coordinates with other site construction activities Power infrastructure installation When determining the final location of the power connections consider the following e Distance between the facility utilities and the location of the HP POD 20c e Distance between possible UPS or generator locations and the HP POD 20c e Requirements for routing electrical feeders underground or overhead The facility power connection must be installed in compliance with local electrical codes and regulations HP reference electrical installation design is based on a maximum distance of 15 2 m 50 ft or a line of sight between the disconnect and the HP POD 20c Appendix B Preparing for delivery 31 Appendix C Regulatory compliance notices HP POD 20c regulatory compliance The HP POD 20c complies with the following regulatory standards Certification level Standard title IEC EN Intertek Tested and e IEC EN 60950 Standard for Safety Information Technology 60950 Certified Equipment Part 1 General Requirements Issue 2006 IEC EN 60950 Standard for Safety Information Technology Equipment Part 22 Equipment to be Installed Outdoors Is
14. at is used for assembly The following figure shows an HP POD 20c assembly site and includes e HP POD 20c location e Crane location Site plan requirements and actions 23 e Assembly equipment locations HP POD 20c lifting requirements Z WARNING The only approved method for lifting the HP POD 20c is the use of a spreader bar harness Lifting an HP POD 20c in any other manner can cause damage to the HP POD 20c and void your warranty The harness and lifting connections must be perpendicular to the lifting blocks HP POD 20c storage requirements If the site is not ready for assembly and operation determine a location for storage when creating the site plan Z CAUTION The HP POD 20c must maintain 20 relative humidity to minimize condensation and oxidation within the HP POD 20c CAUTION While being stored the HP POD 20c must be kept in a level position even if stored on a trailer Changes in ambient temperatures can cause condensation in a non operational HP POD 20c If the HP POD 20c is placed in storage or is in non operating mode for over 72 hours HP recommends using one of the following methods to minimize condensation and oxidation within the HP POD 20c e Desiccant unit e Desiccant material e Heater with a fan e Air conditioner with a heater strip Consult with HP Services to determine the most effective method Site plan requirements and actions 24 Additional structures If a customer pr
15. clearance for all gates headers utility lines and so on Verify that the locations for storage and trash disposal are identified 10 11 12 4 5 Verify that there is adequate clearance around the HP POD 20c for door operation installation and maintenance equipment Verify that all utilities overhead and underground are identified to maintain required clearance 1 1 1 1 N O Verify that the safety equipment is planned for and in place in accordance with the customer s site safety program 22 Verity the site interfaces and locations which connect to the fire alarm access control system and communication system to the HP POD 20c to ensure that the POD can be properly connected to the site BMS Verify that proper disposal methods are used for existing or potentially contaminated and or hazardous materials Verify the availability of security systems or equipment including site fences which are required after construction wo wo N N N N N N O on A Verify the availability of temporary facilities associated with the relocation of existing services and operations 5 Very hat al work relating 1o soil Iesing renova and sie remediation s complete 27 erly ihat a temporary or permanent Toad bak 5 available iFapplicabe 29 Vere locaton ofthe remote electronic monitoring sysem Verify that tie downs and other Authority required facilities for the HP POD 20c and power contai
16. d site assessment prior to planning and preparing the customer site location for the HP POD 20c Consult with HP to schedule a site assessment preparation Site preparation must be complete before the delivery of the POD for a timely installation and commissioning The site must meet all pad power and chilled water requirements safety and security Each customer site must have its own standard safety and security requirements The HP Program Managers work with the customer to ensure adherence to the appropriate precautions HP is not responsible for determining or enforcing safety or security requirements The customer must conduct all health and safety evaluations of the HP POD 20c only using HP as a support mechanism detection and suppression The fire suppression system supplied as an optional component for the HP POD 20c is a Manufacturer Designed system specifically designed for this HP product in compliance with national standards The HP standard suppression system includes a Novec 1230 clean agent system However if the customer or local Authorities require specific modifications or a replacement HP can assist in these actions at the expense of the customer HP does not certify that the fire suppression system that is installed in the HP POD 20c meets all local and jurisdictional requirements The customer is responsible for the following actions as related to the fire suppression system e Verifying that the POD suppress
