Home

BENDIX BW1948 User's Manual

image

Contents

1. pressures Never connect or disconnect a hose or line containing pressure it may whip Never remove a component or plug unless you are certain all system pressure has been depleted 1 8 Use only genuine Bendix replacement parts components and kits Replacement hardware tubing hose fittings etc must be of equivalent size type and strength as original equipment and be designed specifically for such applications and systems 9 Components with stripped threads or damaged parts should be replaced rather than repaired Do not attempt repairs requiring machining or welding unless specifically stated and approved by the vehicle and component manufacturer 10 Prior to returning the vehicle to service make certain all components and systems are restored to their proper operating condition ol For vehicles with Antilock Traction Control ATC the ATC function must be disabled ATC indicator lamp should be ON prior to performing any vehicle maintenance where one or more wheels on a drive axle are lifted off the ground and moving AD IS AIR DRYER GOVERNORS ARE NON ADJUSTABLE AND FEATUREA BREATHER VALVE IN THIS PORT PRESSURE PROTECTION VALVE LOCATIONS FIGURE 5 PRESSURE PROTECTION VALVE LOCATIONS WARNING DO NOT ATTEMPT TO ADJUST OR SERVICE THE PRESSURE PROTECTION VALVES INCORRECT PRESSURE PROTECTION VALVE SETTINGS CAN RESULT IN AUTOMATIC APPLICATION OF VEHICLE SPRING BRAKES WITHOUT
2. SD 98 9808 Bendix Dryer Reservoir Module with AD IS Air Dryer INTEGRATED PURGE RESERVOIR MOUNTING DESICCANT CARTRIDGE BOLTS 3 SECONDARY RESERVOIR AD IS AIR DRYER PART NUMBER STAMPED HERE GOVERNOR DESCRIPTION The function of the dryer reservoir module DRM is to provide heavy vehicles with an integrated vehicle air dryer secondary reservoir purge reservoir governor and a number of the charging valve components in a module The DRM dryer module model covered in this Service Data Sheet is the first to be released see updates to this Service Data Sheet for other models The DRM dryer module includes an integrated solution air dryer AD IS a reservoir including a separate purge reservoir section a governor and four pressure protection valves These have been designed as an integrated air supply system The function of the AD IS air dryer is to collect and remove air system contaminants in solid liquid and vapor form before they enter the brake system It provides clean dry air to the components of the brake system which increases the life of the system and reduces maintenance costs Daily manual draining of the reservoirs is eliminated The function of the pressure protection valves is to both control the order in which the components receive air from the AD IS air dryer and also to protect each reservoir from a pressure loss in the other reservoir or a pressure loss in an air accesso
3. charging system pressure a 1 bubble in 10 seconds is acceptable the vehicle may be returned to temporary service Note This is a temporary bypass of the air dryer and full repair of the unit must be carried out at the earliest opportunity With the air dryer removed from the system contaminants will be entering the air system reservoirs will need to be manually drained daily until the repairs are completed At end of each working day park vehicle and slowly drain pressure through the drain valves leave open to the atmosphere for several hours if possible When repairs are carried out be sure to check that all reservoirs including the purge reservoir incorporated into the secondary reservoir are emptied of all contaminants If after bypassing the dryer reservoir module the system pressure still does not build use the following procedure to remove clean and reinstall the delivery check valve DELIVERY CHECK VALVE CLEANING PROCEDURE Note This is only required if system pressure does not build after temporary bypass is completed See Figure 7 throughout this procedure Depressurize the air brake system following the general safety precautions outlined elsewhere in this document This procedure does not require removal of the AD IS air dryer from the vehicle 1 Remove line from governor and mark for easy reinstallation 2 Remove bolts attaching the governor to the AD IS air dryer and retain for reassembl
