Home

Humanscale M8

image

Contents

1. TION HARDWAR Sees OOOO Humanscale 4 Standard VESA Bracket Screws 4 Plastic Spacers x2 with crossbar x2 with crossbar a The M8 includes a cable management system to keep monitor cables organized and protected Start by inserting cables into Cable Clip A E gt gt 4 Extended VESA Bracket Screws x2 with crossbar b Route cables across the bottom of the Upper Arm and around to the top of the Lower Arm Insert cables into groove on top of the Lower Arm B Hex Key sarin Place Arm Cover C onto the Lower Arm so that the grooves interlock Slide Arm Cover up until it snaps in place Hex Key B 4mm Hex Key C 5mm VESA Bracket x2 with crossbar Note For dual monitor applications first route monitor cables through cable management clips D then refer to Step a Humanscale Bolt Through Mount Clamp Mount a Bolt Through Plate Bolt Through Bolt HEX KEY STORAGE CROSSBAR INS ION HARDWARE a The M8 s VESA bracket is built to house 2 Hex Keys for storage Insert Hex Key B and Hex Key C into the clips on either side of the VESA bracket making sure each Hex Key corresponds to the size of the lip FRICTION A MEN www humanscale com a If your monitor is particularly heavy or after prolonged use the Ball Joint Swivel Tilt Mechanism may require increased friction This can be achieved by tightening the 3 Ba
2. proceed to Step iii i To convert from Clamp Mount to Bolt Through Mount detach Bottom Clamp A from Top Bracket B by loosening Bracket Screws C with Hex Key B ii Using an 8mm Hex Key not include remove Base Stem Screw D from Mount EP 2 ATTACH O BASE STEM iii Drill 13mm hole though work surface in desired location Note Bolt Through Mount can accommodate a hole up to 4 102mm in diameter If hole is 2 51mm or more cables can be routed through the hole For some 2 grommet holes cables should be routed before installation of mount to accommodate cable plugs cable access is approximately 1 5 x 0 25 with 2 grommets iv Position the M8 Base over the work surface hole A v Align Bolt Through Plate A under the work surface Pass the Bolt Through Bolt B through the hole in the plate C and screw into M8 Base Using a 10mm Hex Key not included fully tighten until secure vi Proceed to Step 2 Insert M8 Arm A into the Base Stem B B b Using Hex Key A tighten Screw C so that the arm is unable to lift out Place VESA Bracket in position on back of monitor with clips A on the left and right Attach using 4 Standard VESA Bracket Screws provided VESA bracket can accommodate 75mm and 100mm hole patterns For this installation you may also use screws that came with your monitor i If mounting space for
3. 75mm VESA bracket is inset into back of monitor place the 4 Plastic Spacers B between VESA Bracket and monitor align with hole pattern and using the 4 Extended VESA Bracket Screws C attach through the Spacers STEP 4 ATTACH CROSSBAR TO ARM DUAL MONITOR APPLICATION ONLY If using Crossbar for dual monitor application follow Step i below Otherwise proceed to Step 5 i Attach Crossbar A to Crossbar Link B using Crossbar Link Screws C Tighten with Hex Key D until secure ERIS Slide VESA Bracket A into Ball Joint until it clicks To remove depress Quick Release Tab B and slide monitor up and away from Arm If security is required tighten Security Screw using Hex Key A H MONITOR TO ARM Security Screw Your monitor should move up and down easily and stay in place once adjusted If it is difficult to adjust or moves without assistance it is not properly counterbalanced Use Hex Key C to adjust the Tension Screw A located in the Upper Arm of the M8 Turn the Tension Screw clockwise to increase tension for larger heavier monitors Turn the Tension Screw counterclockwise to decrease tension for smaller lighter monitors Note Monitor should not exceed 40 Ibs 18 kg i If further tension adjustment is required tension can be fine tuned via the half dollar size friction discs B located on the side of the M8 s Upper Arm Us
4. e Hex Key B to turn the screws on each friction disc clockwise to increase friction Turn each screw counterclockwise to decrease friction Be sure to apply the same amount of rotation to each screw MONITOR HEIGHT STEP 3 ATTACH VESA BRACKET TO MONITOR STEP 6 MONITOR WEIGHT ADJUSTMENT INCREASE A TENSION 7 LARGER MONITORS GS 0 Y SMALLER MONITORS A ADJUSTMENT DUAL MONITOR APPLICATION ONLY To fine tune the height of your monitor when using the Crossbar for dua monitor applications use Hex Key B to turn Screw A This will adjust your monitor s height up or down
5. ll Joint Friction Screws A using Hex Key B C a heat ae PE installation Hex Key B PESSE o o a Instructions HSIM80211 P 1 ATTACH M T TO WORK SURFACE CLAMP MOUNT a For installation on open edge of work surface i Slide Mount A against work surface edge and fully tighten Clamp Screws B Note If work surface is too thin to attach Mount at default setting proceed to Step b ii Proceed to Step 2 For installation on work surface positioned against a wall or panel i Attach arm to Base Stem following Step 2 instructions before proceeding ii Detach the Bottom Clamp A from the Top Bracket B by loosening Bracket Screws C with Hex Key B iii Position the Top Bracket against work surface edge iv Underneath the work surface reattach the Bottom Clamp to the Top Bracket using the Bracket Screws Note There are two sets of Bracket Screw holes to accommodate different surface thicknesses Use the set of holes that allow the Clamp Screws to tighten fully Use the top holes for surfaces up to 1 8 48mm thick and lower holes for surfaces up to 2 7 68mm thick v Fully tighten Clamp Screws vi Proceed to Step 2 Note Clamp Mounts cannot be used to mount the M8 to any vertical surface BOLT THROUGH MOUNT a If both mount options were purchased begin with Step i below Otherwise

Download Pdf Manuals

image

Related Search

Related Contents

ACTi ENR-1000  Oracle Database Gateway for APPC User's Guide, 11g Release 2  BEST 100 DPE - Outlet Piscinas  Parachute motorisé - Publications du gouvernement du Canada    Telekurs iD html Mode d`emploi rapide  

Copyright © All rights reserved.
Failed to retrieve file