Home
Allied Telesis AT-SB4311-V2 network switch
Contents
1. at least one functional PSU and a fan tray Table 1 LEDs on the 4412 24 port 10 100 1000BASE RJ 45 Line Card LED UA Link activity State Green Function A 1000 Mbps link is open Flashing green 1000 Mbps activity is occurring Amber A 10 100 Mbps auto negotiating link is open The L A LED for port 1 briefly lights at switch power up or when the card is hot swapped Flashing amber 10 or 100 Mbps activity is occurring D C Duplex C ollision Green The port is operating in full duplex mode Amber The port is operating in half duplex mode Flashing amber Collisions are occurring For the AT SB4311 48 port line card one LED is provided for each port The default is for the LED to show link activity L A To see Duplex Collision activity D C press and hold the LED Mode button located on the line card s front panel Table 2 LEDs on the AT SB4352 32 port 100BASE FX MT RJ Line Card LED State Function VA Green A 100 Mbps link is open Link Activit ERR AGEN Flashing Green 100 Mbps activity is occurring Amber The L A LEDs for ports 1 and 17 briefly light at switch power up or when the card is hot swapped D C Green The port is operating in full duplex mode Dupe Collision Amber The port is operating in half duplex mode Flashing Amber Collisions are occurring C613 04030 01 REV H Quick Install Guide Table 3 LEDs on the A
2. Controller Quick Install Guide Line Card Quick Install Guide Bandwidth Expander Quick Install Guide Y XI a Printed Acrobat PDF KY Website Models Covered By This Guide This Quick Install Guide includes information on installing the following line cards The suffix V2 indicates the silicon revision level m AT SB4311 48 port 10BASE T 100BASE TX RJ 45 AT SB4311 V2 m AT SB4352 32 port 100BASE FX MT RJ AT SB4352 V2 m AT SB4412 24 port 10BASE T 100BASE TX 1000BASE T RJ 45 AT SB4412 V2 m AT SB4441 8 port 1000BASE X GBIC AT SB4441 V2 m AT SB4442 V2 24 port 1000BASE T copper or 1000 BASE SX LX or ZX fibre SFP AT SB4541 1 port 1OGBASE LR XFP Information on installing switch controllers can be found in the SwitchBlade Switch Controller Quick Install Guide Quick Install Guide updates can be downloaded from www alliedtelesyn co nz support switchblade C613 04030 01 REV H SwitchBlade Line Card Package Contents The following items are included with each line card Contact your sales representative if any items are damaged or missing E One SwitchBlade line card E One SwitchBlade Line Card Quick Install Guide E One Safety and Statutory Information booklet E One warranty card Related items that can be purchased separately E Blank faceplates for switch controller and line card bays AT SB4193 E Approved pluggable transceivers GBICs SFPs a
3. faceplate Keep the faceplate for future use If you should remove a line card replace the faceplate to prevent dust and debris from entering the chassis and to maintain proper airflow C613 04030 01 REV H SwitchBlade Line Card The switch may overheat or be damaged by dust and debris if bays are left uncovered To remove an existing line card Loosen the line card s two Phillips screws until they disengage from the chassis Move the line card ejector levers to the unlocked position see Figure 2 on page 6 Slide the line card out of the chassis keeping the card ina straight alignment so it doesn t jam Figure 2 Ejector levers 6 Insert the new line card Make sure the line card s metal back panel is aligned with the card guides see Figure 3 on page 7 Line cards are mounted vertically in the SwitchBlade 8 AT SB4108 chassis and horizontally in the SwitchBlade 4 AT SB4104 chassis With the ejector levers in the unlocked position see Figure 2 on page 6 carefully slide the line card into the chassis When inserting a line card take care to slide the card s metal back panel along both guides at an equal rate If a line card becomes tight it must not be forced Instead gently withdraw the card and try again taking extra care to keep the card aligned with the card guides Forcing a misaligned or jammed line card is likely to damage the card or chassis The ejectors lock
4. SwitchBlade Line Card Quick Install Guide BDI ATZ Alied Telesyn SwitchBlade Line Card Quick Install Guide Document Number C613 04030 01 REV H Copyright 2002 2006 Allied Telesyn International Corp 19800 North Creek Parkway Suite 200 Bothell WA 98011 USA All rights reserved No part of this publication may be reproduced without prior written permission from Allied Telesyn Allied Telesyn International Corp reserves the right to make changes in specifications and other information contained in this document without prior written notice The information provided herein is subject to change without notice In no event shall Allied Telesyn be liable for any incidental special indirect or consequential damages whatsoever including but not limited to lost profits arising out of or related to this manual or the information contained herein even if Allied Telesyn has been advised of known or should have known the possibility of such damages All trademarks are the property of their respective owners Quick Install Guide 3 Documentation Roadmap SwitchBlade Safety and Statutory Information Booklet Hardware Reference E Software Reference Chassis amp Fan Tray Quick Install Guide 7_ General Customer Support eS Al Visit www alliedtelesyn co nz for the latest documentation FAQs and support information Power Supply Unit Quick Install Guide Switch
5. T SB4441 8 port 1000BASE GBIC Line Card LED State Function VA Green A link is open rece Flashing Green Activity is occurring Amber The port is operating in half duplex mode The L A LED for port 1 briefly lights at switch power up or when the card is hot swapped Flashing Amber Half duplex activity is occurring Off No link is present GBIC Status Green A GBIC is installed and enabled Amber A GBIC is installed but disabled Flashing Amber A fault is occurring on the link Off No GBIC is installed Table 4 LEDs on the AT SB4442 V2 24 Port SFP Gigabit Line Card LED State Function SFP Steady Green For fibre SFPs Link Activity Glow The SFP is able to send and receive a light signal For copper SFPs Communication at 1 Gbps has been established Flashing Green Data activity is taking place Steady Amber The SFP has been inserted Glow Flashing Amber The SFP is not functioning correctly Off No link is present Table 5 LEDs on the AT SB4541 1 port XFP 10GBASE R Line Card LED State Function VA Green Communication has been established ICICI Flashing Green 10GE activity is occurring Off No link is present XFP Green An XPFP is installed and enabled Amber An XP is installed but disabled Flashing Amber An XFP is not ready or faulty Off No XFP is installed C613 04030 01 REV H 10 SwitchBlade Line Card More troubleshooting infor
