Home
        APC SY30K40F Symmetra PX 30kW Scalable to 40kW Rack-mountable UPS
         Contents
1.              Unlock the right side panel using key      Depress the latches       Pull out the panel       Lift the panel at an angle away from the enclosure        Route the communication cables through the front holes of the  enclosures  Exit the enclosures from the bottom or top as required     side panels cannot be removed  the Bypass Static Switch    Note  If your UPS has been installed between devices and  Q Module can be removed to gain access        How to connect communication cables                                    Connect the network communication cable       Connect the XR communication cable     enclosure for further details on how to connect  communication cables between the UPS and the XR Battery  Enclosures     Se See Also  Refer to the guide supplied with the battery    Installation and wiring of optional  APC Maintenance Bypass Panel    Wiring overview    MBP   optional    AC Power   EPO equipment       DC Power    E Interface wiring    Battery Enclosure   Optional  4 Max            APC Maintenance Bypass Panel installation and  wiring procedure      Mount the APC Maintenance Bypass Panel  MBP  on a wall close to  the UPS according to the illustration below     A   25 99 in    660 mm                                        4    N    Fixing holes in  the back of box B   33 84 in    860 mm                           Connect the cables from the upstream utility to the main input  terminals on the MBP        Connect the cables from the UPS AC input to the input 
2.  they are  installed and functioning correctly       Successful completion of steps 1 through 6 indicates that the UPS  wiring is properly installed and functioning correctly  Turn off  breakers and switches and shut down utility power to the system  input  See Total Power Off procedure        Reinstall all wiring access panels on the UPS     Contact Information    For local  country specific centers  go to www apc com support contact  or see the back cover of the operation manual for phone numbers     
3. Arc    www apc com    Installation  Symmetra PX 10 40 kW 208 V                      IMPORTANT SAFETY INSTRUCTIONS  SAVE THESE INSTRUCTIONS    Warning  ALL safety instructions in the Safety Sheet  990 2984 must be read  understood  and followed when  installing the UPS system  Failure to do so could result in  equipment damage  serious injury  or death     Warning  The UPS system has no built in disconnection  devices for AC output and DC input  An AC output over   current protection and AC output disconnect must be  provided by the customer     Warning  After the UPS has been electrically wired  do not  start it up  Start up is commissioned to APC authorized  personnel only     Caution  For customer supplied external batteries  over   current protection and a disconnection device for the battery  circuits must be provided     Note  Ensure that the unit is in its final location  prior to the installation     I 07 2007    990 4063F 001       Cable Entry  Rear Cable Entry                                 Loosen the screws to remove the plate       Punch holes as required and reinstall the panel before mounting the  wiring hardware     Bottom Cable Entry                     Loosen the screws to remove the plate       Punch holes as required and reinstall the panel before mounting the  wiring hardware     AC Input  AC Output  and Ground  Cable Landings    Caution  Ensure clockwise phase rotation and neutral  location     Caution  Power terminal lug diameter is 8 mm  Torque value  A
4. N is 6 Nm                      L1 L2 L3 N  AXac output O gt                     L2 L3 N  INPUT          ele                 gt                                                           6             6                                                                                  XR    XR CT  XRG   pe                                                                                   Connect power input and output wiring to terminate as shown  Route  the input and output cables in separate conduits     XR    XR CT   XR     De Input      O                                                                                                                           Make ground connections as shown     EPO Switch Wiring    The UPS must