Home

Force10 Networks Force10 User's Manual

image

Contents

1. Module SFM e e Wo ie P e e e Switch Fabric I q Blank BLNK mica 3 _ _ Air Filter CNC I VV OSV A FAA FAFSA CY OSTA AAD AD Z INA Air Vents wt IX IA SAIDIPADIPIAPADINI m AC Power Supply AC Power Plug 14 The E1200i System Figure 2 E1200i AC Chassis Rear View PELLETS TTP TTT ER i locking screw Installed Fan Tray _ gt 9 mpty Fan Tray with Self closing Door Ground Connection adi 2 g s T Ground Connection
2. g 5 g C 1k Eee 2 DOTOOTTOO TO OOOOOOOOOOOO HI9S000NT Caution It is important that you retain the packaging and installation order of the cards Load cards from right to left beginning with Slot 13 Figure 23 RPM and Line Card Slot Numbering Label Slot 0 1 2 3 4 5 6 RO R1 T 8 9 10 11 12 13 l j I 2 Load first To install line cards and RPMs Step Task 1 Remove the line card from its box and carefully remove the line card from the anti static packaging 2 Align the RPM with the guide and gently slide it into the slot until you feel the connectors engage with the chassis backplane Note Hold the card by the edges Avoid touching the printed circuit board and connector pins Extend the top and bottom card levers before you insert the card into the slot 3 Rotate the levers to seat the backplane connectors and line card in place 4 Secure card and blanks in place by tightening the top and captive screws on each card 5 Follow the same installation procedure for the remaining cards and slots in the appropriate order Note The blank panels do not have board components or connector pins Align the blank with the guides and gently slide toward the backplane Installing RPMs Line Cards and SFMs Installing a Second RPM Note If you
3. Installing and Maintaining the E1200i System May 2008 PN 100 00056 00 Copyright 2008 Force10 Networks All rights reserved Printed in the USA April 2008 Force10 Networks reserves the right to change modify revise this publication without notice Trademarks Force10 Networks and E Series are registered trademarks of Force10 Networks Inc Force10 the Force10 logo E1200 E1200i E600 E600i E300 EtherScale TeraScale and FTOS are trademarks of Force10 Networks Inc All other brand and product names are registered trademarks or trademarks of their respective holders Statement of Conditions In the interest of improving internal design operational function and or reliability Force10 Networks reserves the right to make changes to products described in this document without notice Force10 Networks does not assume any liability that may occur due to the use or application of the product s described herein Note The country specific warnings and statements of compliance have been moved to Agency Compliance on page 94 in the appendix System Specifications on page 91 Feedback on Documentation Send email to techpubs force10networks com Contents LIS OF PIQUIGS PIO 7 e COTTI 9 Chapter 1 About This GUIdE s Lei RETRATTILE RR 11 Information Symbols and Warnings iii i ERE REL 11 elated PUPIESIO NE cccaduaccckennceadededanendeGhe ARREDATA ORERE EENAA SENA 12 Chapter 2 The E120
4. 59 Accessing the Auxiliary Port by Modem cece eee 60 Accessing the 10 100 Ethernet Management Port 60 Chapter 11 Powering Up cirie nei e anni venire ile 61 RIOT eli a teenie ee cher Oe Rein ii idee eee Salad 61 SUP POW AC oc ncceenre sees ences age retaken Sebartdee seed cadietmeetnereds 62 UDP LIO Ridi Deetail a Eee on e eee iaia E ita 62 Booim tote SL Premi assiale 63 Booting rom the BOOT_USER Prof irreale ii rihta wnei ear 63 Chapter 12 Removing and Replacing Components Liri 65 Removing and Replacing Fan Trays cic dunce pia ad eee etere LL Lai 65 Removing and Replacing AC Power Supplies 66 Remove an AC Power Supply in a non redundant installation 68 Remove an AC Power Supply in a redundant installation 68 Removing and Replacing DC Power Supplies 68 Remove a DC POSSI corridoi eel eae De ed eee 70 Removing and Replacing RPMs Line Cards or SFMS_ 1 eee 71 Removing and Replacing line cards or RPMS 6 05 000 50 cee ecb ay cee eee een peenares 71 Removing and Replacing SEME x 0c tation ied dA todd a RO ee Ra dew ease 72 Removing and Replacing the Air Filter cee eee ene 73 Appendix A Using a Flash Memory Catd i ceci RR 75 External Flash Memory Card Overview scri rph cheer ade euekeena Gees enrenareess 75 Inserting the External Flash Memory Card 75 Removing the External Flash Memory Card 76 Porinating an External Fash Cam cccccck ec eli
5. Installing and Maintaining the E1200i System 37 e Two fan trays are installed To test the power supplies and fan trays Step Task 1 With the fan trays and power supplies installed power on the system e Flip the On Standby switch located next to plug AC 0 to the ON position down 2 Power Supply Status LEDs should be green If an LED is not lit or is blinking amber e check that the units are properly installed and are plugged into the correct slot e Verify the power source If the LED remains unlit or blinking amber at power up replace the power supply 3 Both fan tray LEDs should be green online A blinking green fan tray LED indicates booting Verify that air is flowing through the chassis If a fan tray is not operating properly or air is not flowing through the chassis power off the chassis at the remote power source e Ensure that all fan trays are properly installed Verify the remote power source e If afan tray LED remains unlit replace the fan tray 4 After you have verified the power and fan operability power off the chassis to continue the installation process 5 De energize the Main Disconnect and flip the On Off switch to the OFF position 6 Verify that the LEDs are not lit Power Supply and Fan Tray LEDs Table 4 Power Supply LEDs Status LED is No AC power Unlit No connection Operational On Standby switch may be set to Standby Lit GRE
6. Korea MIC certification Korean Class A Warning Statement DDE APsce MI ogu BOA SE MSI Hel StS SR 72 0598 MN WaASSoSS WHOA d Safety Standards and Compliance Agency Certifications e CUS UL 60950 1 1st Edition e CSA 60950 1 03 1st Edition e EN 60950 1 Ist Edition Installing and Maintaining the E1200i System 95 e EN 60825 1 Safety of Laser Products Part 1 Equipment Classification Requirements and User s Guide e EN 60825 2 Safety of Laser Products Part 2 Safety of Optical Fibre Communication Systems e FDA Regulation 21CFR 1040 10 and 1040 11 e TEC 60950 1 Ist Ed including all National Deviations and Group Differences Electromagnetic Emissions e USA FCC CFR47 Part 15 Subpart B Class A e Canada ICES 003 Issue 4 Class A e Europe EN 55022 2006 CISPR 22 2007 Class A e Japan VCCI V3 2007 04 Class A e Australia New Zealand AS NZS CISPR 22 2006 Class A Immunity e EN61000 3 2 Harmonic Current Emissions N6100 3 3 Fluctuation and Flicker N 61000 4 2 ESD N 61000 4 3 Radiated Immunity N 61000 4 4 EFT N 61000 4 5 Surge N 61000 4 6 Low Frequency Conducted Immunity N 300 386 V1 3 3 2005 EMC for Network Equipment N 55024 1998 A1 2001 A2 2003 Hamma m wm w Product Recycling and Disposal This switch must be recycled or discarded according to applicable local and national regulations Force10 Networks encourages owners of information technology IT equipment to responsibly recy
7. 2 Flip the On Standby switch to the ON position The Status LED for each power supply should be green online If a power supply s LED is not lit or is amber e ensure that the unit is properly installed e Verify the power source If the power supply s LED remains unlit power off the remote power source and replace the unit Both fan tray LEDs should be green online Verify that air is flowing through the chassis If a fan tray is not operating properly or air is not flowing through the chassis e power off the chassis at the remote power source e Ensure that the fan tray is properly installed e Verify the power source Ifthe fan tray LED remains unlit on power up replace the fan tray To turn the chassis power off flip the On Standby switch to the Standby position Note The AC power supplies status LEDs will remain lit and the power supply fans will continue to operate even though DC power to the backplane has been turned off Supplying Power DC Step i Task Flip the REMOTE power switch to the ON position 2 The Status LED for each power supply should be green online If a power supply s LED is not lit or is amber e ensure that the unit is properly installed e Verify the power source If the power supply s LED remains unlit power off the remote power source and replace the unit Both fan tray LEDs should be green online Verify that air is flowing through
8. Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 Figure 15 Figure 16 Figure 17 Figure 18 Figure 19 Figure 20 Figure 21 Figure 22 Figure 23 Figure 24 Figure 25 Figure 26 Figure 27 Figure 28 Figure 29 Figure 30 List of Figures E200 AG Chassis Front View siii ir ERRORE 14 E1200 AC Chassis Rear VISI iin pie SO ian a oe A E RA la 15 E1200i DC Chassis Front View ie aad un iene ene PIECE AES cea Da e1200 DC Chassie Rear View siii deve et ESA Re 17 PASM Eid ria bee a a dah LIE LETALI 24 Rack Mounting he Chassis 2 15 ili paria A REATO ARIA 25 ASCRSRElTBaP cirie EA AIR 28 Rack Mounting the Chassis VETTE TENE TTET TEER EEATT TEE EET pessa 29 Installing Fan Tray sic sispe pe re re EEE AREE ERA TARRA 32 CONI alia ilaria RR iaia 32 E1200i AC Power Supply Shelf ids SEO pes TT IT STAT casa eae ca 0 Cable Connector Required for E1200i AC 36 TEENA POR SUPO siii ail alata iero ala ETA PEM 0 and PEM 1 Chassis Locations reati 41 EIA WDO PEM usce coos hes a IRIS 41 E1200i DC PEM Front Panel PEET TETT us agi Sasa aed erry RETF T 42 Cable Connector Required for E1200i DC PEM 0 ccc eee 45 Connecting the Ground Cable to the E1200iDC PEM 0000 00 46 DC PEM with Connections in Place TORE TEST Tore aa iena TEST presa 46 Reinstalling the PEM Safety Cover 0 0 eee eee eee 47 24 Port 1GE and 2 Port 10
9. issue a break key sequence Ctrl if you experience boot problems The console monitor will display the default BOOT_USER prompt Refer to Appendix B on page 79 for instructions to continue the boot process 18 The E1200i System Site Preparation This chapter describes factors to consider before installing your E1200i system The following topics are discussed e Site Selection Criteria on page 19 e Rack Mounting on page 20 e Cabinet Placement on page 20 e Power on page 20 e Fans and Airflow on page 21 e Storing Components on page 22 For complete E1200i System Specifications refer to Appendix D on page 91 Site Selection Criteria Before you begin the installation process make sure that the area where you intend to install your E1200i meets the following safety requirements Select a site e In arestricted access area e Ina dry clean well ventilated and temperature controlled room away from nearby heat sources such as hot air vents or direct sunlight e Away from sources of severe electromagnetic noise e Near an adequate power source Connect the E1200i to the appropriate branch circuit protection as defined by local electrical codes e Means of power disconnect must be located near the equipment e Position in a rack with adequate space in the front and rear and sides of the unit for proper ventilation access to cables and maintenance access Allow at least 18 inches in the front and 20 inches in the re
10. A Information Technology Equipment according to CISPR 22 European Standard EN 55022 The limits for Class A equipment were derived for 94 System Specifications commercial and industrial environments to provide reasonable protection against interference with licensed communication equipment Attention This is a Class A product In a domestic environment this device may cause radio interference in which case the user may be required to take adequate measures European Community Contact Force10 Networks EMEA Central Dahlienweg 19 66265 Heusweiler Germany http www forcel10networks com german Tel 49 172 6802630 Email EMEA Central Sales Japan VCCI Compliance for Class A Equipment CORES HHLBRESE RRS BERE VCCI DH RICZZZATEREMERTI TORE t RERI CHATS CBR He slkE_I_tWH amp W ET COMBIISHASPBOICHREBT SBELIRKENSCEPHVETF This is Class A product based on the standard of the Voluntary Control Council For Interference by Information Technology Equipment VCCI If this equipment is used in a domestic environment radio disturbance may arise When such trouble occurs the user may be required to take corrective actions Danger AC Power cords are for use with Force10 Networks equipment only Do not use Force10 Networks AC power cords with any unauthorized hardware ANS CA 72 TE YET BRO KEY ha BOMBA BRI KEY ba Am AA Dm SUD MRC EAL RIES CESHREGA AmpC tak neg Kt NE AL Rm BR KEY LDESALALTTRE Lio
11. E1200 and E1200i DC chassis Figure 15 E1200i DC PEM Installing and Maintaining the E1200i System 41 Figure 16 E1200i DC PEM Front Panel Studs PEM interlock lever Over current protector Latch Release 48 60Vde 150A 7200VA CC E1200 PWR DC Locking screws dizoLooN4 Cable and Connector Requirements You must provide your own cables to connect to a remote power source for example a circuit breaker panel in your equipment rack or office Cables must be sized to meet the following criteria e rated for at least 150A service to allow for a fully loaded E1200i DC system at low input voltage per your local electrical codes e limits voltage drop across the cable length to 0 5V or less Before you make the cable connections apply a coat of antioxidant paste to un plated metal contact surfaces File un plated connectors braided straps and bus bars to a shiny finish It is not necessary to file and coat tinned connectors or other plated connection surfaces such as on the E1200i DC PEM studs Installing DC PEMs Each E1200i DC system requires at least one load sharing DC PEM to operate Two units are recommended for full facility redundancy Parameter Specifications Maximum DC PEM Input Current 150A Maximum Power Dissipation 6850W 21 598 BTU hour Input Voltage 48 to 60 Vdc 42 Installing DC Power Supplies Use the fol
