Home
GE FTP-1000 User's Manual
Contents
1. See Troubleshooting on page 9 for more information FTP 1000 Installation Manual Testing Use the following procedures to test the touchpad for display function button function and system operation Test touchpad display function Press and hold the 4 5 and 6 buttons together for about three seconds then release them The touchpad cycles though all text messages then returns to the time display Test button function To test the button functions do the following 1 Press and hold the 7 8 and 9 buttons together for about three seconds then release them The display should go blank 2 Press each touchpad button to display a different string of letters or numbers for each button For example 11111111111 AAAAAAAAAAA etc Pressing displays Es and pressing displays Fs After about 15 seconds of no touchpad activity the touchpad returns to the time display Test system operation Testing the system operation requires you to perform some standard operations to ensure that they work properly A CAUTION Contact the central monitoring station before activating alarms to avoid dispatching local police and fire departments To test the system s operation do the following Arm disarm the system activate the touchpad panics bypass sensors and turn chime on off to verify correct operation Note You must enable the touchpad panic buttons in order to activate them Please see the panel installation instructi
2. includes police fire and auxiliary panic buttons that can be activated anytime A built in speaker provides alarm status and button press sounds A swing down door reveals a label with basic system operating commands The door can be removed by simply opening it past its stop point The door can also be reattached later if desired Tools and equipment needed e 4 conductor 22 or 18 gauge wire Screwdriver 6 screws and anchors included e Panhead screws for gang box installation e Saw or utility knife for cutting wallboard Installation Use the following instructions to install and wire your touchpad Guidelines e Mount the touchpad in an environmentally controlled area 32 to 120 F or 0 to 49 C e When mounting the touchpad allow at least 3 inches below it for the swing down cover e Do not exceed the maximum available power See the panel installation instructions for maximum available power e Table 1 describes the power used by the touchpad e Table 2 describes the maximum wire lengths allowed between the touchpad and the panel Table 1 Touchpad power usage Current mA Conditions 05 Maximum alarm current with the buzzer sounding and the touchpad illuminated from a button press 50 Typical operation 12 Power saving mode no panel AC power Table 2 Maximum touchpad wire lengths Wire gauge unshielded or shielded Max touchpad wire length between touchpad and panel 18 750 fe
3. 50 in x 0 75 in Lx W x D UL cUL listings UL 985 1023 1610 CUL C1023 1974 S545 M89 For cUL listed applications the unit shall be installed in accordance with Part 1 of the Canadian Electrical Code Note See specific panel installation instructions for complete UL installation requirements for the system you are installing Radio interferance information to the user If this equipment causes harmful interferance to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interferance by one or more of the following measures e Reorient or relocate the receiving antenna e Increase the separation between the equipment and receiver e Connect the affected equipment and the panel receiver to separate outlets on different branch circuits e Consult the dealer or an experienced radio TV technician help
4. FTP 1000 Touchpad Display Installation Manual Copyright Disclaimer Trademarks and patents Intended use FCC compliance Copyright 2005 GE Security Inc All rights reserved This document may not be copied or otherwise reproduced in whole or in part except as specifically permitted under US and international copyright law without the prior written consent from GE Document number revision 466 2231A December 2005 THE INFORMATION IN THIS DOCUMENT IS SUBJECT TO CHANGE WITHOUT NOTICE GE ASSUMES NO RESPONSIBILITY FOR INACCURACIES OR OMISSIONS AND SPECIFICALLY DISCLAIMS ANY LIABILITIES LOSSES OR RISKS PERSONAL OR OTHERWISE INCURRED AS A CONSEQUENCE DIRECTLY OR INDIRECTLY OF THE USE OR APPLICATION OF ANY OF THE CONTENTS OF THIS DOCUMENT FOR THE LATEST DOCUMENTATION CONTACT YOUR LOCAL SUPPLIER OR VISIT US ONLINE AT WWW GESECURITY COM This publication may contain examples of screen captures and reports used in daily operations Examples may include fictitious names of individuals and companies Any similarity to names and addresses of actual businesses or persons is entirely coincidental GE and the GE monogram are registered trademarks of General Electric FTP 1000 touchpad display product and logo are registered trademarks of GE Security Other trade names used in this document may be trademarks or registered trademarks of the manufacturers or vendors of the respective products Use this product only for the