4. damage the air dryer and may void the warranty OPERATION amp LEAKAGE TESTS ALSO SEE VIDEO BW2327 1 Check all lines and fittings leading to and from the air dryer for leakage and integrity Repair any leaks found Build up system pressure to governor cutout and note that the AD IS air dryer purges with an audible escape of air Watch the system pressure and note the pressure fall off for a ten minute period If pressure drop exceeds for a single vehicle 1 psi minute from either service reservoir or for tractor trailer 3 psi minute from either service reservoir inspect the vehicle air systems for sources of leakage and repair them Refer to section entitled Troubleshooting Symptoms 1 and 4 Check for excessive leakage around the purge valve with the compressor in the loaded mode compressing air Apply a soap solution to the purge valve exhaust port and observe that leakage does not exceed a 1 bubble in 1 second If the leakage exceeds the maximum specified refer to section entitled Troubleshooting Symptom 4 Build up system pressure to governor cutout and note that the AD IS air dryer purges with an audible burst of air followed immediately by approximately 30 seconds of air flowing out of the purge valve Fan the service brakes to reduce system air pressure to governor cut in Note that the system once again builds to full pressure and is followed by an AD IS air dryer purge If system does not follow t
5. EXHAUST PURGE VALVE OPEN CLOSED hy TaN TURBO k Hi COMPRESSOR GOVERNOR SIGNALS AIR COMPRESSOR TO SUSPEND COMPRESSED AIR SUPPLY TO AD IS AIR DRYER FIGURE 3 AD IS AIR DRYER PURGE CYCLE vapor flows through the compressor discharge line to the inlet 1 IN port of the air dryer body As air travels through the AD IS air dryer its temperature falls causing some of the contaminants to condense and drop to the bottom of the air dryer purge valve assembly ready to be expelled at the next purge cycle The air then flows into the desiccant cartridge where it flows through an oil separator which removes liquid oil and solid contaminants Air then flows into the desiccant drying bed and becomes progressively drier as water vapor adheres to the desiccant material in a process known as ADSORPTION PRIMARY SECONDARY PORT RESERVOIR PRI AUXILIARY PORTS TO ACCESSORIES PURGE RESERVOIR DRAIN VALVE PRIMARY RESERVOIR Dry air exits the desiccant cartridge through the center of the base assembly The air then flows to the delivery check valve and also through an orifice into the purge reservoir The delivery check valve opens supplying air to the pressure protection valves A and B the safety valve and also to the reservoir port of the attached governor The purge reservoir fills storing air that will be used to reactivate the desiccant during the purge cycle When the air pressure reac
6. PRIOR WARNING LOCK TABS SPLASH SHIELD BRACKET SPLASH SHIELD COVER FIGURE 6 SPLASH SHIELD BRACKET AND COVER EXPLODED VIEW GENERAL When rebuilding or replacing components of the air dryer use only genuine Bendix parts For ease in servicing the AD IS air dryer has been designed so that any of the following maintenance kits can be installed without removing the air dryer from the vehicle If after completing the routine operation and leakage tests it has been determined that one or more components of the air dryer requires replacement or maintenance refer to the following list to find the appropriate kit s MAINTENANCE KITS AVAILABLE e Service New Desiccant Cartridge Kit This kit contains the parts necessary to change the desiccant cartridge only e Delivery Check Valve Maintenance Kit This kit contains the parts necessary to replace the delivery check valve e Governor Delivery Check Valve Kit This kit contains the parts necessary to replace both the governor and delivery check valve e 12 volt or 24 volt Heater and Thermostat Kits Contains a replacement heater and thermostat assembly and related components required for replacement e Purge Valve Housing Maintenance Kit This kit contains the parts necessary to rebuild the purge valve sub assembly Service New Purge Valve Housing Assembly Contains a service new assembly and related components to change the purge valve sub assembly e Pre
7. returning to the air dryer during the purge cycle After the purge cycle is complete the air dryer is ready for the next charge cycle to begin 4 TURBO CUTOFF FEATURE Refer to Figure 3 The primary function of the turbo cutoff valve is to prevent loss of engine turbocharger air pressure through the AD IS air dryer in systems where the compressor intake is connected to the engine turbocharger At the onset of the purge cycle the downward travel of the purge piston is stopped when the turbo cutoff valve tapered portion of purge piston contacts its mating metal seat in the purge valve housing With the turbo cutoff valve seated closed position air in the compressor discharge line and AD IS air dryer inlet port cannot enter the air dryer In this manner the turbo cutoff effectively maintains turbo charger boost pressure to the engine PREVENTIVE MAINTENANCE Important Review the warranty policy before performing any intrusive maintenance procedures An extended warranty may be voided if intrusive maintenance is performed during this period Because no two vehicles operate under identical conditions maintenance and maintenance intervals will vary Experience is a valuable guide in determining the best maintenance interval for any one particular operation Every 900 operating hours or 25 000 miles or three 3 months 1 Check for moisture in the air brake system by opening reservoir drain valves and checking for presen