17. e HP POD 20c installation is indoors or outdoors as this can affect the degree and type of infrastructure required and the mounting needs Inspect the proposed installation site to assess compliance with the HP POD 20c mounting specifications Ensure that the customer is fully aware of the following requirements Proper support capabilities must exist If the customer intends to edge or point load on the utility and cargo ends there must be support in the center to prevent deflection Upon installation the POD structure must be leveled to lt 0 5 which can be checked at that time with a surveyor s transit Shimming is allowed around the perimeter of the POD Place shims in increments across the length of the HP POD 20c to ensure that the HP POD 20c is level If significant shimming is required shims should be spaced no less than 1 2 m 4 ft apart to ensure sufficient load transfer Visually inspect the materials and construction at the proposed installation site to identify issues that can impact the HP POD 20c installation Verify that the area is adequate for truck delivery staging and crane location Appendix A HP site assessment 26 fw Deen o ee Na fat 8 Clearances Inspect the proposed installation site to confirm clearance requirements for installation and serviceability per the HP POD 20c specifications Necessary clearances are determined in part based on the specific installation plans and infrastructure desi
18. e HP POD 20c is located farther from the utility sources For utility clearance information see Dimensions and clearances on page 8 Humidifier water supply The HP POD 20c requires supply water for the humidifier The supply water must meet the following requirements 1 45 lpm 0 12 gpm Connection 1 9 cm 75 in G Adapter to 1 9 cm 75 in FPS No greater than 40 fH equal to 400 ppm of CaCO Hardness 100 to 1250 pS cm Organic compounds None Drinking water Do not use de mineralized or softened water Instant water fill flow 0 6 lpm 0 16 gpm rate For the exact requirements see the humidifier documentation iy IMPORTANT If your water is out of range consult a water quality expert In addition to the previous requirements observe the following requirements and recommendations Site requirements 12 e Do not treat the water with softeners Softeners can produce foam which affects the operation of the unit e Do not use well water industrial water water from cooling circuits or water contaminated by any chemicals or bacteria e Do not add potential irritants to the water such as disinfectants or anti corrosive compounds e The manufacturer recommends installing an in line filter for the water supply It is your responsibility to determine if a filter should be installed and if so its location The filter cannot be installed inside the HP POD 20c and must be compatible with the type of hum
19. e The HP POD 20c is designed for stationary installation outdoors in a Pollution Degree 3 environment in restricted access locations with field wiring terminals provided for permanent supply connections The HP POD 20c meets the following ratings e Catego Rated Overvoltage Category Ill Surge protection device Appendix C Regulatory compliance notices 32 Feature Spedfication E 2 C to 54 C 35 6 F to 129 2 F Relative humidit 0 to 100 humidity e As part of the overall certification relevant sections of the International Building Code have been applied as part of the design and evaluation The current design supports wind loads up to 144 84 kph 90 mph Safety and regulatory compliance For safety environmental and regulatory information see Safety and Compliance Information for Server Storage Power Networking and Rack Products available at the HP website http www hp com support Safety Compliance EnterpriseProducts Turkey RoHS material content declaration T rkiye Cumhuriyeti EEE Y netmeli ine Uygundur Ukraine RoHS material content declaration OoOnagqHaHHa BIJIORl Jae BHMOraM TexHi4HOrO permaMeHTy MOJO OOM KeCHHA BHKOPHCTAHHA JEAKHX HEOEIIEYHHX PEYOBHH E ETEKTPHYHOMY Ta E1EKTPOHHOMY 0012 JHAHHi 3aTBepKeHOTO moctaHoBow Kadinety Minictpis Vkpainm Big 3 rpygua 2008 Ne 1057 Warranty information HP ProLiant and X86 Servers and Options http www hp com support ProLiantServers Warranties
