Home

Allied Telesis AT-XEM-STK switch component

image

Contents

1. 30 Expansion Modules About this Guide Optional expansion modules XEMs enable economical combinations of port type speed and density in a single switch Front bays in the switch allow quick and easy installation This Installation Guide describes how to install the following XEMs XEM I XP a single XFP port for high speed fibre connections XEM 2XP a dual 10 GbE port expansion module for high speed fibre connections XEM 2XS a dual 10 GbE SFP port expansion module for high speed fibre and SFP Direct Attach copper connections XEM 125 12 SFP ports for copper and fibre links XEM 12Sv2 12 SFP ports for copper and fibre links XEM 12T 12 x 10 100 1000 Mbps RJ 45 ports XEM 12Tv2 12x 10 100 1000 Mbps RJ 45 ports XEM 2XT a dual 10 GbE RJ 45 port expansion module for high speed copper connections XEM 24T 24 x RJ Point Five ports for high density cabling solutions XEM STK dual stacking ports for scalability and high availability You can download the complete document set for x900 Series switches and SwitchBlade x908 from www alliedtelesis com support software For more information about the document set and other resources see Obtaining Documentation and Resources on page 30 Installation Guide Compatible Switches and Operating Systems XEMs can be installed in the following switches m x900 I2XT S m x900 24XT m x900 24XT N m x900 24XS
2. EM 1 2Sv2 LED State Description SFP Green An SFP transceiver module is installed and a link has been established Green An SFP transceiver module is installed and link flashing activity is occurring Amber An SFP transceiver module is installed but a link has not been established Amber An SFP transceiver module is installed but there is a flashing fault Off An SFP transceiver module is not installed Expansion Modules For the latest list of approved SFP transceiver modules contact your authorised Allied Telesis distributor or reseller See the most current revision available of the XEM datasheet document number 617 000034 for further information about which SFP transceiver modules are approved for use with the XEM I2Sv2 Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Installation Guide XEM 12T 10 100 1000 BASE T RJ 45 Ports The XEM I2T 12 port RJ 45 expansion module features m two rows of 6 RJ 45 ports m gigabit ports that support speeds of 10 100 1000 Mbps m LEDs showing port status m cable fault detection and distance to fault diagnostics on switches running the AlliedWare operating system s
3. Installation Guide XEM 2XP Dual l0Gigabit Ports The XEM 2XP Dual lOGigabit Ethernet expansion module features B two XFP ports m four LEDs one set for each XFP port showing port status support for hot swappable transceiver modules Front view XEM 2 XP gt lt e gt lt LINK O GD ENABLED DISABLED FAULT The following LEDs report operations and faults on the XEM 2XP LED L A Link Activity XFP State Green Green flashing Off Green Amber Amber flashing Off Description An transceiver module is installed and a 10 Gbps link has been established An XFP transceiver module is installed and link activity is occurring A link has not been established An XFP transceiver module is installed and enabled An XFP transceiver module is installed but not operating or is disabled The installed XFP transceiver module is not ready or has a fault An XFP transceiver module is not installed Expansion Modules For the latest list of approved XFP transceiver modules contact your authorised Allied Telesis distributor or reseller See the most current revision available of the XEM datasheet document number 617 000034 for further information about which transceiver modules are approved for use with the XEM 2XP Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operatio
4. SwitchBlade x908 The SwitchBlade x908 can operate in Extended Mode to take advantage of larger table sizes and Link Aggregation Groups as shown in the following table Standard Mode Extended Mode MAC entries 16K 32K LAGs 3l 128 Extended Mode can be enabled when the following XEMs are installed in a SwitchBlade x908 switch m 2 XEM 2XS m XEM 12Sv2 m 12 2 m XEM 2XT m 24 The AlliedWare Plus Operating System supports all XEMs The AlliedWare Operating System supports all XEMs except the XEM STK the XEM 2XP and the XEM 2XT Expansion Modules Compatible Pluggable Optical Modules For the latest list of approved SFP SFP and XFP fibre transceivers plus SFP Direct Attach copper modules contact your authorised Allied Telesis distributor or reseller See the most current revision available of the XEM datasheet document number 617 000034 for further information about which SFP SFP and fibre transceivers and SFP Direct Attach copper modules are approved for use Package Contents The following items are included with each XEM m this Installation Guide warranty card Contact your authorised Allied Telesis distributor or reseller if any items are damaged or missing Installation Guide XEM IXP l0Gigabit Port The XEM 1 XP single port lOGigabit Ethernet expansion module features XFP port m LEDs showing port status support for hot swappa