8. INJURY OR DEATH When working on or around a vehicle the following general precautions should be observed at all times 1 Following Park the vehicle on a level surface apply the parking brakes and always block the wheels Always wear safety glasses Stop the engine and remove ignition key when working under or around the vehicle When working in the engine compartment the engine should be shut off and the ignition key should be removed Where circumstances require that the engine be in operation EXTREME CAUTION should be used to prevent personal injury resulting from contact with moving rotating leaking heated or electrically charged components Do not attempt to install remove disassemble or assemble a component until you have read and thoroughly understand the recommended procedures Use only the proper tools and observe all precautions pertaining to use of those tools If the work is being performed on the vehicle s air brake system or any auxiliary pressurized air systems make certain to drain the air pressure from all reservoirs before beginning ANY work on the vehicle If the vehicle is equipped with an AD IS air dryer system or a dryer reservoir module be sure to drain the purge reservoir the vehicle manufacturer s recommended procedures deactivate the electrical system in a manner that safely removes all electrical power from the vehicle Never exceed manufacturer s recommended
9. at fittings and exhaust Compressor unloader Remove air strainer or fitting from compressor mechanism leaking inlet cavity With compressor unloaded check excessively for unloader piston leakage Slight leakage permissible DRM AD IS AIR DRYER TROUBLESHOOTING CHART Continued 2 Water in vehicle A Maximum air dryer inlet A Check for excessive carbon build up in reservoirs temperature is exceeded due to improper discharge line length compressor discharge line Replace if required Make certain that discharge line length is at least 6 ft Increase discharge line length and or diameter to reduce air dryer inlet temperature Air system charged from outside air source outside air not passing through air dryer If system must have outside air fill provision outside air should pass through air dryer Excessive air usage Air dryer not compatible with vehicle air system requirement Improper air dryer vehicle application Note The AD IS air dryer is not intended for use on applications with excessive air usage The following applications require more dry air than the AD IS air dryer is designed to supply Do not use on 1 City buses 2 Vehicle combinations with more than 8 braked axles 3 City refuse vehicles except those with work brakes 4 Concrete mixers 5 Dump trucks with more than 3 axles 6 Off highway construction vehicles with more than 7 braked a
10. ble to build system pressure Charge mode Air dryer purge valve leaking excessively With compressor loaded apply soap solution on purge valve exhaust to test for excessive leakage Repair or replace purge valve as necessary Purge valve frozen open faulty heater and thermostat wiring blown fuse Refer to paragraph 5 of Operation and Leakage Tests for heater and thermostat test Defective AD IS air dryer delivery check valve Refer to Symptom 1 Remedy B Leaking Turbo Cutoff valve Repair or replace purge valve assembly Defective governor Check governor at both cut in and cut out position for i proper pressures and ii excessive leakage at fittings and exhaust Leaking purge valve control piston quad ring Repair or replace purge valve assembly DRM AD IS AIR DRYER TROUBLESHOOTING CHART Continued 5 Cannot build system A Kinked or blocked Check to determine if air passes through air pressure 6 Air dryer does not purge or exhaust air plugged discharge line discharge line Check for kinks bends excessive carbon deposits or ice blockage Excessive bends in discharge line water collects and freezes Discharge line should be constantly sloping from compressor to air dryer with as few bends as possible Pressure protection valve s in air dryer will not open Replace air dr
11. ce of water If moisture is present the desiccant cartridge may require replacement however the following conditions can also cause water accumulation and should be considered before replacing the desiccant A An outside air source has been used to charge the system This air does not pass through the drying bed B Air usage is exceptionally high and not normal This may be due to high air system leakage C In areas where more than a 30 degree range of temperature occurs in one day small amounts of water can temporarily accumulate in the air brake system due to condensation Under these conditions the presence of small amounts of moisture is normal Note A small amount of oil in the system is normal and should not be considered as a reason to replace the desiccant cartridge Some oil at the dryer exhaust is normal 2 Visually check for physical damage such as chaffed or broken air and electrical lines and broken or missing parts 3 Check mounting bolts for tightness See Figure 1 Re torque to 360 420 inch pounds 4 Perform the Operation amp Leakage Tests listed in this publication WARNING This air dryer is intended to remove moisture and other contaminants normally found in the air brake system Do not inject alcohol anti freeze or other de icing substances into or upstream of the air dryer Alcohol is removed by the dryer but reduces the effectiveness of the device to dry air Use of other substances can