20. ed on e Chilled water inlet temperature of 15 6 C 60 F e Pure water cooling e Chilled water flow rate of 454 lpm 120 gpm e Average air flow of 1700 cfm per rack Overall system capacities The HP POD 20c overall system capacities are provided in the following table The customer must know the level of redundancy required for the application and its associated limiting factor Redundancy level Electrical kW Thermal kW IN 2 2 1392 144 The electrical limitation factors are described in Electrical power capacities critical IT power on page 7 HP POD 20c capacities 7 Site requirements Site pad The structural design of the HP POD 20c site pad must be based on the specific weight load of the complete POD solution with IT installed as well as any additional equipment During design calculations HP recommends that you provide structural support along the entire perimeter of the POD and use the maximum allowable POD weight Upon installation the POD structure must be leveled to less than or equal to 0 5 Shimming is allowed around the perimeter of the POD to ensure that the POD remains level If significant shimming is required shims should be spaced no less than 1 2 m 4 ft apart to ensure sufficient load transfer Shims are not included We IMPORTANT The HP POD 20c is designed for ground level installation If you install the HP POD 20c on an elevated surface verify that the minimum height requirem
21. ents for circuit breaker actuators are considered per national regional and local regulations and electrical codes The area in front of the outside panels must include a work platform HP POD 20c weight iy IMPORTANT The weight provided is a minimum and an absolute maximum rated weight The total weight of the HP POD 20c differs based on the IT equipment and optional components purchased and installed The overall weight might significantly vary depending on the final customer chosen solution for the HP POD 20c Each site pad must meet the weight requirements of the equipment that is expected to be installed The HP POD 20c must be installed on a surface capable of supporting the following weights e HP POD 20c with no IT equipment installed Approximately 7 711 kg 17 000 Ib e HP POD 20c with IT equipment installed Maximum 22 680 kg 50 000 Ib Dimensions and clearances The selected site for the HP POD 20c must be large enough to install service maintain and provide space for potential growth or expansion with additional PODs Site requirements 8 End 1 view clearances shown 3 05 m 10 Pa a 244m 8 97 8 Top view keep out and door swing clearances shown shaded areas indicate the required clearance 1 37 m 64 71m 28 1 06 m 42 Site requirements 9 Side view clearances shown 6 06m 19 10 1 2
22. eriodic Glossary 34 inspection of production of listed equipment or materials or periodic evaluation of services and whose listing states that either the equipment material or service meets appropriate designated standards potential of not more than 42 4 V DC or peak supplied by a primary battery or by an isolated secondary circuit and where the current capacity is limited by an overcurrent device such as a fuse or by the inherent capacity of the secondary transformer or power supply or a combination of a secondary winding and an impedance A circuit derived from a line voltage circuit by connecting a resistance in series with the supply circuit to limit the voltage and current is not identified as a low voltage limited energy circuit or has been tested and found suitable for a specified purpose The means for identifying listed equipment might vary for each organization concerned with product evaluation some of which do not recognize equipment as listed unless it is also labeled Use of the system employed by the listing organization allows the authority having jurisdiction to identify a listed product overcurrent protection A device designed to open a circuit when the current through it exceeds a predetermined value The ampere rating of the device is selected for a circuit to terminate a condition where the current exceeds the rating of conductors and equipment due to overloads short circuits and faults to ground structure Encl
23. eseeceesesceeaeeceeeseeseecesaeeceseesesaeseesaeeceseeeesaeesesaeesesaeensaes 16 Additional POD C NNeEChoNS EE EE NE ER ee 16 Conneccion pors 16 dv NNN 17 HP POD 20c access conbrolnngkmnermmemneennuinn himna 18 Fire safety and access notifications ccccccsscccssscecesseessececssececseecesseeeesseceseeeeesececssecesseeecseeesesecesseeessseeessaes 18 Te NN NN E A 18 Demarcation box rsrrrrrvnrrvarrn vnr nnrsnarennnrsnnrsnnrrnnnrsnnrsnnrsn ner nnrsnnrrn ner nnrsnnrrn ness nnrsnnernnnrsnnrsnnernnnrsnnrsnnnrnnnnrsnnenn 19 Envirenmental IS EE EE 21 Enyirsnm ntal EEE EE EEEE eee EERS 21 NN 21 Areas prone to lightning or power SURGES s 20 lt iexnsesusranslesnnleninlesiestaiest iestecnstsleaaulesulestenosians ianetvisaidnsleadleaiesesitinietigntisesnSe 21 Se e a r AIE N drain drnntdsd danene iaedatde 21 AGE I ee GOE EEE EEE 22 NNN 22 HP site Preparation Drawing Red 22 Contents 3 Zoning and permit requirements cccccecceeseeesseceseeeeeeseecseeeeeeeeeceeeenseeceecneeenseeeeeceeseseeeeesneeenaeeneesteeeneees 22 Project coordination saus a e Ke Teke tdi derretter A 22 Sil le Te EEA A Eee 23 HR POP 2 OG installation ce asecseteaccencncaennnaessdaatss ESSE SE EEEE E AEE EEES EE S E E E 23 Appendix At HP sile EEE EE 26 HP POD 20c site assessment checklist ccccccccssccessecessscccseccessecesseceesseeeeseeecesececssecesseeeesseeessseeesssesenseeensaes 26 Appendis B Preparing for deley EEE 29 Peder 29 Installation prereq