12. ERE ei 76 Copying Files to the External Flash 77 Displaying Files Stored on the External Flash 77 Appendix B Syst m BOO sin cccceccissaesassenrees ARIETE RARE ATA pene nes 79 The Sysiem Boat Process sassi SRI TREE 79 Booting Toni the BOOT USER POMP iii het iaia 79 Appendix C I AEREI III NINO 87 Power Supplies and AIRIS scsi RELA ERE LETTA eil 88 SPU aie Ale 04 LEARN 89 Appendix D SvelemSpecilicalion iuscscsicricni baia air 91 ET2Z00 AG Chassis Physical Design ncccacdateescent eG narid aeneae paani a arri 91 E1200i AC System Power Requirements 0 00 cece teen eee 91 E1200 DG Chassis Physical Design scorsi one peer per a 93 Installing and Maintaining the E1200i System 5 E1200i DC System Power Requirements 93 Environmental Bie pe Regola nr hide vd A ala did A a 94 Agency COMmpllanee lt iigews case Fiere ara ee aerea eee 4 94 Safety Standards and Compliance Agency Certifications LL 95 Eleciromagnelie EMISSIONE sadici li cde RIE ERA ER 96 INU ccc ac ceeenee en tie ee oe Ra RRR ARR eR RIDE EEE RRR ROR LE 96 Product Recycling and Disposal see cirio EL a 96 Appendix E Technical SUPPOM i ccivsediee i veeniernes costes Re 99 The iSuppoit WEBBIIO criceti se devsadenachenuaenda 99 Accessing iSupport Services c cette tees 100 Contacting the Technical Assistance Center 101 Requesting a Hardware Replacement 000 cece eee 102 Figure 1 Figure 2 Figure 3 Figure 4
13. Front Shipping cover Remove the chassis from the shipping packaging and move the chassis with a hand cart pallet jack or fork lift to its rack Do not unpack the power supplies fan trays air filter or cards until the chassis is installed Warning The E1200i AC shipping containers each weigh up to 400 pounds The unpacked AN chassis and pallet weigh approximately 200 pounds Do not attempt to lift or move the chassis without the use of a hand cart pallet jack or forklift Caution Lift the E1200i AC chassis only with the handles provided or from the bottom Lifting by the chassis shelves will cause chassis damage Do not remove the shipping cover during the installation process The cover prevents damage to the internal framework and EMI seals Warning Electrostatic discharge ESD damage can occur when components are mishandled Always wear an ESD preventative wrist or foot heal ground strap when handling RPMs SFMs or line cards After you remove the original packaging place RPMs SFMs and line cards directly into the chassis or on an antistatic surface Warning Complete the chassis installation into the rack before you install any other component fan trays power supplies line cards RPMs SFMs cables gt amp Installing and Maintaining the E1200i System 23 Installing the Equipment Rack Shelf Bar The rack shelf bar Figure 5 enables you to easily position the chassis into the rack and provides the unit addi
14. Installing and Maintaining the E1200i System 15 Figure 3 E1200i DC Chassis Front View Line Card Slots Line Card Slots RPM 1 e o o UO000H e o o P00000 Switch Fabric Module SEM Blank BLNK DC Power Supply DC Power Supply Air Filter FA FX FX FX 7 FX i FA e FX F FAX FX FAX FA M00000000000DO ZVNAGANAIADIAS Air Vents 16 The E1200i System Figure 4 E1200i DC Chassis Rear View Locking screw Installed Fan Tray Empty Fan Tray with Self closing Door Ground Connection Ground Connection o Table 2 E1200i Hardware Component Operating Requirements Summary Component Minimum Maximum Field Replaceable Backplane factory installed 1 1 N Air filter factory installed 1 1 Y Fan trays 2 2 Y RPMs 1 2 Y Line cards 1 14 Y SFMs 8 9 Y AC Power Supply 2 6 Y DC Power Supply 1 2 Y Cable management system 0 1 Y Cable management system cover 0 1 Y Installing and Maintaining the E1200i System To install the E1200i system Force10 Networks recommends that you perform the
15. Signal RTS 1 8 5 CTS DTR 2 7 6 DSR TxD 3 6 3 RxD GND 4 5 7 GND GND 5 4 7 GND RxD 6 3 2 TxD DSR 7 2 20 DTR CTS 8 1 RTS Installing and Maintaining the E1200i System 59 Accessing the 10 100 Ethernet Management Port Accessing the Auxiliary Port by Modem You can access the auxiliary port using a dial up modem using an RJ 45 to RJ 45 rollover cable and RJ 45 to DB 25 male DCE adapter labeled MODEM Table 12 lists the pin assignments Table 12 RJ 45 to DB 25 Adapter Pin Modem Assignments E1200i RJ 45 to RJ 45 Rollover Cable RJ 45 to DB 25 Auxiliary Port Modem Adapter Modem Signal RJ 45 Pinout RJ 45 Pinout DB 45 Pinout Signal RTS 1 8 4 RTS DTR 2 7 20 DTR TxD 3 6 3 TxD GND 4 5 7 GND GND 5 4 T GND RxD 6 3 2 RxD DSR 7 2 8 DCD CTS 8 1 5 CTS Configure the 10 100 Ethernet management port labeled 10 100 Ethernet on the primary RPM card in order to obtain network access capability such as downloading a runtime image onto your system You can connect this port to an Ethernet hub or FastEthernet port on a router Table 13 10 100 Ethernet Management Port LEDs Label Description L Link Lit Link is up Unlit No connection A Activity Lit Activity on port Unlit No activity 60 RPM Ports and Cables Powering Up This chapter provides instructions for powering up your E12001 AC or DC system after you have installed all the chassis components
16. and made your power and network connections It covers the following topics e Preparation e Supplying Power AC e Supplying Power DC e Booting to the CLI Prompt Preparation Note Make sure that the switch on the remote power source is in the OFF position until you are ready to supply power to the chassis Before you supply power to your chassis Force10 Networks recommends that you re inspect your equipment rack and chassis Verify that e The equipment rack is properly secured and grounded e The chassis is bolted and secured into your equipment rack e The chassis is grounded e Each power supply module is properly installed and secured e The AC Cord Retainer is installed if applicable AC systems e The power switch is in the OFF position if applicable DC systems e Power cables connect to a compliant remote power source e Both fan trays are installed and secured e All line cards RPMs and SFMs are properly installed and secured e All chassis slots are filled Blank panels and covers are installed in all empty slots Danger Leakage Current High Touch Current The AC power cords are secured to the power inlet using the provided bracket The power cord plugs must be secured to the building outlets by the chassis installer or a qualified electrician Installing and Maintaining the E1200i System 61 Supplying Power AC Step 1 Task Flip the REMOTE power switch to the ON position
17. e Replace the washers and nuts on the studs f With a 7 16 inch box or socket wrench tighten the nuts Installing and Maintaining the E1200i System 45 Step Task continued T Route the terminated cables down and toward the rack rail as shown below Figure 18 Connecting the Ground Cable to the E1200i DC PEM Lug Split lock washer Gi gt Ground studs Status digo roof Figure 19 DC PEM with Connections in Place L JL JL L JL P Ground cable typically green 48 cable typically black Return cable typically red 4901004 46 Installing DC Power Supplies Step Task continued 8 Replace the safety cover and tighten the captive screw with a 2 Phillips screwdriver Figure 20 Figure 20 Reinstalling the PEM Safety Cover 9 Check that the over current protector located on the PEM front panel is in the OFF position Energize the remote power source The Voltage LED should be green If it is amber the 48 VDC and Return cables are connected incorrectly or are reversed 10 Go to DC Power Supply and Fan Operability Test next to complete the installation DC Power Supply and Fan Operability Test After you have completed the fan tray and PEM installation verify their operability by supplying power to the chassis and verifying the sta
18. field flash YE1200 3 x bin eA interface management port config 100m interface management port config 10m interface management port config auto negotiate interface management port config no auto negotiate interface management port config full duplex interface management port config half duplex interface management port config show OPTIONAL Use these commands to set the speed and duplex settings for the Management interface The default setting is full duplex and auto negotiation e Use the interface management port config show command to view the Management interface s physical settings show interface management ethernet interface management ethernet ip address ip address ip address mask Use the show interface management ethernet command to display the IP address and network mask of the management Ethernet port If the show command output does not display configured IP address information use the interface management ethernet ip address ip address ip address mask command to set the IP address of the Management Ethernet port for network ftp tftp operating system boot Installing and Maintaining the E1200i System 83 Step Command Task continued iva show interface management ethernet a No IP address set for interface management ethernet 0 0 BOOT_USER interface management ethernet ip address 1 2 3 4 255 255 0 0 Management ethernet 0 0 IP add
19. improper handling and installation could result in bodily Dancer injury Before you begin work on this equipment be aware of hazards involving ger electrical circuitry networking environments and instigate accident prevention procedures Caution This symbol informs you that improper handling and installation could result in equipment damage or loss of data Warnina This symbol informs you that improper handling may reduce your component AN g or system performance Note This symbol informs you of important operational information Installing and Maintaining the E1200i System 11 A A Danger The installation of this equipment shall be performed by trained and qualified personnel only Read this guide before installing and powering up this equipment This equipment contains two power cords Disconnect both power cords before servicing Danger This equipment contains optical transceivers which comply with the limits of Class 1 laser radiation CLASS 1 LASER PRODUCT Visible and invisible laser radiation may be emitted from the aperture of the optical transceiver ports when no cable is connected Avoid exposure to laser radiation and do not stare into open apertures Caution Wear grounding wrist straps when handling this equipment to avoid ESD damage Danger Leakage Current High Touch Current in AC powered systems AC power cords are secured to the power inlet using the provided brackets The
20. installation procedures in the following order Step Task Section 1 Prepare the site Site Preparation on page 19 2 Unpack the AC chassis and components Unpacking the E1200i AC System on page 23 or Unpack the DC chassis and components Unpacking the E1200i DC System on page 27 3 Mount the AC chassis Standard Front Chassis Mounting on page 24 Installing the Chassis into an Equipment Cabinet on page 25 or Mount the DC chassis Standard Front Chassis Mounting on page 28 Installing the Chassis into an Equipment Cabinet on page 29 4 Install the cable management system See the instructions that come with the cable management system 5 Install components Fan trays Installing Fan Trays on page 31 e Power Supplies including power and Installing AC Power Supplies on page 35 grounding cables Installing DC Power Supplies on page 41 6 Verify power supply and fan tray operability AC Power Supply and Fan Operability Test on page 37 DC Power Supply and Fan Operability Test on page 47 7 Install card components e RPM s and line cards Installing Line Cards and RPMs on page 50 e SFMs Installing Switch Fabric Modules SFMs on page 54 8 Connect network cable RPM Ports and Cables on page 57 9 Supply power to the chassis Supplying Power AC on page 62 Supplying Power DC on page 62 10 Initial boot The initial boot operation automatically brings up the system to the runtime CLI To interrupt the automatic boot process
21. interface management port config full duplex 83 interface management port config half duplex 83 interface management port config no auto negotiate 83 interface management port config show 83 reload 85 show boot selector 81 show bootflash 81 show bootvar 82 show default gateway 84 show interface management ethernet 83 T Technical Assistance Center TAC contacting 99 Test Power Supply and Fan Operability 37 47 U unpacking 23 27 Index W Warning 12 WEEE 97 Installing and Maintaining the E1200i System 105
22. issue a break control sequence CNTL to interrupt the automatic boot process or if you experience boot problems This mode allows you to modify the parameters necessary to manage the boot process Only console port access is enabled for the BOOT_USER mode Installing and Maintaining the E1200i System 79 To configure the chassis from the BOOT_USER prompt Step Command Task 1 help e The soor user prompt appears after an autoboot interrup or tion This is the default boot prompt not the CLI prompt e Enter help or to display a list of available commands and syntax e Enter syntax help to display syntax information and variable descriptions e On some display output you are given the option to continue the help screen display lt cr gt or to stop lt q gt e You can abbreviate the boot commands by entering only the first letter of a command word A matching algorithm dis plays the commands starting with the letter or letters you entered For example b displays the commands starting with the letter b boot change and boot selector Entering s h displays the syntax help information e All commands are case insensitive System Boot Step Command Task continued 2 Execute the following show commands to display important boot information show boot selector This command displays the boot ROM image currently selected and the most recently booted ROM image 2001_USER show boot selector de ROM BOOTSTRAP
23. most slot 0 Step Task i Remove an SFM from the anti static packaging 2 Align the SFM with the guide and gently slide it into the slot until you feel the connectors engage with the chassis backplane Note Hold the SFM by the edges Avoid touching the printed circuit board and connector pins Extend the top and bottom card levers before you insert the card into the slot Rotate the lever to seat the backplane connectors and card in place Secure each SFM in place by tightening the captive screw Continue the process for the remaining SFMs Dn P w Align any blank panels with the guides and gently slide toward the backplane Secure each blank panel by tightening the single captive screw Note If you are not operating your E1200i system with redundancy your SFM package will include blank panels Blanks are slot covers that have no board components or connector pins 54 Installing RPMs Line Cards and SFMs Figure 24 Installing SFMs Start with slot 8 or slot 9 SFM Front Panel and LEDs Table 7 illustrates the SFM front panel and LEDs Table 7 SFM Front Panel and LED Descriptions CC E SFM3 Active Status Switch Fabric LED Description Active Green active and passing traffic Unlit in standby mode Status Flashing Green booting Green operational Flashing Amber communicatio