12. cycle this drain is closed FIGURE 2 AD IS AIR DRYER CHARGE CYCLE DIAGRAM SHOWS PRESSURE PROTECTION VALVES A AND B OPEN C amp D CLOSED The removable purge valve assembly incorporates the purge valve mechanism and a turbocharger cutoff feature that is designed to prevent loss of engine turbo boost pressure during the purge cycle of the AD IS air dryer For ease of serviceability all replaceable assemblies can be replaced without removal of the air dryer from its mounting on the vehicle Refer to Preventive Maintenance section DRM DRYER MODULE OPERATION GENERAL Refer to Figure 2 The DRM dryer module is designed to receive compressed air from the vehicle air compressor clean and dry the air using the AD IS air dryer deliver air to the vehicle s primary 2 reservoir Secondary reservoir and accessories and control the compressor dryer charge cycle AIR DRYER OPERATION GENERAL The AD IS air dryer alternates between two operational modes or cycles during operation the Charge Cycle and the Purge Cycle The following descriptions are separated into these cycles of operation CHARGE CYCLE Refer to Figure 2 When the compressor is loaded compressing air compressed air along with oil oil vapor water and water DELIVERY CHECK VALVE GOVERNOR CLOSED UNLOADER PORT DESICCANT BED OIL SEPARATOR PURGE ORIFICE PURGE RESERVOIR 6 A SG SR l X H a
13. ective delivery check Build system pressure to governor cut out Wait valve 1 minute for completion of purge cycle Using soap solution at exhaust of purge valve leakage should not exceed a 1 bubble in less than 5 seconds If a rapid loss of pressure is found the following procedure will determine if the delivery check valve is malfunctioning Build system pressure to governor cut out and allow a full minute for the normal dryer purge cycle to empty the purge reservoir Switch off the engine and fan the brakes so that the system pressure reaches governor cut in The purge valve will return to its closed position The purge reservoir has a drain valve which is opened by moving the center lever away from its closed position Open the drain valve and wait 10 seconds to allow any residual purge pressure to be released Release the lever closing the drain valve Carefully remove the air dryer cartridge using a strap wrench and then test for air leaking through the center of the threaded boss by applying a soap solution to the boss Replace the delivery check valve if there is excessive leakage exceeding a 1 bubble in 5 seconds Regrease the seal on the air dryer cartridge before reinstalling Be sure the drain valve on the purge reservoir is not leaking before restoring vehicle to service Defective governor Check governor at both cut in and cut out position for i proper pressures and ii excessive leakage
14. hes approximately 103 p s i the first pressure protection valve A will open and air will be supplied to the primary reservoir When the air pressure in the primary reservoir reaches approximately 109 p s i 3 the second pressure protection valve B opens and air will be supplied to the secondary reservoir and to the accessory pressure protection valves C amp D Note there is no external air hose feeding the secondary reservoir instead air is supplied by a connector passing through the bulkhead of the purge reservoir section of the reservoir When the air pressure in the secondary reservoir reaches approximately 55 p s i and 85 p s i respectively the two remaining pressure protection valves C amp D will open and supply air to the vehicle accessories The air dryer will remain in the charge cycle until the air brake system pressure builds to the governor cutout setting of approximately 130 p s i PURGE CYCLE Refer to Figure 3 When air brake system pressure reaches the cutout setting of the governor the governor unloads the compressor and the purge cycle of the air dryer begins The governor unloads the compressor by allowing air pressure to fill the line leading to the compressor unloader mechanism causing the delivery of compressed air to the AD IS air dryer to be suspended Similarly the governor also supplies air pressure to the AD IS air dryer purge control channel The AD IS air dryer purge piston