5. ablished Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Installation Guide XEM 2XT Dual lOGBASE T RJ 45 Ports The XEM 2XT Dual IOGBASE T RJ 45 expansion module features m two lOGBASE T RJ 45 ports m LEDs showing port status Front view XEM 2XT gt lt ih Lu gt lt 10GLINK ACT The following LEDs report operations and faults on the XEM 2XT LED State Description 10 Gbps link has been established Link Activity Green 10 Gbps activity is occurring flashing Off A link has not been established Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Note You must use Cat 6A cables to enable the XEM 2XT to achieve optimal performance In noisy RF environments we recommend shielded Cat 6A cables 21 Expansion Modules XEM 24T 24 Tri speed Gigab
6. ble transceiver modules Front view XEM I e gt lt MT LLI gt lt LINK ENABLED DISABLED FAULT one oa The following LEDs report operations and faults on the XEM XP LED State Description L A Green An transceiver module is installed and a 10 Gb Link Activity link has been established Green An XFP transceiver module is installed and link flashing activity is occurring Off A link has not been established XFP Green An XFP transceiver module is installed and enabled Amber transceiver module is installed but not operating or is disabled Amber The installed XFP transceiver module has a fault flashing Off An XFP transceiver module is not installed Expansion Modules For the latest list of approved XFP transceiver modules contact your authorised Allied Telesis distributor or reseller See the most current revision available of the XEM datasheet document number 617 000034 for further information about which transceiver modules are approved for use with the XEM XP A Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller
7. dobe com Other resources How To Notes describe a range of standard Allied Telesis solutions and include technical tips and guides to configuring specific hardware and software features You can download the latest How To Notes from www alliedtelesis com resources literature howto aspx MIBs supported by Allied Telesis products can be downloaded from www alliedtelesis com support software Microsoft Visio9 stencils for Allied Telesis products can be downloaded from www alliedtelesis com resources images visio aspx AT TFTP Server for Windows is a TFTP Trivial File Transfer Protocol server for transferring software versions configuration scripts and other files between a PC and the switch You download AT TFTP Server from www alliedtelesis com support software Installation Guide Contacting us With locations covering all of the established markets in North America Latin America Europe Asia and the Pacific Allied Telesis provides localized sales and technical support worldwide To find the representative nearest you visit us on the Web at www alliedtelesis com 3l
8. e switch has recognised the XEM On switches running the Allied Ware operating system use the commands show log show system On switches running the AlliedWare Plus operating system use the commands awplus gt show system awplus gt enable awplus show log Installing or replacing XEMs with hot swap support Caution It is recommended that you should wait 30 seconds between hot swapping any XEM to resume normal operations Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Follow this procedure to hot swap a XEM in a switch running the AlliedWare Plus operating system Note that the XEM STK cannot be hot swapped I If you are replacing a XEM first save the switch configuration by using the commands awplus gt enable awplus copy running config startup config 2 If you are replacing an existing XEM disconnect any data cables 3 Loosen the thumbscrews on the faceplate or existing XEM and remove it Keep the faceplate for future use If you remove a XEM cover the bay with the faceplate to prevent dust and debris from entering it and to maintain proper airflow 4 Carefully slide the new XEM into the empty bay until you feel it engage the rear plug 5 Secure the XEM by tightening the thumbscrews Installation Guide 6 Verify the installation If you have a terminal connected to the asynO p
9. ee the Test Facility chapter in the Software Reference for the switch Front view XEM I2T L c s imer III Lu gt a QI a 1000m E ACT LINK 10 100M ACT FULL DUP HALF DUP e COL The following LEDs report operations and faults on the XEM I2T LED State Description L A Green A 1000 Mbps link has been established Link Activity reen 1000 Mbps activity is occurring flashing Amber 10 100 Mbps link has been established Amber 10 100 Mbps activity is occurring flashing Off A link has not been established D C Green The port is operating in full duplex mode Amb Th i ing in half dupl d Collision mber e port is operating in half duplex mode Amber Collisions are occurring flashing Expansion Modules A Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Installation Guide XEM 12Tv2 10 100 1000BASE T RJ 45 Ports The XEM I2Tv2 2 port RJ 45 expansion module features m two rows of 6 RJ 45 ports m gigabit ports that support speeds of 10 100 1000 Mbps support for Energy Efficient Ethernet m LEDs showing port status m cable fault d