24. nine to eight the system sends a minor alarm event The system always triggers a major alarm when the number of working SFMs reaches seven Installing and Maintaining the E1200i System 89 90 Alarms System Specifications This appendix contains two major sections e E1200i AC Chassis Physical Design e E1200i DC Chassis Physical Design e Environmental Specifications e Agency Compliance E1200i AC Chassis Physical Design Parameter Specifications Height 42 inches 106 68 cm Width 17 40 inches 44 20 cm Depth without cable management system 22 25 inches 56 51 cm Chassis weight with factory installed components backplane and air filter 139 pounds approx 63 05kg Weight fully loaded backplane air filter 2 fan trays 10 SFMs RPMs and 14 line cards Mounting 394 pounds approx 178 7 kg Attached rack mount brackets are factory set for front mounting in a standard 19 inch rack Mounting brackets are adjustable for center and rear mounting Optional brackets are available for front or center mounting in a 23 inch rack or cabinet Rack clearance required Front 18 inches Rear 20 inches Thermal Output Maximum for fully loaded chassis Minimum for chassis with one 48 port 1GE line card 7 784W 26 578BTU HR 1 450W 4 951 BTU HR E1200i AC System Power Requirements Parameter Specifications Maximum Power Consumption 7 784W Input Voltag
25. seals Warning Electrostatic discharge ESD damage can occur when components are mishandled Always wear an ESD preventative wrist or foot heal ground strap when handling RPMs SFMs or line cards After you remove the original packaging place RPMs SFMs and line cards directly into the chassis or on an antistatic surface Warning Complete the chassis installation into the rack before you install any other component fan trays power supplies line cards RPMs SFMs cables gt O Installing and Maintaining the E1200i System 27 Installing the Equipment Rack Shelf Bar The rack shelf bar Figure 7 enables you to easily position the chassis into the rack and provides the unit additional stability The E1200i DC system must be mounted in a rack that is permanently secured to the floor Figure 7 Rack Shelf Bar o o o b b To install a equipment rack shelf bar Step Task ik Determine the chassis mounting location in the equipment rack 2 Orient the bar with the arrows pointing upward The smooth side of the bar should face outward 3 Attach the bar to the equipment rack brackets using the mounting screws provided by the manufacturer Standard Front Chassis Mounting Note Force10 Networks recommends that you install and operate the E1200i DC system in a standard 19 inch or 23 inch equipment rack Install the E1200i DC system after you secure the equipme
26. stops Figure 27 Replacing the Air Filter VSSOOONT Installing and Maintaining the E1200i System 73 74 Removing and Replacing Components Using a Flash Memory Card This appendix provides information about using an external flash memory card and contains the following sections e External Flash Memory Card Overview e Inserting the External Flash Memory Card e Removing the External Flash Memory Card e Formatting an External Flash Card e Copying Files to the External Flash e Displaying Files Stored on the External Flash External Flash Memory Card Overview Each RPM card is designed with a slot to accommodate an external flash memory card slot0 You can use a flash card to copy the image and configuration files for storage and backup purposes For complex configurations use the copies for other E1200i systems in your network Configure your boot execution process to use the images stored on a flash card as the primary active secondary standby or default boot order preference Optional external flash memory cards are shipped blank Inserting the External Flash Memory Card Note Only insert the external flash before system boot or after the system has completed its boot and is run time mode Installing and Maintaining the E1200i System 75 To install the flash memory card Step Task 1 Press the ejector button to ensure it is in the extended position Hold the
27. the chassis If a fan tray is not operating properly or air is not flowing through the chassis e power off the chassis at the remote power source e Ensure that the fan tray is properly installed e Verify the power source e If the fan tray LED remains unlit on power up replace the fan tray 62 Powering Up Booting to the CLI Prompt After you supply power to the system the following should occur e During bootup power is removed temporarily from all line cards and SFMs This is expected behavior e Both fan trays should be operating e The green online LEDs for the fan trays Power Supplies RPMs SFMs and line cards should be lit and remain lit as long as the system is receiving power and is operational When you supply power to the E1200i system the system performs a series of power on self tests RPM line card and SFM LEDs blink as the diagnostic programs run No user interaction is required at this point Observe the process on your console monitor When the boot process is complete the card LEDs remain online green and the console monitor displays the Command Line Interface CLI prompt Note Do not press any keys or control sequences at any time during the boot process Doing so may cause the boot process to terminate Refer to the FTOS Configuration Guide on the technical publications CD ROM for initial configuration procedures and configuration instructions Booting from the BOOT_USER Prompt T
28. unit that experienced the failure This report is included as a section in the output of show tech support e Console captures showing the error messages e Console captures showing the troubleshooting steps taken e Saved messages to a syslog server if one is used 102 Technical Support Index A AC Power Supply minimum requirement 35 air filter replacing 73 air flow 20 21 alarms fan trays 65 line cards 71 Power Supplies 66 69 RPMs 71 SFMs 71 B blanks 51 BTM ASIC 13 C cable management system 56 commands show logging eventlog 102 show tech 102 connecting auxiliary port 57 console port 57 line card ports 56 management port 60 contacting TAC technical support 99 D Danger 12 DC PEMs cable requirements 42 connector requirements 42 full redundancy 41 minimum requirement 41 remote power source 41 disposal switch 96 E ESD 49 71 European WEEE Directive 97 external flash copying files 77 formatting 76 inserting 75 installing 76 overview 75 removing 76 when to insert external flash 75 F fan trays installing 33 replacing 65 FPC ASIC 13 H hardware requesting replacement 102 High Touch Current see Leakage Current 12 37 61 installing chassis in equipment cabinet 25 29 in rack 24 28 fan trays 33 line cards 50 PEMs 43 rack shelf 24 28 RPMs 50 SFMs 54 iSupport 100 L Leakage Current 12 37 61 LEDs AC power supplies 38 48 fans 38 48 62 In Use LED 76 PEM S
29. which fall within the scope of the WEEE are labeled with the crossed out wheelie bin symbol as shown above as required by WEEE For information on Force10 product recycling offerings see the WEEE Recycling instructions on iSupport at https www force10networks com CSPortal20 Support WEEEandRecycling pdf For more information contact the Force10 Technical Assistance Center TAC see Appendix E Technical Support For California Perchlorate Material Special handling may apply See http www dtsc ca gov hazardouswaste perchlorate The foregoing notice is provided in accordance with California Code of Regulations Title 22 Division 4 5 Chapter 33 Best Management Practices for Perchlorate Materials Installing and Maintaining the E1200i System 97 98 System Specifications Technical Support This appendix contains these major sections e The iSupport Website e Contacting the Technical Assistance Center on page 101 e Requesting a Hardware Replacement on page 102 The iSupport Website iSupport provides a range of documents and tools to assist you with effectively using Force10 equipment and mitigating the impact of network outages Through iSupport you can obtain technical information regarding Force10 products access to software upgrades and patches and open and manage your Technical Assistance Center TAC cases Force10 iSupport provides integrated secure access to these services The i Support w
30. 0 SYSIOM isrrissririiriid ttiis A nE ARAS L AAAA EEA RARE LEE 13 Wai PRIORE TOI AAA 13 Chapter 3 Site Prepatatlon iii csiciisnenianica piera dida giare ener ene 19 Ole Selecion OONA ceci desi ellerre RECEPITE SETTE 19 RRGR MOUN oy 2665 TAATA RNS FG FORK RE CATIA PRETE Ri 20 CADDE PRCE costei ri pi ha a Rw ea rl 20 POWO ccc eee RARE UE ELLI TIRI RETE ERRATA ITER ERROR RRR RR RRS RA 20 PRS Si AUTO caging 3245S OSE EE SRLS He RAL RIA EBRD EY RAH DLR E PRR Ry RL LARS 21 SAET EA aN Ael I sissi ei ai 22 Chapter 4 Installing the AC Chassis 10000 editti deriso 23 Unpacking the E1200 AG SYSIBM css ip REISER REISER RIA 23 installing the Equipment Rack Shelf Balcani RTLA ERRE RR 24 Standard Front Chassis Mounting css iso ewe eee ee wd do Eee ede eee eee wes 24 Installing the Chassis into an Equipment Cabinet 25 Chapter 5 Installing the DC Chassis 2ccsc cst cecsicccaecvscdecdi dace sear tenvecdecaenecs 27 Unpacking the E1200i DC System eran dean ind CE E 27 Installing the Equipment Rack Shelf Bar 22252 cs0 0e060 086 0 6ahsbdaeedeeeeraiaecenens 28 plandatd From Chassis MIOUNIO siii woe Bde Be Sek poner aia ak Sch wa hw A de edo pa aia de dg 28 Installing the Chassis into an Equipment Cabinet 29 Installing and Maintaining the E1200i System 3 Chapter 6 installing Fan Trap essre arie 31 Chapter 7 Installing AC Power Supplies iii 35 Securing the Chassis Ground sicari ERRE RTRT reed 36
31. D 5 GND 6 RxD Input 7 DSR Input 8 NC unused 3 Table 9 Auxiliary Port RJ 45 Pin Assignments Pin Signal Input Output 1 RTS Output 2 DTR Output 3 TxD Output 4 GND 5 GND 6 RxD Input 58 RPM Ports and Cables Table 9 Auxiliary Port RJ 45 Pin Assignments Pin Signal Input Output 7 DSR Input 8 CTS Input Accessing the Console with a DB 9 Adapter You can connect to the console using a RJ 45 to RJ 45 rollover cable and a RJ 45 to DB 9 female DTE adapter labeled TERMINAL to a terminal server for example PC Table 10 lists the pin assignments Table 10 Pin Assignments Between the E1200i Console and a DTE Terminal Server E1200i RJ 45 to DB 9 Terminal Server Console Port RJ 45 to RJ 45 Rollover Cable Adapter Device Signal RJ 45 pinout RJ 45 Pinout DB 9 Pin Signal RTS 1 8 8 CTS DTR 2 7 6 DSR TxD 3 6 2 RxD GND 4 5 5 GND GND 5 4 5 GND RxD 6 3 3 TxD DSR 7 2 4 DTR CTS 8 1 7 RTS Accessing the Console with a DB 25 Adapter You can connect to the console using an RJ 45 to RJ 45 rollover cable and RJ 45 to DB 25 female DTE adapter Table 11 lists the pin assignments Table 11 Pin Assignments Between E1200i Console and DB 25 Adapter E1200i RJ 45 to DB 25 Terminal Server Console Port RJ 45 to RJ 45 Rollover Cable Modem Adapier Device Signal RJ 45 Pinout Ru 45 Pinout DB 25 Pinout
32. EN Power Supply Failure Lit AMBER Table 5 Fan Tray LEDs Status LED is Booting Blinking GREEN Fault Detected Lit YELLOW Communication Failure Blinking YELLOW 38 Installing AC Power Supplies Table 5 Fan Tray LEDs Status LED is Operational Lit GREEN Loss of Power Unlit Installing and Maintaining the E1200i System 39 40 Installing AC Power Supplies Installing DC Power Supplies The E12001 DC system requires a minimum of one DC Power Entry Module PEM to operate but two are recommended for redundancy To comply with safety agency and EMI regulations you must install covers on all power supply slots not containing a PEM Connect the PEMs to the appropriate branch circuit protection as defined by local electrical codes For full redundancy each PEM must be attached to an independent power source with a dedicated circuit breaker For example the PEM in slot 0 connects to circuit breaker A and the PEM in slot 1 connects to circuit breaker B The E1200i DC chassis contains two DC PEM slots as shown in Figure 14 Figure 14 PEM 0 and PEM 1 Chassis Locations PEMO PEM 1 a rt ww AAA DA The DC PEM shown in Figure 15 is used in both the
33. GE Line Card Port Numbering 00 51 Installing an RPM into the E1200 terad Errr SNRN 52 RPM and Line Card Slot Numbering Label 52 Installing SFMs ears TPE SII Lea PRETE CIRROSI O Leda DO Pinout for an RJ 45 Connector End Adaptors 0000 c cece eee ee 58 Securing the Fan Tray Screw Latch naaa ccc eee eens 66 Replacing the Air Filter Terre CISTI VITTI FELICI Tere CITE 73 dir Command Example srar errre dra Ea iaaa aaa Pi T7 The European WEEE SyMDO io dna the ee eed ale die ee ee ade 97 Support Policies section of Support ssi i eee dee de ees 100 Installing and Maintaining the E1200i System 7 List of Tables Table 1 namain SEO siii iI RIA RA 11 Table 2 E1200i Hardware Component Operating Requirements Summary 17 Table 3 Fan Tray Safety Labels Coe era TETE CORTEO PRETI VITE ida OS Table 4 Power Supply LEDS i siria lie Aerea 38 Table 5 Pena LED ng eit i Bete eh dee iride lei 38 Table 6 APM LEDS 22623000 o taeeatddectaretanone seated A PRIA ARIA 53 Table 7 SFM Front Panel and LED Descriptions LL 55 Table 8 Console Port RJ 45 Pin Assignments enue beers CERTE Meee DI Table 9 Auxiliary Port RJ 45 Pin Assignments Li 58 Table 10 Pin Assignments Between the E1200i Console and a DTE Terminal Server 59 Table 11 Pin Assignments Between E1200i Console and DB 25 Adapter 59 Table 12 RJ 45 to DB 25 Adapter Pin Modem As
34. SELECTOR PARMETERS Current ROM bootstrap selector set to Bootflash partition A Last ROM bootstrap occurred from Bootflash partition A co A 3 show bootflash This command displays information about the current boot ROM STE show bootflash N GENERAL BOOTFLASH INFO Bootflash Partition A Forcel0 Networks System Boot Copyright 1999 2007 Forcel0 Networks Inc ROM Header Version 1 0 Official CP_IMG_BOOT BSP Release 2 0 0 14 Created Fri Nov 2 18 22 47 US Pacific 2007 Bootflash Partition B Forcel0 Networks System Boot Copyright 1999 2007 Forcel0 Networks Inc ROM Header Version 1 0 Official CP_IMG_BOOT BSP Release 2 0 0 14 Created Fri Nov 2 18 22 47 US Pacific 2007 Boot Selector Partition Forcel0 Networks System Boot Copyright 1999 2007 Forcel0 Networks Inc ROM Header Version 1 0 Official CP_IMG_BOOT_SELECTOR BSP Release 2 0 0 14 Created Fri Nov 2 18 26 56 US Pacific 2007 e E Installing and Maintaining the E1200i System 81 Step Command Task continued 4 show bootvar This command displays the current operating system boot configuration parameters 8001 usER show bootvar PRIMARY OPERATING SYSTEM BOOT PARAMETERS ge VV file name E1200i x bin SECONDARY OPERATING SYSTEM BOOT PARAMETERS coso pria DEFAULT OPERATING SYSTEM BOOT PARAMETERS ni O res file name i E1200 g bin Ve P 5 boot change If your configuration displays no pre