15. his pattern refer to section entitled Troubleshooting Symptoms 5 and 6 Check the operation of the end cover heater and thermostat assembly during cold weather operation as follows A Electric Power to the Dryer With the ignition or engine kill switch in the RUN position check for voltage to the heater and thermostat assembly using a voltmeter or testlight Unplug the electrical connector at the air dryer and place the test leads on each of the connections of the female connector on the vehicle power lead If there is no voltage look for a blown fuse broken wires or corrosion in the vehicle wiring harness Check to see if a good ground path exists HEATER amp THERMOSTAT CONNECTOR FIGURE 4 AD IS AIR DRYER HEATER AND THERMOSTAT CONNECTOR B Thermostat and Heater Operation Note These tests are not possible except in cold weather operation Turn off the ignition switch and cool the thermostat and heater assembly to below 40 degrees Fahrenheit Using an ohmmeter check the resistance between the electrical pins in the air dryer connector half The resistance should be 1 5 to 3 0 ohms for the 12 volt heater assembly and 6 0 to 9 0 ohms for the 24 volt heater assembly Warm the thermostat and heater assembly to approximately 90 degrees Fahrenheit and again check the resistance The resistance should exceed 1000 ohms If the resistance values obtained are within the stated limits the thermostat and heater a
16. ium or silicon grease Install this o ring on the check valve body by sliding the o ring over the set of 4 tapered guide lands The o ring groove holds the o ring in its correct location At the other end of the check valve body the spring is installed over the set of 4 straight guide lands When the spring has been pushed to the correct location the check valve body is designed to hold the end of the spring in position be sure that the spring is not loose before continuing with this installation Install the assembled check valve body o ring spring in the delivery port so that the o ring rests on its seat and the free end of the spring is visible Grease the adapter and the remaining larger o ring and install it onto the fitting Position gasket insert bolts through the governor and tighten to 125 in lbs Note Do not replace with a standard compressor governor gasket Reattach line to the governor Before placing vehicle back into service check to see that the system pressure now builds to full operational pressure DRM AD IS AIR DRYER TROUBLESHOOTING CHART 1 Dryer is constantly A Excessive system A Test for excessive system leakage cycling or purging leakage Allowable leakage observed at dash gauge Single vehicle 1 psi minute Tractor trailer 3 psi minute Using soap solution test vehicle for leakage at fittings drain valves and system valves Repair or replace as necessary B Def
17. moves down in response to this air pressure causing the purge valve to open to the atmosphere and the turbo cutoff valve to close off the supply of air from the compressor this will be further discussed in the Turbo Cutoff Feature section Water and contaminants which have collected in the purge valve base are expelled immediately when the purge valve opens Also air which was flowing through the desiccant cartridge changes direction and begins to flow toward the open purge valve Oil and solid contaminants collected by the oil separator are removed by air flowing from the purge reservoir through the desiccant drying bed to the open purge valve The initial purge and desiccant cartridge decompression lasts only a few seconds and is evidenced by an audible burst of air at the AD IS air dryer exhaust The actual reactivation of the desiccant drying bed begins as dry air from the purge reservoir flows through the purge orifice into the desiccant bed Pressurized air from the purge reservoir expands after passing through the purge orifice its pressure is lowered and its volume increased The flow of dry air through the drying bed reactivates the desiccant material by removing the water vapor adhering to it Approximately 30 seconds are required for the entire contents of the purge reservoir of a standard AD IS air dryer to flow through the desiccant drying bed The delivery check valve assembly prevents air pressure in the brake system from
18. ng sound may be heard during system build up when a single cylinder compressor is used If this sound is deemed objectionable it can be reduced substantially by increasing the discharge line volume This can be accomplished by adding a 90 cubic inch reservoir between the compressor and the AD IS air dryer DRM AD IS AIR DRYER TROUBLESHOOTING CHART Continued 10 The air dryer purge A Compressor fails to A Check air hose from governor to compressor for piston cycles rapidly in unload a missing kinked or restricted line Install or the compressor repair air hose unloaded non Repair or replace compressor unloader compressing mode 14 15 16 BW1948 2007 Bendix Commercial Vehicle Systems LLC All rights reserved 3 2007 Printed in U S A
