Home

Hampton Direct H15-LP1 Indoor Fireplace User Manual

image

Contents

1. May be installed in Manufactured Mobile Offset to Vertical Terminations Homes after first sale 6 1 8m Max l i 34 Maximum 12 3 66m Max f 3 0 9m i 5 1 5m a Min 22 e 1 0 3m 30 30 20 4 4 28 28 18 X Restrictor 16 Position ii zi N Tea S B E 24 24 Restrictor Ss NU Position A 12 o EN B 4o Restrictor amp 20 Restrictor 20 2 Position E Position x x 8 RA 18 B _ 18 C E E E I 6 lt G 16 2 16 x 9 jus SM e T is lt E 4 pen D 14 e 14 l oO D Q O E NEE T a br g 9 e O e lt 2z D BB RI RE BIR ii I 10 l o 10 E N co 2 c gt Em Horizontal Run Feet 8 8 c E gt 6 6 N _ c 4 4 gt 2 a E a H 5 U LL tT P I P tf ipo eb spp CN N sO oo CN St co co Horizontal Distance Feet Horizontal Distance Feet Venting Arrangements Horizontal Terminations 2 0 Mex12 305mm Max 12 305mm e two diagrams show all allowable com V 4 i Max 24 610mm binations of straight horizontal termination l 2 Mae OLOA with one 45 elbow off the unit Restrictor li g E z iti A oO I d c9 as E co position I A 2 BB om c T TAT EN _ is 12 max w AstroCap or Simpson Duravent 2 st S lt ae N Horizontal Squ
2. plumber s tape connected to wall strap wall 4 45 strap gt gt Elbows i 2 Firestop Diagram 8 Spacer 3 Toinstall the Round Support Box Wall Thim ble in a flat ceiling cut a 10 inch square hole in the ceiling centred on the hole drilled in Step 2 Frame the hole as shown in diagram Note Diagram 10 The upper half of the flashing is installed under the roofing material and not nailed down until the chimney is installed This allows for small adjustments If an offset is necessary in the attic to avoid obstructions itis important to supportthe vent pipe every 3 feet to avoid excessive stress on the elbows and possible separation 9 firestop spacer 4 Assemble the desired lengths of black pipe Note 5 6 and elbows necessary to reach from the appliance adapter up though the Round Support Box Insure that all pipes and elbow connections are in the fully twist locked position and sealed Mill Pac to Inner Pipe For best results and optimum performance with each approved venting system it is highly recom mended to apply Mill Pac sealant supplied to every inner pipe con nection Failure to do so may result in drafting or performance issues notcovered under warranty Silicone red RTV is optional Cut a hole in the roof centred on the small drilled hole placed in the roof in Step 2 The hole should be of sufficient size to meet the minimum
3. 2 Turn gas control knob so indicator points to OFF position and allow 5 minutes for any gas in the combustion chamber to escape 3 Turn gas control knob counterclockwise so indicator points to the PILOT posi tion Depress the gas control knob fully Depress the igniter button several times until the pilotlights After approximately one minute release the gas control knob The pilot flame should continue to burn If the pilot does not remain lit repeat operation allowing a longer period before releasing gas control knob 4 When the pilot stays lit turn the gas knob further counterclockwise to the ON posi tion 5 Use the thermostat or remote control to turn on the unit 6 Rotate the flame height regulator to adjust the flame height higher or lower SHUTDOWN PROCEDURE 1 Use the thermostat or remote control to turn off the main burner 2 Turn the main gas control clockwise to the OFF position to turn off the pilot push knob in slightly 3 Turn off all electric power to appliance if service is to be performed FIRST FIRE The FIRST FIRE in your stove is part of the paint curing process To ensure that the paint is properly cured it is recommended that you burn your fireplace for at least four 4 hours the first time you use it with the fan on When first operated the unit will release an odour caused by the curing of the paint and the burn ing off of any oils remaining from manu
4. 21 Dura Vent Termination Kit eeeeeeeesseussss 22 Horizontal Terminations seeseeeses 23 Vertical Terminations ii EE 24 Converting Class A Metal Chimney or Masonry Chimney to Direct Vent System 26 Cathedral Comings soot A ar nen e eie tatus adds 27 High Elevation riseire aaia aaa AA aa 27 GaS Col TeO ll 4y E e Kn a E K a yep 27 Aeration Adjustment EE 28 Gas Pipe Pressure Testing 28 Conversion Kit 381 969 from NG to LP 29 Log Set Installatlonec as use te de kann e dk b x n c taxus 32 Hampton H15 1 Direct Vent Freestanding Gas Stove Optional Wall Thermostat ssssse 34 Optional Remote Control EEE 34 PIN AW CHEGCK C 34 Wiring Diagrams cccceceeseeeeceeeeeeeeeeeeeeseeeeseeeseeeens 35 Operating Instructions cinsin a 37 Lighting Procedure ccccecccseececeeeeeeeeeseeeeeeeeeeseeeees 37 Shutdown ProOCedUre kk k 37 gite YD ks Avene dg genn 37 OPERATING INSTRUCTIONS Adjusting Flame Height 37 Automatic Convection Fan Operation 37 Copy of the Lighting Plate Instructions 38 MAINTENANCE Normal Operating Sounds of Gas Appliances 39 Ma
5. Min 12 305mm Diagram 2a Riser Vent Termination EH pw I E KON TL T 4 ll EE mL E XXXXAX 1 r MAAS 1 a WWW eS Min 6 1 4 MAAAAY t an Aa 159mm e CE a E ur er Me e _ S 00 D Diagram 2b NOTE For Snorkel terminations in ABOVE grade installations follow national or local code requirements Below Grade Snorkel Installation If the Snorkel Termination must be installed below grade i e basement application proper drainage must be provided to prevent water from entering the Snorkel Termination Refer to Dura Vent Installation instructions for details Do not attempt to enclose the Snorkel within the wall or any other type of enclosure 4 Install wall penetration heat shield in the center of the 9 1 2 round hole and attach with wood screws The four wood screws provided should be replaced with appropri ate fasteners for stucco brick concrete or other types of sidings Diagram 3 5 If installing termination on a siding covered wall a vinyl siding standoff or furring strips must be used to ensure that the termination is not recessed into the siding Diagram 3 6 Take the Riser Vent terminal and separate the Backing Plate from the Riser Vent Front by removing 8 screws as shown in diagram 4 Vinyl Siding Shield
6. D Storm Collar Vertical Termination Kit Termination Installation 3 Part 978 A Horizontal Termination Kit Flashing CS Part 971 0 12 6 12 Horizontal Cathedral Ceiling Round Support Ws D included in 971 Ceiling Firestop Box Wall Thimble included in 971 Support Box included in 971 ES Vinyl Siding AJ Standoff Optional Round Support e v Part 950 Box Wall Thimble 24 Pipe Length included in 971 lt Adj Pipe Length 11 14 5 8 included in 971 Dura Vent Basic Horizontal Kit 970 90 Elbow Wall Thimble Cover Horiz Sq Term Cap Wall Thimble B Part 942 Pipe Length 90 Elbow included in 971 Alternate Horizontal Termination Caps AstroCap Part 946 523 P Alternate Horizontal Riser Vent Terminal Part 640 530 P The FPIAstroCap is certified for installations using FPI venting systems as well as Simpson Dura Vent and Direct Vent GS The FPI AstroCap is a proprietary trademark of FPI Fireplace Prod ucts International Ltd Dura Vent and Direct Vent GS are registered and or proprietary trademarks of Simpson Dura Vent Co Inc 22 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION You will require the following components with your new Direct Vent Freestanding Gas Stove Please review your product to make sure you have everything you need In the event that you are missing any part contac
7. HAMPTON www hampton fire com H15 Direct Vent Gas Fireplace Owners amp a Installation Manual LAT MODELS H15 NG1 Natural Gas H15 LP1 Propane WARNING FOR YOUR SAFETY This appliance may only be If the information in these instructions are not installed in an aftermarket followed exactly a fire or explosion may result What to do if you smell gas permanently located manu causing property damage personal injury or loss 9 Do not try to light any appliance factured USA only or mobile of life e Do not touch any electrical switch home where not prohibited by do not use any phone in your local codes FOR YOUR SAFETY building Do not store or use gasoline or other flammable 9 Immediately call your gas supplier This appliance is only for use vapours and liquids in the vicinity of this or any from a neighbour s phone Follow with the type of gas indicated other appliance the gas supplier s instructions on the rating plate This ap If you cannot reach your gas sup pliance is not convertible for Installation and service must be performed by plier call the fire department use with other gases unless a qualified installer service agency or the gas a certified kit is used Tested by Installer Please complete the details on the back cover and leave this manual with the homeowner Homeowner Please keep these instructions for future reference 918 516a FPI FIREPLACE PRODUCTS INTERNAT
8. 2 Loosenthe IN and or OUT pressuretap s turning counterclockwise with a 1 8 wide flat screwdriver 3 Attach manometer to IN and or OUT pressure tap s using a 5 16 ID hose 4 Light the pilot and turn the valve to ON position Read manometer 5 The pressure check should be carried out with the unit burning and the setting should be within the limits specified on the safety label 6 When finished reading manometer turn off the gas valve disconnect the hose and tighten the screw clockwise with a 1 8 flat screwdriver Note Screw should be snug but do not over tighten Valve Description Gas on off knob 2 Manual high low adjustment 3 Pilot Adjustment 4 Thermocouple Connection 5 Main Operator 6 Outlet Pressure Tap Manifold Pressure 7T Inlet Pressure Tap Supply Pressure 8 Pilot Outlet 9 Main Gas Outlet 10 Flange Securing Screw Holes 11 Alternative TC Connection Point 12 Thermoelectric Unit 13 Additional Valve Mounting Hole 28 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION CONVERSION KIT 381 969 FROM NG TO LP THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER IF INDOUBT DO NOT DO THIS CONVERSION Each Kit contains one LPG Conversion Kit and one DC 7 Check that the screw is clean and if necessary remove dirt 3 Remove burner by removing the 2 screws on each side and then slide the burner to the left and lift out 8 Flip the scr
9. Optional Wall Penetration _ Riser Vent Heat Shield Backing Plate round inside Pipe Length EZ m Wall Thimble Riser Vent Cover Front Wall Penetration Heat Shield square outside Diagram 3 Hampton H15 1 Direct Vent Freestanding Gas Stove 23 INSTALLATION c Before connecting the vent pipe to the vent termination slide the black decorative wall Ricar Vent thimble cover over the vent pipe then slide Backing Plate the Wall Penetration Heat Shield Part x 946 202 over the vent pipe Dia 3 Riser Vent d Slide the appliance and vent assembly lt x Front towards the wall carefully inserting the vent gt pipe into the riser vent terminal assembly It 7 p N is important that the vent pipe extends into z4 the Riser Vent Backing Plate a sufficient P d N distance so as to result in a minimum pipe 4 P N overlap of 1 1 4 inches Secure the con Pipe Length l N nection between the ven
10. The State of Massachusetts requires the installation of a carbon monoxide alarm in accordance with NFPA 720 and a CO alarm with battery back up in the same room where the gas appliance is installed 4 Hampton H15 1 Direct Vent Freestanding Gas Stove REQUIREMENTS MA Code CO Detector for the State of Massachusetts only 5 08 Modifications to NFPA 54 Chapter 10 2 Revise 10 8 3 by adding the following additional requirements a For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in part for residential purposes including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven 7 feet above finished grade in the area of the venting including but not limited to decks and porches the following requirements shall be satisfied 1 INSTALLATION OF CARBON MONOXIDE DETECTORS At the time of installation of the side wall horizontal vented gas fueled equipment the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back up is installed on the floor level where the gas equipment is to be installed In addition the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling building or structure served by the side wall horizonta
11. as shown in diagram 1 Cut and frame the 9 1 2 round hole in the exterior wall where the vent will be terminated If the wall being penetrated is constructed of non combusti ble material i e masonry block or concrete a 7 diameter hole is acceptable center of hole I F J Si Centerline 21 1 4 533mm Diagram 1 Note a The horizontal run of vent should have a 1 4 inch rise for every 1 foot of run towards the termination Never allow the vent to run downward This could cause high tempera tures and may present the possibility of a fire b Thelocation ofthe horizontal venttermination on an exterior wall must meet all local and national building codes and must not be blocked or obstructed Refer to the Exterior Vent Terminal Locations section c Snorkel Terminations For installations requiring a vertical rise on the exterior of the building 14 inch and 36 inch tall Snorkel Terminations as shown in Diagram 2 are available as well as the standard Riser Vent Follow the same in stallation procedures as used for standard Horizontal Termination NEVER install the snorkel upside down Diagram 2a As specified in CGA B149 Instal lation Code Local codes or regulations may require different clearances i lim Dura Vent Snorkel