35. ajor alarm LED is lit the entire Power Supply Module must be replaced There are no field serviceable parts inside the Power Supply unit AN Danger Do not remove the AC Cord Retainer until the power supplied by the remote power source is OFF AN Danger Do not remove the AC Cord Retainer until the power supplied by the remote power source is OFF 66 Removing and Replacing Components Note The On Standby switch disconnects power to the rest of the chassis from all 6 AC power supplies e When the AC cord is attached power supply fans will spin and the LEDs will indicate status while the On Standby switch is in Standby Note AC Power Supplies may be replaced without removing the AC cord retainer or the AC cords Installing and Maintaining the E1200i System 67 Remove an AC Power Supply in a non redundant installation Step Task 1 Unplug the network interface cables connected to the line card or RPM 2 Activate the disconnect switch at the Main power source or disconnect the AC cord at the remote power source 3 Grip the handle and squeeze the thumb latch 4 Slide the Power Supply out of the slot 5 If you are replacing the Power Supply go to Installing AC Power Supplies on page 35 Remove an AC Power Supply in a redundant installation Step Task AC Power Plugs Switch This retainer must be in place during normal operation Do not remove except for servicing AC Cord Retainer Safety Cove
36. ar of the rack for ventilation If placing the chassis in a cabinet ensure that there is enough clearance between the closed cabinet door and the cables in the cable management system on the chassis Caution Lift the E1200i chassis either from the bottom or by the handles provided with the front shipping cover Lifting by the chassis shelves or fan tray openings will cause chassis damage Do not remove the protective front shipping cover until the chassis is secured in the equipment rack Installing and Maintaining the E1200i System 19 Rack Mounting When you prepare your equipment rack make sure the rack is bolted to the floor and or braced to a wall or ceiling When you install the chassis e Make sure that the rack is grounded to the grounding electrode Each DC PEM must be grounded to the rack or building ground bus The equipment rack must be grounded to the same grounding electrode used by the power service in your area The ground path must be permanent e Install the E12001 chassis in the rack before you install internal components or make network and power connections e In an empty rack place the chassis in the lower half of the rack to ensure rack stability Cabinet Placement The cabinet must meet the following criteria e Minimum cabinet size is 30 inches deep and 24 inches wide e Minimum air flow is 750 cubic feet per minute CFM e Minimum of 3 inches between the closed doors and the front of the cable mana
37. are installed and verified and RPMs SFMs line cards and any blank panels are installed Force10 Networks recommends that you keep all components in the original packaging until you are ready to install them Important Points to Remember e Do NOT remove the cards from their protective bags until you are ready to install them in a chassis e When you are ready to install the cards unwrap and install one card at a time starting with the right most slot Slot 13 for line cards Slot R1 for RPMs and Slot 9 for SFMs ending with the left most slot Slot 0 for line cards Slot RO for RPMs and Slot 0 for SFMs Installing and Maintaining the E1200i System 49 Installing Line Cards and RPMs At a minimum the E1200i requires one RPM and one line card to operate Caution Any slot not filled with a line card or RPM must be filled with a blank to ensure adequate cooling and EMI containment RPMs The E1200i system requires the installation of at least one RPM although two are recommended for redundancy RPMs are designed to be installed in either the center RO or RI slots Since FTOS searches for an RPM in slot 0 first Force 10 recommends you install your RPM in slot 0 when only running with one RPM Do not force RPMs into line card slots RPMs are keyed differently than line cards to prevent improper installation You can hot insert a second RPM into a running system without performance interruption or software intervention A seco
38. ciali Power CUPS nas cake rei ied aa a ii 36 AC Power Supply and Fan Operability Test 37 Power Supply and Fan Tray LEDs 38 Chapter 8 Installing DG Power Supplies lt sscscccsecasdecndstsecesioesctesscdec aus cs 41 Cable and Connector Requirements 42 ingtalling DO PEME lt alati FERRARI cere ree otPetaides A aea a 42 DC Power Supply and Fan Operability Test 47 Chapter 9 Installing RPMs Line Cards and SFMS Lr 49 Unpacking an RPM or Lite Caldi ERRATI AEREA 49 Important Points to Remember iii ARRE RIA 49 Installing Line Cards and RPMS sii RT ee rare 50 RPS sinsssssselanfiustesi stor ne a Lean teo Lala ene edi 50 BICE RR RO cee FCC ESTINTO CIA NORTE SITO TI ISO 50 Line Card Port Numbering 50 Bink PAWS sasari rii ede pe RAS LEK R SDRAM EORD EERE OOO Rear th RRA a TIR SI Preparing and Installing RPMs and Line Cards i iii i a 51 ingtalling a Second RAPIMENTO ARIE SHEN ehe 53 PP Gabel ane LEDS RARE Cow Rha AAA SAG AN a a dea 53 Installing Switch Fabric Modules SFMS 0 54 GEM Front Panel ang LED pui Eli RARA RIA ALERT RR 55 Line Card Cable Management Systems iii i i ee dn a 56 Chapter 10 RPM Ports and Cables iis cccisiwkcasereesenien randa de 57 RPM PONG i tccceciacne ekeae ERRE PERALTRO Ges tenes ERRE 57 Connecting the Console and Auxiliary Ports LL 57 Cable and Adapter Pin Assignments cases abano elisa ei eta 58 Accessing the Console with a DB 9 Adapter 59 Accessing the Console with a DB 25 Adapter
39. cies are streamline quickly assist customers receive solutions to their technical issues Support Guide Forcei0 Support guide provides process guidelines for requesting services from Force Common questions regarding technical support requests RMA s training and i Support usi covered Support Guide Support Agreement The StarSupport end user agreement covers Force10 support obligations process for reque technical and hardware support support limitations terminations and definitions i Force10 Master Support Agreement amp Product Warranty hd Force10 Warranty and End User License Agreement The screenshot above shows the Support Policies section of iSupport The Support Guide available on that page details the types of information and services that you can access through iSupport and through various types of support contracts Accessing iSupport Services The URL for iSupport is http www force 1Onetworks com support To access iSupport services you must have a userid and password If you do not have one you can request one at the website 1 On the Force10 Networks iSupport page click the Account Request link 2 Fill out the User Account Request form and click Send You will receive your userid and password by E mail 3 To access iSupport services click the LOGIN link and enter your userid and password See Contacting the Technical Assistance Center below for more 100 Technical Support Contac
40. cle their equipment when it is no longer needed Force10 offers a variety of product return programs and services in several countries to assist equipment owners in recycling their IT products Waste Electrical and Electronic Equipment WEEE Directive for Recovery Recycle and Reuse of IT and Telecommunications Products Force10 switches are labeled in accordance with European Directive 2002 96 EC concerning waste electrical and electronic equipment WEEE The Directive determines the framework for the return and recycling of used appliances as applicable throughout the European Union This label as shown in Figure 29 is applied to various products to indicate that the product is not to be thrown away but rather reclaimed upon end of life per this Directive System Specifications Figure 29 The European WEEE symbol In accordance with the European WEEE Directive electrical and electronic equipment EEE is to be collected separately and to be reused recycled or recovered at end of life Users of EEE with the WEEE marking per Annex IV of the WEEE Directive as shown above must not dispose of end of life EEE as unsorted municipal waste but use the collection framework available to customers for the return recycling and recovery of WEEE Customer participation is important to minimize any potential effects of EEE on the environment and human health due to the potential presence of hazardous substances in EEE Force10 Networks products
41. configured operating system boot primary secondary default parameters use the boot change command to edit appropriate fields e The primary operating system boot parameters are used in the first attempt to boot the system e The secondary operating system boot parameters are used if the primary operating system boot selection is not available e The default operating system boot parameters are used if the secondary operating system boot parameter selection is not available The default parameters always reside on the internal flash device flash Note These parameters as well as other boot parameters can be modified in the CLI mode When you enter the boot change command you are prompted for a response Enter anew parameter or press the ENTER key carriage return to accept the default parameter e Enter period to clear a field e Enter dash to edit a field above the current cursor position Note When you enter a new parameter that extends beyond 80 characters you cannot use the BACKSPACE key to correct any mistakes If you make a mistake you must re enter the parameter System Boot Step Command Task continued BOOT_USER boot change clear field boot device file name BOOT_USER boot change clear field gt boot device file name BOOT_USER primary DN go to previous field flash o YE1l2Z00 3 xbin default go to previous
42. current protector Latch Release 48 60Vde 150A 7200VA CC E1200 PWR DC Locking screws dizo LOONH 4 Loosen the Locking screws 70 Removing and Replacing Components Step Task continued 5 Lift and hold the PEM interlock lever to release the PEM 6 While holding the interlock lever up using the bottom handle pull the PEM straight out of the slot Removing and Replacing RPMs Line Cards or SFMs Warning AN Do not remove a panel blank unless you are ready to install a line card RPM or SFM into that slot If you remove a card immediately replace the empty slot with a panel blank Blanks are required to control airflow and electromagnetic interference Electrostatic discharge ESD damage can occur when components are mishandled Always wear an ESD preventive wrist or foot heel ground strap when handling RPMs SFMs or line cards Connect the ESD strap to the grounding plug located on the front of the chassis After you remove the original packaging place RPMs SFMs and line cards on an antistatic surface Note e If you operate your E1200i without redundant RPMs the system enters a software defined power down state when you remove the only RPM for replacement e Your E1200i system will not function properly with fewer than eight SFMs You can add replace or remove modules without interrupting the system power or system operations RPMs line cards and SFMs are hot swa
43. e Range 200 240 VAC 50 60 Hz Installing and Maintaining the E1200i System 91 Maximum Heat Dissipation 7 188W 24 541 BTU HR Maximum Power Supply Input Current 16A per module 92 System Specifications E1200i DC Chassis Physical Design Parameter Specifications Height 36 75 inches 93 35 cm Width 17 40 inches 44 20 cm Depth without cable management system 21 25 inches 53 98 cm Chassis weight with factory installed components backplane and air filter 97 pounds approx 44 00 kg Weight fully loaded backplane air filter 2 fan trays 10 SFMs RPMs and 14 line cards 319 pounds approx 144 70 kg Mounting Attached rack mount brackets are factory set for front mounting in a standard 19 inch rack Mounting brackets are adjustable for center and rear mounting Optional brackets are available for front or center mounting in a 23 inch rack or cabinet Rack clearance required Front 18 inches Rear 20 inches Thermal Output Maximum for fully loaded chassis Minimum for chassis with one 48 port 1GE line card 6850W 23 389 BTU HR 1 450W 4 951 BTU HR E1200i DC System Power Requirements Parameter Maximum Power Consumption Specifications 6 850W Input Voltage Range 200 240 VAC 50 60 Hz Maximum Heat Dissipation 6 325W 21 598 BTU HR Maximum Power Supply Input Current 16A per module Installing and Main
44. ebsite see Figure 30 below http www force1Onetworks com support contains a publicly available interface that includes access to techtips white papers and user manuals After you get an account and log in the available documentation expands to other types including bug lists error message decoder release notes You can even track your own Force10 inventory Once you are logged in the following five tabs become available e Home Summary of open cases RMA management and field notices as shown below e Service Request Case management e Software Center Software downloads bug fixes and bug tracking tool e Documents User documentation FAQs field notices technical tips and white papers e Support Programs Information on the suite of Force10 support and professional support services Installing and Maintaining the E1200i System 99 Figure 30 Support Policies section of iSupport FORCEGO PUGILI CUTLE AU Products Applications gt Login Support Overview Contact Support Professional Services Support Policies Customer Login Account Request Documentation E Series Tech Tips and FAQ S Series Tech Tips and FAQ S Series Downloads White Papers Support Partners News Events Company Careers Support Policies Force10 world class support Forcet0 Networks provide world class technical support with modular hardware and softy services to maintain a high performance network Force10 support poli