19. r brake circuit This allows a vehicle to be moved in an emergency but with reduced braking capacity Compare this to a conventional system where a loss of pressure in one service tank leaves the vehicle with a limited number of reduced braking capacity applications before the parking brakes automatically apply and stay on ROADSIDE INSPECTION In the event of a roadside inspection the system behavior will be as follows When the system is charged to governor cut out and then one reservoir drain valve is opened initially both reservoir gauges will fall however the AD IS air dryer s primary and secondary pressure protection valves will close at pressures above 70 psi protecting the remaining brake circuit from further loss of pressure TEMPORARY AIR DRYER BYPASS To temporarily bypass the air dryer the following procedure needs to be followed Follow the Maintenance Precautions outlined elsewhere in this document Make sure that all residual pressure has been released then remove the air supply line from the compressor to the inlet port 1 IN Remove the safety valve from the AD IS air dryer body see Figure 1 for location and install a T fitting into the port Using any adapters necessary re install the safety valve in one of the branches of the T fitting Using any adapters necessary install the air supply line into the remaining T fitting port After testing the T fitting for any air leakage using a soap solution after
20. ry AD IS Air Dryer PRESSURE PROTECTION AUXILIARY DELIVERY PORTS 5 SAFETY VALVE HEATER THERMOSTAT VALVES 4 FIGURE 1 DRYER RESERVOIR MODULE The air dryer consists of a spin on desiccant cartridge secured to a base assembly The base assembly contains a delivery check valve assembly safety valve heater and thermostat assembly pressure protection valves threaded air connections and the purge valve assembly Air Connection Function Connection Port ID Inlet Port air in Delivery Port out to Primary reservoir Auxiliary Delivery Port air out Auxiliary Delivery Port air out Unloader Control Air D 2A Governor Common Reservoir Pressure D 2A Governor Governor Exhaust TABLE 1 DRM DRYER MODULE AIR CONNECTIONS DELIVERY CHECK VALVE OPEN GOVERNOR UNLOADER POR CUTOFF VALVE OPEN SURGE SEE VALVE NOTE 1 CLOSED PRIMARY PORT PRI ENGINE TURBO 2 4 TO 7 ia pO COMPRESSOR PRIMARY RESERVOIR DESICCANT BED PURGE ORIFICE PURGE RESERVOIR SECONDARY AUXILIARY PORTS RESERVOIR TO ACCESSORIES PURGE RESERVOIR DRAIN VALVE Note 1 The AD IS air dryer purge piston has a purge control channel drain This allows any condensation in this area to flow past a diaphragm in the top of the purge piston and out through a channel in the middle of the central bolt of the purge assembly to be drained During the purge
21. ssembly is operating properly If the resistance values obtained are outside the stated limits replace the heater and thermostat assembly Pressure protection valves Observe the pressure gauges of the vehicle as system pressure builds from zero The primary gauge should rise until it reaches approximately 109 psi 5 psi then level off or a momentary slight fall as the second pressure protection valve opens supplying the secondary reservoir When the secondary pressure gauge passes through approximately 55 5 psi and then 85 psi 5 psi there should be an associated leveling off or momentary slight fall of pressure as the third and fourth pressure protection valves open Finally both the primary and secondary gauges should reach their full pressure of approximately 130 psi 5 psi If the AD IS air dryer does not perform within the pressure ranges as described above recheck using gauges known to be accurate If the readings remain outside of the ranges outlined above replace the AD IS air dryer NOTE There are no kits available for 5 the servicing of the pressure protection valves WARNING Do not attempt to adjust or service the pressure protection valves incorrect pressure protection valve settings can result in automatic application of the vehicle spring brakes without prior warning REBUILDING THE AD IS AIR DRYER GENERAL SAFETY GUIDELINES WARNING PLEASE READ AND FOLLOW THESE INSTRUCTIONS TO AVOID PERSONAL
22. ssure Protection Valve Boot Replacement e AD IS Air Dryer Replacement Replaces the complete air dryer assembly Includes air dryer assembly and governor e AD IS Air Dryer Splash Shield Replacement Kit e Purge Reservoir Drain Valve Replaces the drain valve on the purge reservoir SEE CATALOG PAGE 98 A 1 FOR FULL LIST OF MAINTENANCE KITS AVAILABLE NOTE There is no kit available for the servicing of the pressure protection valves See Figure 5 Do not attempt to adjust or service the pressure protection valves these are not service items TESTING THE AD IS AIR DRYER Before placing the vehicle in service perform the following tests 1 Close all reservoir drain valves 2 Build up system pressure to governor cutout and note that the AD IS air dryer purges with an audible burst of air followed immediately by approximately 30 seconds of air flowing out of the purge valve 3 Fan the service brakes to reduce system air pressure to governor cut in Note that the system once again builds to full pressure and is followed by a purge at the AD IS air dryer exhaust 4 Itis recommended that the total air system be tested for leakage to assure that the AD IS air dryer will not cycle excessively See Bendix publication BW 5057 Air Brake Handbook BRAKING SYSTEM PROTECTION The DRM dryer module allows the system to maintain one brake circuit up to about 100 psi even after a pressure loss in the othe