10. eiver module is installed but a link has not been established Amber An SFP transceiver module is installed but there is a flashing fault Off An SFP transceiver module is not installed Expansion Modules For the latest list of approved SFP transceiver modules contact your authorised Allied Telesis distributor or reseller See the most current revision available of the XEM datasheet document number 617 000034 for further information about which SFP transceiver modules are approved for use with the 125 Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Installation Guide XEM 12Sv2 100 1000BASE X SFP Ports The 125 I2 port 100 1000 expansion module features B two rows of 6 SFP ports m LEDs showing port status B support for hot swappable SFP transceiver modules Front view XEM 12Sv2 PAY awe XEM 12Sv2 PORTS 1 12 LINK INSTALLED FAULT The following LEDs report operations and faults on the X
11. etection and distance to fault diagnostics on switches running the Allied Ware amp operating system see the Test Facility chapter in the Software Reference for the switch Front view XEM I2Tv2 zi r L 2 L T LL 7T M ici ca c es c E XEM 12Tv2 zn a Link 1000m ACT LINK 10 100M ACT FULL DUP HALF DUP ES COL The following LEDs report operations and faults on the XEM 12 Tv2 LED State Description L A Green 1000 Mbps link has been established Link Activity Green 1000 Mbps activity is occurring flashing Amber 10 100 Mbps link has been established Amber 10 100 Mbps activity is occurring flashing Off A link has not been established Expansion Modules 20 LED State D C Green Duplex Collision AMORI Amber flashing Off Description The port is operating in full duplex mode The port is operating in half duplex mode Collisions are occurring A link has not been est
12. f An SFP fibre transceiver or a Direct Attach copper module is not installed For the latest list of approved SFP fibre transceivers and Direct Attach copper modules contact your authorised Allied Telesis distributor or reseller See the most current revision available of the XEM datasheet document number 617 000034 for further information about which SFP fibre transceivers modules and Direct Attach copper modules are approved for use with the XEM 2XS Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Installation Guide XEM 12S 100 1000 BASE X SFP Ports The 125 I2 port 100 1000 5 expansion module features m two rows of 6 SFP ports m LEDs showing port status support for hot swappable SFP transceiver modules m NEBS compliant Front view XEM 12S XEM 12S PORTS 1 12 D LINK ACT INSTALLED FAULT The following LEDs report operations and faults on the 125 LED State Description SFP Green An SFP transceiver module is installed and a link has been established Green An SFP transceiver module is installed and link flashing activity is occurring Amber An SFP transc
13. iedWare Operating System Switches running the AlliedWare operating system support all XEMs except the XEM STK and the XEM 2XP XEMs are not hot swappable under the AlliedWare operating system and must be installed following the procedure Installing or replacing XEMs without hot swap support on page 27 Before you begin m Unpack the XEM In an anti static environment remove the XEM from its packing material Be sure to observe ESD precautions Caution Failure to observe proper anti static procedures may damage the unit If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller m Verify the package contents if you have not already done so See Package Contents on page 6 If any items are damaged or missing contact your authorised Allied Telesis distributor or reseller m Read the safety information for the switch Safety information is available in the Installation and Safety Guide that is shipped with each switch You can also download this document from www alliedtelesis com support software Installation Guide Gather necessary tools You may need a Phillips 2 screwdriver to adjust the thumbscrews on the XEM Installing or replacing XEMs without hot swap support Follow this procedure to install a XEM except the XEM STK in a switch running the AlliedWare operating system install a XEM STK in a switch running the Allied Ware Plus operating syste
