Home
Hitachi M24SSD User's Manual
Contents
1. 20 x 1 1 2 Pan Head Philips machine screws and 4 1 4 20 nylon insert locknuts First put bolts through holes in frame then through holes in bottom of hopper Secure with locknuts Tighten these locknuts now 1 4 20 Nylon P PAGE 1 3 Install impeller onto pinion shaft Insert 1 8 x 1 cotter pin through impeller then through pinion shaft Use hole nearest gear box Spread cotter pin to prevent from falling out 4 Install gear box by inserting the pinion shaft into hole in center of hoppers bottom The word FRONT on the gearbox I leavy d uty must point to Front of the hopper axle support 5 A Install lower handles onto axle to both sides as shown Now insert 1 1 2 bolt through first hole in lower handle Then through frame brace NOTE Dimples on frame brace must be facing toward gear box as shown Next into threaded connector in cross brace DO NOT TIGHTEN YET B Next insert 1 1 2 bolt through other end of frame brace and through second hole in frame install locknut DO NOT TIGHTEN YET C Now in sert 2 1 4 bolt through second hole in lower handle and through first hole in frame NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP DO NOT OVER TIGHTEN PAGE 2 Drive Wheel Pin Hole ay a Cotter Pin Ax y 2 I tp gt 6 In stall drive wheel to axle using pin hole nearest to lower handles as shown Insert 2 cotter pin through wheel and through axle Ben
2. ASSEMBLY and OPERATING INSTRUCTIONS EarthWay Ev N Spred M24ssp Series Broadcast Spreader PLEASE CALL US IF YOU HAVE DIFFICULTY BEFORE YOU RETURN THIS TO THE STORE PARTS HOT LINE PHONE 574 848 7491 HELPFUL HINTS lt If your spreader does not spread evenly be sure the FRONT on the gear box points to the front of the spreader The impeller must turn clockwise Reversing the gearbox will cause the impeller to turn counter clockwise Clean the impeller plate after each use Fertilizer stuck on the impeller blades will cause uneven spreading lt Your spreader is designed to be pushed at three miles per hour which is a brisk walking speed Slower or faster speeds will change the spread patterns Wet fertilizer will also change the spread pattern and flow rate Clean your spreader thoroughly after each use Wash between the shut off plate and bottom of the hopper Gears are permanently lubricated at the factory Do not open the gearbox or dirt may enter Upper Handle Lower Handles x 1 8 x 1 Cotter Va i WA CHR Agitator yA fu Handle Shaft all Brace a dx 1 4 20 x 1x I 16 x C2aP amp 5 gro yezo ea co oY Look Nut Sonne ED 2x 1 4 20 Di 4 1 4 p Impeller ON AE iii AS Bx 1 4 20 x o 2x 1 4 20 x Brace 3x 1 4 20 x 23 4 Bot a D 2 1 4 Bot Gauge amp Lever Pivot Rod 1 Remove and identify loose parts from carton 2 Position hopper on side Install frame using 4 1 4
3. NC makes no you stop moving warranty or guarantee against corrosion failure on models with X When finished empty any remaining material from hop plated steel or painted steel frames Clean your spreader well after per each use Warranty covers parts only but not labor charges Thoroughly wash spreader and allow to dry before stor ing No oiling is necessary DO NOT RETURN TO DEALER FOR REPAIR HOW TO ORDER SPARE PARTS EARTHWAY PRODUCTS INC l l l 1009 Maple Street All spare parts listed herein may be ordered direct from the P O Box 547 manufacturer EARTHWAY PRODUCTS INC Bristol IN 46507 Be sure to give the following information when ordering 1 Model Number FOR YOUR RECORDS 2 Part Number 3 Part Description Call 574 848 7491 or write for current prices Date Purchased Store Name PAGE 5 P O Box 547 Bristol Indiana 46507 574 848 7491 www earthway com M24SSD Series Professional 100 Broadcast Spreader a Part Description Part Description