24. gn Location orientation and planned utilization can affect the necessary clearances Consider future planning for the space around the installation site 9 Support Evaluate the HP POD 20c installation site in relation to the infrastructure planned support infrastructure location Conduit lengths and location the utility pathway design must be taken into consideration in the planning stages The proposed support infrastructure design and the location of required utilities are discussed with the customer s site engineering personnel to identity elements that can impact the HP POD 20c installation site decisions 10 Support Evaluate the proposed installation site for the HP POD 20c infrastructure for and the support infrastructure for access requirements The access requirements evaluation is based on the information provided by the customer at the time of the site visit In the absence of installation specific information general requirements are used as the basis for the evaluation The delivery path is visually examined and discussed with the customer s site engineering personnel to identify obstacles to installation 11 Site engineering Conduct interviews with the customer s site engineering interviews personnel and site facilities personnel to gather information related to the origin of the power source and network services that are proposed for use with the HP POD 20c HP must visually inspect the proposed power protection equipment
25. ical cooling capacities Lumnva4vuvavusknekkkmmenmenosnkkemrnkunemnasnnh 7 Overall system capacities ccccceccccessecessececssececseecssececseeesseeecsseeecseeeeseescssececsseceseeecsseeeseseceseeeesseeestseeeaas 7 SS EEE seni easiest ene ee eT eS 8 Sie PAA me Seacn tne reset ats A E E A E staat E eaten cossneenses 8 HP POD EN skys EEA Aa EE EAEE AA shi seed aseaaheash utes ANERE E EESE 8 BT ete e sg see o go eee een mee ee E EAE E EE AERE E AE EE E E 8 PUTUFE EXPANSIONS vss viccs cat cadadehccntadetcntedsecssedstasstedstusstecstusssedsusstesseusstesstosssesbeusssesseussseassusnsesnsestmets 10 Grounding requirements saa ss ccws caren canes eeerocemesronte cere earn earenoeeresrnaearome conten ear dare ea eeerowealont dans canting eancgacaseompnton depen INR 1 NE s 12 Humidifier water supply ccccccesccssseceessceeseceeseeeesseeecsseeeesseeesseeecssecessseceeseeeesseeecssecessesenseeeensesensaes 12 PRIM OG Cs uvante aae E EEE sss vavensveuans EEE E EEE tens EEE E EEE E EE E T EET 13 Chilled water sipo y NS 13 Piping materials EE NE EE EE ER EN 14 EE Me Eee ERE RER ER EEE 14 Site electrical SyStem ccccccccsccecsseceessceceececseeceseeecesececseeecsseeeseseeesseesesseeecsseeesseescsececseceseesessesensaes 15 Electrical power system CONG UNOM xine nusdnsnayuraencannasansieaonass ania arenassalayanaedy ubbeanioambnsmantadndasiayanapaiaeie nies 15 NAG na 16 Environmental control system ccccccssscesscecessseeeseecesacec
26. ical feeders underground or overhead The facility power connection must be installed in compliance with local electrical codes and regulations HP reference electrical installation design is based on a maximum distance of 15 2 m 50 ft or a line of sight between the disconnect and the HP POD 20c Site electrical system To ensure a complete and safe integration of the HP POD solution with your facility HP requires that you complete the following actions for the installed electrical system prior to the installation of the HP POD solution e Short circuit analysis e Arc flash study e Circuit breaker coordination study These actions must be performed for all associated parts of the electrical power train The majority of the details and factors required to complete these studies are associated with the existing installed facility infrastructure CAUTION Failure to complete these studies can cause serious issues with the electrical integration of the POD into your electrical system Electrical power system configuration A preliminary meeting with the HP POD Electrical Engineering team is necessary to discuss your decision concerning capacity limitations and the impacts of this decision on the electrical design A IN electrical configuration can be achieved by providing all of the required electrical feeders from a common power source common switchboards and transformers A 2N electrical configuration can be achieved by feeding
27. idifier that is installed For more information see the Operations and Maintenance Manual or the HP Performance Optimized Datacenter 20c Maintenance and Service Guide Drainage Regiment Jei Spetnion U Hot aisle side 3 18 cm 1 25 in drain line and 26 5 lpm 7 gpm max 2 Chill Water Header drains Cold aisle side 2 3 18 cm 1 25 in drain line and 26 5 lpm 7 gpm max Humidifier drain Cold aisle side 1 3 18 cm 1 25 in drain line and 26 5 lpm 7 gpm max Chilled water supply The following are the water quality requirements and specifications e _Closed loop water must not contain any lime scale deposits or loose debris e The temperature of the chilled water supplied to the HP POD 20c must be 12 C to 24 C 55 F to 75 F Z CAUTION Freezing water can cause a blockage and damage to the unit In outside locations that are subject to freezing temperatures an additive such as glycol might be necessary to lower the freezing point However since the heat transfer potential of water with glycol is lower the HP POD 20c must be de rated accordingly iy IMPORTANT The chilled water system piping and heat exchangers must be drained completely and then purged using compressed air when storing or transporting at or below freezing temperatures 2 IMPORTANT Operating the chilled water system at the higher end of the acceptable range decreases the overall thermal capacity of the POD Acceptable water quality specificatio
