Home
        Chief SLB024 mounting kit
         Contents
1.  3  Place the four 1 2  spacers on the bottom of the projector over the four threaded mounting inserts    4  Place the interface bracket onto the four spacers on the bottom of the projector  lining up the four threaded inserts in the bottom of the  projector with the four mounting holes in the bracket    5  Using the four M4 x 20mm mounting screws and washers  start them into the mounting holes by hand and secure all four fasteners at this    time     NOTE  Security screws can be substituted when mounting Interface bracket to projector by using the parts and installation instructions in the  All Points Security Kit     CSAV  Inc   and its affiliated corporations and subsidiaries  collectively   CSAV    intend to make this manual accurate and complete  However  CSAV makes  no claim that the information contained herein covers all details  conditions or variations  nor does it provide for every possible contingency in connection with  the installation or use of this product  The information contained in this document is subject to change without notice or obligation of any kind  CSAV makes no  representation of warranty  expressed or implied  regarding the information contained herein  CSAV assumes no responsibility for accuracy  completeness or  sufficiency of the information contained in this document        Lo  CH l E F    2006 Chief Manufacturing  8401 Eagle Creek Parkway  Savage  MN 55378 8850 000021  D4 e P  800 582 6480   952 894 6280   F 877 894 6918   952 894 6918 06 0
2. 6       
3. INSTALLATION INSTRUCTIONS       SLB 024 and SLM 024 Interface Brackets    SLB and SLM series Interface brackets are designed for use with Chief RPA  RPM  and Smart Lift series projector mounts  See the  specific installation instructions provided with the mount for additional installation information     Unpack carton and verify kit contents  If any listed parts are missing  immediately contact a Chief Customer Service representative by  calling 1 800 582 6480     WARNING  IMPROPER INSTALLATION CAN LEAD TO EQUIPMENT FALLING CAUSING SERIOUS PERSONAL INJURY  AND DAMAGE TO EQUIPMENT  DO NOT substitute hardware  Use only hardware supplied by manufacturer      1  Interface Bracket  4  Screw  Philips Pan Head  Machine  M4 x 20mm        4  10 24 Thumb Nuts     4  Washer  Flat  M4   1  All Points Security Kit  4  1 2  x  194  x 1 2  Round Spacer               SLB 024 a SLM 024                    Only used when installing SLB Interface brackets        Used when mounting surface of projector is recessed     Installation     WARNING  OVERTIGHTENING OF SCREWS CAN DAMAGE PARTS AND LEAD TO SERIOUS PERSONAL INJURY AND DAMAGE  TO EQUIPMENT  DO NOT over tighten screws when installing Interface bracket     NOTE  Step 1 is only required when installing an SLB Interface bracket  If an SLM bracket is being installed proceed to step 2     ae    Screw four thumb screws onto four 10 24 x 5 8  Philips pan head screws  DO NOT fully tighten thumb screws at this time     2  Turn projector upside down   
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
    Betriebsanleitung - FOXBORO  Panasonic WV-SFR310 surveillance camera  取扱説明書(PDF)  Lenovo 1982 User's Manual  HP Pavilion 15 Notebook PC HP Pavilion TouchSmart 15 Notebook  Trevi HMP 690  Triax DVB 75SI User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file