Home

Cornelius 569000689 User's Manual

image

Contents

1. fy proper operation Double check syrup connection for leak Disconnect BIB connector from each syrup line or pinch line closed to simulate soldout condition Draw a couple of drinks from each barrel to verify soldout condition occurs Pay close attention that the correct barrel soldout is lit to verify wiring integrity Reconnect BIB connectors and verify that soldouts clear Replace side front access and rear panels Pack circuit boards into the protective packaging from the replacement boards for return to IMI Cornelius Scrap flow sensors syrup inlet lines that were removed and any leftover parts Page 2 of 2 569000338
2. ill be left over 7 Repeat steps 5 and 6 for No 2 3 and 4 syrup inlet lines and syrup flow sensor assemblies 8 Remove existing main control board EPROM chip using an EPROM extraction tool Install EPROM taking great care not to misalign pins or cause damage to chip Note wearing ground strap is stronly recom mended to protect board from electrostatic discharge Take care to put each connector back in its proper location 9 Remove existing No 1 cylinder product delivery board Install new product delivery board using ground strap Take care to put each connector back in its proper location 10 Repeat step 9 for product delivery boards No 2 3 and 4 569000338 Page 1 of 2 Revised October 9 2003 January 23 2002 15 16 FCB Countertop Product Plumbing Components a 1 d p 10 5 O i FCB Standing Product Plumbing Components FIGURE 1 PRODUCT PLUMBING COMPONENTS Remove the existing display board for cylinders No 1 and No 2 Install new display board removing pro tective coating on lens Pay special attention to putting the connectors back in the proper location Repeat for cylinders No 3 and No 4 if applicable Turn CO supply back on to syrup pumps Visually check soldout connections for leaks Turn main power back on Set clock wakeup time sleep time defrost time s and viscosity settings Turn barrels to ON and let unit cycle Draw a couple of drinks from each barrel to veri
3. ovnellus IMI CORNELIUS INC i One Cornelius Place amp Anoka MN 55303 6234 Telephone 800 238 3600 Facsimile 800 535 4231 INSTALLATION INSTRUCTIONS FOR PRESSURE SWITCH PCL KIT 569000689 Table 1 Loose Shipped Parts 1 Board Circ Prod Delivery 2 Chip Micro EPROM Main 3 Board Circ Oper Interface 4 Switch Press Syr 30 37 PSI 5 Fitg T 7 16 20 x 1 8 FPT Fitg Push P14512F4S 375 x 25 7 Harn Adaptor Press Switch Tube Prod 250 I D x 22 1 2 Tube Prod 250 I D x 20 1 2 Clip Flow Bend 375 O D Tube Clip Lock 375 O D Push in Fitg 12 Sak Obtain wakeup time sleep time defrost times and viscosity settings from current setup Disconnect power unit may have to be pulled from wall to access electrical outlet Shut off syrup supply by shutting down COs Bleed CO from inlets to BIB pumps Remove left side front access and rear panel Remove No 1 cylinder syrup inlet line and No 1 syrup flow sensor assembly leftmost if facing unit o a FF O PD Install new syrup inlet line 2 flavor OC unit or connect existing line with tubing elbow and cable tie 2 and 4 flavor standing units to pressure switch assembly see Figure 1 Assemble locks onto pressure switch assembly and reconnect electrical harness paying close attention to maintaining wiring integrity Switch is supplied with adapter harness to retrofit existing wiring wires to be attached to C common and NC nor mally closed Note some parts w

Download Pdf Manuals

image

Related Search

Related Contents

  取扱説明書 デジタルレコーダー SDRS-1601 SDRS-801  Bosch KGV36VE32S fridge-freezer  GUÍA DEL USUARIO USER`S GUIDE    Philips AQ6691/00 User's Manual  0P-034 BARNIZ MADERA BRILLO  67号  WTclient DLL User's Guide  

Copyright © All rights reserved.
Failed to retrieve file