4. d with pliers to prevent pin from falling out Next slide the wheel spacer and then the outer wheel and cotter pin through the axle only Gauge amp Lever Assembly mounts to left side 3 16 x 1 Cotter Pin out 2 1 4 Bolt 7 Install inner coast wheel to axle then wheel spacer and then the outer coast wheel and install cotter pin using outside hole As shown insert 1 cotter pin through axle not thru the wheel Bend with pliers to prevent pin from falling out TURN SPREADER UPRIGHT ON TO WHEELS 8 NOTE BEFORE INSTALLING GAUGE AND UPPER HANDLES TO HANDLE SHAFT UPPER HANDLES FEA TURE THREE POSITIONS FOR OPERATOR S COM FORT You can select lower middle or upper positions for best fit to the operator Insert 234 bolt through the Gauge then upper handle and finally through handle DO NOT TIGHTEN LOCKNUT YET 9 Insert pivot rod into shut off plate as shown Turn to lock in place Shut Off Plate Pivot Rod 10 Insert other end of pivot rod into pivot and bracket assembly as shown Turn to lock in place PAGE 3 4 20 x 1 1 2 Bott 1 4 20 x 1 1 2 Bolt 11 Install handle shaft to lower handles and pivot amp bracket assembly as shown Using 4 1 bolts and 4 locknuts Tighten bolts and nuts now Turn to Lock in Place Control 1 4 20 Rod Regular Nut Pivot Bracket 13 Install flattened end of control rod in to lever on gauge as shown Turn to lock in plac
5. e Next push lever forward to setting 12 Install 1 1 4 20 regular nut not a locknut on to con trol rod as shown 0 Align control rod with hole in pivot bracket pull lever backward to insert control rod through hole in pivot bracket Now install 1 4 20 regular nut on to control rod DO NOT 14 Pull lever back to setting 30 as shown Next push pivot amp bracket forward so that the shut off plate in the hopper is in the full open position REMEMBER SETTING 30 ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALI BRATED Now tighten the nuts against the pivot bracket to prevent change in calibration TIGHTEN NUTS YET 15 Insert large hair pin clip to pinion shaft on inside of hopper Note Position of flat side of hair pin clip This pin should be in stalled as shown PAGE 4 17 For normal operation both plates should VA be fully opened To reduce flow to the left side partially or completely close the plate over the rear large hole To reduce flow to the right side partially or completely close the plate over the front small hole Close both plates for a narrow center spread pat tern WARNING If the optional side de flector is being used in the down position the plate over the rear large hole MUST BE CLOSED or an over application of material will occur 16 Tension on the flow control lever may be adjusted by tightening or looseni
6. ng the tension nut as shown The New EV N SPRED The settings furnished on the Rate Setting Chart are intended as a guide only Variations in physical characteristics of material applied walking speed and roughness of ground surface may require slightly different spreader settings Due to the above conditions EARTH WAY PRODUCTS INC makes no warranty as to the uniformity of coverage actually obtained from the settings listed WARRANTY OPERATING INSTRUCTIONS EARTHWAY guarantees this product to be free of defects in origi Before filling hopper become familiar with the operation of nal workmanship and materials for a period of 90 days from sale to this spreader the original user If any defect develops during this period Obtain proper setting for material to be used from the EARTHWAY will repair or replace this product at no charge pro RATE SETTING CHART included with this spreader vided the defect is not the result of mishandling or tampering and Move stop bolt on rate gauge assembly to the proper that this product is received at the factory with shipping charges setting prepaid For quicker service you may call EARTHWAY at 574 While pushing spreader forward pull control lever back 848 7491 or write and describe the nature of the defect and we will to stop bolt send repair parts to you Due to the corrosive nature of most fertil To stop push lever forward to close flow holes before izers and ice melters EARTHWAY PRODUCTS I
Download Pdf Manuals
Related Search
Related Contents
Promise Technology Vess R2600tiS SENS。RED ESC 印刷用仕様表を表示 カワサキ K3PUシリーズ TE 70-ATC - Hilti Danmark A/S ICF-T30 TV (1-3ch)•FM/AM Radio 主な特長 使用 まもる君Light48用 前扉ブランクタイプ 取扱説明書 Mode d'emploi Copyright © All rights reserved.
Failed to retrieve file