28. ion system meets local codes including specific local requirements for initial and periodic inspections e Arranging for and receiving all required local permits including initial commissioning as well as standard and repair maintenance e Arranging for the connection of the agent tanks refilling of tanks and all system testing including pressure tests All general maintenance of the suppression system must be completed by an authorized technician Additional local requirements are not covered as part of the option price or basic installation and deployment services unless specifically included in an executed Statement of Work Overview 6 HP POD 20c capacities HP POD 20c capacity limitations The capacity limitations for the HP POD 20c are separated into two categories electrical power and mechanical cooling capacities Both of these categories are interdependent and must be considered in conjunction with the overall customer requirements Electrical power capacities critical IT power The electrical system of the HP POD 20c contains two main feeds A and B that are each rated at 320 A 380 415 VAC Wye 3 Phase The HP POD 20c has two critical IT load circuits that are each rated at 200 A which electrically limits the POD regardless of the redundancy configuration Mechanical cooling capacities The HP POD 20c cooling system consists of 3 zones Each zone includes 2 heat exchangers and 12 fans Cooling capacities are bas
29. lt with HP to schedule a site assessment A standard site assessment visit includes the following tasks e Selecting an appropriate site for the HP POD 20c e Assessing the proposed site for o Measurements for clearances o Infrastructure for the final solution o Access to utilities o Site pad o Installation considerations including locations for delivery trucks large installation equipment such as cranes and storage o Electrical infrastructure o Chilled water infrastructure o Facility network and access control systems e Developing an engagement plan and verifying customer contacts e Discussing future development and growth plans For a complete site assessment checklist see Appendix A HP site assessment on page 26 HP Site Preparation Drawing Package After receiving a signed purchase agreement HP provides detailed engineering drawings These drawings contain information to assist you and your MEP team to prepare the site for POD installation If there are areas of special interest HP can work directly with your MEP team to provide additional assistance Zoning and permit requirements You are responsible for compliance of the overall installation in accordance with all local and national regulations ordinances codes and the product specifications Project coordination Your Project Manager must perform the following tasks e Coordinate with all trades prior to installation to ensure that trade conflicts are
30. ners are complete at least one week prior to arrival of HP provided equipment General Water Supply Verify that the site drainage is complete and the HP POD 20c is not in a drainage path or flood prone area HP recommends placing the HP POD 20c on a raised site pad to prevent water from entering the HP POD 20c 2 Verify that the humidification water quality meets or exceeds these standards which are essentially drinking water standards Verify the humidification water supply isolation valve is installed for each POD Chilled Water Supply Verity the chilled water supply and return headers are accessible are in the appropriate location and are 80 cm 3 in in diameter Appendix B Preparing for delivery 30 lem Description 2 Verify that the chilled water supply temperature meets the minimum POD chilled water supply temperature of 12 C 55 F Verity that a sufficient chilled water flow rate is available mn If necessary verify that the customer required chilled water return temperatures can be a attained Power Requirements te pen ol Verify that the short circuit analysis arc flash and circuit breaker coordination studies are complete Verity power work is completed according to the approved conduit routing drawings that show the exact routes plan view sections and elevations 2 Verity that temporary site power for installation and construction is planned and available if applicable Verity that