14. it Copper Ports The XEM 24T 24 port RJ Point Five expansion module features B two rows of 12 RJ Point Five ports m gigabit ports that support speeds of 10 100 1000 Mbps support for Energy Efficient Ethernet m LEDs showing port status m cable fault detection and distance to fault diagnostics on switches running the Allied Ware amp operating system see the Test Facility chapter in the Software Reference for the switch Front view XEM 24T 19 5 a m remm ESI St TESTI et et TISSU XEM 24T C LINK 1000M ACT LINK 10 100M 6 ACT FULL DUP HALF DUP COL The following LEDs report operations and faults on the XEM 24 T LED State Description L A Green 1000 Mbps link has been established Link Activity reen 1000 Mbps activity is occurring flashing Amber 10 100 Mbps link has been established Amber 10 100 Mbps activity is occurring flashing Off A link has not been established 22 Installation Guide LED State D C Green Duplex Collision AMORI Amber flashing Off Description The port is operating in full duplex mode The port is operating in half duplex mode Collisions are occurring A link has not been established Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal ope
15. m install a XEM without hot swapping in a switch running the Allied Ware Plus operating system To install or replace a XEM EU cde e ue If you are replacing a XEM first save the switch configuration On switches running the Allied VWVare amp operating system use the commands create config lt filename gt cfg set config lt filename gt cfg On switches running the AlliedWare Plus operating system use the commands awplus gt enable awplus copy running config startup config If connected disconnect the switch from its redundant power supply Disconnect the switch from its AC or DC power supply If you are replacing an existing XEM disconnect any data cables Loosen the thumbscrews on the faceplate or existing XEM and remove it Keep the faceplate for future use If you remove a XEM cover the bay with the faceplate to prevent dust and debris from entering it and to maintain proper airflow Carefully slide the new XEM into the empty bay until you feel it engage the rear plug Secure the XEM by tightening the thumbscrews Apply power to the switch by re attaching the power cord If you disconnected a redundant power supply reconnect it 27 Expansion Modules 28 10 Restart the switch and verify the installation If you have a terminal connected to the asynO port any error message is displayed during startup self tests Confirm there is no error message about installation in the log file and that th
16. ns The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller Installation Guide XEM 2XS Dual l0 Gigabit SFP Ports The XEM 2XS Dual lOGigabit Ethernet expansion module features m two SFP ports m four LEDs one set for each SFP port showing port status B support for hot swappable SFP fibre transceivers and Direct Attach copper modules Front view XEM 2 XS XEM 2XS QD LINK GD ENABLED DISABLED FAULT The following LEDs report operations and faults on the XEM 2XS LED State Description Green SFP fibre transceiver or Direct Attach copper Link Activity module is installed and a 10 Gbps link has been established Green SFP fibre transceiver or a Direct Attach copper flashing module is installed and link activity is occurring Off A link has not been established Expansion Modules LED State Description SFP Green SFP fibre transceiver or a Direct Attach copper module is installed and enabled Amber The port is disabled because either a non SFP fibre transceiver or a disabled Direct Attach copper module is installed Amber SFP fibre transceiver is not ready or has a fault flashing Direct Attach copper modules cannot indicate a fault Of
17. on in the United States and or other countries Additional brands names and products mentioned herein may be trademarks of their respective companies Installation Guide Contents ADOUEthils u q n ev o an enisi n IRA 4 Compatible Switches and Operating Systems 5 Compatible Pluggable Optical Modules 6 Package oOntentSv uy k kaun mua tum food 6 AXEMEIXP TIO Gigabit Perty u RE ds 7 XEM 2XP Dual lOGigabit Ports 9 XEM 2XS Dual lOGigabit SFP Ports oe au SQ a E XEM 12S 100 1000 BASE X SFP Ports 13 125 2 IO0 L 000 BASE X SFP Ports rtt tite rtis 15 XEM I2T 10 100 1000 BASE T RJ 45 Ports 17 XEM 12Tv2 10 100 1000 BASE T RJ 45 Ports 19 XEM 2XT Dual IOGBASE T RJ 45 Ports 21 XEM 24T 24 Tri speed Gigabit Copper Ports 22 AEMESTK Stacking uy u va ede ere pe DINE 24 Installation Procedure E Suka Sawa 26 Obtaining Documentation and Resources
18. ort any error message is displayed during installation Confirm there is no error message about installation in the log file and that the switch has recognised the XEM by using the commands awplus gt show system awplus gt enable awplus show log 29 Expansion Modules 30 Obtaining Documentation and Resources The complete document set for x900 Series switches and SwitchBlade x908 includes B this Installation Guide m the x900 Series Switch and SwitchBlade x908 Installation and Safety Guide which describes how to install the switch and includes important safety and statutory information the x900 Series Switch and SwitchBlade x908 Hardware Reference which contains detailed information on the switch and its hardware features m the Removable Power Supply and Fan Installation Guide which describes how to install power supply units and fan only modules in the switch m the x900 Series Switch AlliedWare Operating System Software Reference which contains detailed information on configuring switches running the Allied Ware operating system m the AlliedWare Plus Operating System Software Reference which contains detailed information on configuring switches running the Allied Ware Plus V operating system You can download these documents and updates from www alliedtelesis com support software You need Adobe Acrobat Reader software to view search or print these documents You can download it from www a