12. 27 INSTALLATION AERATION ADJUSTMENT The air shutter can be adjusted by moving the adjusting wire up or down The wire is accessed through the bottom Open the air shutter for a blue flame or close for a yellower flame The burner aeration is factory set but may need adjusting due to either the local gas supply or altitude Minimum Air Shutter Opening 3 16 Natural Gas 1 4 Propane CAUTION Carbon will be produced if air shutter is closed too much Note Any damage due to carboning result ing from improperly setting the aera tion controls is NOT covered under warranty Note Aeration Adjustment should only be performed by an authorized FPI Installer at the time of installation or service Pull adjustment wire up or down to close aeration Closed Tall yellow Open Short Blue GAS PIPE PRESSURE TESTING The appliance must be isolated from the gas supply piping system by closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 45 kPa Disconnect piping from valve at pressures over 1 2 psig Themanifold pressure is controlled by a regulator built into the gas control and should be checked at the pressure test point Note To properly check gas pressure both inlet and manifold pressures should be checked using the valve pressure ports on the valve 1 Make sure the valve is in the OFF posi tion
13. 490 061 936 170 910 038 910 039 380 013 W840470 380 019 380 032 380 033 380 930 380 505 380 015 381 969 BURNER amp LOG ASSEMBLY Description Valve Pilot Assembly S I T NG Valve S I T NG LPG 447 Orifice NG Piezo Ignitor amp Nut Control Panel Decal Switch Plate Orifice Gasket Pilot Assy S I T 3 flame NG Pilot Assy S I T 3 flame LP Pilot Holder Pilot Assembly Gasket Valve Shield Valve Plate Valve Door Log Set Burner Assembly NG Burner Box Gasket Air Shutter Burner Box Conversion Kit NG to LP 74 Hampton H15 1 Direct Vent Freestanding Gas Stove 43 NOTES 44 Hampton H15 1 Direct Vent Freestanding Gas Stove NOTES Hampton H15 1 Direct Vent Freestanding Gas Stove 45 NOTES 46 Hampton H15 1 Direct Vent Freestanding Gas Stove WARRANTY HAMPTON Hampton Fireplace Products are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team carefully inspects each unit thoroughly before it leaves our facility FPI Fireplace Products International Ltd is pleased to extend this limited lifetime warranty to the original purchaser of a Hampton Product This warranty is not transferable The Warranty Limited Lifetime External casting not directly in contact with the fire such as hobs sides ash lips legs fronts and fire doors are covered against cracks and warps resulting from manufacturer
14. Changed Components Vertical Termination Kit DISC 4DT VKC 4DVTK 4DVTK High Wind Vertical Cap 46DVA VCH N A N A High Wind Horizontal Cap 46DVA HC N A N A Horizontal Square Termination Cap Disc See 46DVA HC 4DT HHC SVACHC 1 Vertical Termination Cap 46DVA VC 4DT HVC SVACGV 1 Storm Collar 46DVA SC 4DT SC SV4FC Adjustable Flashing 0 12 6 12 46DVA F6 943 4DT AF6 4DF 4DF SVAFA Adjustable Flashing 6 12 12 12 46DVA F12 943S 4DT AF12 4DF12 4DF 12 SV4FB Vinyl Siding Standoff 46DVA VSS 950 4DT VS N A 4DVS SV4VS Vinyl Siding Shield Plate N A N A 4DT VSP N A N A SV4VS Snorkel Termination 14 46DVA SNK14 982 4DT ST14 4D12S 4DST14 SV4STC14 Snorkel Termination 36 N A 981 4DT ST36 4D36S 4DST36 SV4STC36 Restrictor Disk 46DVA RD Extended Vertical Termination Cap 46DVA VCE Chimney Conversion Kit A 46DVA KCA Chimney Conversion Kit B 46DVA KCB Chimney Conversion Kit C 46DVA KCC Chimney Conversion Kit Masonry 46DVA KMC Mansonry Chimney Conversion Kit includes Cap Adapter 18 x18 Flashing Wall Firestop 46DVA WFS Colinear Flex Connectors 46DVA ADF 46DVA KCT 946 506 P Vent Guard Optional for AstropCap 946 205 Vinyl Siding Shield for Riser Vent Terminal 510 994 Rigid Pipe Adapter Must use with all Rigid Piping 946 208 P Vent Guard Optional for Riser Vent Terminal 640 530 P Riser Vent Terminal 946 523 P AstroCap Horizontal Cap 946 206 Vinyl Siding Standoff for AstroCap NOTE When using Metal Fab Sure Seal Rigid Piping please note
15. For Vent Termination requirements see the Exterior Vent Terminal Locations section MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS 1 Ensure that structural members are not cut or weakened during installation 2 Ensure proper grounding using the 8 ground lug provided 3 Appliance must be anchored to the floor with the supplied anchoring methods COMBUSTION AND VENTILATION AIR The combustion airfrom this appliance is drawn from outside the building through the outer flue Extra provision for combustion airinside the room is not required 1 1 1 1 1 Fan Assembly c w green wire attached Thermodisc Fan Speed Control Grommet Remove the rear access panel on the back of the stove by removing the 2 screws under the rear panel then lift rear panel off of 2 bolts at the top Take care not to cut wires when lowering the panel Lift Rear Panel off of the 2 top bolts 2 Disconnect the red and grey wires 3 Remove the Top Control Panel Assembly by removing the three screws Top Control Panel Assembly 4 5 6 Remove the nylon hole plug from the control panel Install the fan speed controller onto the control panel and secure with nut and washer Connect the red and black wires from the wire harness to speed controller NOTE Speed control wires must be in the down position when control panel is in place Push black knob onto speed control Fan Speed Con
16. MAINTENANCE NORMAL OPERATING SOUNDS OF GAS APPLIANCES It is possible that you will hear some sounds from your gas appliance This is perfectly normal due to the fact that there are various gauges and types of steel used within your appliance Listed below are some examples All are normal operating sounds and should notbe considered as defects in your appliance Blower Hampton gas appliances use high tech blowers to push heated air farther into the room It is not unusual for the fan to make a whirring sound when ON This sound will increase or decrease in volume depending on the speed setting of your fan speed control Burner Tray The burner tray is positioned directly under the burner tube s and logs and is made of a differ ent gauge material from the rest of the firebox and body Therefore the varying thicknesses of steel willexpand and contract at slightly different rates which can cause ticking and cracking sounds You should also be aware that as there are temperature changes within the unit these sounds will likely re occur Again this is normal for steel fireboxes Blower Thermodisc When this thermally activated switch turns ON it will create a small clicking sound This is the switch contacts closing and is normal Pilot Flame While the pilot flame is on it can make a very slight whisper sound Gas Control Valve As the gas control valve turns ON and OFF a dull clicking sound may be aud
17. defects parts and subsidized labour for three 3 years from the date of purchase and parts only thereafter The combustion chamber heat exchanger burner tubes pans and logs are covered under the Limited Lifetime Warranty for five 5 years for parts and subsidized labour and parts only thereafter Glass is covered for lifetime against thermal breakage only parts and subsidized labour for five 5 years and parts only thereafter from date of purchase Electrical and mechanical components such as blowers switches wiring thermodiscs FPI remote controls spill switches thermopiles thermocouples pilot assembly components and gas valves are covered for two years parts and one year subsidized labour from the date of purchase Blowers and valves replaced under warranty are considered repairs and continue as if new with appliance ie twelve 12 months from original purchase date of appliance with a minimum of three 3 months coverage from date of replacement FPI venting components are covered parts and subsidized labour for three 3 years from date of purchase Simpson Dura Vent venting components are covered by Simpson Dura Vent Inc warranty Repair replacement parts purchased by the consumer from FPI after the original coverage has expired on the unit will carry a 90 day warranty valid with a receipt only Any item shown to be defective will be repaired or replaced at our discretion No labor coverage is included with these parts C
18. disconnect power continue source to stove 14 Remove two 2 thermopile wires 2 Remove access panel 15 Remove thermocouple with a 9 mm metric Screws wrench 16 Remove pilot nut with an 11 mm wrench SOK i Note Use a magnetic type screwdriver if 17 Remove valve to orifice nut with a 13 16 il possible wrench 10 Remove all 8 screws holding the burnertray 18 Remove inlet pipe with pipe wrench Note Control Panel assembly in place Remove deflector orientation of 90 elbow 19 Remove two 2 phillips head M5 screws on 3 Disconnect gas line to stove each side of the valve 4 Disconnect 3 8 NPT pipe from 90 elbow 20 Remove valve and remove gas out 90 brass on valve or flex connector fitting Note orientation of fitting 5 Disconnect the two 2 switch wires from valve INSTALLING PILOT HEAT VALVE ASSEMBLY control control knob knob 1 To install a new valve assembly reverse instructions for Removing Valve 2 Checkforleaks and manifold pressure See Gas Pressure Test instructions 3 To reinstall valve reverse instructions for removing valve assembly steps 11 20 6 Disconnect piezo wire 7 Lift off Cast Top remove Cast Front and remove Glass Door Seethe Glass Replace ment section for removal instructions 8 Carefully remove the logs and embers Hampton H15 1 Direct Vent Freestanding Gas Stove
19. including pinholes scratches and minor shade mismatch door or glass gasketing or trim At no time will FPI be liable for any consequential damages which exceed the purchase price of the unit FPI has no obligation to enhance or modify any unit once manufac tured ie as products evolve field modifications or upgrades will not be performed FPI will not be liable for travel costs for service work Installation and environmental problems are not the responsibility of the manufacturer and therefore are not covered under the terms of this warranty policy Embers door and glass gaskets door handles paint are not covered under the terms of this warranty policy Any unit which shows signs of neglect or misuse is not covered under the terms of this warranty policy The warranty will not extend to any part which has been tampered with or altered in any way or in our judgment has been subject to misuse improper installation negligence or accident spillage or downdrafts caused by environmental or geographical conditions inadequate ventilation excessive offsets negative air pressure caused by mechanical systems such as furnaces fans clothes dryer etc Freight damage to stoves and replacement parts is not covered by warranty and is subject to a claim against the freight carrier by the dealer FPI will not be liable for acts of God or acts of terrorism which cause malfunction of the appliance Performance problems due to operator error will n
20. A N A N A SV4L12 SV4LB12 SV4LA SV4LA SV4L24 SV4LB24 SV4L36 SV4LB36 SV4L48 SV4LB48 N A N A N A N A Disc See 46DV 08A N A 4DT AJ N A N A Disc See 46DV 08AB 911B 4DT AJB N A N A Disc See 46DV 16A 917 N A from FPI N A N A N A Disc See 46DV 16AB 917B N A N A SV4LBA24 Adjustable Length 11 14 Galvanized Adjustable Length 11 14 Black Adjustable Length 17 24 Galvanized Adjustable Length 177 24 Black Adjustable Length 7 Galvanized Adjustable Length 7 Black Extension Pipe 8 1 2 Galvanized Extension Pipe 8 1 2 Black Adjustable Length 12 Galvanized Adjustable Length 12 Black Extension Pipe 16 Galvanized Extension Pipe 16 Black 45 Elbow Galvanized 45 Elbow Black 45 Elbow Swivel Galvanized 45 Elbow Swivel Black 90 Elbow Galvanized 90 Elbow Black 90 Elbow Swivel Galvanized 90 Elbow Swivel Black 90 Starter Elbow Swivel Galvanized Adaptor Ceiling Support Cathedral Support Box Wall Support Band Offset Support Wall Thimble Black Wall Thimble Support Box Ceiling Support Firestop Spacer Trim Plate Black N A N A 46DVA 08A 46DVA 08AB N A N A 46DVA 16A 46DVA 16AB 46DVA E45 46DVA E45B Disc See 46DVA E45 Disc See 46DVA E45B 46DVA E90 46DVA E90B Disc See 46DVA E90 Disc See 46DVA E90B N A N A N A 46DVA CS 46DVA WS 46DVA ES N A from FPI 46DVA WT 46DVA DC 46DVA FS N A N A N A N A N A N A N