31. ns Water must be maintained per the following acceptable water quality standards 8 0 10 Specific conductance at 25 C 77 F 10 2500 umhos Chloride Cl 0 350 ppm Site requirements 13 Phosphate Ortho PO If your water is out of range consult a water quality expert The following table describes the chilled water system specifications for the HP POD 20c Feature Specification Facility input temperature to the HP POD 12 to 24 C 55 to 75 F 20c 1 034 kPa 150 psi i HP POD 20c pressure drop 172 4 kPa 25 psi HP POD 20c water flow rate 454 lpm 120 gpm Chilled water supply and return Two DIN PN16 DN80 flanges connections Piping materials Do not use the following interconnecting piping materials in a closed water system e Okxidizing biocides e Aluminum components e Brass components with high levels of zinc e Non stainless steel iron components e PVC 2 IMPORTANT Even though some PVC grade piping materials are designed to handle the expected water pressure the use of PVC materials should be reviewed and approved by the customer site engineers Power infrastructure installation When determining the final location of the power connections consider the following Distance between the facility utilities and the location of the HP POD 20c Site requirements 14 e Distance between possible UPS or generator locations and the HP POD 20c e Requirements for routing electr
32. nts to your facility It is your responsibility to facilitate these connections HP can make these connections when specifically contracted to deliver these services and a Scope of Work has been drafted reviewed and signed for delivery services Available POD connections include the following e Life safety systems o EPO o Fire detection o Fire suppression e Site communication o Phone o Access control e Networking IT connections Connection portals Networking and connection portals are located on the cargo end of the HP POD 20c Each HP POD 20c has six 6 35 cm 2 5 in portals for customer data connection These portals are provided to allow the customer to make connections to the HP POD 20c Supported facility connections 16 End view shown Humidifier A dedicated water supply and approved drainage is required for the humidifier For more information about the humidifier see the HP Performance Optimized Datacenter 20c User Guide that is provided with the HP POD 20c The following image shows the location of the humidifier drain and water supply Side view shown We IMPORTANT Confirm with local Authorities that condensate water and rain water can be mixed in the same drainage Supported facility connections 17 HP POD 20c access control The HP POD 20c is equipped with standard key lock hardware for each personnel entry door and external electrical cabinet Each personnel entry door incl
33. ommunication connections between the fire system and the HP POD 20c are made through the fire box Supported facility connections 18 Front view shown You must make the connections between the facility and the HP POD 20c For configuration and installation instructions consult with HP Demarcation box The following communication connections between the customer facility and the HP POD 20c are made through the demarcation box e ECS communication e Access control communication e Telephone Front view shown Supported facility connections 19 You must make the connections between the facility and the HP POD 20c For configuration and installation instructions consult with HP Supported facility connections 20 Environmental considerations Environmental risks e Avoid placing the HP POD 20c directly along a drainage path or in an area prone to flooding e Verify that the HP POD 20c is properly grounded in accordance with national regional and local regulations ordinances codes and the product specifications Cold weather The HP POD 20c requires a site chilled water supply and return humidifier supply and drain and condensate drains Extreme cold weather can cause damage to the supply and drain lines Evaluate the following for additional cold weather protection e Regional location of the HP POD 20c e Exposure of the supply and drain lines to extreme cold
34. osure of sufficient size to enable entry of personnel UL Underwriters Laboratory UPS uninterruptible power system VESDA very early smoke detection apparatus Glossary 35 Documentation feedback HP is committed to providing documentation that meets your needs To help us improve the documentation send any errors suggestions or comments to Documentation Feedback mailto docsfeedback hp com Include the document title and part number version number or the URL when submitting your feedback Documentation feedback 36 Index A about this guide 5 areas prone to lightning or power surges 21 assembly 29 assembly area 23 C capacity limitations 7 clearance area 8 cold weather considerations 21 communication connections 18 19 connection portals 16 connections additional 16 connections facility 16 D delivery considerations 29 dimensions 8 drainage 13 electrical power capacity 7 electrical system 15 environmental considerations 21 environmental control system ECS 16 environmental risks 21 equipment installation 23 F facility connections 16 fire and safety 18 fire suppression 6 future expansions 10 G grounding requirements 11 H HP site preparation drawing package 22 humidifier 12 17 installation 23 installation equipment 23 L lifting layout and requirements 23 lightning protection 21 M materials piping 14 mechanical cooling capacity 7 modifications FCC