5. et 22 300 feet Mounting plate installation To install the mounting plate do the following 1 Separate the mounting plate from the touchpad by first loosening the screw then lift the touchpad away from the mounting plate see Figure Figure 1 Mounting plate screw mnm OG Leccese Mounting plate screw 4 FTP 1000 Installation Manual 2 For wall mounting place the mounting plate on the wall and mark the mounting holes see Figure 2 Be sure to leave a 3 inch clearance below for the touchpad door to open Figure 2 Mounting hole locations o Q 2 o Insert anchors into the wall at the marked locations where studs are not present Align the mounting plate holes with the wall or gang box screw holes and secure the back plate using the screws provided Note Do not overtighten screws or the mounting plate may bind and prevent the touchpad from mounting properly For wall mount installations cut a hole in the wall behind the mounting plate to pull the wiring cable through Wiring the touchpad to the panel To wire the touchpad to the panel do the following l 2 Remove panel AC and backup battery power Run a 4 conductor 18 to 22 gauge wire from the panel to the touchpad location see Table 2 on page 3 Connect the touchpad 12V Bus A Bus B and GND terminals to the matching panel terminals Figure 3 on page 5 Note The wiring
6. fore installing or operating this product The most current versions of this and related documentation may be found on our website Refer to Online publication library on page 9 for instructions on accessing our online publication library Note A qualified service person complying with all applicable codes should perform all required hardware installation Conventions used in this document The following conventions are used in this document Bold Menu items and buttons Italic Emphasis of an instruction or point special terms File names path names windows panes tabs fields variables and other GUI elements Titles of books and various documents Blue italic Electronic version Hyperlinks to cross references related topics and URL addresses Monospace Text that displays on the computer screen Programming or coding sequences Safety terms and symbols These terms may appear in this manual A CAUTION Cautions identify conditions or practices that may result in damage to the equipment or other property A WARNING Warnings identify conditions or practices that could result in equipment damage or serious personal injury FTP 1000 Installation Manual Product overview The FTP 1000 lets you control the operation of compatible security systems see Table 4 on page 10 The large display provides easy to read messages to indicate the current status of the system The touchpad
7. itch To change the status tone pitch do the following 1 Press and hold the and 0 buttons together until you hear a steady tone then release the buttons 2 Press and hold 1 to lower the pitch or press and hold 2 to raise the pitch 3 Release the button when the desired pitch is heard After about 15 seconds of no touchpad activity the steady tone stops sounding Troubleshooting The following describes what to do if the touchpad does not operate correctly The touchpad doesn t power up no display and no beeps when buttons are pressed 1 Check for correct wiring connections at touchpad and panel terminals 2 Make sure that the panel battery is connected correctly and that the panel transformer is plugged in 3 Make sure panel transformer is not plugged into an electrical outlet controlled by a switch Relocate the transformer to an unswitched outlet location if necessary e The touchpad display appears blank but beeps sound when I press buttons Check for correct bus wiring connections green and white wires at touchpad and panel terminals Contacting technical support For assistance installing operating maintaining and troubleshooting this product refer to this document and any other documentation provided If you still have questions you may contact technical support during normal business hours Monday through Friday excluding holidays between 6 a m and 5 p m Pacific Time Table 3 Sales and support contact i
8. nformation Sales Technical support Phone Toll free 888 GESECUR ty 888 437 3287 in the US including Alaska and Hawaii Puerto Rico Canada Outside the toll free area 503 885 5700 E mail info gesecurity com generaltech ge com Fax 800 483 2495 541 752 9096 available 24 hours a day Note Be ready at the equipment before calling for technical support Online publication library Another great resource for assistance with your GE Security products is our online publication library available to all of our customers on our website To access our publication library go to our website at the following location http www gesecurity com In the Tools area at the top click the Publication Library link After you register and log on you may search through our online library for the documentation you need 1 Many GE Security documents are provided as PDFs portable document format To read these documents you will need Adobe Acrobat Reader which can be downloaded free from Adobe s website at www adobe com 10 FTP 1000 Installation Manual Appendix A Specifications and notices Table 4 Specifications Specification Rating Compatibility Concord Concord Express Concord Ultra Concord 4 Power requirements 12 VDC nominal 75 mA Temperature range 32 to 120 F 0 to 49 C Operating 30 to 140 F 34 to 60 C Storage Maximum humidity 85 relative noncondensing Dimensions 5 in x 4