21. A N A 949 N A from FPI 941 988 989 N A from FPI 942 N A 963 N A N A N A N A N A N A N A N A 4DT EL45 4DT EL45B N A N A 4DT EL90S 4DT EL90SB N A N A N A N A 4DT CS 4DT CSS 4DT WS B 4DT OS 4DT WT N A 4DT FS 4DT TP 4D7A 4D7AB N A N A 4D12A 4D12AB N A N A 4D45L 4D45LB N A N A 4D90LS 4D90LBS N A N A N A N A N A N A 4D45L 4D45LB N A N A 4D90L 4D90LB 4D90A 4DDA N A N A N A N A SV4LA12 SV4LBA12 N A N A N A N A SV4E45 SV4EB45 N A SV4EBR90 1 SV4E90 1 SV4EB90 1 N A N A SV4SD SV4CSB SV4BM SV4SU SV4RSM SV4PF SV4BF SV4LA Masonry Chimney Flashing Brass Trim for Wall Thimble Ceiling Support DISC 3951 12 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION 4 x 6 5 8 Rigid Pipe Cross Reference Chart Cont Components from different Manufacturers may not be mixed Not All Rigid Pipe components are available directly from FPI Simpson American Metal TT Simpson Selkirk Metal Fab Security Descri ption Direct Vent Pro alee hek lea Direct Temp Products Sure Seal Secure Vent Discontinued Amerivent Direct Attic Insulation Shield 12 46DVA IS N A from FPI N A N A 4DAIS 12 N A SVARSA Attic Insulation Shield Cold Climates 36 N A N A N A 4DAIS36 N A N A Basic Horizontal Termination Kit A DISC 4DT HKA 4DHTK2 4DHTKA Horizontal Termination Kit B pied LA 4DT HKB 4DHTK1 4DHTKB
22. Black Pipe and Elbows necessary to reach from the appliance adapter up through the support box and flashing to proper height as per Dia 12 local codes Ensure that all pipe and elbow connections are in their fully twist lock position 5 Ensure ventis vertical and secure flashing to the roof with roofing nails Slide the storm collar over the pipe section and seal witha mastic 6 Twist lock the vent cap on to the last sec tion Support Extensions Round RDSE or Square SQSE Steep pitched cathedral ceilings may require the use of a support extension This piece fits down inside the support and can be adjusted to increase the support s length by up to 22 The extension is attached to the support using the eight metal screws provided Be sure there is at least a 2 inch overlap where the extension joins the support HIGH ELEVATION This unit is approved in Canada for altitude to 4500 ft CAN CGA 2 17 M91 For Natural Gas installations above 4500 ft follow current CAN CGA B149 1 GAS CONNECTION The gas connection is a 3 8 NPT 90 elbow The gas line can be rigid pipe or to make installation easier use alisted flexible connector and or cop per tubing if allowed by local codes Since some municipalities have additional local codes it is always best to consult with your local authorities and the CAN CGA B149 installation codes For USA installations follow local codes and or the current National Fuel Gas Code ANS
23. Gas Stove INSTALLATION If any of the original wires as supplied with the appliance must be replaced it must be replaced with CSA type SEW 200 C or its equivalent WIRING DIAGRAMS Caution Ensure that the wires do not touch any hot surfaces and are away from sharp edges CAUTION Label all wires prior to disconnection when servicing controls Wiring errors can cause This heater does not require a 120V A C sup ply for operation In case of a power failure the burner switch and the optional remote control thermostat will continue to operate However a 120V A C power supply is needed for the fan blower operation improper and dangerous opera For NATURAL GAS Units and Units NOT Equipped with DC Spark Boxes 8 Ground Lug Grou nding for mobile home Lug Detail Qu Ground wire Lockwasher Ujj Star washer Electrode L Thermocouple Gas Pilot Sround wire from power cord Pilot Assembly Star washer _ Thermopile 0 Fan Thermodisc normally open Rotary Speed Control Piezo Ignitor P l l l l l Gas dn J l l l ON tae S OFF Burner S I T Valve E Thermostat e Pen d EG ne R ji a Hiper dnm Remote Receiver or Thermostat Mi
24. accommodate However keep the flexible liner as straight as possible avoid unnecessary bending The Air Intake pipe must be attached to the inlet air collar of the termination cap Required Parts Alternate Approved Caps Part Description 980 Vertical Termination Cap 946 529 Co linear DV Vertical 991 High Wind Cap Termination Cap 923GK 3 Co linear Adapter with flashing 948 305 3 Flex 35 ft 946 563 Co Axial to Co Linear Adapter Kit which contains the following Co linear Flex Adapter 270 585 Outer Pipe 946 257 Inner Pipe Adapter 946 219 Co linear DV Vertical Termination uum Cap 946 529 REBERE A maximum Of two certified joiner kits 948 305 35 ft Outer Pipe with Kit 946 563 in CNN NN NN VAY Air Intake A Co Linear A Flex Adapter with Kit 946 563 Inner Pipe Adapter with Kit 946 563 LF For 45 to vertical Horizontal Distance Feet 18 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION DV STOVE HORIZONTAL VENT KIT DV 2 ft Stove Vent Kit Part 946 116 and DV 4 ft Stove Vent Kit 946 216 includes all the parts needed to install the H15 1 Direct Vent unit with up amp out horizontal and vertical vent dimensions For installations that require longer vertical and or horizontal vents use the Dura Vent system as shown in the Dura Vent Termina tion Kit and Dura Vent Venting Components s
25. and Length 2 pcs V gioca vinyl siding standoff to prevent water from A L entering and to make a tight seal between CN I the cap and the standoff p al A 5 Note To make the installation more aes Stretch the 4 dia flex liner out fully and get oues li rues thetically pleasing we recommend a trial fit of the liner onto the 4 dia starter A M framing out a square that the cap can collar be mounted on If the pipe needs to be touched up use only 8 Cut the 4 dia flex liner to the desired size Stove Brite High Temperature Metallic Black Hint leave an extra 12 to 16 of length this will make the final assembly easier to work with Stove Paint 20 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION RESIDENTIAL AND MANUFACTURED HOMES MOBILE HOMES MINIMUM HORIZONTAL TERMINATION INSTALLATIONS Planning Your Venting Installation You will require the following components with your new Hampton Direct Vent Freestanding Gas Stove Please review your product to make sure you have everything you need In the event that See the Exterior Vent Terminal Locations you are missing any part contact your dealer Decorative brass or chrome trim kits are available section for requirements from Simpson Dura Vent for their wall thimbles as well as a square wall thimble cover When planning your installation it willbe nec Note These are the minimum pieces required Other parts may be required for your par essar
26. eese 6 SDECIICATIONS EE 6 Mobile Manufactured Homes After First Sale 6 Before YOU Star xy men vi roto tc kan s CT ud U k e nz 6 General Safety Information 7 Installation Checklist eeesseeseeeesesse 7 Clearances to Combustibles 7 Locating Your Gas Stove Eu ZE 8 Manufactured Mobile Home Additional Requirements 8 Combustion and Ventilation Air 8 Optional Fan Installation 8 Venting Introduction 10 Installation Precautions ccccccccsecseeeeeeeeeeteeeaeeees 10 Safety Precautions for the Installer 10 Vent Restrictor Position eeeseeseeeses 10 Rotating ETO WW ioris anini 1a aku nia a Eh k a DEWERE aiaia 10 Exterior Vent Terminal Locations 11 4 x 6 5 8 Rigid Pipe Cross Reference Chart 12 Rigid Pipe Venting Systems sees 14 Venting Arrangements ll kk 17 Vertical Termination with Co linear Flex System 18 DV Stove Horizontal Vent Kit sse 19 Residential and Manufactured Homes Mobile Homes eeeeeeeeeeeee 21 Minimum Horizontal Termination Installations
27. that either the Adaptor 4DDA or 90 Starter Elbow 4D90A must be used in conjunction with FPI Rigid Pipe Adaptor 510 994 Offset Pipe Selection Use this table to determine offset pipe lengths 4 x 6 5 8 Venting Pipe Length Run X Rise Y 0 0mm 13 3 8 340mm 6 152mm 16 1 2 419mm 2 For specific instructions or details on particular venting components please visit the following websites Simpson Direct Vent Pro www duravent com Selkirk Direct Temp www selkirkcorp com American Metal Products Amerivent Direct www americanmetalproducts com x 9 229mm 18 5 8 473mm 12 305mm 20 3 4 527mm i Metal Fab Sure Seal www mtlfab com Security Secure Vent www securitychimneys com 36 914mm 4 9 737mm 37 1 2 953mm 48 1219mm 37 7 16 951mm 45 15 16 1167mm NOTE Horizontal runs of vent must be level or have a 1 4 inch rise for every 1 foot of run towards the termination Never allow the vent to run downward This could cause high temperatures and may present a possible fire hazard 24 610mm 20 5 8 b24mm 29 1 8 740mm Hampton H15 1 Direct Vent Freestanding Gas Stove 13 INSTALLATION RIGID PIPE VENTING SYSTEMS Horizontal or Vertical Terminations Alternate Horizontal Termination Caps 2 e gt Alternate Horizontal Riser Vent Terminal Alternate Snorkel Termination Cap WARNING Do not combi
28. the rear log on the 2 rear log locating pins on the rear of the If the logs are broken do not use the unit until they are replaced burner with the flat side to the back Broken logs can interfere with the pilot operation The gas log kit contains the following a Rear Log b Left Side Front Log c Right Side Front Log d Center Front Log e Embers 902 156 f Platinum Embers 946 669 supplied with packaged manual 7 Place the 2 front logs on the front log locating pins Ensure the back of both logs rest against the tabs 1 Shut off the gas supply 2 Lift off Cast Top 3 Remove Cast Front by removing the 2 screws using a 7 16 wrench Pull front out and then up as shown below Inside view Left Front Log 4 Remove Glass Door Right Front Log 5 Carefully remove the logs from the unit and unwrap them The logs are fragile handle with care do not force into position 32 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION 8 Take the embers and place on the burner in the space between the 9 Place the center cross log on the locating pin in the top of the rear 2 front logs ensure not to cover any burner ports Do not put embers log and position as shown below on the burner in the area between the front logs and the rear log See photo below Logs must be oriented as shown below Separate platinum embers and place at the front of the burner in and around where the embers are pl
29. top Insure that you are in fact drilling into the metal on the chimney Twist lock the Termination Cap Part 980 or 991 onto the Adaptor Diagram 3 and 4 Diagram 3 un a3 ak Drill 4 EE Termination 1 8 u4 Cap d 1 1 1 holes sheet metal Screws Diagram 4 5 Pull the flex pipe down through the ceiling support box until it protrudes approximately 3 76mm Connect the flex pipe to the Retro Connector by slipping it into the 4 3 4 diameter sleeve on the top side of the Connector Use 3 sheet metal screws to assemble these two parts 6 Push the flex pipe back up into the ceiling support box center the Retro Connector and attach it to the support box or decorative sleeve for double wall solid packed pipe with the sheet metal screws supplied The holes in the Retro Connector are pre punched Diagram 5 Existing Ceiling Support JJ P 3 sheet palus metal Screws screws Diagram 5 7 The connection between the appliance and the Retro Connector may be completed with sections of black direct vent pipe together with an adjustable length 26 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION CATHEDRAL CEILINGS Round Support RDS amp Square Support SQS If your home has a cathedral ceiling no attic space between the ceiling and the roof install the chimney and support as follow
30. vented gas fueled equipment shall not approve the installation unless upon inspection the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5 08 2 a 1 through 4 b EXEMPTIONS The following equipment is exempt from 248 CMR 5 08 2 a 1 through 4 1 The equipment listed in Chapter 10 entitled Equipment Not Required To Be Vented in the most current edition of NFPA 54 as adopted by the Board and 2 Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling building or structure used in whole or in part for residential purposes c MANUFACTURER REQUIREMENTS GAS EQUIPMENT VENTING SYSTEM PROVIDED When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment the instructions provided by the manufacturer for installation of the equipment and the venting system shall include 1 Detailed instructions for the installation of the venting system design or the venting system components and 2 A complete parts list for the venting system design or venting system d MANUFACTURER REQUIREMENTS GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases but identifies special venting
31. 41 PARTS LIST MAIN ASSEMBLY Part Description Part Description Part Description 1 942 601 Casting Top 20 380 012 Rear Panel 47 380 011 Restrictor 2 942 621 Casting Side amp Leg 25 910 330 Fan Speed Control 120V 50 948 255 Latch Ojop W J Hook 3 942 611 Casting Front 26 904 569 Knob Fan Speed Control 51 940 338 P Replacement Glass 28 910 241 Burner ON OFF Switch 52 41225 Gasket Tadpole 6 770 066F Top Relief Plate 29 260 037 Rear Control Panel 53 380 008 Glass Bracket 7 W260280 Top Relief Plate Gasket 54 380 007 Door Frame 8 770 067F Plate Insulation Holder 35 380 002 Firebox Bracket Left 56 910 157 P Fan Motor 120 V 9 942 117 Top Relief Frame 36 380 003 Firebox Bracket Right 57 910 794 Power Cord 120 V 10 W260260 Top Relief Frame Gasket 38 380 034 Casting Mount Bracket 11 945F Dura Vent Collar 918 516 Manual 12 W842051 Gasket for Flue Adaptor 45 380 001 Door Support 13 W260108 Gasket for Inner Flue 46 380 010 Baffle Plate of Firebox Not available as a replacement part 14 Rear Bracket Last digit of part number represents colour 15 380 024 Fan Deflector Right 3 Slate Blue 4 Ivory 5 Timberline Brown 16 380 023 Fan Deflector Left 910 142 Thermodisc Switch 42 Hampton H15 1 Direct Vent Freestanding Gas Stove PARTS LIST 60 63 64 65 66 67 68 69 73 74 75 80 88 89 90 Part 380 574 P 910 478 904 434 910 190 908 672