45. ecuring the Chassis Ground Step Task 1 Locate the chassis ground connector nuts on the chassis rear see Figure 2 on page 15 2 Install the grounding cables to the ground nuts The grounding cable must comply with your local electrical codes in size and color typically the color is green or green with yellow stripe Note Grounding cables must be terminated only with a UL listed 2 hole lug with 1 4 inch holes on 3 4 inch spacing see Figure 12 a Use ANSI UNC 1 4 20 x 1 2 bolt b Tighten the bolt torque should not exceed 25inch Ibs c Connect the opposite end of the grounding cable to the nearest appropriate facility grounding post Figure 12 Cable Connector Required for E1200i AC 0 267 diameter VILOOONA All measurements in inches Installing Power Supplies Caution An E1200i AC power supply still has power after extraction and has completely powered off when the fans have stopped rotating When replacing a power supply to avoid arcing and discoloration of the supply and the chassis pins please wait for the fans to stop rotating before reinserting the supply Step Task 1 Make sure that the On Standby switch located on the left side of plug AC 0 is in the Standby up position Figure 11 2 Loosen the cord retainers locking screws if needed and tilt the AC cord retainer up approximately 15 and gently slide the cover away from the chassis 36 Installing AC Power Supplies Step Ta
46. flash card vertically with the manufacturer s label on the left and the barcode on the right 2 Gently insert the flash card into the primary RPM flash slot until the card is flush with the front panel Do not force the flash card into the slot 3 The In Use LED illuminates only during read or write operations VPSOOONA Removing the External Flash Memory Card To remove the flash memory card Step Task 1 Gently depress the flash card in the slot The card should partially pop out of the slot Di Remove the card and place it in an antistatic bag Formatting an External Flash Card New external flash cards must be formatted in the E1200i before use Flash cards used on systems other than the E1200i as well as cards formatted on PCs must be reformatted in the E12001 flash slot before they can be used Similar to formatting a new diskette formatting erases all information stored on the flash card To format the flash card Step Task 1 Insert the flash card into the flash slot on the primary RPM 2 In the EXEC CLI mode enter format slot0 3 The formatted flash card is ready to use 76 Copying Files to the External Flash Copy files to the flash when you want keep a backup image The In Use LED illuminates during a read or write operation Do not eject the flash card from the slot while this LED is lit To copy files to the external flash card use the follo
47. from 0 to 13 and card type is the five character code for the card type e If you are replacing the line card with a blank panel delete the line card information from the configuration by entering no linecard 6 If you are not operating your system with redundant cards with only one line card one RPM and eight SFMs you must power off your system until the cards are replaced Removing and Replacing SFMs To remove and replace an SFM Step Task 1 Loosen the captive screw and pull the ejector lever towards you to disengage the backplane connections 2 Slide the card out of the slot and store in the original anti static packaging System messages appear on the console including the following TSM 6 SFM_REMOVE Removed SFM Wait 5 to 10 seconds to install a new SFM or reinsert an SFM 3 Remove the new SFM from the antistatic packaging 4 Align the new SFM with the guide and gently slide the card into the slot until you feel the connectors engage with the chassis backplane Note Hold the SFM by the edges Avoid touching the printed circuit board and connector pins Extend the card lever before you insert the card into the slot 5 Rotate the lever to seat the backplane connectors and SFM in place 6 Secure the SFM in place using the provided screw ve If you are not operating your E1200i system with redundancy replace the empty slot with a filler panel blank Blanks do not have board components or c
48. gement panel and a minimum of 3 inches between the chassis rear and the rear of the cabinet with the cabinet door closed With the rear doors of the cabinet open you will need a clearance of at least 20 inches from the rear to access the chassis fan trays e Minimum of 20 inches clearance at the chassis front to access the air filter power supplies and cards Power At a minimum the E1200i requires either 2 AC Power Supplies or 1 DC PEM to operate Caution You cannot power the system with both types of power supply module installed The system must contain only one type of power module either AC or DC Caution The E1200i AC Chassis is shipped with blank inserts covering the DC PEM openings DO NOT REMOVE THEM The blank inserts must remain installed for proper system cooling and for EMI containments during system operation 20 Site Preparation Danger e Make your chassis ground connections first see Figure 2 If the chassis is not correctly grounded excessive electromagnet emission may result e Disconnect all power to the equipment rack or cabinet before chassis installation e Never operate the E1200i system with empty RPM SFM or line card slots Always replace empty slots with blank panels Each E1200i system requires at least two AC Power Supplies or at least one DC Power Supply to operate Three AC units are required for power supply redundancy four AC units are required for full facility redundancy and
49. he initial boot operation automatically brings up the system to the runtime CLI To interrupt the automatic boot process issue a break key sequence CNTL The console monitor will display the default BOOT_USER prompt Refer to Appendix B on page 79 for instructions to continue the boot process Installing and Maintaining the E1200i System 63 64 Powering Up Removing and Replacing Components This chapter provides instructions for removing and replacing E1200i AC and DC components It covers the following topics e Removing and Replacing Fan Trays e Removing and Replacing AC Power Supplies e Removing and Replacing DC Power Supplies e Removing and Replacing RPMs Line Cards or SFMs e Removing and Replacing the Air Filter When a component fails the E1200i system triggers major or minor alarm LEDs located on the RPM sends events to the SNMP trap and show alarms table disables or changes component Status LEDs or triggers an audible alarm Refer to Appendix C on page 87 for more information on alarms Removing and Replacing Fan Trays In the event of a fan tray failure signified by an amber LED an SNMP trap or major alarm event the entire fan tray must be replaced If one or more fans within a fan tray fail the system generates a minor alarm and an SNMP trap The fan trays are hot swappable To remove and replace the fan tray you must have access to the rear of the chassis and be able to pull the fan
50. i AC system requires a minimum of two AC power supplies to operate three for power redundancy four for facility redundancy 2 2 and 6 for 3 3 redundancy To comply with safety agency and EMI regulations you must install the AC cord retainer over all power cords The E1200i AC chassis contains six AC power supply slots as shown in Figure 11 Note If you are installing only two power supplies they must be installed in the same row FTOS will generate an error message if the two power supplies are not in the same row Note If you are installing power supplies for redundancy e For 2 2 redundancy two power supplies must reside in each row That is two in the top row and two in the bottom row e For redundant operation with only three power supplies install all three power supplies in the same row Note The On Standby switch disconnects power to the rest of the chassis from all 6 AC power supplies e When the AC cord is attached power supply fans will spin and the LEDs will indicate status while the On Standby switch is in Standby Figure 11 E1200i AC Power Supply Shelf AL e fi i 2 LS ARR Power Supplies a J DEDE 5 i AC Power Plugs This retainer must be in place during normal operation Do not remove except for servicing AC Cord Retainer Safety Cover Installing and Maintaining the E1200i System 35 Secure your chassis ground first and then install each power supply S
51. inch adapter brackets 3 Using a hand cart pallet jack or forklift align the rack mount holes with the equipment rack holes situating the chassis on top of the equipment rack shelf bar 4 Insert rack mounting screws in the holes that are not obscured by the metal chassis shipping cover Tighten the screws See Figure 6 5 Loosen and remove the screws that secure the chassis Front Shipping Cover and remove the cover 6 Insert the remaining rack mounting screws and tighten to secure the chassis in the rack Installing the Chassis into an Equipment Cabinet Install the E12001 AC system after you secure the rack shelf bar Load the chassis in the lower half of the cabinet to avoid it becoming top heavy Make sure the cabinet is positioned with adequate space in the front rear and sides of the unit for proper ventilation access to cables and access for maintenance Refer to Chapter 3 Site Preparation for complete requirements To install the chassis into an equipment cabinet Step Task 1 Install the equipment rack shelf bar Installing and Maintaining the E1200i System 25 Step Task 2 Adjust the chassis mounting brackets to the desired front rear position and add a 23 inch adapter brackets as required 3 Using a hand cart pallet jack or forklift align the rack mount holes with the cabinet holes 4 Insert rack mounting screws in the holes that are not obscured by the metal chassis shipping c
52. k during initialization No user interaction is required as long as the boot process proceeds without interruption Observe the process on your console monitor and note the message output on the display When the boot process is complete the RPM and line card Status LEDs remain online green and the console monitor displays the command line interface CLD prompt Force10 gt The RPM cards in the E12001 system contain an internal flash memory card flash This is the default storage area for the boot files and the startup configuration file Upon system power up or a system reset the boot process uses parameters stored in non volatile random access memory NVRAM to boot the system Each RPM card is equipped with a slot for an external flash memory card slot0 You can copy the image files and configuration files to the external flash device on the primary RPM You can also begin your boot process by accessing a remote server containing the boot image and system image files When you configure your system to boot you can specify the boot preference order primary secondary or default in the BOOT_USER mode and the CLI mode Note The E1200i system supports up to a 40 character file name length up to a 180 character local file path length and up to a 256 character remote file path length For information about the flash memory card refer to Appendix A on page 75 Booting from the BOOT_USER Prompt To get into the BOOT_USER mode you can
53. lowing steps to install a DC PEM Step Task 1 Make sure that the remote power source the circuit breaker panel is in the OFF position 2 Make sure that the over current protector located on the PEM front panel is in the OFF position 3 Loosen the retaining screw and remove the PEM safety cover Retaining screw Safety cover UEOIOONA Installing and Maintaining the E1200i System 43 Step Task continued 4 Slide the PEM into the 0 or 1 slot Figure b a Lift up and hold the PEM interlock lever and carefully push the unit inward to fully seat it to the backplane When the PEM is fully inserted the interlock lever will drop to hold the PEM in position b Tighten the two locking screws with a 2 Phillips screw driver to secure the PEM Do not exceed 5 inch Ibs torque Over current protector PEM interlock lever Locking screws dtoroouf Step Task continued 5 Secure the chassis ground connection first a Remove one outer nut and one washer from each of the six studs One nut should remain tight on the stud If the inner nut is loose re tighten it to 25 inch lbs maximum b Locate the chassis ground connector studs on the PEM front panel see Figure 16 The two rightmost studs are the ground connection c Install the grounding cable onto the ground studs The grounding cable must compl
54. m conditions ACO LT Allows you to test the operability of LEDs to verify that they are able to light Press the ACO LT button to temporarily illuminate the LEDs on the RPM If you press this button when the alarm status LED is lit the alarm relay contacts are reset until the next alarm event Flash In Use Green flash memory card is in the process of a read or write process Do not remove the flash card when the In Use LED is lit Unlit not in use Installing and Maintaining the E1200i System 53 Table 6 RPM LEDs Primary Green primary Unlit secondary or standby Status This is a bi color LED Green operational Amber fault detected Flashing green booting Unlit in secondary mode or power is off Installing Switch Fabric Modules SFMs A minimum of eight SFMs are required in order for the E1200i system to operate properly Slot 9 allows for a redundant SFM allowing up to ten SFMs in the E12001 system SFMs carry user traffic between line cards or between RPMs and a line card SFMs plug directly into the backplane which provides high speed access to the line cards The switch fabric receives user data packets and redirects them to the appropriate destinations according to the routing information Caution If you are not operating your system with a redundant tenth SFM you must install an SFM blank to avoid overheating and ensure EMI containment Install SFMs from the right most slot 9 to the left
55. n components are mishandled A Always wear an ESD preventative wrist or foot heal ground strap when handling chassis components After you remove the original packaging place chassis components on an antistatic surface Installing and Maintaining the E1200i System 31 Figure 9 Installing Fan Tray screw latch 08 32 Installing Fan Trays To install fan trays Step Task dh Unpack the fan tray 2 Prior to inserting a fan tray fully turn its screw latch counter clockwise with flathead screwdriver until the fan tray latching mechanism fully retracts into the fan tray see Figure 10 3 Grip the fan tray handle Slide the connector end of each fan tray into the slot until it stops and the handle end is flush with the chassis rear 4 Secure the fan trays into place by turning the screw latch clockwise Table 3 is an illustration of the fan tray safety labels Table 3 Fan Tray Safety Labels Label Location A CAUTION Fan tray faceplate Verify fan blades have stopped rotating before removing fan tray VLSO00N4 Installing and Maintaining the E1200i System 33 34 Installing Fan Trays Installing AC Power Supplies The E1200