35. ovided vestibule or other structure is installed and connected to the HP POD 20c the following specifications must be maintained e To protect the HP POD 20c and ensure a waterproof barrier flashing must be installed to the exterior of the HP POD 20c in the location where the other structure is attached e Access landings might be required to maintain the required access to the HP POD 20c electrical panels Site plan requirements and actions 25 Appendix A HP site assessment HP POD 20c site assessment checklist During a survey of the readiness of a proposed customer site for the HP POD 20c the site is inspected for the following e Accessibility of machinery for the transportation and installation of the HP POD 20c e Assessment of the suitability of the site infrastructure for installing the HP POD 20c and for supporting infrastructure preparation and serviceability requirements HP responsibilities hen os Yr i I ette ed rate relating to the proposed installation site ek MM normal HP business hours Br sd ER 4 Installation site review 5 Indoor outdoor installation 6 Site pad 7 Materials and construction inspection Review and discuss the proposed installation site with the customer This initial review includes physical examination of the proposed installation site and at the sole discretion of HP can include physical measurements of the area size and clearances Identify whether th
36. resolved e Coordinate the installation and integration of all systems Site plan requirements and actions 22 e Ensure that the site safety and security programs are properly administered e Interface directly with the HP installation project manager to ensure clear lines of communication during the installation and commissioning processes Site planning A comprehensive site plan assists with the site design MEP and ensures the best possible HP POD 20c installation process When creating a site plan consider the following information e HP POD 20c site requirements detailed in this document e HP POD 20c site preparation drawing package e HP POD 20c readiness checklist HP POD 20c site readiness checklist on page 29 e HP POD 20c installation on page 23 The HP team can assist you by answering questions and help to guiding you throughout the process HP POD 20c installation HP POD 20c installation includes the following e Installation equipment staging on page 23 e HP POD 20c lifting layout on page 23 e HP POD 20c storage requirements on page 24 e Additional structures on page 25 Installation equipment staging Staging for the following items must be identified and considered e Truck and component staging e Installation equipment staging e Site traffic e Regulatory or local permits HP POD 20c lifting layout When preparing a site plan identity where to place the HP POD 20c and the equipment th
37. sonnel and personnel responsible for the maintenance and support of the existing infrastructure must be available to answer questions s appropriate to the specific location provide HP with campus maps building drawings floor plans and other relevant prints to assist in the documentation and evaluation of the proposed installation site 8 Network Provide HP information regarding the planned network infrastructure infrastructure connection points and pathways information 9 Permission for Grant HP permission to take photographs for report illustration purposes Photographs 10 Project logistics Arrange site specific project logistics at the time of scheduling Failure to provide necessary authorizations can limit the effectiveness of the service and can at the discretion of HP impact scheduling or result in the postponement of the service 11 Business visas Provide assistance in instances where a temporary business visa is required for HP personnel to visit the site This assistance typically takes the form of preparing a letter of invitation In some cases a formal request must be made by the local company for which the work is taking place if applicable 7 Documentation _ Provide HP copies of all available mechanical and electrical system design documentation including as built drawings and electrical single line drawings Appendix A HP site assessment 28 Appendix B Preparing for delivery Pre delivery tasks
38. sue 2006 IBC 2009 Designed to Comply 2009 International Building Code 2010 International Code With the applicable Council Inc requirements Safety and IEC compliance The HP POD 20c is examined tested and found to be in compliance with IEC EN 60950 Part 1 and Part 22 as an Information Technology Product For more information see HP POD 20c regulatory compliance on page 32 The HP POD 20c is not suitable for long term human occupancy The HP POD 20c is Listed as a Product that provides service access areas for periodic maintenance and service These areas must be used only by owner authorized and qualified personnel who are trained in the maintenance and service of the HP POD 20c components We IMPORTANT Before installing the HP POD 20c consult your local Authorities for applicable regulations and to review site specific location guidelines If needed obtain any necessary permits Additional considerations for safety and Electrical compliance are as follows e The HP POD 20c is Certified as an Information Technology Product to IEC EN 60950 Part 1 and Part 22 e The HP POD 20c is evaluated as a non inhabitable product that provides service access areas for customer authorized qualified and trained service personnel e The electrical connections of the HP POD 20c are evaluated as feeder connections for connection to an existing facility and are not suitable as service entrance for connection to the utility