32. A Vertical Venting with Two 2 90 Elbows One 90 elbow Two 45 elbows Option H H1 V Withtheseoptions max total 2 Max 2 Min 3 Max 3 Min 4 Max 4 Min 5 Max 5 Min 6 Max 6 Min pipe length is 30 feet with min of 6feettotal vertical and max 6 feet total horizontal Please note min 1 foot between 90 elbows is required Lengths do not include elbow indicated Vent restrictor position A fully open refer to the Vent Restrictor Postion section 16 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION VENTING ARRANGEMENTS Horizontal Terminations for Vertical Terminations Systems for All Venting Systems Residential Manufactured and Mobile Homes The shaded areas in the diagram below show all The shaded area in the diagram below shows all allowable combinations of straight allowable combinations of vertical runs with hori X vertical and offset to vertical runs with vertical terminations Maximum two 45 zontal terminations Maximum one 90 elbow two elbows 45 elbows equal one 90 elbow If the vent is ENCLOSED in a chase min size 9 x 9 maintain a 1 1 4 clearance to Propane and Natural Gas combustibles Residential Manufactured and Mobile May be installed in Manufactured Mobile Homes after first sale J Homes Installations
33. ALLY THE FIRE PLACE GLASS AND SHOULD STAY AWAY TO AVOID BURNS OR CLOTHING IGNITION YOUNG CHILDREN SHOULD BE CAREFULLY SUPERVISED WHEN THEY ARE IN THE SAME ROOM AS THE APPLIANCE CLOTHING OR OTHER FLAM MABLE MATERIAL SHOULD NOT BE PLACED ON OR NEAR THE APPLIANCE 1 Provide adequate clearances for servicing proper operation and around the air openings into the combustion chamber 2 The appliance must be installed on a flat solid continuous surface e g wood metal concrete This may be the floor or it can be raised up on a platform to enhance its visual impact The appliance may be installed on carpeting tile wood flooring or other com bustible material because the appliance s base extends the full width and depth of the appliance The Direct Vent Freestanding Gas Stove can be installed in a wide variety of ways and will fit nearly any room layout It may be installed in a recessed position framed out into the room or across a cor ner 3 The Direct Vent Freestanding Gas Stove is approved for alcove installations which meet the clearances listed in the Clearance to Combustibles section This unitis approved for manufactured home installations see the Manufactured Mobile Home Additional Requirements and Rigid Pipe Venting Systems sections for the required vent ar rangements If installed into a manufactured home the unit must be bolted down to the floor 4 This appliance is Listed for be
34. Dimensions de l orifice V Altitude 2000 4500 ft pi 610 1372m L altitude Minimum Clearances to Combustibles Degagement Minimum De Materiaux Combustibles Minimum ceiling height from top of unit 24 610mm Left Side Wall Left Side Wall See Manual for details Minimum plafond hauteur en haut de l l appareil 24 610mm A 6 150mm C 2 50mm B 0 O0mm E 2 50mm Right Side Wall Right Side Wall GAS FIRED VENTED ROOM HEATER This appliance must be installed in accordance with local codes if any If not follow ANSI Z223 1 CAN CGA B149 Electrical Supply 115 V 1 13A 60 Hz This vented gas fireplace heater is not for use with filters Notfor use with solid fuels This appliance is only for use with the type of gas indicated on the rating plate and may be installed in an aftermarket permanently located manufactured home USA only or mobile home where not prohibited by local codes See owner si manual for details This appliance is not convertible for use with other gases unless a certified kit is used FPI Fireplace Products International Ltd Delta BC Canada Made in Canada Fabrique au Canada 918 494 For the State of Massachusetts installation and repair must be done by a plumber or gasfitter licensed in the Commonwealth of Massachusetts For the State of Massachusetts flexible connectors shall not exceed 36 inches in length For the State of Massachusetts the appliances individual manual shut off must be a t handle type valve
35. E Ru 1 640 545 P Decorative Wall Trim Black 1 948 128 Tube Mill Pac Screws 380 946 Horizontal Termination Kit which includes Max 15 1 2 1 6 5 8 Dia x 12 Black Pipe 394mm 1 4 Dia x 12 Aluminum Vent 1 946 202 Wall Penetration Heat Shield Wall Thimble 2 pcs 1 946 523 P AstroCap 1 640 545 P Decorative Wall Trim Black 1 948 128 Tube Mill Pac Screws Optional Components 946 204 45 Elbow 6 5 8 Black pipe 946 523 P X AstroCap and 4 Aluminum Vent 946 206 Vinyl Siding Standoff AstroCap En 946 205 Vinyl Siding Shield for Riser Vent 946 506 P Vent Guard AstroCap EE 61mm Terminal dd 946 208 P Vent Guard Riser Vent Terminal 940 Square Wall Thimble Cover NOTE Ensure compliance with the outside ae Sy Tera don SP vent terminal location before cutting hole as 982 Snorkel Termination 14 both dimensions must be met 942 Wall Penetration Heat Shield Simpson Dura Vent Components Hampton H15 1 Direct Vent Freestanding Gas Stove 21 INSTALLATION DURA VENT TERMINATION KIT Planning Your Dura Vent Installation There are two basic types of Dura Vent Direct Vent System installations horizontal termination and vertical termination Confirm the maximum horizontal run and maximum vertical rise from the diagrams in the Rigid Pipe Venting Sys tems section When planning your installation it will be nec essary to select the proper length of vent pipe for your particular requirements For horizont
36. Grounding Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong receptacle Do not cut or remove the grounding prong from this plug Hampton H15 1 Direct Vent Freestanding Gas Stove 9 INSTALLATION VENTING INTRODUCTION The Horizontal Termination Kit and the Simpson Dura Vent Direct Vent System Model DV GS venting systems in combination with the Direct Vent Freestanding Gas Stoves H15 NG1 and H15 LP1 have been tested and listed as direct vent heater systems by Warnock Hersey Theseunits use the balanced flue technology Co Axial system The inner liner vents products of combustion to the outside while the outer pipe draws outside combustion air into the combus tion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney Note These flue pipes must not be connected to any other appliance The gas appliance and vent system must be vented directly to the outside of the building and never be attached to a chimney serving a separate solid fuel or gas burning appliance Each direct vent gas appliance must use it s own separate vent system Common vent systems are prohibited IMPORTANT Read all instructions carefully before starting the installation Failure to follow these instruc tions may create a fire or other safety hazard a
37. I 2223 1 When using copper or flex connectors use only approved fittings Always provide a union so that gas lines can be easily disconnected for burner and or valve servicing Flare nuts for copper lines and flex connectors are usually considered to meet this requirement IMPORTANT ALWAYS CHECK FOR GAS LEAKS WITH A SOAP AND WATER SOLUTION OR GAS LEAK DETECTOR DO NOT USE OPEN FLAME FOR LEAK TESTING Note Priortoany pressure testing ofthe gas supply piping system that exceeds test pressures of 1 2 psig this ap pliance must be disconnected from the piping system If test pressures equal to orless than 1 2 psig are used then this appliance must be isolated from the piping system by closing its individual manual shut off valve during the testing H15 NG1 System Data For 0 to 4500 feet altitude Burner Inlet Orifice Sizes 47 18 000 Btu h 10 500 Btu h Max Input Rating Min Input Rating Supply Pressure min 5 0 w c Manifold Pressure High 3 8 0 2 w c H15 LP1 System Data Conversion Kit 380 969 For 0 to 2000 feet altitude Burner Inlet Orifice Sizes 55 Max Input Rating 18 000 Btu h Min Input Rating 10 600 Btu h For 2000 to 4500 feet altitude Burner Inlet Orifice Sizes 56 Max Input Rating 15 500 Btu h Min Input Rating 8 200 Btu h Supply Pressure min 12 0 w c Manifold Pressure High 11 0 2 w c Hampton H15 1 Direct Vent Freestanding Gas Stove
38. IONAL LTD 6988 Venture St Delta BC Canada V4G 1H4 12 17 07 HAMPTON Direct Vent Freestanding Gas Stove To the New Owner Congratulations You are the owner of a state of the art Hampton Gas Stove by FPI FIREPLACE PRODUCTS INTERNATIONAL LTD The H15 1 is a hand crafted appliance and has been designed to provide you with all the warmth and charm of a wood fireplace at the flick of a switch The model H15 1 has been approved by Warnock Hersey for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to follow Please take a moment now to acquaint yourself with these instructions and the many features of your Hampton Stove UNIT DIMENSIONS 14 1 4 361mm 20 11 16 525mm X X XY X RY Ns 22 1 2 572mm 16 3 16 411mm HATIONAL FIREPLACE We recommend that our products be INSTITUTE installed and serviced by professionals 48 who are certified in the U S by the ONE REGENCY ONE TREE National Fireplace Institute NFI or in Canada by Wood eph iL sold Energy Technical rei Ld AmericanForests or CERTIFIED Training WETT Technical Training Org www nlicartified arg 2 Hampton H15 1 Direct Vent Freestanding Gas Stove TABLE OF CONTENTS SAFETY LABEL Safety ADSL E 4 REQUIREMENTS MA Code CO Detector l i kU 5 INSTALLATION Important Message
39. IONS FOR YOUR SAFETY READ BEFORE LIGHTING This appliance must be installed in accordance with local codes if any if none follow the National Fuel Gas Code ANSI Z223 1 NFPA 54 or Natural Gas and Propane Installation Codes CSA B149 1 Australia AS5601 2004 New Zealand NZS 5261 WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal injury or loss of life Improper installation adjustment alteration service or maintenance can cause injury or property damage Refer to the owner s information manual provided with this appliance For assistance or additional information consult a qualified installer service agency or gas supplier A This appliance has a pilot which must be lighted by hand following the instructions below exactly B BEFORE LIGHTING smell all around the appliance area for gas Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electric switch do not use any phone in your building Immediately call your gas supplier from a neighbors phone Follow the gas supplier s instructions f you cannot reach your gas supplier call the fire department C Use only your hand to push in or turn the gas control knob Never use tools If the knob will not push in or turn by hand don t try to repair it call a qualified service technici
40. UR GAZ NATURAL Minimum supply pressure 5 WCI C E 1 25 kPa Pression d allimentation minimum Manifold pressure High 3 8 WC C E 0 94 kPa Pression la tubulure d chappement lev e O CTORY EQUIPPED FOR PROPANE GAS Model H15 LP1 EQUIPE A L UISINE POUR GAZ PROPANE gt x Manifold pressure Low 1 1 WC C E 0 27 kPa Pression la tubulure d chappement basse pu lu pu 18 000 Btu h 5 28 Kw h D bit Calorifique maximum lt Minimum Input 10 500 Btu h 3 08 Kw h D bit Calorifique minimum Orifice size 47 DMS Dimensions de l orifice 2 Altitude 0 4500 ft pi 0 1372m L altitude o i Minimum clearance of Vent Terminal to Outside Corner amp Inside Corner with AstroCap 6 150mm with Dura Vent Cap 12 300mm Q Minimum supply pressure 12 WC C E 3 00kPa Pression d allimentation minimum Manifold pressure High 11 WC C E 2 74 kPa Pression la tubulure d chappement lev e Manifold pressure Low 2 9 WC C E 0 72 kPa Pression la tubulure d chappement basse 9 Maximum Input 18 000 Btu h 5 28 Kw h D bit Calorifique maximum 2 Minimum Input 10 600 Btu h 3 10 Kw h D bit Calorifique minimum 2 Orifice size 55 DMS Dimensions de l orifice 2 Altitude 0 2000 ft pi 0 610m L altitude 2 Maximum Input 15 500 Btu h 4 54 Kw h D bit Calorifique maximum Minimum Input 8 200 Btu h 2 40 Kw h D bit Calorifique minimum Orifice size 56 DMS
41. aced Avoid stacking platinum embers 10 Test fire to ensure proper light off make sure flame flows smoothly from one end of burner to the other If there is any flame hesitation check that area for any blockage of the burner ports 11 Re install the Glass Front Cast Front and Top nada erese er re iests or ts TF t E r A m1 me r e AV Sls b Hampton H15 1 Direct Vent Freestanding Gas Stove 33 INSTALLATION OPTIONAL WALL THERMOSTAT A wall thermostat may be installed if desired Connect the wires as per the wiring diagrams Note that the wires are connected to the TH on the gas valve Use table below to determine the maximum wire length Note Preferable ifthe thermostat is installed on an interior wall Hampton offers an optional programmable thermostat but any 250 750 millivolt rated non anticipator type thermostat that is CSA ULC or UL approved may be used CAUTION Do not connect the millivolt wall thermostat wires to the 120V wires Thermostat Wire Table Recommended Maximum Lead Length Two Wire When Using Wall Thermostat CP 2 System Wire Size 14 GA Max Length 90 Ft 32 Ft 20 Ft 12 Ft 9 Ft 16 GA 18 GA 20 GA 22 GA OPTIONAL REMOTE CONTROL Usethe Hampton Remote Control Kitapproved for this unit Use of other systems may void your warranty The remote control kit comes with a hand held transmitter a receiver and a wall moun
