Home
American Standard Enfield T373.741 User's Manual
Contents
1. ARM 17 with SHOWER ARM ESCUTCHEON 18 SHOWER HEAD 12 and TUB FILLER SPOUT 13 by threading onto 7 pipe nipples Use teflon tape or pipe sealant on pipe threads a 7 7 8 REF OPTIONAL TO FINISHED FLOOR USUALLY BETWEEN 74 AND 80 FOR HEAD CLEARANCE i 18 OPTIONAL 4 4a g Zi ay 4 ALIGNMENT ij k lt I HOLES FOR 4 i DIAL PLATE word camar TOP OF 1 2 NPT 53 4 ia TUB RIM BOTTOM OF TUB 1 Required Tools 3 Phillips Screwdriver Flat Blade Screwdriver r Adjustable Wrench Channel Locks INSTALL HANDLES Align CROSS HANDLE 1 and push onto VOLUME CONTROL ADAPTER 2 Tighten set screw in CROSS HANDLE 1 securley with HEX WRENCH 3 supplied Align LEVER HANDLE 4 and push onto TEMPERATURE CONTROL ADAPTER 5 Tighten set screw in LEVER HANDLE 4 securley with HEX WRENCH 3 supplied TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION eae Should the hot and cold water supply pipes have been transposed making BLUE TO RED adjustment impossible proceed as follows m Shut off water supply m Remove handle and rim E Remove check stops and re install them transposed m Important note RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left CHECK STOP E Turn the water supply
2. Americam Standard Installation Instructions ENFIELD 1373 742 BATH SHOWER T 373 741 TRIM KITS T373 740 Thank you for selecting American Standard the benchmark of fine quality for over 100 years To ensure that your installation proceeds smoothly please read these instructions carefully before you begin Certified to comply with ANSI A112 18 1 M968294 REV 1 1 ATTENTION INSTALL CAUTION Protect finish on SHOWER ARM If TRIM T373 742 or diverter tub spout is used TRIM SHOWER HEAD and TUB SPOUT when installing make sure TWIN ELL B P N 8888 120 is connected to valve body as indicated in roughing E When finished tiling the wall remove PLASTER GUARD A and in sketch an turn off water supply ey E Attach STEM ADAPTER 1 to TEMPERATURE CONTROL 2 valve stem with SELF TAPPING SCREW 8 Attach HANDLE SCREW 4 TWIN ELL to VOLUME CONTROL ADAPTER 5 TWIN ELL P N 8888 120 can be ordered as Push CAPS 6 onto TEMPERATURE CONTROL 2 and VOLUME shown in the American Standard List Price Book CONTROL ADAPTER 5 ROUGHING IN DIMENSIONS f Installation for Bath Shower Mount ESCUTCHEON 7 to valve body with SCREWS 8 Shower only or Valve only Trim i Push DIAL PLATE 9 over CAPS 6 and into the four alignment holes in m Dimensions are for reference ESCUTCHEON 7 and snap into place ane re Remove PIPE CAP 10 and PIPE CAP 11 from shower pipe and tub filler pipe 1 2 NPT gt 1 MIN Install SHOWER
3. O NOT CLEAN THE PRODUCT WITH SOAPS ACID POLISH ABRASIVES HARSH CLEANERS OR A CLOTH WITH A COARSE SURFACE M968294 REV 1 1 M962365 YYYOA ESCUTCHEON AND SCREWS 907090 YYYOA ESCUTCHEON CAP A918434 YYYOA ESCUTCHEON SCREWS M950220 YYYOA DIVERTER SPOUT IPS HOT LINE FOR HELP For toll free information and answers to your questions call 1 800 442 1902 Weekdays 8 00 a m to 8 00 p m EST IN CANADA 1 800 387 0369 TORONTO 1 905 306 1093 Weekdays 8 00 a m to 7 00 p m EST Product names listed herein are trademarks of American Standard Inc American Standard Inc 2003 ENFIELD SHOWER ARM BATH SHOWER AND ESCUTCHEON TRIM KITS MODEL NUMBER T373 742 T373 741 T373 740 M953565 YYYOA SHOWER HEAD M909625 YYYOA DIAL PLATE M918318 0070A HANDLE SCREW M950119 YYYOA CROSS HANDLE ASSEMBLY MI950118 