Home
American Standard One 2064.461 User's Manual
Contents
1. 5 against finished wall Install SEAL 9 into VALVE ESCUTCHEON 10 Place VALVE ESCUTCHEON 10 with SEAL 9 onto VALVE 11 Push VALVE ESCUTCHEON 5 against finished wall Fig B INSTALL HANDLE m Push VALVE STEM 1 down to off position E Attach HANDLE ADAPTER 2 to VALVE STEM 1 with ADAPTER SCREW 3 Tighten fully Install HANDLE 4 onto VALVE STEM 1 and tighten SET SCREW 5 with 2 5mm HEX WRENCH 6 supplied Install PLUG BUTTON 7 into HANDLE 4 4 DRAIN INSTALLATION Apply a bead of PUTTY to underside of FLANGE on DRAIN BODY 1 Feed DRAIN BODY 1 down through lavatory Assembly GASKET 2 WASHER 3 and LOCKNUT 4 onto DRAIN BODY 1 Tighten LOCKNUT 4 firmly Assembly TAILPIECE 5 to DRAIN BODY 1 M968918 6 TEST INSTALLED FAUCET Turn HANDLE to off position Remove AERATOR 1 using TOOL 2 supplied Turn hot and cold water supplies on Operate HANDLE to flush water lines thoroughly Check spout connections for leaks m Check all drain connections for leaks m Turn handle to OFF position Replace AERATOR 1 F ADJUST HOT LIMIT SAFTY STOP HOT LIMIT SAFETY STOP ADJUSTMENT By restricting handle rotation and limiting the amount of hot water allowed to mix with the cold the HOT LIMIT SAFETY STOP reduces risk of accidental scalding To set the maximum hot water temperature of your faucets all you need to do is adjust the setting on the HOT LIMIT SA
2. Amiran Standard Installation ONE Instructions SINGLE CONTROL WALL 2064 461 MOUNT FAUCET IN WALL LAVATORY FITTING with EverClean Finish Congratulations on purchasing your American Standard faucet with EverClean finish found only on American Standard faucets EverClean Finish One wipe effortlessly removes spots p ae Certified to comply with ASME A112 18 1M Eliminates the need for cleaners and scrubbing U S Patent No 5 819 789 e Permanent surface protectant remains beautiful for the life of the faucet M96891 EverClean available on Polished Chrome Satin Nickel Stainless Steel Polished Brass or any combination of these finishes To ensure that your installation proceeds smoothly please read these instructions carefully before you begin ROUGHING IN k k 4 3 8 gt 1 MIN 2 MAX DIMENSIONS 110mm 25mm 50mm 4 2 NPT 2 1 16 een ra INLETS 7 FINISHED WALL COLD FINISHED WALL Ix 2 50mm a 2 D 52mm 2 1 8 D lt 54mm 47 90 2 MAX 51mm MAX e Hn i 233mm le 1 1 4 O D 32mm O D Required Tools EES Pipe Wrench Channel Locks Adjustable Wrench ar naan gt 2 N Plumbers Putty or poy Caulking Flat Blade Screwdriver Teflon Tape 1 INSTALL VALVE BODY CAUTION Turn off hot and cold water supplies before beginning Determine where the finish
3. FETY STOP Remove HANDLE 1 ESCUTCHEON 2 and LOCK NUT 3 from cartridge Pull off HOT LIMIT SAFTY STOP 4 Use a flat blade screwdriver if needed Rotate HOT LIMIT SAFTY STOP 4 counter clockwise to increase max temperature and clockwise to decrease y l ADJUSTMENT WHEN N ADJUSTMENT WHEN WATER IS TOO HOT 8 EverClean Finish Care Instructions American Standard s EverClean finish will wipe clean with a soft dry cloth A soft cloth with clean water may also be used if desired No additional cleaning productsare required DO NOT USE Soaps acid polish abrasives harsh cleaners or a cloth with a coarse surface M968918
4. ed wall location will be This measurement 16 is very important Note The rough in measurement from the finished CROSS BRACE wall is 1 minimum and 2 maximum This is a 1 tolerance See rough in illustration above woop SCREWS 4 Secure FAUCET BODY 4 to cross brace of wall structure 4nd PIPE BRACE at required height using two wood screws and and pipe brace Connect HOT water supply to left VALVE inlet and COLD water supply to ne VALVE inlet Use pipe sealant or Teflon tape for Dos all threaded connections For sweat connections do not make WALL STUDS sweat connections directly to valve body Damage to seals and and valve cartridge may occur Remove all valve parts before making sweat connections to valve body it Vv Turn valve to off position Turn hot and cold supplies on and check fitting connections for leaks TYPICAL INSTALLATION Complete wall construction T c INSTALL WALL SPOUT Remove PLASTER GUARDS 1 1a from VALVE BODY and SPOUT NIPPLE 2 Apply thread sealant to SPOUT NIPPLE 2 Thread SPOUT MOUNT 3 onto SPOUT NIPPLE 2 using a 10mm Hex Wrench Tighten completely 10mm HEX WRENCH INSTALL WALL SPOUT E Install SEAL 4 into SPOUT ESCUTCHEON 5 Place SPOUT ESCUTCHEON 5 with SEAL 4 onto SPOUT 6 Fig A Push SPOUT 6 onto SPOUT MOUNT 3 Align SPOUT 6 and tighten SPOUT SET SCREW 7 with 2mm HEX WRENCH 8 supplied Push SPOUT ESCUTCHEON
Download Pdf Manuals
Related Search
Related Contents
Kinetix 6000 Multi-axis Servo Drives Product Information Precont S Driving Your Shoprider Portable Powerchair Philips 21PT5408/01 User's Manual Husqvarna LTH18542 User's Manual MANUALE DI INSTALLAZIONE ED USO SERIE OCEANIA Modello AM0096A-LMU_02 Kroonde - Cyrille Henry Copyright © All rights reserved.
Failed to retrieve file