be connected to either a dry contact or a 24 Vde  Emergency Power Off  EPO  switch     The EPO circuit is considered Class 2 and SELV  Safety Extra Low  Voltage   A SELV circuit is isolated from primary circuitry through an  isolating transformer and designed so that under normal conditions  the  voltage is limited to 42 4 Vac peak or 60 Vdc  SELV and Class 2 circuits  must be isolated from all primary circuitry  Do not connect any circuit to  the EPO terminal block unless it can be confirmed that the circuit is  SELV or Class 2     For installations in US         CL2Class 2 cable for general purpose use         CL2PPlenum cable for use in a vertical shaft or from floor to  floor         CL2R Racer cable for use in dwellings and raceways       CL2XLimit
5. ed cable lugs and crimping tools  Manufacturer   Framatome Connectors International  FCI   see table                                             Cable Size Terminal bolt diameter  8 mm  CNG Cable Lug Type Crimping Tool Die  8 YA8CL2TC38 MD7 34R W8CVT  6 YA6CL2TC38 MD7 34R WSCVT  4 YA4CL2TC38 MD7 34R W4CVT  3 YA3CL2TC38 Y35 U3CRT  2 YA2CL2TC38 MD7 34R W2CVT  1 YAICL2TC38 MD7 34R WICVT  1 0 YA25CL2TC38 MD7 34R W25VT  2 0 YA26CL2TC38 MD7 34R W26VT  3 0 YA27CL2TC38 MD7 34R W27VT  4 0 YA28CL2TC38 MD7 34R W28VT                      Checklist    Q  Note  Do not install power or battery modules       Ensure all power wiring is torqued to a minimum of 53 1b in  6 Nm        Ensure that the system enable switch and the DC breaker are in the  OFF or STAND BY position        Apply utility power to the system input and measure the voltage at  the input terminal block  Record voltages between   L1 and N  L2 and N   L3 and N   Measured voltage must be between 96 and 130  If not  STOP   Verify correct wiring  correct location of N  from the power  source to the input wiring connections  Repeat Step 3              Verify clockwise phase rotation using a phase rotation meter        Turn on system enable switch  Wait 1 minute for system to self test   Ignore display warning  fault light will be on         Test the EPO switch  The system enable switch should trip to the  STAND BY position  and the system should shut down completely  If  not  check the connections and the EPO switch to ensure that
6. ed use cable for dwellings and raceways     For installations in Canada         CL2RCertified  type ELC  Extra Low Voltage Control Cable        CL2XCertified  type ELC  Extra Low Voltage Control Cable      Emergency shut down with internal supply  N O EPO Control N C EPO Control  r        XR    XR CT  XR     A Demu               saa   eeg    pe       om          put          Ground 8 Ground   Relay Coil 1 716 Relay Coil 2  Internal Power   5 Internal Power   24V Supply  24V Supply                                                          STASIS I  UU    1   2 Battery Breaker present   34 Ext  battery fuse Battery Breaker 1   NO position    56 Ext  battery fuse Battery Breaker 2   NO position                                                                       78 Temp  sensor  ext  battery    910 Temp  sensor  ext  battery present    11 12 Iso  trafo temp  switch  N C position     13 14 Iso  trafo temp  switch present    Communication Cables    Side panel removal    Warning  Ensure Total Power Off before removing the  AN side panel  see Total Power Off procedure in the Safety    Sheet      cable length is inadequate  a longer Cat 5 cable  or couplers     Note  Use 20 foot standard Cat 5 data cable  supplied   If the  Q  can be used  not supplied      to gain access to the communication cables  If not  proceed to  Connecting communication cables     Q  Note  If bottom routing is required  follow steps 1 to 5 below                                                                 