YYYOA H LEVER HANDLE ASSEMBLY L M918990 0070A SELF TAPPING HANDLE SCREW L M918038 0070A HANDLE ADAPTER M962256 YYYOA DIVERTER SPOUT REPAIR KIT Replace the YYY with appropriate finish code CHROME POLISHED NICKEL BLACKENED BRONZE POLISHED BRASS SATIN M968294 REV 1 1 Amirieam Standard Installation Instructions CERATHERM 3 4 CENTRAL THERMOSTAT WITH VOLUME CONTROL Thank you for selecting American Standard the benchmark of fine quality for over 100 years To ensure that your installation proceeds smoothly please Certified
4. RING to the right pull off KNOB MOUNT and reinstall KNOB MOUNT with arrow B pointing upwards The maximum mixed water temperature is set at 109 F at the factory F r i TEMPERATURE This setting can be changed if desired LIMIT STOP Remove the TEMPERATURE LIMIT STOP H shaped Black Plastic part Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water A temperature to 104 F or 112 F SECURING ye For 100 F adjustment turn the water supply on Turn KNOB MOUNT until the spout RING temperature is 100 F Check that arrow marking A on the KNOB MOUNT still points upward after adjusting the thermostat to 100 F If not pull out the RED LOCKING DEVICE RED LOCKING Remove KNOB MOUNT by pulling it towards you while standing directly in front of the valve DEVICE E Reinstall the KNOB MOUNT so that the arrow marking A points upwards E Reinstall RED LOCKING DEVICE TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION Should the hot and cold water supply pipes have been transposed making adjustment impossible proceed as follows 5 CHECK STOP E Shut off water supply iF hres E Remove handle and rim E Remove check stops and re install them transposed Important note RED CHECK STOP is now on the right of the mixer body and the BL CHECK STOP is now on the left E Turn the water supply back on and perform the temperature adjustment in step 2 CHECK STOP RED TO BLUE M968480 CERA
5. TER GUARD is up Connect the hot and cold water supplies Assemble all connecting pipes Flush lines to remove any dirt Connections are 3 4 NPT Assemble the connection pipe to one of the MIXED OUTLETS of the VALVE Cap the other MIXED OUTLET Tub port is fitted with a plug at the factory IMPORTANT INSTALL ANY REQUIRED SHUT OFF OR DIVERTER VALVES INTO THE PIPING SYSTEM PORT If the CHECK STOPS 4 5 were removed during installation ensure the hot and cold CHECK STOPS 4 5 are not reversed The hot CHECK STOP 4 has a red top and the cold CHECK STOP 5 has a blue top sola Lg CHECK STOP CHECK STOPS 4 5 are supplied in the open position J COLD BLUE Closing using 5 32 4 mm hex wrench to pressure test and to check for leaks To flush lines remove the CHECK STOPS 4 5 and run water If desired the TEMPERATURE CONTROL UNIT can be removed Reinstall CHECK STOPS 4 5 and CONTROL UNIT 6 if it was removed Remove PLASTER GUARD 2 if still installed Turn on water supplies and check for leaks Reassemble PLASTER GUARD 2 and FINISH WALL Beware of Freezing No water should remain in the MIXING VALVE if freezing is a possibility CHECK STOP Remove the CHECK STOPS 4 5 to completely HOT RED drain the MIXER UNIT 1 TEMPERATURE ADJUSTMENT Unscrew PLASTER GUARD SCREWS and remove PLASTER GUARD Check that arrow marking B points vertically upwards If not push the BLACK CLAMP on the SECURING