9. ons for more information Refer to the panel s user manual for complete system operating instructions and user programming procedures Adjusting display brightness You can adjust the background lighting provided by yellow LEDs of each touchpad individually to help compensate for lighting conditions at the touchpad location The brightness adjustment lightens or darkens the display background and button lighting Adjust display background brightness To adjust display background brightness do the following l Oy ae te IS Enter user programming mode by pressing 9 system master code The display shows SYSTEM MENU then TIME dATE Press A or B until the display shows options then press The display shows downLd on Press A or B until the display shows BRIgHT 2 default setting Enter a setting from 0 LEDs off to 3 brightest then press The display shows the new setting Exit user programming by pressing e 4 for Concord Express panels e or 00 for Concord panels FTP 1000 Installation Manual Changing chime and trouble beep tones The frequency pitch of chime and trouble beep tones from each touchpad can be adjusted to a more desirable or distinct tone and to compensate for hearing impaired persons Note Chime and trouble beep tones sound using the default frequency during or within 15 seconds of any button activity at that specific touchpad Change status tone p
10. purpose it was designed for refer to the data sheet and user documentation For the latest product information contact your local supplier or visit us online atwww gesecurity com This equipment has been tested and found to comply with the limits for a Class B digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications You are cautioned that any changes or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate the equipment Preface This is the GE FTP 1000 Installation Manual for model 600 1020 This document includes an overview of the product and detailed instructions explaining e how to install the touchpad and e how to program the touchpad There is also information describing how to contact technical support if you have questions or concerns To use this document effectively you should have the following minimum qualifications e abasic knowledge of security systems and components and e abasic knowledge of electrical wiring and low voltage electrical connections Read these instructions and all ancillary documentation entirely be
11. should extend from the right side of the connector Figure 3 Touchpad wiring connections SRI Attaching the touchpad to the mounting plate Align the tabs at the top of the mounting plate with the slots on the touchpad and swing the touchpad bottom toward the mounting plate Gently tighten the screw into the bottom of the touchpad Power up and bus communication After making all wiring connections from the touchpad to the panel you are ready to power up the panel and verify correct communication between the touchpad and the panel Upon power up the panel scans the bus for connected devices and automatically learns the unit number of each bus device Note Ifyou plan to install systems with no alphanumeric touchpads we recommend that you keep an alphanumeric touchpad with you specifically for installer programming This touchpad can be quickly connected and disconnected from the header pins on the lower left portion of the panel just above the terminal strip To power up the panel and verify bus communication 1 Verify that all wiring between the panel and touchpad is correct 2 Connect the panel battery and plug in the panel transformer The touchpad should display BUS scan then show a time display with the PRESS STATUS prompt in the upper left corner Note If the touchpad does not power up show any display or respond as described above unplug the panel AC transformer and disconnect the backup battery
Download Pdf Manuals
Related Search
Related Contents
RCA Flat Panel Television Flat Panel Television User Manual Avaya BCM50 Installation and Maintenance Manual Geovision GV-VD321D Samsung YP-T7FZ manual de utilizador Descargar Formulario - Instituto de Salud Pública de Chile télécharger le mode d`emploi au format pdf Jonesco 2003 Catalogue Samsung 삼성 무선 도킹 오디오 APC Smart-UPS VT Machine à pop-corn Mode d`emploi – page 1 Copyright © All rights reserved.
Failed to retrieve file