23. xles 7 Vehicles with compressor on times in excess of 20 If the vehicle is equipped with high air usage accessories such as trailer pump off systems or central tire inflation the air for these accessories must by pass the dryer Desiccant requires replacement Replace desiccant cartridge assembly Air by passes desiccant cartridge assembly If vehicle uses Holset compressor inspect feedback check valve for proper installation and operation Air dryer not purging Refer to Symptom 6 Purge air exhaust time insufficient due to excessive system leakage Refer to Symptom 1 DRM AD IS AIR DRYER TROUBLESHOOTING CHART Continued 3 Safety valve on air dryer A Defective AD IS air A Test to determine if air is passing through check popping off or exhausting air dryer delivery check valve valve Repair or replace Refer to Symptom 1 Remedy B System pressure too high gt 135 p s i Test with accurate gauge Replace governor if necessary Excessive pressure pulsations from compressor Typical single cylinder type Increase volume in discharge line This can be accomplished by adding a 90 cubic inch or larger reservoir between the compressor and the AD IS air dryer Safety valve setting too low lt 150 p s i Replace safety valve 4 Constant exhaust of air at air dryer purge valve exhaust or una
24. y 3 Remove governor and the adapter s o ring 4 The spring delivery check valve can now be removed Note The spring delivery check valve may be a previous design See Figure 7 5 Remove o ring from check valve body CLEANING amp INSPECTION 1 Use a suitable solvent to clean all metal parts and use a cotton swab to clean the bore Note Do not use abrasives or tools to clean the bore any scratches caused may necessitate replacing the AD IS air dryer Superficial external corrosion and or pitting is acceptable 2 Clean the o rings with a clean dry cloth Do not use solvents 3 Inspect for physical damage to the bore and the check valve seat If the bore is damaged by scratches etc that would prevent delivery check valve from seating replace the AD IS air dryer 4 Inspect the delivery check valve o rings etc for wear or damage Replace if necessary using the check valve replacement kit available at authorized Bendix parts outlets 5 Inspect all air line fittings for corrosion and replace as necessary ORIGINALSTYLE CHECK VALVE AND SPRING Early models include a different style check valve and spring GOVERNOR GASKET SPECIALGASKET SEE NOTE 6 ON PREVIOUS PAGE Tr GOVERNOR NON ADJ USTABLE 130 PSI CUT OUT NG ee pets SPRING LARGE O RING ADAPTER FIGURE 7 AD IS AIR DRYER DELIVERY CHECK VALVE ASSEMBLY 1 Lubricate the smaller o ring and check valve body with bar
25. yer pressure protection valves are not serviceable D Refer to Symptom 4 Refer to Symptom 4 Remedy A E Refer to Symptom 7 Faulty air dryer purge valve E Refer to Symptom 7 Remedies A through D After determining air reaches purge valve control port by installing a T fitting with a pressure gauge into the governor unloader port repair purge valve if necessary See Causes B E and G for Symptom 4 Refer to Symptom 4 Remedies B E and G Also refer to Symptom 1 Remedy B 7 Desiccant material being expelled from air dryer purge valve exhaust may look like whitish liquid or paste or small beads Faulty dryer cartridge Replace AD IS air dryer cartridge and or AD IS air dryer Excessive dryer vibration Check reservoir mounting for looseness or damage Repair mounting and replace cartridge 8 Unsatisfactory desiccant life Excessive system leakage Refer to Symptom 1 Remedy A Wrong vehicle application for AD IS air dryer Refer to Symptom 2 Remedy C Compressor passing excessive oil Check for proper compressor installation if symptoms persist replace compressor Refer to Bendix Advanced Troubleshooting Guide for Air Brake Compressors BW1971 9 Pinging noise excessive during compressor loaded cycle Single cylinder compressor with high pulse cycles Aslight pingi

Download Pdf Manuals

image

Related Search

Related Contents

  Oracle Audio Technologies Retail Place 12.2 User's Manual  Philips ComfortCare Steam iron GC2710  アルミ鍛造ブレーキアームフロントセット 取扱説明書  IlIIIIIIIIIIIIIHIIHIIIII“Il"IIIIIIIIIIIIIIIIIIIIIIIIIIlllllllllllllllllllfll  Printable Version    en Operator`s Manual es Manual del Operario fr Manuel de l`opérateur  télécharger la fiche descriptive  Mataway Overseeder Manuale d`uso e di sicurezza  

Copyright © All rights reserved.
Failed to retrieve file