42. al installations determine the minimum clearance from the rear of the unit to the wall It is also important to note the wall thickness The wall thimble is suitable for 2 x 4 or 2 x 6 wall construction Select the amount of vertical rise desired for vertical to horizontal type installations Warning Always maintain required clearances air spaces to nearby combustibles to prevent a fire hazard Do not fill air spaces with insulation The minimum clearance requirements between the outer wall of the vent pipe and nearby com bustible surfaces is 1 1 4 inch Be sure to check Dura Vent Vertical Termination Installation Vertical Terminal SS the vent termination clearance requirements from decks windows soffits gas regulators air supply inlets and public walkways as specified inthe Exterior Vent Terminal Locations section and in your local building codes To determine the length of vent pipe required for vertical installations measure the distance from the unit flue outlet to the ceiling the ceiling thickness the vertical rise in an attic or second storey and allow for sufficient vertical height above the roof line For multi storey applications fire stops are required at each floor level If an offset is needed additional pipe elbows and supports will be required Do not exceed the maximum number of elbows One 90 for horizontal terminations and two 45 for vertical termination Dura Vent Horizontal
43. alcony is fully open on a minimum of two sides beneath the floor Hampton H15 1 Direct Vent Freestanding Gas Stove 11 INSTALLATION 4 X 6 5 8 RIGID PIPE CROSS REFERENCE CHART Components from different Manufacturers may not be mixed Not All Rigid Pipe components are available directly from FPI Simpson Direct Vent GS a SERI Discontinued p American Metal Products Amerivent Direct Simpson Direct Vent Pro Metal Fab Security Sure Seal Secure Vent Description 6 Pipe Length Galvanized 6 Pipe Length Black T Pipe Length Galvanized 7 Pipe Length Black 9 Pipe Length Galvanized 9 Pipe Length Black 12 Pipe Length Galvanized 12 Pipe Length Black 18 Pipe Length Galvanized 18 Pipe Length Black 24 Pipe Length Galvanized 24 Pipe Length Black 36 Pipe Length Galvanized 36 Pipe Length Black 48 Pipe Length Galvanized 48 Pipe Length Black 60 Pipe Length Galvanized 60 Pipe Length Black Adjustable Length 3 10 Galvanized Adjustable Length 3 10 Black 46DVA 06 46DVA 06B N A N A 46DVA 09 46DVA 09B 46DVA 12 46DVA 12B 46DVA 18 46DVA 18B 46DVA 24 46DVA 24B 46DVA 36 46DVA 36B 46DVA 48 46DVA 48B 46DVA 60 46DVA 60B N A N A N A N A 4DT 6 4DT 6B N A N A 4DT 9 4DT 9B 4DT 12 4DT 12B 4DT 18 4DT 18B 4DT 24 4DT 24B 4DT 36 4DT 36B 4DT 48 4DT 48B N A N A N A N A N A N A SV4L6 SV4LB6 N A N
44. an Force or attempted repair may result in a fire or explosion D Do not use this appliance if any part has been under water Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control which has been under water E This appliance needs fresh air for safe operation and must be installed so there are provisions for adequate combustion and ventilation air CAUTION Hot while in operation Do not touch Severe Burns may result Due to high surface temperatures keep children clothing and furniture gasoline and other liquids having fammable vapors away Keep burner and control compartment clean See installation and operating instructions accompanying appliance LIGHTING INSTRUCTIONS STOP Read the safety information above on this label FOR UNITS NOT EQUIPPED WITH ELECTRIC SPARK FOR ALL PROPANE UNITS AND 1 Push in gas control knob slightly and turn clockwise to UNITS EQUIPPED WITH ELECTRIC SPARK BOXES OFF Knob cannot be turned from PILOT to OFF unless knob is pushed in slightly Do not force 1 Push in gas control knob slightly and turn to PILOT position PILOT BURNER w OFF 2 Push in control knob all the way and hold in until the pilot lights VEILLEUSE E E amp up Continue to hold the control knob in for about 20 seconds ELEMENT he THERMO ELECTRIQUE l 4 Turn ON the flame switch 3 Push in gas control knob
45. are Termination Cap Mi 1 N gt N 24 max w FPI Riser or Simpson Duravent A m B WEL Al at Li Horizontal Distance Feet Horizontal Distance Feet Hampton H15 1 Direct Vent Freestanding Gas Stove 17 INSTALLATION VERTICAL TERMINATION WITH CO LINEAR FLEX SYSTEM THE APPLIANCE MUST NOT BE CONNECTED TO A CHIMNEY FLUE SERVING A SEPARATE SOLID FUEL BURNING APPLIANCE This appliance is designed to be attached to two 3 76mm co linear aluminium flex running the full length of the chimney See the Venting Arrangements chart below for minimum and maximum flue lengths See chart below for minimum distances from roof Periodically check that the vent is unrestricted Minimum vertical distance in ft m from roof up to lowest opening in top Min Vertical Distance OO N JS QI O N oc 2 amp 2 g 2 O E 9 2 2 2 NN 212 442 6112 812 1012 1212 1412 1612 1812 Roof pitch Venting Arrangements Vertical Terminations with Co linear Flex System for both Residential amp Manufactured Homes may be used into Masonry Fireplaces per length The shaded area in the diagram shows the allowable vertical terminations Straight Vertical Terminations 32 4 30 28 Vent Restrictors set at fully closed Position B x 8 1 2 216mm Vertical Height feet Min 21 1 4 533mm Masonry chimneys may take various contours which the flexible liner will
46. crew ing the two screws 20 First remove the Piezo Ignition Wire from the Piezo Ignitor Then remove the Piezo Ignitor from the control panel 24 Attach the ground wire to the grounding stud 21 Plug up the Piezo hole with the plastic bushing After 30 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION 25 Attach the Piezo ignition wire to the DC Sparker 26 Insert both the ground wire and the DC sparker generator wire through the hole of the DC spark heat shield 27 Install the plastic bushing over the outside of the hole 31 28 Attach the ground wire to the DC spark mounting bracket 29 Attach the DC sparker generator wires to the DC sparker Compartment 32 Tie up the loose wire with the wire clip 30 Install the supplied battery into the DC Sparker Box by opening the battery compartment NOTE The battery in the DC Sparker Box will need to be replaced annually Battery Attach the heat shield to the DC sparker then mount onto the stove using the velcro already attached to the DC Sparker mounting bracket Note We recommend attaching the DC sparker box to the bottom rear of the stove or place this in a convenient location away from the heat source Velcro Hampton H15 1 Direct Vent Freestanding Gas Stove 31 INSTALLATION LOG SET INSTALLATION Read the instructions below carefully and refer to the diagrams 6 Place
47. droom instal lations when used with a Listed Millivolt Thermostat Some areas may have further requirements check local codes before installation 5 This appliance is Listed for Alcove installa tions maintain minimum Alcove clearances as follows minimum width of 32 1 2 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION 825mm amaximum depth of 36 914mm and minimum height of 24 610mm from top of unit to ceiling 6 We recommend that you plan your instal lation on paper using exact measurements for clearances and floor protection before actually installing this appliance Have a qualified building inspector review your plans before installation GENERAL SAFETY INFORMATION 1 Theappliance installation must conform with local Canadian Electrical Code 2 The appliance when installed must be electrically grounded in accordance with local codes or in the absence of local codes with the current National Electrical Code ANSI NFPA 70 or CSA C22 1 Canadian Electrical Code 3 The appliance should be inspected for ship ping damage before use and serviced an nually by a professional service person More frequent cleaning may be required due to excessive lint from carpeting bedding material etc It is imperative that control compartments and circulating air passage ways ofthe appliance be kept clean and free from excessive lint from carpeting 4 See general construction and assembly instruc
48. e 8 x 1 2 screws stainless steel NOTE For best results and optimum per formance with each approved vent ing system itis highly recommended to apply Mill Pac sealant supplied to every inner pipe connection Fail ure to do so may result in drafting or performance issues not covered vent terminal assembly through the wall thimbles from the exterior into the interior and secure the cap to the exterior wall with 4 of the supplied screws 8 x 1 1 2 drill point stainless steel Note pilot holes will need to be drilled through the wall thimble on all 4 corners of the telescopic section The flex may have to be compressed back in order for the adjustable pipe to properly mate to the elbow Seal with Mill Pac and or high temperature silicone and secure with 3 of the 8 x 1 2 screws black Pipe seams facing down din Note The four screws provided for the 18 Install the trim collar over the starter col under warranty Silicone red RTV vent cap should be replaced with lar and secure with a 8 x 1 2 screw is optional appropriate fasteners for stucco black brick concrete or other types of n sidings Wall Thimble Note Thepipeseam mi 7 m m Vinyl Siding Shield MRE IE n A 6 A bead of non hardening mastic should Adj Pipe Optional should be fac Pipe be run around both the termination
49. e second floor and any subsequent floor Diagram 12 The opening should be framed to 10 x 10 inside dimen sions in the same manner as shown in diagram 9 b Anyoccupied areas abovethe firstfloor including closets and storage spaces through which the vertical vent passes must be enclosed nails Ceiling Firestop I me 1 j Aa es m Min j 1 1 4 Min l 1 1 4 Min 1 1 4 Min CE Diagram 12 Offset Chart GS 6 152mm Nominal Diameter ID Offset Pipe Length L Height inches mm inches mm inches Offset j Hampton H15 1 Direct Vent Freestanding Gas Stove 25 INSTALLATION CONVERTING CLASS A METAL CHIMNEY OR MASONRY CHIMNEY TO DIRECT VENT SYSTEM There are two different types of direct vent conversion systems listed below Follow the appropriate directions for your installation A Through an existing factory built metal chimney going through the ceiling A typical conversion of this type is shown in diagram 1 The concept of direct vent conversion is to connect an adaptor to an Underwriters Laboratories UL listed 4 inch diameter aluminum flex pipe which is then passed down through the center ofthe existing metal chimney system Three sizes of Top Adap tors are available from Simpson Dura Vent The Retro Connector 909B is attached
50. e until the correct clearance to the connector is obtained This appliance may be installed only with the clearances as shown in the situations pictured Do not combine clearances from one type of installation with another in order to achieve closer clearances This unit can be installed on a solid combustible surface like a wood floor This unit can also be installed directly on carpeting or vinyl Use the minimum clearances shown in the diagrams below H15 NG1 amp H15 LP1 Clearances A Left Side Wall to Unit 6 150 mm BBack Wall to Unit 0 0mm C Vertical Vent Pipe to Back Wall 2 50mm E Unit Corner to Wall 2 50mm Unit Top to Alcove Ceiling 24 610 mm Minimum ceiling height is 24 610 mm from top of unit IMPORTANT Itis recommended that unit is moved away from the wall ifinstalling the blower option so the fan can be easily installed and or serviced Left Side Wall Left Side Wall Horizontal Pipe Vertical Pipe Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION LOCATING YOUR GAS STOVE When selecting a location for your stove ensure that the clearances listed above are met as well OPTIONAL FAN INSTALLATION Fan Kit Contains as ensuring that there is adequate accessibility Qty Description for servicing and proper operation A Cross Corner B Room Divider C Island D Flat on Wall E Flat on Wall Corner F Flush with Wall Alcove