39. t path of any external heat loads such as generators _ ee protection is provided such as cold weather protection if required Verify that the site altitude is less than 3 048 m 10 000 fi mn When installing on an elevated surface verify that the maximum height requirements for the 7 circuit breaker actuator meet the national regional and local regulations Verify that proper landings and the catwalk are planned for electrical cabinet access e nl doors and service area doors including landings the catwalk and stairs Verity that the local Authorities are contacted all applicable codes and site specific location a guidelines are reviewed and all required permits are obtained Appendix B Preparing for delivery 29 Verity that the site location has clearances for the HP POD 20c installation including any permanent structures such as fences walls vestibules and buildings i w switchboard generators and powerhouses grounding electrode system Verify that the site location has adequate lighting for the HP POD 20c installation Verify that a truck and equipment staging areas are identified Verify the location for the fuel tanks for generators powerhouses and other equipment if applicable Verify the locations for cranes off loading and operation during HP POD 20c installation Verify site access and clearances for equipment including the crane and forklifts A clear path to the site must be maintained with
40. udes a door access contact that can be connected to the customer facility security system Additional options for controlled access include the following e Electronic card reader e 12 digit access control code keypad e Magnetic lock on each personnel access door and dynamic hot aisle door Fire safety and access notifications Dry contacts are provided to enable the connection between the HP POD 20c and the customer s facility If the HP POD 20c is connected to the customer facility systems then the alarm conditions of the HP POD 20c can be detected by the facility systems It is your responsibility to facilitate these connections HP can make these connections when specifically contracted to deliver these services and a Scope of Work has been drafted reviewed and signed for delivery services The customer must provide an independent connection for each system listed in the following table Fire prevention alarm Smoke is detected in the HP POD 20c Fire suppression The suppression system alarm is activated and gas is system optional dispersed to suppress a fire Access control A door of the POD has been opened EPO The EPO system is activated by manually pressing the EPO button or by a thermal event and the HP POD 20c is shut down The electrical layout of the fire alarm system is described in the schematic drawing that is supplied with the HP Performance Optimized Datacenter 20c Site Drawing Package Fire box The c
41. uisites cccccccsccccssecessececssececsseeeseeeceececseeeseeeeessececssecesseeecsseeecsseeecssesesseeeseseeensaes 29 HP POD 20c site readiness checklist ccccccsccccssscecssscessscecssececssecessececssecesseeeessececsseceesseecssecessseeesseesesseeessaes 29 Power infrastructure installation cccccccsssccssscecsseceesseeeesececssececeeccsseeecsseceseeeesseeecsseeessseecssecessseeesseeessseeessaes 31 Appendix C Regulatory compliance notices rrrrrrrrrrrrvrrrrrrenvrrnnrrrrnvnrrerrrnnnnnnrrrrnnnnssrsnnnnssrrernnnsernn 372 HP POD 20c regulatory compliance RER EEE EEEE EES EE EEE EEEE EEEE RRR 32 Safety and IEC compliance ccccccecccccsscecssececseccssececsececseeecsseeecesecesseeeesseeecsseeesseescsececsseeeseesenesessaes 32 Safetyand regulatory compliance Cremeans reser re trtterreteerereiseritrerentecrire rater eeteernr erase ierneteee ree traetenreense terete 33 Turkey RoHS material content declaration cccccccccescccsseccssececseeesseeecsseeecseeesseeecssececseeeseeecsseeessseeeneeessseees 33 Ukraine RoHS material content declaration ccccccescccssscecssececsseccsseeecssecesseeeessececsseceesseeesecessseseseeseneeessaes 33 Warranty information cccccccccccssscccsscccssececsseccseeecsececseeeceeecsseeeceseeesseeeesseeecsseeeeseescuecessesesseeseseeessseseseaaes 33 VELT NR NE A ENN NE EN RE NON E E 34 EE RR 36 0 EE ad Neate cine EA E N EEE A aids A A 37 Contents 4 Overview About this document This

Download Pdf Manuals

image

Related Search

Related Contents

Istruzioni per l`uso della Guida Icone utilizzate in questa Guida  Sony VGN-NW305F/B User's Guide  DVD HOME THEATRE SYSTEM  EasyLink+  TEFAL ZP600031 Instruction Manual  User Manual of 3A UBEC - RC-Tek  Software Starter Guide v26  pdf - 713.8 ko - Société Chimique de France  hp deskjet series  薬事 ・ 食品衛生審議会 議 事 医療機器 口 体外診断薬部会 次 第 配 付  

Copyright © All rights reserved.
Failed to retrieve file