56. n failure Amber fault detected Unlit no power Installing and Maintaining the E1200i System 55 Line Card Cable Management Systems Force10 provides a variety of E12001 chassis cable management systems to manage your fiber optic and auxiliary cables connecting to line cards For details see the Force 10 price list For installation instructions see the instructions that come with the specific cable management system 56 Installing RPMs Line Cards and SFMs RPM Ports and Cables This chapter describes standard RPM cables and adapter pin assignments for the E1200i AC and DC systems It contains the following sections e RPM Ports e Cable and Adapter Pin Assignments e Accessing the 10 100 Ethernet Management Port RPM Ports There are three ports on the RPM They are labeled and described as e Console A Universal Asynchronous Receiver Transmitter UART port with an RJ 45 jack is used for system configuration and monitoring Modem connections are not supported on this port e Auxiliary A UART port with an RJ 45 jack allows modem access to the E1200i system from a remote location e 10 100 Ethernet A 10 100 Ethernet port is the Management port which is a channel to download images and manage the system as well as FTP and Telnet operations You must provide a RJ 45 Ethernet cable to connect to the Ethernet receptacle Connecting the Console and Auxiliary Ports Note Attach an ESD preventive wrist s
57. nd RPM for redundant functionality provides uninterrupted operability if the system transitions from the active RPM to the standby RPM The standby RPM constantly performs updates and receives the same configuration information received by the active RPM The standby RPM also performs diagnostics on its subsystems In the event of a failover the standby RPM immediately takes over and resumes the control activities that the active RPM was performing Installing a Second RPM on page 53 provides more information on the second RPM The RPM Major and Minor alarm LEDs are controlled by software which sets the threshold levels for triggering the different stages of alarms Line Cards Your E1200i configuration requires a minimum of one line card Line cards are hot swappable The line card ports provide external interface functions for connections to other systems for example a router or switch Each line card has an onboard CPU for line card management which updates packet forwarding information obtains statistical information and performs synchronization tasks with the RPM as well as Force10 Networks custom built ASICs which enable line rate forwarding Line Card Port Numbering There are 14 line card slots available in the E1200i chassis A minimum of one line card is required for operation Line cards are installed in slots 0 through 13 Ports on line cards are numbered from the top starting from 0 see Figure 21 50 Installing RPMs Li
58. ne Cards and SFMs Figure 21 24 Port 1GE and 2 Port 10GE Line Card Port Numbering Forssto 24 port 1GE line card 2 port 10GE line card Force10 Networks Networks Port 0 Jo pr dl Jo r 0 Cal oL GA Ei Port 1 OL jaa vio Port 2 OL p Ei Port 3 PORTO cei SARI Port 4 Sk ap 5 a e e VOZOOONA Blank Panels Caution To avoid a chassis over temperature condition install blanks for RPMs SFMs and line card slots not in use Always replace cards or blanks immediately Blank panels for RPMs SFMs and line cards must be installed in empty slots to control airflow If a slot is not filled for more than five minutes the following message appears on the console CHMGR 2 MINORTEMP Minor alarm chassis temperature high SFM temperature reaches or exceeds threshold of 65C Blank panels are shipped with the system to ensure that all chassis slots are installed with operational modules or blanks Preparing and Installing RPMs and Line Cards To prolong the life of the EMI seals begin installing cards in the right most slot slot 13 filling the slots leftward slot 12 then slot 11 then slot 10 and so on Installing and Maintaining the E1200i System 51 Figure 22 Installing an RPM into the E1200i
59. nt rack shelf bar Load the chassis in the lower half of an empty rack to avoid a top heavy rack Figure 8 Warning Do not remove the Front shipping Cover during the initial installation process The cover provides front handles to assist in lifting and prevents damage to the internal framework and EMI seals 28 Installing the DC Chassis Figure 8 Rack Mounting the Chassis To install the chassis into a prepared rack Step Task 1 If you center or rear mount the chassis in a 19 inch rack adjust the chassis rack mounting brackets to the desired position 2 If you mount the chassis in a 23 inch rack install the 23 inch adapter brackets 3 Use a hand cart pallet jack or forklift to align the rack mount holes with the equipment rack holes situating the chassis on top of the equipment rack shelf bar 4 Insert rack mounting screws in the holes that are not obscured by the metal chassis shipping cover Tighten the screws See Figure 8 5 Loosen and remove the screws that secure the chassis Front Shipping Cover and remove the cover 6 Insert the remaining rack mounting screws and tighten to secure the chassis in the rack Installing the Chassis into an Equipment Cabinet Install the E1200i DC system after you secure the rack shelf bar Load the chassis in the lower half of the cabinet to avoid it becoming top heavy Make sure the cabinet is positioned with adequa
60. ocesses from each other increasing reliability Operating the E1200i system with redundant RPMs enables automatic fail over redundancy Line cards perform all data forwarding operations Each line card has Force10 Networks proprietary ASICs the flexible packet classification FPC ASIC and the Buffer and Traffic Manager BTM ASIC The FPC accepts packets feeds packets to input output ports handles packet classification access lists and Layer 2 and Layer 3 lookups and packet marking Diffserv or 802 1p The BTM is responsible for all queuing operations The internal flash memory device shipped with the RPM contains the boot ROM and runtime images Each RPM accommodates an external flash memory card that can be used to copy and store system boot software images and configuration files For information about using a flash card refer to Appendix A on page 75 Installing and Maintaining the E1200i System 13 Figure 1 E1200i AC Chassis Front View Cable Management System Line Card Slots Line Card Slots N e o o pom e o o pmm p 2 gt RPM 1 dai C C o oso ooo
61. onnector pins Align the blank with the guides and gently slide toward the backplane Rotate the lever to secure the blank in place Note If you mistakenly insert an SFM too quickly after removing it traffic flow is interrupted To correct the situation remove an active SFM or the standby SFM wait several seconds and reinsert System messages stating that the active interfaces status changed and the switch fabric is up appear when an SFM is inserted correctly and traffic is flowing 72 Removing and Replacing Components Removing and Replacing the Air Filter A factory installed air filter Figure 27 is shipped with the E1200i system The hot swappable air filter prevents large particles debris and dust from entering and circulating through the system and ensures proper air flow through the system Filters should be inspected monthly and replaced every twelve months or as required Warning An improperly installed air filter will restrict air flow and will generate thermal problems throughout the chassis Ensure the air filter is oriented correctly and seated securely in the slot Do not operate without a filter for any longer than 30 minutes to avoid card over temperature conditions To remove and replace the air filter Step Task 1 Pull the air filter straight out of the chassis 2 Rotate the replacement filter so that the front handle label is right reading 3 Guide the filter firmly into the slot until it
62. over Tighten the screws 5 Loosen and remove the screws attaching the chassis shipping cover Remove the shipping cover 6 Insert the remaining mounting screws and tighten to secure the chassis in the cabinet 26 Installing the AC Chassis Installing the DC Chassis This chapter provides instructions to rack mount your E1200i DC system into a standard 19 inch or 23 inch equipment rack It contains the following sections e Unpacking the E1200i DC System e Installing the Equipment Rack Shelf Bar e Standard Front Chassis Mounting e Installing the Chassis into an Equipment Cabinet Unpacking the E1200i DC System The E1200i DC system and components are shipped on a wooden pallet with Front Shipping cover Remove the chassis from the shipping packaging and move the chassis with a hand cart pallet jack or fork lift to its rack Do not unpack the power supplies fan trays air filter or cards until the chassis is installed Warning The E1200i DC shipping containers each weigh up to 400 pounds The unpacked AN chassis and pallet weigh approximately 200 pounds Do not attempt to lift or move the chassis without the use of a hand cart pallet jack or forklift Caution Lift the E1200i DC chassis only with the handles provided or from the bottom Lifting by the chassis shelves will cause chassis damage Do not remove the shipping cover during the installation process The cover prevents damage to the internal framework and EMI
63. power cord plugs must be secured to the building outlets by the qualified chassis installer or a qualified electrician See Chapter 3 Site Preparation for more cautions Related Publications For more information about the E1200i system refer to the following documents e FTOS Configuration Guide for the E Series e FTOS Command Reference for the E Series e E Series Network Operations Guide e Release Notes for the E Series and FTOS Feedback on Documentation Send email to techpubs force10networks com 12 About This Guide The E1200i System The Force10 Networks E1200i system is a carrier class high capacity aggregation router The 16 slot modular system provides two slots dedicated for Route Processor Modules RPMs and 14 slots for line cards with Layer 2 switching and Layer 3 and routing capabilities Operating Overview The E1200i system requires a Route Processor Module RPM at least one line card and at least eight Switch Fabric Modules SFMs for packet processing The RPM is the core for routing and control operations all traffic destined to the E1200i terminates on the RPM Routing table entries are built on the RPM and directed to the forwarding information tables on the line cards Software processes such as Telnet SNMP CLI Layer 2 and Layer 3 functions are divided among three CPUs for redundancy and speed Independent software images run on each CPU Each CPU has its own memory which isolates pr
64. ppable The E1200i system generates major alarm events for high temperatures over 75 C and module failures depending on the module and whether or not it is redundant Minor alarms are generated for component temperatures over 65 C and 75 C for line cards SNMP traps are sent for both alarm types Refer to Appendix C on page 87 for more details Removing and Replacing line cards or RPMs To remove and replace E1200i line card or RPM modules Step Task 1 Unplug the network interface cables connected to the line card or RPM 2 Loosen the captive screws and pull the ejector levers simultaneously toward you to disengage the backplane connections 3 Slide the card out of the slot and store the cards in the original antistatic packaging 4 If you are immediately installing a replacement card align the new card with the guide and gently slide the card into the slot until you feel the connectors engage with the chassis backplane If you are not planning to install a new card immediately install a blank panel Installing and Maintaining the E1200i System 71 Step Task continued 5 If you are installing a line card follow these procedures e f you are hot swapping replacing the line card with the same card type no additional configuration is required e If you are installing a different line card type enter in Configuration mode the following command linecard number card type where number is a slot number
65. pport force10networks com Web http www force 1 Onetworks com support Telephone US and Canada 866 965 5800 International 408 965 5800 Installing and Maintaining the E1200i System 101 Requesting a Hardware Replacement To request replacement hardware follow these steps Step Task 1 Determine the part number and serial number of the component To list the numbers for all components installed in the chassis use the show hardware command 2 Request a Return Materials Authorization RMA number from TAC by opening a support case Open a support case by e Using the Create Service Request form on the iSupport page see Contacting the Technical Assistance Center on page 101 e Contacting Force10 directly by E mail or by phone see Contacting the Technical Assistance Center on page 101 Provide the following information when using E mail or phone e Part number description and serial number of the component e Your name organization name telephone number fax number and e mail address e Shipping address for the replacement component including a contact name phone number and e mail address e A description of the failure including log messages This generally includes e Output from the show tech support non paged command This report is very long so the storage buffer in your terminal program should be set high e Output from the show logging eventlog unit command where unit is the stack ID of the member
66. r dl Tilt the AC cord Retainer Safety cover approximately 15 and gently slide the cover away from the chassis 2 Grip the handle and squeeze the thumb latch 3 Slide the Power Supply out of the slot 4 If you are replacing the Power Supply go to Installing AC Power Supplies on page 35 Removing and Replacing DC Power Supplies 68 Removing and Replacing Components If you are operating your E1200i DC chassis with redundant Power Supplies you can install remove or replace a Power Supply without affecting system operation If you are operating your E1200i DC system with only one Power Supply the minimum you must completely power off the system Note If there is a Power Supply failure Power Supply LED is not lit or major alarm LED is lit the entire Power Supply Module must be replaced There are no field serviceable parts inside the Power Supply unit Installing and Maintaining the E1200i System 69 Remove a DC Power Supply Step Task i Ensure that the remote power source is in the OFF position and that the PEM status light is off e PEM 0 connects to remote power source 0 e PEM 1 connects to remote power source 1 2 Loosen the retaining screw and remove the PEM safety cover S afety F cover UEOT0ONT 3 Switch the Over Current Protector located on the PEM front panel to the OFF position Studs PEM interlock lever Over