51. earance to permanently closed window min 12 30cm D Vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 24 60cm from the centerline of the terminal min 22 55cm check with local code E Clearance to unventilated soffit min 12 30cm F Clearance to outside corner with AstroCap Termination Cap min 6 15cm with Dura Vent Termination Cap min 12 30cm with Riser Vent min 6 15cm G Clearance to inside corner with AstroCap Termination Cap min 6 15cm with Dura Vent Termination Cap min 12 30cm with Riser Vent min 6 15cm H Not to be installed above a meter regulator assembly within 3 90cm horizontally from the centerline of the regulator J Clearance to service regulator vent outlet min 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 30cm L Clearance to a mechanical air supply inlet min 72 1 8m M Clearance above paved sidewalk or a paved driveway located on public property min 84 2 1m N Clearance under veranda porch deck or balcony min 12 30cm Note As specified in CGA B149 Installation Code Note Local codes or regulations may require different clearances A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings Only permitted if veranda porch deck or b
52. ections Qty Description 1 1 Rigid Pipe Section Kit 946 116 2 ft 1 2m length Kit 946 216 4 ft 1 2m length 6 1 2 165mm inside diameter 2 1 Flex Liner compressed aluminium 2 ply liner 4 102mm inside diameter AstroCap Termination Cap Part 946 523 P Wall Thimble required for combustible walls Adjustable Pipe Length 13 1 2 24 3 4 spring spacers 2 pieces 4 1 90 deg Elbow 5 1 Adjustable pipe section 13 1 2 to 24 843mm x 610mm 2 pcs 6 1 Thimble Cover wA 7 1 Wall Thimble 2 pcs P UN 8 1 Adapter or 2 ft Pipe Length with 9 1 AstroCap Termination Cap Kit 946 116 Note 10 2 Trim Collars a Liner sections should be con 11 1 tube of Mill Pac high temperature sealant tinuous without any joints or 12 12 Screws 8 x 1 2 Self tapping Stainless Steel 13 14 Screws 8 x 1 2 Self tapping Black scams 14 4 Screws 8 x 1 1 2 Drill Point Black b This is an approved system 15 4 Screws 8 x 1 1 2 Drill Point Stainless Steel therefore components in this 16 8 Wood screws 8 x 1 system must not be substituted Review the following sequence of instructions which are typical of most installations The sequence may vary depending on wall thick ness Refer to the Exterior Vent Terminal Locations and Rigid Pipe Venting Systems sections for vent location and clearance dimensions and the Vent Restrictor Posi tion for the correct positioning 1 Set the
53. ew Fig 3 Sparker Kit LPG Conversion Kit Contains Qty Part Description 1 904 575 Burner Orifice 55 1 918 590 Label Converted to Propane 908 528 Red LPG label 904 529 5 3 Allen Key 910 037 LP Injector Pilot Orifice Screws 918 479 Instruction Sheet Note Use a magnetic type screwdriver DC Sparker Kit Contains if possible Qty Part Description l uU 820 475 Bracket DC Sparker Pilot assembly gsx 820 476 Bracket DC Sparker IS NOW ys N 9 Using the Allen wrench as shown in 904 153 Washer 8 External Star accessible Vy M Fig 4 rotate the screw clockwise until 904 330 Nut 8 32 Hex for steps the snug do not overtighten 904 438 Plug Nylon 0 750 Hole following Black Steps 904 531 904 543 904 553 910 073 910 074 910 078 910 199 910 903 904 781 904 782 Bushing Split Plastic 0 500 in Screw 8 32 x 3 4 Pan Head Screw 8 x 1 2 Type B Black Oxide Spark Generator Battery Holder Spark Generator Switch C W Wire Battery Size AA Energizer En91 Clip Wire Holder Wire Fan To Power Cord Ground 30 in Velcro Hook Black Velcro Hook Black Installation of LPG Conversion Kit 1 Shut off the gas supply 4 Turn control knob to the OFF position 5 Remove the black protection cap by hand from the high low knob Fig 1 Fig 4 amp JH WARNING Do not overtighten the screw Recommended to grip the wrench by the short side 10 Verify that if the conversi
54. ey serving a separate solid fuel or gas burning appli ance Each direct vent gas appliance must use i s own separate vent system Common vent systems are prohibited ROTATING ELBOW it with the 4 screws 3 Rotate the elbow 180 4 Secure the elbow by securing SAFETY PRECAUTIONS FOR THE INSTALLER 1 Wear gloves and safety glasses for protec tion 2 Exercise extreme caution when using lad ders or on roof tops 3 Be aware of electrical wiring locations in walls and ceilings VENT RESTRICTOR POSITION To set the Vent restriction as indicated in the Venting Arrangement diagrams in the Rigid Pipe Venting System section simply loosen the screws and push the vent restrictor plate to the correct position Tighten the screws This will be located inside the firebox Vent Vent Restrictor Restrictor Position A Plate fully open Vent Vent Restrictor Restrictor Position ZB Plate restricted 10 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION EXTERIOR VENT TERMINAL LOCATIONS I E jji TH Openable pa ji Vent Termination Air Supply Outlet Area where terminal is not permitted A Clearance above grade veranda porch deck or balcony min 12 30cm B Clearance to window or door that may be opened 12 30cm C Cl
55. factur ing Smoke detectors in the house may go off at this time Open a few windows to ventilate the room for a couple of hours The glass may require cleaning DO NOT ATTEMPT TO CLEAN THE GLASS WHILE IT IS STILL HOT Note When the glass is cold and the appli anceis lit it may cause condensation and fog the glass This condensation is normal and will disappear in a few minutes as the glass heats up During the first few fires a white film may develop on the glass front as part of the curing process The glass should be cleaned or the film will bake on and become very difficult to remove Use a non abrasive cleaner and NEVER clean the glass while it is hot ADJUSTING FLAME HEIGHT Your heater has an adjustable flame to tailor the look and heat output to your specific needs It is adjusted by turning the flame adjustment dial on the gas control valve Turn clockwise to adjust the flame higher coun terclockwise for a lower flame HEAT AUTOMATIC CONVECTION FAN OPERATION The fan operates automatically turn the knob at the top right rear corner to adjust to the desired speed The fan will turn on as the stove comes up to operating temperature After the unit has been turned off and the unit cooled to below a useful heat output range the fan will shut off automatically Hampton H15 1 Direct Vent Freestanding Gas Stove 37 OPERATING INSTRUCTIONS COPY OF THE LIGHTING PLATE INSTRUCT
56. from all outer pipe joints by using at least two Wall ijed i screws ee the edi ai the bottom of Thimbl St E e A ra the ceiling and mark the spot where the iheni Cover ff diia e pipe so thatthe screw heads are hidden cut o vent will penetrate the roof Determine if on the final installation inicio ceiling joists roof rafters or other framing Note For best results and optimum per Ee we end s bd diae Mus d 7 wish to relocate the appliance or to offset formance with each approved ventin in di i i it i lt hi ide the decorative wall thimble up to the system it is highly commenced 8 Slide the d ti ll thimble up to th DEEST Eanes apply Mill Pac sealant supplied to wall surface being careful not to scratch the every inner pipe connection Failure paint See diagram 5 2a to do so may result in drafting or a a performance issues not covered 9 Back outside Apply sealant to the 4 inner under warranty Silicone red RTV flue and slide the Riser Vent Front into the is optional Backing Plate and fasten with 8 screws IMPORTANT EN When connecting the pipe to the Riser Vent apply Mill Pac to the inner pipe on the Riser Vent Terminal around the bead A 2 Ensure that the vent pipe is pushed past sl ie the bead for a secure fit Pipe 10 Seal around the outer edge of the Riser Vent Backing Plate eS T Diagram 7 24 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION
57. g across the rear of the burner it does not have to be touching the burner Note If you have an incorrect flame pat tern contact your Hampton dealer for further instructions PILOT ADJUSTMENT Rear of Burner O O O O O O O O O O O O O O O O O O O OR O O O O O O O O O O Thermopile O O O O O O O O O O O O O O O O O O O Front of Burner Top View of pilot flame Incorrect flame pattern will have small probably yellow flames not coming into proper contact with the rear of the burner or thermopile Rear of Burner Front of Burner Top View of pilot flame Hampton H15 1 Direct Vent Freestanding Gas Stove 39 MAINTENANCE GENERAL VENT MAINTENANCE Conduct an inspection of the venting system semi annually Recommended areas to inspect as follows 1 Check the Venting System for corrosion in areas that are exposed to the elements These will appear as rust spots or streaks and in extreme cases holes These com ponents should be replaced immediately 2 Remove the Cap and shine a flashlight down the Vent Remove any bird nests or other foreign material 3 Check for evidences of excessive condensa tion such as water droplets forming in the innerliner and subsequently dripping outthe joints Continuous condensation can cause corrosion of caps pipe and fittings It may be caused by having excessive lateral runs too many elbows and exterior portions of the system being exposed t
58. gas connections Refer to the Gas Connection section Test the pilot Must be as per diagram in the Pilot Adjustment section If converting to Propane make changes prior as instructed in the Conversion from Natural Gas to Propane section 6 Test Gas Pressure Refer to the Gas Pipe Pressure Testing section 7 Install standard and optional features Refer to the following sections where applicable a Log Set Installation b Wall Thermostat c Remote Control 8 Final check Refer to the Final Check sec tion Before leaving this unit with the customer the installer must ensure that the appliance is fir ing correctly and operation fully explained to customer This includes 1 Clocking the appliance to ensure the correct firing rate rate noted on label after burning appliance for 15 minutes 2 Ifrequired adjusting the primary air to ensure that the flame does not carbon First allow the unit to burn for 15 20 min to stabilize CAUTION Any alteration to the product that causes sooting or carboning that results in damage is not the responsibility of the manufacturer CLEARANCES TO COMBUSTIBLES The clearances listed are MINIMUM distances Measure the clearance to both the appliance and the chimney connector The farthest distance is correct if the two clearances do not coincide For example if the appliance is set as indicated in one of the figures but the connector is too close move the stov
59. ible this is normal operation of a gas regulator or valve Unit Body Firebox Different types and thicknesses of steel will expand and contract at different rates resulting in some cracking and ticking sounds will be heard throughout the cycling process MAINTENANCE INSTRUCTIONS 1 Always turn off the valve before cleaning For relighting refer to lighting instructions Keep the burner and control compartment clean by brushing and vacuuming at least once a year When cleaning the logs use a soft clean paint brush as the logs are fragile and easily damaged 2 Clean glass never when unit is hot appli ance and door with a damp cloth Never use an abrasive cleaner 3 Theheater is finished in a porcelain finish or with a heat resistant paint and should only be refinished with heat resistant paint not with wall paint Never use an abrasive cleaner on the por celain finish as it may scratch the surface 4 Make a periodic check of burner for proper position and condition Visually check the flame of the burner periodically making sure the flames are steady not lifting or floating If there is a problem call a qualified service person 5 Caution Label all wires prior to discon nection when servicing controls Wiring errors can cause improper and danger ous operation 6 The appliance and venting system must be inspected before use and at least annually by a qualified field service person to ensure tha
60. intenance Instructions u EEE 39 Pilot Adjustment eeseeeeesseeeeeeeeeenn 39 Fan Maihtenari6eu i i xandin eco Eb etr Viadana Hess 40 General Vent Maintenance eeeeeeeseses 40 Log Replacement aa a 40 Glass Replacement L L EEE 40 Sermovirig Valves catu kilala el kan te Md bu d r k beyaz ana 41 Installing Valve Assembly UU 41 PARTS LIST WIAIMASSOMDIY lt 1 54 xuyan ayende deyk dek n Nava x n az va d na 42 Burner amp Log Assembly EEEE 43 WARRANTY Warton Y DD 47 3 SAFETY LABEL This is a copy of the label that accompanies NOTE Hampton units are constantly being each Direct Vent Freestanding Gas Stove improved Check the label on the unit and if We have printed a copy of the contents here there is a difference the label on the unit is for your review the correct one KERA Listed DIRECT VENTED GAS FIREPLACE HEATER DO NOT REMOVE THIS LABEL Ge Certified for Certifi e pour NE PAS ENLEVER CETTE ETIQUETTE d E l a CANADA and U S A 301 Report No 476 3044834 June 2003 Tested to Gas Fired Appliances For Use At High HAMPTON Serial No No de serie Altitudes CGA 2 17 M91 Vented Gas Fireplace Heaters ANS Z21 88b 2003 CSA 2 33b 2003 MAY BE INSTALLED IN MANUFACTURED MOBILE HOMES AFTER FIRST SALE FACTORY EQUIPPED FOR NATURAL GAS Model H15 NG1 QUIP A L UISINE PO