19. rations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller 23 Expansion Modules 24 XEM STK Stacking Ports The XEM STK dual port stacking expansion module features m two 15 Gbps full duplex stacking connections m LEDs showing port and stack member status B seven segment stack ID display m recessed Select button to reset stack ID to Front view XEM STK SELECT STATUS ID PORT 1 STACK XEM STK me Re GID MASTER MEMBER NEGOTIATING 1 LINK FAULT The following LEDs report operations and faults on the XEM STK LED State Description Port Green A link has been established Port 2 Amber slow The link has a transmission fault flashing Status Green The switch is the stack master Amber The switch is a stack member Green The switch is in the process of learning the stack flashing topology and selecting the stack master Off The switch is not a stack member ID to 8 Numeric ID of the stack member Off The switch is not a stack member Installation Guide A choice of 0 5m or 2 0m stacking cables can be ordered separately For the latest list of approved cables contact your authorised Allied Telesis distributor or reseller The Select button resets the stack ID of this switch to and ca
20. uses the other members of the stack to be renumbered Use this to put the stack into a pre defined configuration for ease of installation Note You should install only one XEM STK expansion module in a switch If you install more than one only the first expansion module is enabled Caution Allied Telesis recommends waiting 30 seconds after hot swapping any XEM before resuming normal operations The switch must fully complete the bootup process before you can hot swap any XEM Also ensure the XEM fastening thumbscrews are fully tightened If you are unsure about correct procedures contact your authorised Allied Telesis distributor or reseller 25 Expansion Modules 26 Installation Procedure The installation procedure and XEMs supported by each switch depend on the operating system running on the switch AlliedWare Plus Operating System Switches running the Allied Ware Plus operating system support all XEMs All XEMs except the XEM STK are hot swappable and can be installed following either of these procedures m Installing or replacing XEMs without hot swap support on page 27 m Installing or replacing XEMs with hot swap support on page 28 The XEM STK is hot removable only To remove the XEM STK disconnect the stacking cables loosen the thumbscrews on the faceplate and remove the XEM To install or replace the XEM STK follow the procedure Installing or replacing XEMs without hot swap support on page 27 All
21. x900 Series Switch and SwitchBlade x908 Expansion Module Installation Guide XEM I XP XEM 2XP XEM 2XS 125 125 2 12 12 2 XEM 2XT XEM 24T XEM STK P v Allied Telesis Expansion Modules x900 Series Switch and SwitchBlade x908 Expansion Module Installation Guide Document Number 613 000032 REV N 2005 2012 Allied Telesis Inc All rights reserved No part of this publication may be reproduced without prior written permission from Allied Telesis Inc Allied Telesis Inc reserves the right to change specifications and other information in this document without prior written notice The information provided herein is subject to change without notice In no event shall Allied Telesis Inc be liable for any incidental special indirect or consequential damages whatsoever including but not limited to lost profits arising out of or related to this manual or the information contained herein even if Allied Telesis Inc has been advised of known or should have known the possibility of such damages Allied Telesis Allied Ware Allied Ware Plus and SwitchBlade are trademarks or registered trademarks in the United States and elsewhere of Allied Telesis Inc Adobe Acrobat and Reader are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and or other countries Microsoft and Visio are either registered trademarks or trademarks of Microsoft Corporati

Download Pdf Manuals

image

Related Search

Related Contents

妥協のない精度を求めた熱線式 デジタル風速計。誰でも簡単に 風速と  AlbaCombi Module: User Manual  Ninja Spirit - Sinclair ZX Spectrum - Manual  Philips hair clipper QC5375  20A021-00 E2 User Manual - Diamond Point International  

Copyright © All rights reserved.
Failed to retrieve file