67. r system contains two RPMs both RPMs must contain the same software image Install a second RPM either before the system is powered on or after the Primary RPM is up and stable After the second RPM is installed wait several seconds until the connection between the two RPMs is established before configuring any commands Below is an example of the messages that should appear sPOLLMGR 2 ALT RPM STATE Alternate RPM is present sIRC 6 IRC COMMUP Link to peer RPM is up SRAM 6 RAM TASK RPM1 is in Standby State Once the link between the two RPMs is established copy the running configuration to the startup configuration RPM Label and LEDs Table 6 describes the RPM LED states and the RPM front panel Table 6 RPM LEDs Section Label Description Management 10 100 L Green link is up Ethernet A Green activity on port Alarms Major Red a critical condition exists such as a severe over temperature condition a fan tray failure an overcurrent condition in a power supply or an out of tolerance voltage The RPM LEDs are controlled by software which sets the threshold levels for triggering the different stages of alarms Unlit no major conditions Minor Amber a serious condition exists such as an over temperature condition a single fan failure or a line card failure The RPM LEDs are controlled by software which sets the threshold levels for triggering the different stages of alarms Unlit no minor alar
68. ress 1 2 3 4 255 255 0 0 BOOT_USER show interface management ethernet Management ethernet IP address 1 2 3 4 ffffff00 Z00T_USER 8 show Optional Use the show default gateway command to view gateway default gateway information default gateway If your server is on the same subnet you do not need to configure a gateway ip address parameter If your server is not on the same subnet use the default gateway ip address command to set the gateway IP address 001_USER show default gateway No gateway IP address specified BOOT_USER default gateway ip 1 2 3 5 Gateway IP address 1 2 3 5 BOOT_USER show default gateway Gateway IP address 1 2 3 5 BOOT_USER E 9 dir flash Use the dir flash command to list files stored on the internal flash device dir slot0 Use the dir slotO command to list files stored on the external flash device AGRO dir flash p Displaying files in flash size date time name 11187685 FEB 15 2002 05 37 58 el200 bin 11031398 FEB 23 2002 22 42 46 E1200 3 bin 9280984 FEB 17 2002 21 02 36 E1200 2 bin 10778521 FEB 18 2002 22 53 26 E1200 3 1 bin 1787 FEB 23 2002 22 42 46 startup config BOOT_USER a y 84 System Boot Step Command Task continued 10 reload Reload software The autoboot program initializes and displays self test results on the console screen NOTE Do not press break control sequence at any time du
69. ring the boot reboot process Doing so causes the boot process to terminate 11 Forcel0 gt When the reboot completes the CLI defaults to the EXEC mode Refer to the FTOS Command Line Interface Reference for CLI configuration procedures and configuration instructions Installing and Maintaining the E1200i System 85 86 System Boot Alarms The E1200i generates major and minor alarms for the following conditions e fan trays status e Power Supply status e RPMs status e high temperature on RPMs e line cards status e high temperature on line cards e SFMs status e high temperature on SFMs A major alarm is any fault that would render the E1200i non functional A minor alarm is any fault that threatens the operation of the E1200i You can monitor alarm conditions on the E1200i system through the console LEDs and audible alarms If you configure the SNMP command snmp server enable traps envmon the FTOS also sends an SNMP trap In the E1200i system alarms are logged for each occurrence but the system may not send an event log for multiple occurrences For example whenever a module exceeds the shutdown threshold the module shuts down If more than one module exceeds the warning or high temperature thresholds within a five minute period the system generates one event for all effected modules but alarms are logged for each occurrence If the modules temperature falls to 5 lower than the warning thre
70. rly or air is not flowing through the chassis power off the chassis at the remote power source Ensure that all fan trays are properly installed Verify the remote power source If a fan tray LED remains unlit replace the fan tray 4 After you have verified the power and fan operability power off the chassis to continue the installation process 5 De energize the Main Disconnect and flip the over current protector to the OFF position 6 Verify that the LEDs are not lit 48 Installing DC Power Supplies Installing RPMs Line Cards and SFMs This chapter provides instructions for installing cards into the E1200i AC or DC chassis It contains the following sections e Unpacking an RPM or Line Card e Installing Line Cards and RPMs e Preparing and Installing RPMs and Line Cards e RPM Label and LEDs e Installing Switch Fabric Modules SFMs e Line Card Cable Management Systems Unpacking an RPM or Line Card Warning AN e Electrostatic discharge ESD damage can occur when components are mishandled Always wear an ESD preventive wrist or foot heel ground strap when handling RPMs SFMs or line cards Connect your ESD strap to the grounding plug located on the front of the chassis See Figure 2 for ESD strap connector location After you remove the original packaging place RPMs SFMs and line cards on an antistatic surface e Do not supply power to your E1200i system until the power supplies and fan tray s
71. shold temperature the system clears the alarm and an SNMP trap Table 14 Alarm Events and Reporting Reported in Status LED Audible Module Alarm Event Alarm LED event log on Module Alarm Fans Entire Fan Tray fails major red major unlit yes 1 or 2 individual fans fail minor amber minor unlit no Power Power Supply input power fail major red major unlit yes suppy Power Supply power fails at boot unlit not reported unlit no Installing and Maintaining the E1200i System 87 Table 14 Alarm Events and Reporting Reported in Status LED Audible Module Alarm Event Alarm LED event log on Module Alarm Line Card Hardware failure major red major amber no Exceeds high temperature limit major red major unlit yes Exceeds warning temperature minor amber minor green yes limit Individual interface fails minor amber reported amber no RPM Non redundant Configuration with 1 RPM Exceeds high temperature limit major red major unlit yes eee warning temperature minor amber minor green no imi RPM fails but CP is ok major red major amber yes SFMs Redundant Configuration with 10 SFMs Exceeds high temperature limit major red major unlit yes Exceeds warning temperature minor amber minor green no limit Any card fails minor amber minor amber no Any card removed minor amber minor
72. signments eee e ee eee 60 Table 13 10 100 Ethernet Management Port LEDS 0 ccc eee 60 Table 14 Alarm Events and Reporting i ni 87 Installing and Maintaining the E1200i System 9 About This Guide This guide provides site preparation recommendations step by step procedures to rack mount the Force10 Networks E12001 chassis as well as instructions to install fan trays power supplies route processor modules RPMs switch fabric modules SFMs and line cards This guide also includes instructions for removing and installing field replaceable parts including power supplies for both the AC and DC models The E12001 system is packaged with components necessary for optimal performance including blank panels for RPM SFM and line card slots Blanks are required in empty slots to ensure adequate system cooling and for EMI containment during operation After you complete the hardware installation process and power up the system refer to the FTOS Configuration Guide for preliminary software configuration information E1200i systems run Force10 OS FTOS M software The FTOS Command Reference for the E Series provides detailed CLI information and the FTOS Configuration Guide for the E Series includes FTOS configuration information Information Symbols and Warnings Table 1 defines the information symbols used throughout this guide Table 1 Information Symbols Symbol Warning Description This symbol warns that
73. six AC units provide 3 3 redundancy Two DC units are required for power supply and full facility redundancy Danger Leakage Current High Touch Current The AC power cords are secured to the power inlet using the provided bracket The AC power cord plugs must be secured to the building outlets by the chassis installer or a qualified electrician Refer to Appendix D on page 91 for specifications on thermal output and other power related numbers Fans and Airflow Your E1200i chassis contains two field replaceable fan trays Air flows through the system from a filtered intake vent located in the lower part of the chassis Air circulates from the bottom front and sides to the back and exhausts through a top rear vent The variable fan speed is reduced at normal operating temperatures and increases to full speed as operating temperatures increase up to 104 F 40 C For fan tray access maintenance and proper ventilation position the chassis and equipment rack or cabinet so that e At least three inches clearance is around the front and side intake and exhaust vents for free air flow e Provide 20 inches in the rear to access the fan tray e Operate the E1200i system with two fan trays For instructions on replacing a fan tray refer to Removing and Replacing Fan Trays on page 65 Installing and Maintaining the E1200i System 21 Storing Components Trays Power Supply or SFMs installed in the chassis Place the modules in
74. sk continued 3 Slide the power supplies into their slots until the module front is flush with the shelf front Figure 13 Insert power supply 4 Connect the Power Supply cord to the designated socket Figure 11 5 Re install the AC cord Retainer by tilting approximately 15 and gently sliding in the long edge just above the AC cords 6 Secure the retainer by tighten the locking screws on either side of the retainer Danger Leakage Current High Touch Current in AC powered systems AC power cords are secured to the power inlet using the provided brackets The power cord plugs must be secured to the building outlets by the qualified chassis installer or a qualified electrician AC Power Supply and Fan Operability Test Once your power supplies and fan trays are installed verify their operability by supplying power to the chassis and verifying the status LEDs Before you begin this power test inspect your equipment rack and chassis Verify that e Each Power Supply is properly installed and plugged into the assigned slot e The AC cord Retainer is secured over the plugs Danger Prevent exposure and contact with hazardous voltages Do not attempt to operate this system without the AC cord Retainer e Your power cables connect to an appropriate AC power supply in a manner that complies with your local electrical codes For AC systems a Main Disconnect must be provided for each AC cord
75. t be used in order to meet FCC emission limits Force10 Networks is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications in the equipment Unauthorized changes or modification could void the user s authority to operate the equipment This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation Canadian Department of Communication Statement Industry Canada Class A emission compliance statement This Class A digital apparatus complies with Canadian ICES 003 Avis de conformit a la r glementation d Industrie Canada Cet appareil num rique de la classe A est conforme la norme NMB 003 du Canada European Union EMC Directive Conformance Statement This product is in conformity with the protection requirements of EU Council Directive 2004 108 EC on the approximation of the laws of the Member States relating to electromagnetic compatibility Force 10 Networks can not accept responsibility for any failure to satisfy the protection requirements resulting from a non recommended modification of this product including the fitting of non Force10 option cards This product has been tested and found to comply with the limits for Class
76. taining the E1200i System 93 Environmental Specifications Operating Specifications Temperature 32 to 104 F 0 to 40 C Maximum altitude No performance degradation to 10 000 feet 3 048 meters Relative humidity 5 to 85 percent noncondensing Shock Designed to meet Telcordia GR 63 CORE Vibration Designed to meet Telcordia GR 63 CORE Non operating Temperature 40 to 158 40 to 70 C Maximum altitude 15 000 feet 4 572 meters Relative humidity 5 to 95 percent noncondensing Vibration Bellcore GR 63 Agency Compliance The E1200i is designed to comply with the following safety and agency requirements USA Federal Communications Commission FCC Statement This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC rules These limits are designated to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy If it is not installed and used in accordance to the instructions it may cause harmful interference to radio communications Operation of this equipment in a residential area is likely to cause harmful interference in which case users will be required to take whatever measures necessary to correct the interference at their own expense Properly shielded and grounded cables and connectors mus
77. tatus 48 PEM Voltage LED 48 Power Supply 62 Power Supply Status 38 SFMs 55 modem connecting to the system 60 N numbering line card ports 50 line card slots 50 RPM slots 50 P PEMs installing 43 PEMS Installing 42 pin assignments auxiliary port 60 console port 58 DB 9 adapter 59 power turning off 62 turning on 62 power requirements 35 41 Power Supply DC Cables 42 DC PEM Installing 42 replacing 66 69 Power Supply and Fan Operability Test 37 47 R rack installing 25 29 mounting 20 placement 20 recycling switch 96 removing air filters 73 fan trays 65 line cards 71 Power Supply 70 RPMs 71 SFMs 71 72 requesting replacement hardware 102 requirements AC power 35 104 requirements DC power 42 Route Processor Module RPM 13 RPM Route Processor Module 13 S safety considerations cabinet placement 20 equipment site selection 19 rack mounting 20 SFM Switch Fabric Module 13 show logging eventlog command 102 show tech command 102 specifications chassis 91 93 environmental 19 storing components 22 support contacts 100 Switch Fabric Module SFM 13 switch recycling 96 system boot BOOT_USER 79 80 break control sequence 79 commands question mark 80 boot change 82 default gateway 84 dir flash 84 dir sloto 84 help 80 interface management ethernet ip address 83 interface management port config 100m 83 interface management port config 10m 83 interface management port config auto negotiate 83