7. requency  on line  in bypass  Synchronized to input    Output frequency  on battery  50 60 Hz       Overcurrent device and disconnect switch for external safety    DC bus voltage     192 V  DC voltage rating of the battery supply 250 V  Maximum available battery supply fault current 10 kA       Notes    Recommended source connection       Input electricity to be provided from a dedicated  grounded 4 wire  WYE utility power source with a grounded neutral       If a grounded 3 wire utility is present  a Delta to WYE isolation  transformer on UPS input is required        Ensure clockwise voltage phase rotation  L1 L7 L3      Recommended current protection        Input  175 Amp  3 Pole AC circuit breaker with 30 kAIC   Note  If your installation does not include an Isolation Transformer  and a MBP  optional equipment   use a 175 Amp Class    J    current  limiting fuse on each input phase        Output  150 Amp 3 pole AC circuit breaker with 30 kAIC   Recommended wiring for a 104  F  40  C  temperature environment        Input wires  2 0 AWG 90  C  194  F  rated copper wire   Output wires  1 0 AWG 90  C  194  F  rated copper wire   Refer to NEC Articles 310 15  310 16 and 315 for further  information       Neutral output wires  rate for 173  of output phase current if feeding  all Switch Mode Power Supply loads without power factor  correction        Ground wires  sized in accordance with NEC Article 250 122 and  Table 250 122        Maximum cable sizes  250 kemil       Recommend
8. t      Ensure that the wiring is correct      Switch on Q001  Q003  and Q002       Measure and record voltages between input and output points on the  Symmetra PX  L1 input and L1 output   L3 input and L3 output   Measured voltages must be 0 Volt     2 Volt  If not  STOP  Verify  correct wiring from MBP to the Symmetra PX     L2 input and L2 output        Successful completion of steps 1 through 7 indicates that the MBP is  properly installed and functioning correctly  Turn off breakers and  switches and shut down input power to the system  Reinstall all  wiring access panels on the Symmetra PX     Specifications    Caution  All electrical power and power control wiring must  AN be installed by a qualified electrician  and must comply with    local and national regulations for maximum power rating     Note  All current values are based on a 40 kW maximum  Q  configuration of the UPS        Input   Input voltage 3 Phase 208 V   166 V 240V     Input current  nominal  per phase  123 A    Maximum input current  continuous  at minimum 162 A  mains voltage        Input current protection  external to UPS  not 175 A  note 4  supplied    Input frequency 40 70 Hz  Output   Output voltage  on line  3 Phase 208 V  Output current  nominal  per phase  111 A    Maximum output current  in bypass only at 125  139 A  overload  per phase     Neutral output current  with 100  switch mode 192 A  note 7  load     Output current protection  external to UPS  not 150 A  note 5    supplied   Output f
9. terminals on  the MBP        Connect the cables from the UPS AC output to the output terminals  on the MBP        Connect the cables from the MBP mains output terminals to the load  equipment distribution        Connect control wires between the UPS and the MBP     UTILITY INPUT 208V WYE SYSTEM OUTPUT 208V  4 WIRE   GROUND 4 WIRE   GROUND     5           iC OOOO MAINTENANCE BYPASS PANEL iO OOOC    ILI L2 L3 N Gi ILI L2 L3 N G   pra xot pe   a e     umiLiTy OUTPUT S       ILI L2 L3 N G  1 5 6 7 8 9 10  L1 L2 L3 N G     29999 990909 9909 OGO                                                             o OO000 IOOOOCO         L1 L2 L3 N G   L1 L2 L3 N G   omw h OQOQO0O0O O00000 OO icour A     1123 4 5 6 7 8 9 10 13 14     J2  Maintenance Bypass Monitor Board             SYMMETRA PX UPS             Maintenance Bypass Panel wiring checklist      Ensure that both the DC breaker and the system enable switch are in  the OFF or STAND BY positions       Torque terminal screws to 1 6 1 8 Nm and terminal bolts to 6 Nm   Verify wires in terminal block X010  Wires 1 10 connect to  equipment interface 1 10        Apply power to system input of MBP and measure voltages at input  terminal block  X001   Measure and record voltages below between   L1 and Neutral  L2 and Neutral   L3 and Neutral   Measured voltages must be 96 and 130  If not  STOP  Verify  correct wiring from the power source to the input wiring  connections and repeat the procedure        Ensure that the phase rotation is correc
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Mitsumi Optical Wheel Mouse 3Btn PS2 Beige Ret  Mode d`Emploi - Fondation Marianiste  西中学校特別教室棟耐震補強(建築主体)工事  Mener des activités de projet en documentation  Intel Pentium 4 M  CVHD Manual - Cerwin Vega  Samsung GT-S3100 Korisničko uputstvo  Samsung GT-I6410 Εγχειρίδιο χρήσης  9 - Johannus  Hets User Guide    Copyright © All rights reserved. 
   Failed to retrieve file