6. THERM 3 4 CENTRAL THERMOSTAT WITH VOLUME CONTROL MODEL NUMBER 912647 0070A O RING A953971 0070A CHECK STOP COLD BLUE A994352 0070A CARTRIDGE g 923348 0070A E HANDLE ADAPTER N K 918428 0070A Wy CARTRIDGE SCREW i 5 953963 0070A 954040 0070A THERMOSTAT HANDLE EXTENSION CARTRIDGE A953972 0070A CHECK STOP HOT RED 912647 0070A j tl T 0070A O RING CALIBRATION UNIT 963434 YYYOA DEEP ROUGH KIT SOLD SEPARATELY HOT LINE FOR HELP For toll free information and answers to your questions call 1 800 442 1902 Weekdays 8 00 a m to 8 00 p m EST IN CANADA 1 800 387 0369 TORONTO 1 905 306 1093 Weekdays 8 00 a m to 7 00 p m EST Product names listed herein are trademarks of American Standard Inc American Standard Inc 2003 M968480
7. back on and perform the temperature adjustment in step 2 PED aaa 4 TEMPERATURE ADJUSTMENT Loosen set screw in LEVER HANDLE ASSEMBLY 1 with HEX WRENCH 2 supplied and pull off LEVER HANDLE ASSEMBLY 1 Check that arrow marking B points vertically upward If not push the BLACK CLAMP on the SECURING RING to the right pull off KNOB MOUNT 3 and reinstall KNOB MOUNT 3 with arrow B vertically upward See Figure 1 SET HOT LIMIT STOP m The maximum mixed water temperature is set at 109 F at the factory This setting can be changed if desired m Remove the TEMPERATURE LIMIT STOP H shaped Black Plastic part Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104 F or 112 F For 100 F adjustment turn the water supply on Turn KNOB MOUNT 3 until the spout temperature is 100 F Check that arrow A on the KNOB MOUNT 3 still points vertically upward after adjusting the thermostat to 100 F If not pull out the RED LOCKING DEVICE Remove KNOB MOUNT 3 by pulling it towards you while standing directly in front of the valve Reinstall the KNOB MOUNT 3 with arrow marking A vertically upward ARROWS AT 12 O CLOCK POSITION Reinstall RED LOCKING DEVICE Vertically Upward ao Figure 1 KNOB MOUNT TEMPERATURE LIMIT STOP RED LOCKING DEVICE CARE INSTRUCTIONS DO SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER DRY WITH A SOFT COTTON FLANNEL CLOTH D
8. to comply with ANS CATE te IN f F ASSE 1016 read these instructions carefully before you begin pasate ROUGHING IN DIMENSIONS CONNECTIONS ARE 3 4 NPT 3 4 NPT JO t 3 15 16 eT lea 3 4 NPT INLET 1 5 8 2 1 2 THERMOSTATIC BATH THERMOSTATIC SHOWER INSTALLATION THERMOSTATIC SHOWER INSTALLATION USING A SHOWER INSTALLATION USING A DIVERTER VALVE FIXED DIVERTER VALVE FIXED SHOWER HEAD ADJUSTABLE HAND HELD SHOWER ON OFF VALVE AND TWO BODY SPRAYS D D DIVERTER amp VALVE DIVERTER CEE E E 80 86 l X ON OFF TUB PORT F r VALVE 18 OPTIONAL MUST BE PLUGGED i TOP OF TUB RIM 3 4 BOTTOM OF TUB TUB PORT MUST f a IY TUB PORT MUST BE PLUGGED BE PLUGGED IMPORTANT WHEN NOT USING A NOTE MINIMUM FLOWING PRESSURE REQUIRED FOR DIVERTER SPOUT A SEPARATE THIS SYSTEM OPERATING WITH ONE SHOWER HEAD DIVERTER VALVE MUST BE USED AND 2 BODY SPRAYS IS 40 PSI DO NOT SOLDER DIRECTLY TO THE VALVE BODY THIS WILL DAMAGE ROUGHING IN THE VALVE WARNING THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES Prepare water supplies per ROUGHING IN DIMENSIONS Make sure the finished wall is between the minimum and maximum rough dimension Install VALVE at indicated height and depth Make sure the TOP marking on the PLAS
Download Pdf Manuals
Related Search
Related Contents
White Rodgers 50A55-3797 Installation Instructions Adagio User`s Manual HMI41 Bedienungsanleitung auf Deutsch Copyright © All rights reserved.
Failed to retrieve file