78. te space in the front rear and sides of the unit for proper ventilation access to cables and access for maintenance Refer to Chapter 3 Site Preparation for complete requirements To install the chassis into an equipment cabinet Step Task 1 Install the equipment rack shelf bar Installing and Maintaining the E1200i System 29 Step Task 2 Adjust the chassis mounting brackets to the desired front rear position and add a 23 inch adapter brackets as required 3 Using a hand cart pallet jack or forklift align the rack mount holes with the cabinet holes 4 Insert rack mounting screws in the holes that are not obscured by the metal chassis shipping cover Tighten the screws 5 Loosen and remove the screws attaching the chassis shipping cover Remove the shipping cover 6 Insert the remaining mounting screws and tighten to secure the chassis in the cabinet 30 Installing the DC Chassis Installing Fan Trays Access the fan tray slots from the rear of the chassis Figure 9 Two fan trays are required in the chassis When a fan tray is not installed in the lower slot a self closing door will seal the slot Panel blanks are not required However to ensure fail safe chassis operation do not operate the chassis with only one fan tray for more than 30 minutes AN Warning Install the fan trays before you supply power to the system Warning Electrostatic discharge ESD damage can occur whe
79. their original ESD preventative packaging and attach the Front Shipping Cover on the front of the chassis prior to placing the chassis in its original shipping crate Shipping the chassis with components installed may damage the components and the chassis backplane Caution Do not transport a chassis with components line cards power supplies RPMs Fan If you do not install your E1200i system and components right away Force10 Networks recommends that you properly store components and all extra field replaceable components spares until you are ready to install them Keep all components in the original packaging during storage Follow these indoor storage guidelines e Storage temperature should remain constant ranging from 40 to 158 F 40 to 70 C e Non condensing relative humidity should be maintained within 5 to 95 percent e Store on a dry floor away from direct sunlight heat and air conditioning ducts e Store in a dust free environment 22 Site Preparation Installing the AC Chassis This chapter provides instructions to rack mount your E1200i AC system into a standard 19 inch or 23 inch equipment rack It contains the following sections e Unpacking the E1200i AC System e Installing the Equipment Rack Shelf Bar e Standard Front Chassis Mounting e Installing the Chassis into an Equipment Cabinet Unpacking the E1200i AC System The E1200i AC system and components are shipped on a wooden pallet with
80. ting the Technical Assistance Center How to Contact Force10 Log in to iSupport at http www force10networks com support and select the TAC Service Request tab Information to Submit Your name company name phone number and E mail address When Opening a Support Preferred method of contact Case Model number Serial Number see Requesting a Hardware Replacement on page 102 Software version number e Symptom description e Screen shots illustrating the symptom including any error messages These can include e Output from the show tech support non paged command This report is very long so the storage buffer in your terminal program should be set high e Output from the show logging eventlog unit command where unit is the stack ID of the member unit that experienced the failure This report is included as a section in the output of show tech support e Console captures showing the error messages e Console captures showing the troubleshooting steps taken e Saved messages to a syslog server if one is used Managing Your Case Log in to iSupport and select the Service Request tab to view all open cases and RMAs Downloading Software Log in to iSupport and select the Software Center tab Updates Log in to iSupport and select the Documents tab This page can be accessed without logging in via the Documentation link on the iSupport page Technical Documentation Contact Information E mail su
81. tional stability The E1200i AC system must be mounted in a rack that is permanently secured to the floor Figure 5 Rack Shelf Bar o o o b b To install a equipment rack shelf bar Step Task ik Determine the chassis mounting location in the equipment rack 2 Orient the bar with the arrows pointing upward The smooth side of the bar should face outward 3 Attach the bar to the equipment rack brackets using the mounting screws provided by the manufacturer Standard Front Chassis Mounting Note Force10 Networks recommends that you install and operate the E1200i AC system in a standard 19 inch or 23 inch equipment rack Install the E1200i AC system after you secure the equipment rack shelf bar Load the chassis in the lower half of an empty rack to avoid a top heavy rack Figure 6 Warning Do not remove the Front shipping Cover during the initial installation process The cover provides front handles to assist in lifting and prevents damage to the internal framework and EMI seals 24 Installing the AC Chassis Figure 6 Rack Mounting the Chassis To install the chassis into a prepared rack Step Task 1 If you are center or rear mounting the chassis in a 19 inch rack adjust the chassis rack mounting brackets to the desired position 2 If you are mounting the chassis in a 23 inch rack install the 23
82. trap and connect the leash to the ESD connection on the front of the E1200i chassis Always wear an ESD preventive wrist or foot heel ground strap when handling components The console and auxiliary ports are asynchronous serial ports If you connect a device to these ports it must be capable of asynchronous transmission Your terminal or terminal emulation mode must be set to VT100 with the following settings e 9600 baud rate to avoid autobaud input the default is set to a 9600 bps baud rate e No parity e 8 data bits e stop bit e Window Terminal Emulator option set to NO e 24 lines X 80 characters Installing and Maintaining the E1200i System 57 e No flow control console port only e Hardware flow control RTS CTS for auxiliary port only Cable and Adapter Pin Assignments Use the E1200i Console port on the RPM to connect to a terminal port PC serial port or a terminal server to configure and monitor your system Use the E1200i Auxiliary port on the RPM to connect to a modem Both the Console and Auxiliary port are RJ 45 ports Figure 25 displays the pinouts in an RJ 45 port Figure 25 Pinout for an RJ 45 Connector End Adaptors i 87654321 Table 8 displays the RJ 45 console port pin assignments Table 9 displays the RJ 45 auxiliary port pin assignments Table 8 Console Port RJ 45 Pin Assignments Pin Signal Input Output 1 NC unused hi 2 DTR Output 3 TxD Output 4 GN
83. tray completely out of the slot at least 20 inches To remove and replace a fan tray Step Task 1 Prior to removing a fan tray turn the screw latch counter clockwise with a flathead screwdriver one quarter of a turn to unlock the fan tray Figure 26 Installing and Maintaining the E1200i System 65 Step Task 2 Grip the handle and pull the fan tray out approximately one inch from the chassis Wait 30 seconds until the fan blades stop rotating then remove AN Danger Keep fingers clear of rotating fan blades 3 Prior to inserting a new fan tray fully turn with a flathead screwdriver the screw latch counter clockwise until the fan tray latching mechanism retracts into the fan tray 4 Insert the fan tray into the chassis Guide the tray firmly into the slot until it stops and the handle end is flush with the chassis rear 5 To secure the fan trays into place turn the screw latch clockwise to tighten the latching mechanism see Figure 26 Figure 26 Securing the Fan Tray Screw Latch screw latch Removing and Replacing AC Power Supplies If you are operating your E1200i AC chassis with redundant Power Supplies you can install remove or replace a Power Supply without affecting system operation If you are operating your E1200i AC system with only two Power Supplies the minimum you must completely power off the system Note If there is a Power Supply failure Power Supply LED is not lit or m
84. tus LEDs Note If there is a DC PEM failure the entire PEM must be replaced There are no field serviceable parts inside the DC PEM unit Before you begin this power test inspect your equipment rack and chassis Verify that e Each PEM is properly installed and grounded e The safety covers are installed on each PEM Danger Prevent exposure and contact with hazardous voltages Do not attempt to operate this system without the safety cover provided with each DC PEM Installing and Maintaining the E1200i System 47 e Your power cables connect to an appropriate DC supply in a manner that complies with your local electrical codes For DC systems a Main Disconnect must be provided e On the DC PEM s use a voltage meter to verify power on the cables Also verify that the Voltage LED is green e A power supply blank is installed in any empty slot e Six fan trays are installed To test the power supplies and fan trays Step Task 1 With the fan trays and DC PEMs installed power on the system e Flip the over current protector located on the PEM front panel to the ON position 2 PEM Status LEDs should be green If an LED is not lit or is amber check that the unit is properly installed Verify the power source If the LED remains unlit power off all modules and replace the unit 3 All six fan tray LEDs should be green online Verify that air is flowing through the chassis If a fan tray is not operating prope
85. unlit no 8 SFMs Non Redundant Configuration Exceeds high temperature limit major red major unlit yes Exceeds warning temperature minor amber minor green no limit Any card fails major red major amber yes Any card removed major red major unlit yes 1 Event appears only in the show alarms command output 2 The interface s Link LED is unlit Power Supplies and Alarms If a Power Supply fails while the E1200i is operating the software generates a major alarm and an SNMP trap lights the major LED and activates the audible alarm When a Power Supply fails the software also records one alarm event for line cards RPM and SFM though each contains its own power source The system generates one alarm event and SNMP trap summarizing the Power Supply failure and the components affected Alarms SFMs and Alarms The number of SFMs present in the system when it boots determines the level of alarms sent when a tenth redundant SFM is removed or fails At boot time if ten SFMs are present and functioning the E12001 system issues no alarms However if one SFM fails or is removed the system sends a minor alarm stating that nine SFMs are present The system requires eight functioning SFMs to pass traffic At boot time if eight SFMs are present and functioning the E1200i system issues no alarms The system issues no alarms if an SFM is added to the system however if the number of functioning SFMs changes from
86. wing command Command Syntax Command Mode Purpose copy file url1 file url2 EXEC Privilege Configure the following parameters e file url1 the file source e file url2 enter slot0 Displaying Files Stored on the External Flash Flash cards can be used to copy and store system images boot images and configuration files Optional flash memory cards are shipped blank To display files stored on a flash use the following command Command Syntax Command Mode Purpose dir filesystem EXEC Privilege Configure the following optional parameters to view files on the flash card e filesystem enter either flash for the internal flash or slot0 for the external flash The default is flash the internal flash To view the external flash enter dir slotO Figure 28 dir Command Example Forcel0 dir slot0 Directory of slot0 1 rwx 6478482 Sep 7 101 16 54 34 E1200i BIN flash 64077824 bytes total 57454592 bytes free Forcel0 FTOS supports up to a 40 character file name length up to a 180 character local file path length and up to a 256 character remote file path length Installing and Maintaining the E1200i System 77 78 System Boot This appendix provides instructions to boot the E1200i AC and DC system from the BOOT_USER prompt The System Boot Process When you supply power to the E1200i system the system performs a series of power on self tests RPM and line card Status LEDs blin
87. y with your local electrical codes in size and color typically the color is green or green with yellow stripe NOTE Grounding cables must be terminated only with a UL listed 2 hole lug with 1 4 inch holes on 3 4 inch spacing see Figure 17 d Replace the two washers and nuts on the studs e With a 7 16 inch box or socket wrench tighten the nuts torque should not exceed 25inch Ibs f Connect the opposite end of the grounding cable to the nearest appropriate facility grounding post Figure 17 Cable Connector Required for E1200i DC PEM All measurements shown in inches 0 267 High strand count diameter conductor N T o D v disoLoow 0 750 _ 6 Connect the 48 VDC and Return cables from each PEM to the remote power sources circuit breakers A and B a Check that the remote power sources for example circuit breakers are in the OFF position b Locate the appropriate studs on the PEM front panel Figure 16 c The two leftmost studs on the PEM are the 48 VDC connection The cable attached to these studs is typically black e The two middle studs are the return connection The cable attached to these studs is typically red d Install the 48 VDC and Return cables on the studs The cables should be of the size and color to comply with local electrical codes Note Power cables must be terminated only with a UL listed 2 hole lug with 1 4 inch studs with 3 4 inch spacing Figure 19

Download Pdf Manuals

image

Related Search

Related Contents

Vannes ED et EAD easy-et de Fisherr CL125 à CL600  Manual SVAN959  Outlook Express User Manual  Copyright © 2008 Apple Inc. All rights reserved      自動車専用 ツ ー ル 編  Documents  

Copyright © All rights reserved.
Failed to retrieve file