61. l Point Black 7 Qty 3 j 14 Attach the 45 elbow onto the starter col E 8 x 1 Wood Screws lar by sealing with Mill Pac and or high Adani temperature silicone and securing with 3 ER of the 8 x 1 2 black screws l Note If installing termination pov Trim Collar on a siding cov A 15 Attach the pipe section to the 45 elbow by ered wall a vinyl ssid wall 2 sealing with Mill Pac and or high tempera Starter Collar E siding standoff ou 2005 ture silicone and securing with 3 of the 8 or furring strips 2 x 1 2 screws black Pipe seams should 3 Attach the 4 dia flex liner to the vent ter must be used to 2 be facing the wall minal ensuring that the flex overlaps the ensure that the S35 N colar one yey aioe RU termination is not Furring S16 Attach the 90 elbow onto the pipe section of 1 3 8 35mm Use MI ge fo seal recessed into the PS by sealing with Mill Pac and or high tem and secure with 3 of the 8 x 1 2 screws siding For vinyl perature silicone and securing with 3 of the stainless steel siding standoff 8 x 1 2 screws black i i i installation refer to the Dura Vent 4 Attach the adjustable pipe section to the Termination instructions 17 Slide the adjustable pipe section onto the vent terminal MIS N Mill Pac and or high 90 elbow Slide the trim collar over the temperature silicone and attach with 3 of 5 Slide the partially connected pipe and adjustable pipe sections to cover the joint th
62. l vented gas fueled equipment It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors a In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic the hard wired carbon monoxide detector with alarm and battery back up may be installed on the next adjacent floor level b In the event that the requirements of this subdivision can not be met at the time of completion of installation the owner shall have a period of thirty 30 days to comply with the above requirements provided however that during said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed 2 APPROVED CARBON MONOXIDE DETECTORS Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI UL 2034 listed and IAS certified 3 SIGNAGE A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local gas inspector of the side wall horizontally
63. llivolt Optional Remote Transmitter Optional WARNING Electrical Grounding Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong receptacle Do not cut or remove the grounding prong from this plug Hampton H15 1 Direct Vent Freestanding Gas Stove 35 INSTALLATION For PROPANE Units and Units Equipped with DC Spark Boxes For installation of the DC Spark Box refer to the LP Conversion instructions in this manual 8 Ground Lug Grou nding for mobile home 2 Lug Detail w gg 2 een Lockwasher e ie o D roun H O Star washer E A e E o0 C U o AZ e 120VA Star net Ground wire O LLI 60 Hz from power cord j De m Pilot i Assembl Oj o LI E y j J c Rotary Speed Fan Thermodisc Tr En Control normally open To Thermocouple IN l l l DC Spark Box r1 Ground l i Pot 3 9 s 2 MM e LS lt wT i In gt eae Drawn mam ON Burner ioo oar gt OFF S I T Valve BEN Thermostat l l 9 eo w M NE J ee gt OFF ON Remote Transmitter pple AA WW Optional or Thermosta Millivolt Optio
64. mpton Mobile Manufactured Home listed appliance comes equipped with a dedicated 8 ground lug to which an 18 gauge copper wire from the steel chassis ground must be attached This appliance may only be installed in an aftermarket permanently located manufactured USA only or mobile home where not prohibited by local codes This appliance is only for use with the type of gas indicated on the rating plate This appliance is not convert ible for use with other gases unless a certified kit is used BEFORE YOU START Safe installation and operation of this appli ance requires common sense however we are required by the Canadian Safety Standards and ANSI Standards to make you aware of the following INSTALLATION AND REPAIRS SHOULD BE DONE BY A QUALI FIED SERVICE PERSON THIS AP PLIANCESHOULDBEINSTALLED REPAIRED INSPECTED BEFORE USE AND AT LEAST ANNUALLY BY A QUALIFIED SERVICE PER SON MORE FREQUENT CLEAN ING MAY BE REQUIRED DUE TO EXCESSIVE LINT FROM CARPET ING ETC ITISIMPERATIVE THAT THE CONTROL COMPARTMENT BURNERS AND CIRCULATING AIR PASSAGEWAYS OF THE AP PLIANCE BE KEPT CLEAN DUE TO HIGH TEMPERATURES THE APPLIANCE SHOULD BE LOCATED OUT OF TRAFFIC AND AWAY FROM FURNITURE AND DRAPERIES WARNING FAILURE TO INSTALL THIS APPLIANCE CORRECTLY WILL VOID YOUR WARRANTY AND MAY CAUSE A SERIOUS HOUSE FIRE CHILDRENANDADULTSSHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERA TURES ESPECI
65. nal 36 Hampton H15 1 Direct Vent Freestanding Gas Stove OPERATING INSTRUCTIONS OPERATING INSTRUCTIONS 1 Read and understand these instructions before operating this appliance 2 Check to see that all wiring is correct and enclosed to prevent possible shock 3 Check to ensure there are no gas leaks 4 Make sure the glass in the door frame is properly positioned Never operate the ap pliance with the glass removed Never strike the glass 5 Verify that the venting and cap are unob structed 6 Verify log placement If the pilot cannot be seen when lighting the unit the logs have been incorrectly positioned 7 The unit should never be turned off and on again without a minimum of a 60 second wait Pilot Adjust LIGHTING PROCEDURE IMPORTANT To ignite or reignite the pilot the door to the firebox must be opened NOTE For all propane units and units equipped with electric spark boxes see Copy of Lighting Plate Instruc tions section for more details Only when the pilot holds without pressure being applied to the control knob should the door to the firebox be closed The unit must never be operated with the glass or door open IMPORTANT Gas on off knob cannot be turned from PILOT to OFF unless it is partially depressed 1 Turn stove OFF using the Burner ON OFF switch remote or thermostat Switches are located at the top right hand corner rear of the stove
66. nd will void the warranty Be sure to check the venting and clearance to combustible require ments Consult your local building codes before beginning installation The location of the termination cap must con form to the requirements in the Exterior Vent Terminal Locations section 1 Remove top casting 2 Remove all 4 screws that secure the elbow to the unit using a 1 4 magnetic nut driver Remove all 4 screws and washers INSTALLATION PRECAUTIONS These venting systems are engineered products that have been designed and tested for use with the H15 NG1 and H15 LP1 The warranty will be voided and serious fire health or other safety hazards may result from any of the fol lowing actions 1 Installation of any damaged Rigid Pipe component 2 Unauthorized modification of any Rigid Pipe System 3 Installation other than as instructed by Simp son Dura Vent and FPI Fireplace Products International Ltd Warning Always maintain required clearances air spaces to nearby combustibles to prevent a fire hazard Do not fill air spaces with insulation Be sure to check the vent termination clearance requirements from decks windows soffits gas regulators air supply inlets and public walkways as specified in the Exterior Vent Terminal Locations section and in your local building codes The gas appliance and vent system must be vented directly to the outside ofthe building and never be attached to a chimn
67. ne venting components from different venting systems However use of the the AstroCap and FPI Riser is acceptable with all systems This producthas been evaluated by Intertek for using a Rigid Pipe Adaptor in conjunction with Duravent Direct Vent GS Selkirk Direct Temp Ameri Vent Direct venting and Security Secure Vent systems Use of these systems with the Rigid Pipe adaptor is deemed acceptable and does not affect the Intertek WHI listing of components Vertical Termination CS Cop WE storm Collar K Vinyl Siding Flashing e Standoff Optional Horizontal Ceiling Preso lt gt AN iui Pipe Length r lt Adj Pipe Length 11 14 5 8 90 Elbow 24 Pipe When using Rigid Vent other than Simpson Dura Vent 3 screws must be used to secure rigid pipe to adaptor The FPI AstroCap and FPI Riser Vent terminal are certified for installations using FPI venting systems as well as Simpson Dura Vent Direct Vent GS American Metal Products Ameri Vent Direct Vent Security Secure Vent Selkirk Direct Temp AstroCap is a proprietary trademark of FPI Fireplace Products International Ltd Dura Vent and Direct Vent GS are registered and or proprietary trademarks of Simpson Dura Vent Co Inc 14 Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION Horizontal Venting with Two 2 90 Elbows One 90 elbow Two 45 elbows With these options maxi mum to
68. o cold weather 4 Inspect joints to verify that no pipe sections or fittings have been disturbed and conse quently loosened Also check mechanical supports such as Wall Straps or plumbers tape for rigidity 5 Verify proper operation after servicing LOG REPLACEMENT The unit should never be used with broken logs Turn off the gas valve and allow the unit to cool before opening door to carefully remove the logs The pilot light generates enough heat to burn someone If for any reason a log should need replacement you must use the proper replacement log The position of these logs must be as shown in the diagram under Log Installation GLASS REPLACEMENT Your stove is supplied with high temperature 5 mm Neoceram ceramic glass that will withstand the highest heat that your unit will produce In the event that you break your glass by impact purchase your replacement door from an au thorized Hampton dealer only and follow our step by step instructions for replacement 1 Lift off Cast Top 2 Open the 2 latches to remove Glass Front Angle out and then lift same as Cast Front 3 Remove glass and replace with glass new 4 Re install Cast Top WARNING Donotoperate appliance with glass panel removed cracked or broken Replacement of the glass should be done by a licensed or qualified service person Note Wearing gloves will protect your hands while handling glass FAN MAINTENANCE If you
69. on is from NG to LPG the screw must be reassembled with the red o ring visible Fig 5 6 Insert a 5 32 or 4mm Allen wrench into the hexagonal LPG Configuration 2 Liftoff Cast Top remove Cast Front and Red o ring visible Glass Door refer to the glass replace ment section in the manual and carefully remove logs and lava rock key way of the screw Fig 2 rotate it counter clockwise until it is free and extract it Hampton H15 1 Direct Vent Freestanding Gas Stove 29 INSTALLATION 11 Reassemble the black protection cap Fig 6 WARNING Also check that the pilot and main burner injectors are appropriate for the gas type 12 Pull off the pilot cap to expose the pilot orifice 13 Unscrew the pilot orifice with the allen key and replace with the LP pilot orifice in the kit 14 Remove burner orifice with a 1 2 wrench and discard Use another wrench to hold on to the elbow behind the orifice Burner Orifice 15 Reinstall new burner orifice LP stamped 55 and tighten 16 Reverse steps 3 to 2 22 Attach the DC sparker generator connector to the valve with a screw 17 Attach the label This unit has been converted to LPG near or on top of the serial decal 18 Replace yellow Natural Gas label with red LPG label Installation of the DC Sparker 19 Remove the control panel by unscrewing the 2 screws 23 Remove the stove s rear panel by uns
70. onditions Porcelain Enamel Absolute perfection is neither guaranteed nor commercially possible Any chips must be reported and inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection Any part or parts of this unit which in our judgement show evidence of such defects will be repaired or replaced at FPI s option through an accredited distributor or agent provided that the defective part be returned to the distributor or agent Transportation Prepaid if requested It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the replaced component has been returned to FPI and evaluated for manufacturer defect The authorized selling dealer is responsible for all in field service work carried out on your Hampton product FPI will not be liable for results or costs of workmanship from unauthorized service persons or dealers At all times FPI reserves the right to inspect product in the field which is claimed to be defective All claims must be submitted to FPI by authorized selling dealers It is essential that all submitted claims provide all of the necessary information including customer name purchase date serial type of unit problem and part or parts requested without this information the warranty will be invalid Exclusions This limited Lifetime Warranty does not extend to or include paint charcoal units porcelain
71. ot be covered by this warranty policy Products made or provided by other manufacturers and used in conjunction with the operation of this appliance without prior authorization from FPI may nullify your war ranty on this product Any alteration to the unit which causes sooting or carboning that results in damage to the interior exterior facia is not the responsibility of FPI Subsidy according to job scale as predetermined by FPI Hampton H15 1 Direct Vent Freestanding Gas Stove 47 Hampton fireplace products are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team carefully inspects each unit thoroughly before it leaves our door FPI Fireplace Products International Ltd is pleased to extend this Limited Lifetime Warranty to the original purchaser of a Hampton Product See the inside back cover for details Register your Hampton online at http www hampton fire com Installer Please complete the following information Dealer Name amp Address Installer Phone Date Installed Serial No Jamg on is a trademark of FPI 28 Products International Ltd FPI Fireplace Pre ducts International Ltd All rights reserved