6. ing mechanisms should align with their slots in the chassis see Figure 4 on page 7 C 613 04030 01 REV H Quick Install Guide 7 Figure 3 Card guides on the SwitchBlade 8 chassis Figure 4 Ejector lever and locking slot 7 Secure the line card Move the ejector levers to the locked position and tighten the line card s two Phillips screws see Figure 2 on page 6 If the chassis is receiving power one or more L A LEDs will light amber when the line card is correctly installed The LED s will remain lit until the card is configured 8 For cards that accept miniature pluggable transceivers such as GBICs SFPs and XFPs install the transceivers Slide each transceiver into its appropriate slot and press it firmly into place en A range of pluggable transceivers have been tested and approved for use with the SwitchBlade Contact your authorised Allied Telesyn distributor or reseller for more information or visit www alliedtelesyn co nz In order to connect each fibre into its correct terminal check which terminal is the Send and which is the Receive by reading the marking on each GBIC before ILE inserting it into its card socket 9 Connect the data cables Make sure each cable connection is secure C613 04030 01 REV H SwitchBlade Line Card Line Card LEDs The following LEDs will operate if the line card is installed in conjunction with a properly configured switch controller
7. mation can be found in the SwitchBlade Hardware Reference Where To Find More Information Sources of further information A Documentation and Tools CD ROM is included with every switch controller or chassis supplied This contains the complete documentation set for your switch and its expansion options as well as tools for managing the switch The SwitchBlade Safety and Statutory Information booklet which provides safety and statutory information for the SwitchBlade and its accessories The SwitchBlade Hardware Reference which provides detailed information on the switch and its hardware features The SwitchBlade Software Reference which provides detailed information on configuring the switch and its software The SwitchBlade Power Supply Unit Quick Install Guide which outlines the procedure for installing AC and DC power supply units The SwitchBlade Switch Controller Quick Install Guide which outlines the procedure for installing switch controllers The SwitchBlade Chassis and Fan Tray Quick Install Guide which outlines the procedure for installing the chassis and its fan tray The SwitchBlade Bandwidth Expander Quick Install Guide which outlines the procedure for installing bandwidth expanders www alliedtelesyn co nz support switchblade C613 04030 01 REV H
8. nd XFPs Contact your authorised Allied Telesyn distributor or reseller for more information Installing a Line Card Line cards can be hot swapped There is no need to power down the switch when installing or removing line cards See the SwitchBlade Hardware Reference for detailed information on the operational characteristics of hot swapped interfaces Follow these steps to install a line card 1 Read the safety information The SwitchBlade Safety and Statutory Information booklet includes all relevant safety information A copy of this booklet is supplied with each line card A PDF version can be found on the CD ROM that ships with every switch controller and every chassis or can be downloaded from www alliedtelesyn co nz support switchblade 2 Gather the tools and equipment you will need To loosen or secure the line card s mounting screws you will need a Phillips 2 screwdriver 3 Choose a bay for the line card For the SwitchBlade 8 chassis AT SB4108 Unless replacing an existing line card choose the empty line card bay that is closest to the chassis centre This provides optimum cooling Line card bays are bays 1 to 8 For example fill line card bays 4 and 5 first followed by bays 3 and 6 then bays 2 and 7 and lastly bays 1 and 8 Bay numbers can be found on the chassis above each bay C613 04030 01 REV H Quick Install Guide 5 For the SwitchBlade 4 chassis AT SB4104 Unless replacing an existi
9. ng line card choose the empty line card bay that is closest to bottom of the chassis This provides optimum cooling Line card bays are bays 1 to 4 For example fill line card bay 4 first and bay 1 last Bay numbers can be found on the chassis right of each bay Although line cards will operate in any combination of line card bays filling the bays in the order described above provides optimum cooling D Do not attempt to install a line card in a switch controller bay bay A or B Attempting to install a line card in a switch controller bay is likely to damage the line card and chassis 4 Prepare the line card In an antistatic environment remove the line card from its packing material Be sure to observe ESD precautions Do not attempt to install a line card without observing correct antistatic procedures Failure to do so may damage the line card and chassis If you are unsure what the correct procedures are contact your authorised Allied Telesyn distributor or reseller gt An ESD socket is provided on the front panel of the SwitchBlade chassis see Figure 1 on page 5 This socket provides a connection for an ESD wrist strap o Figure 1 ESD socket on the SwitchBlade 8 chassis ESD socke 5 Remove the line card bay faceplate or existing line card To remove a blank faceplate Loosen the faceplate s two Phillips mounting screws until they disengage from the chassis then remove the
Download Pdf Manuals
Related Search
Related Contents
Forex Sensation Samsung 320PX Priručnik za korisnike Cornelius Nordic CCU0220 User's Manual Cisco Systems SFS 3504 User's Manual sdj1-rev-march2010 AITech HDMI-DVI Cable User Manual - CNET Content Solutions RSS-243, Active Medical Implants Operating in the Guía de operación 3298 Règlement de consultation - Communauté de communes de Thann Copyright © All rights reserved.
Failed to retrieve file