72. ow will seat onto both the starter collar and the 90 elbow Crimped section of rigid pipe seats into the 90 elbow Only cut the uncrimped side of pipe Assemble atrial fit to determine the vertical center line for the vent termination Dismantle all pipe sections including vent terminal a Cut a 9 1 2 x 9 1 2 241mm x 241 mm square hole on both the interior and exterior wall Hampton H15 1 Direct Vent Freestanding Gas Stove 19 INSTALLATION Adj Pipe Section 2 pieces AstroCap Termination Cap Thimble Thimble Cover 2 pieces 9 Secure the 4 dia flex liner to the 4 adapter with Mill Pac and 3 of the 8 x 1 2 screws stainless steel Qty 31 10 Slide the decorative Thimble Cover over the pipe sections and secure with 4 screws 8 x 1 1 2 drill point black to the wall E 3 Stim D Qty 3 Qty 3 Qty 3 Collar Qty 4 Qiy 4 Qiy 4 Qty 3 Qty 4 11 Slide the 90 elbow crimp end up the 459 elbow and ned ft pipe section crimp end Qty 1 up over the 4 dia flex liner 12 Install the spring spacers onto the pipe Roa Pipe A 8 x Self Tapping Stainless Steel seguons Section 13 Secure the 4 dia flex liner with adapter RO XE Sel Tapping Black onto the stove collar Put a bead of Mill Pac C 8 x 172 Drill Point Stainless Steel around the appliance adapter and secure with 3 screws 8 x 1 2 stainless steel D 8 x 1 Dril
73. r fan requires maintenance or replacement access to the fan is through the rear access panel on the back of the unit IMPORTANT These fans collect a lot of dust from within your home Ensure you maintain these fan motors on aregular basis by vacuuming out the fan squirrel cages around the motor and around the grills on the back of the stove WARNING Electrical Grounding Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be plugged directly into a properly grounded three prong receptacle Do not cut or remove the grounding prong from this plug IMPORTANT Disconnect power supply before servicing Note Improper positioning of logs may create carbon build up and will alter the unit s performance which is not covered under warranty 40 Hampton H15 1 Direct Vent Freestanding Gas Stove MAINTENANCE REMOVI NG VALVE 9 Remove burner by removing the 2 screws 12 To remove the valve remove the 4 screws on each side slide the burnerto the left and 2 per bracket that hold the valve to the If your valve requires maintenance or replace then lift the burner tray out valve bracket assembly ment use the following instructions l 13 To replace the burner tray assembly simply Note Always close offthe gas supply before reverse these instructions removing the valve To remove valve from valve assembly 1 Ifoptionalfan is installed
74. requirements for clearance to combustibles of 1 1 4 Slip the flashing underthe shingles shingles should overlap half the flashing as per diagram 10 Continue to assemble pipe lengths Wall straps are available for this purpose See diagram 5 Galvanized pipe and elbows may be utilized in the attic as well as above the roofline The galvanized finish is desirable above the roofline due to its higher corrosion resistance Continue to add pipe sections through the flashing until the height of the vent cap meets the minimum height requirements specified in diagram 11 or local codes Note that for steep roof pitches the vertical height must be increased A poor draft or down drafting can result from high wind conditions near big trees or adjoining roof lines in these cases increasing the vent height may solve the problem Diagram 11 Roof Pitch Minimum Vent Height Feet Meters flat to 7 12 over 7 12 to 8 12 over 8 12 to 9 12 over 9 12 to 10 12 over 10 12 to 11 12 over 11 12 to 12 12 over 12 12 to 14 12 over 14 12 to 16 12 over 16 12 to 18 12 over 18 12 to 20 12 over 20 12 to 21 12 7 Ensure vent is vertical and secure the base of the flashing to the roof with roofing rails slide storm collar over the pipe section and seal with a mastic Install the vertical termination cap by twist locking it a For multistorey vertical installations a Ceiling Fire stop Part 963 is required at th
75. s 1 Situate the chimney in a convenient loca tion as near as possible to the appliance outlet Cut and frame a hole in the roof for the support The sides of this hole must be vertical with 1 1 4 clearance 2 Place the support in the opening Lower it to the correct height as determined by the table and diagram below Finish Trim X a Round or Square Support oM2 212 2 12 7 12 5 1 2 7 112 12 12 6 3 4 12 12 24 12 7 1 2 24 12 12 1 2 Using a level make sure the support is vertical If the support extends above the roof cut it flush with the top of the roof Nail the supportto the frame opening using 8 3 spiral nails or 8 x 1 1 2 screws Note If you are using a 6 square support you may find it difficult to screw it in place because it is fairly small inside Simpson Dura Vent has provided angle brackets with this support which can be screwed to the outside of the support box and nailed to surrounding framing as required Use a minimum of four 8 x 1 2 screws per bracket In some cases these brackets may need to be trimmed e g to fit under a flashing Place the Finish Collar around the support and fasten it to the ceiling using the screws provided 3 Use appropriate roof flashing Place the flashing under the upper shingles and on top of the lower shingles approximately half of the flashing should be under the shingles 4 Assemble the desired lengths of
76. s approved for use with natural gas Fuels H15 LP1 is approved for use with liq uefied petroleum gases propane Electrical 120V A C system Optional Circulation Fan Variable speed 125 75 Log Sets Ceramic fibre 4 per set Vent System Coaxial 6 5 8 outer 4 inner liner rigid flue and termination cap MOBILE MANUFACTURED HOMES AFTER FIRST SALE This Hampton product has been tested and listed by ITS Testing Services as a Direct Vent Room Heater to the following standards CGA 2 17 M91 and ANSI Z21 88B 2003 CSA 2 33B 2003 This Direct Vent System Appliance must be installed in accordance with the manufacturer s installation instructions and the Manufactured Home Construction and Safety Standard Title 24 CFR Part 3280 or the current Standard of Fire Safety Criteria for Manufactured Home In stallations Sites and Communities ANSI NFPA 501A and with CAN CSA Z240 MH Mobile Home Standard in Canada This appliance installation must comply with the manufacturer s installation instructions and local codes if any In the absence of local codes fol low the current National Fuel Gas Code ANSI 2223 1 and the current National Electrical Code ANSI NFPA 70 in the U S A and the current CAN CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22 1 in Canada This Hampton Mobile Manufactured Home Listed appliance comes factory equipped with a means to secure the unit This Ha
77. slightly and turn to ON position THERMOPILE al UU l Inet e after the pilot is lit Release knob SII v 2 Wait five 5 minutes to clear out any gas If you then smell gas STOP follow B in the safety information above on this label If you don t smell gas go to the next step 3 Turn knob on gas control counterclockwise to PILOT Gas Inlet 4 Push in control knob all the way and hold in Immediately push black button on spark igniter until pilot lights Continue to hold the QO control knob in for about 1 2 minute after the pilot is lit Release knob and it will pop back up Pilot should remain lit If it goes out repeat steps 3 and 4 If Knob does not pop up when released stop and immediately call your service technician or gas supplier If the pilot will not stay lit after several tries turn the gas control knob to OFF and call your service technician or gas supplier 5 Turn gas control knob counterclockwise to ON 6 Use rocker switch to operate main burner TO TURN OFF GAS APPLIANCE 1 Turn off the flame switch 2 Push in the gas control knob slightly and turn clockwise TN to OFF Do not force 3 Turn off all electric power to the appliance if service is to be performed You may shut off the pilot during prolonged non use periods to conserve fuel 38 Hampton H15 1 Direct Vent Freestanding Gas Stove
78. systems the following requirements shall be satisfied by the manufacturer 1 The referenced special venting system instructions shall be included with the appliance or equipment installation instructions and 2 The special venting systems shall be Product Approved by the Board and the instructions for that system shall include a parts list and detailed installation instructions e A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment all venting instructions all parts lists for venting instructions and or all venting design instructions shall remain with the appliance or equipment at the completion of the installation Hampton H15 1 Direct Vent Freestanding Gas Stove 5 INSTALLATION IMPORTANT MESSAGE SAVE THESE INSTRUCTIONS The Direct Vent Freestanding Gas Stove must be installed in accordance with these instruc tions Carefully read all the instructions in this manual first Consult the building authority having jurisdiction to determine the need for a permit prior to starting the installation Failure to follow the instructions could cause a malfunction of the heater which could result in death serious bodily injury and or prop erty damage Failure to follow these instructions may also void your fire insurance and or warranty Note Note These instructions take precedence over Simpson Dura Vent instruc tions SPECIFICATIONS H15 NG1 i
79. t pipe and the vent ee B cap by attaching the two sheet metal strips HeatShield extending from the Riser Vent Backing Plate VE RTICAL square outside into the outer wall of the vent pipe Use not required for two aluminum screws provided to connect TE RMINATIONS non combustible walls the strips to the pipe section Bend any Diagram 4 remaining portion of the sheet metal strip 1 Maintain the 1 1 4 clearances air spaces n ke v n i e Ek yr a eb to combustibles when passing through ceil i p ings walls roofs enclosures attic rafter 7 Install the Backing Plate into the wall penetra tive wall thimble cover See diagram 5 or other nearby combustible surfaces Do a Pas shield and attach using 4 screws not pack air spaces with insulation Check la the Venting Arrangement section for the Wall NASER i l l l l n maximum vertical rise of the venting system 8 d all pipe sections to unit and install b E and the maximum horizontal offset limita into wall mm j SA tions fold strap a Measure pipe length required and cut to here 2 Set the gas appliance in its desired loca length Hint use the cut end of the 6 5 8 E tion Drop a plumb bob down from the dia outer pipe at the vent terminal end Sheet Metal ceiling to the position of the appliance flue Screw ea exit and mark the location where the vent b eer E bn ei i will penetrate the ceiling Drill a small hole at his point Next drop a plumb bob
80. t the flow of combustion and ventilation air is not obstructed During the annual service call the burner should be removed from the burner tray and cleaned Replace the embers but do not block the pilot 7 Keep the area near the appliance clear and free from combustible materials gasoline and other flammable vapours and liquids WARNING CHILDRENANDADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATURE AND SHOULD STAY AWAY TOAVOID BURNS OR CLOTHING IGNITION YOUNG CHILDREN SHOULD BE CARE FULLY SUPERVISED WHEN THEY ARE IN THE SAME ROOM AS THE APPLIANCE DO NOT USE THIS APPLIANCE IF ANY PART HAS BEEN UNDER WATER IMMEDIATELY CALL A QUALIFIED SERVICE TECHNI CIAN TO INSPECT THE APPLI ANCE AND TO REPLACE ANY PART OF CONTROL SYSTEM ANDANY GAS CONTROL WHICH HAS BEEN UNDER WATER CAUTION ANY SAFETY SCREEN OR GUARD REMOVED FOR SERVICING AN APPLIANCE MUST BE REPLACED PRIOR TO OPERATING THE APPLIANCE CLOTHING OR OTHER FLAM MABLE MATERIAL SHOULD NOT BE PLACED ON OR NEAR THE APPLIANCE 8 Each time the appliance is lit it may cause condensation and fog the glass This condensation and fog is normal and will disappear in a few minutes as the glass heats up Never operate the appliance without the glass properly secured in place 9 Periodically check the pilot flames Correct flame pattern has three strong blue flames 1 flowing around the thermopile and 1 around the thermocouple and 1 flowin
81. t your dealer Note These are the minimum pieces re quired Other parts may be required for your particular installation See above for a list of vent parts If installing termination on a siding covered wall a vinyl siding standoff or furring strips can be used in order to ensure that the termination is not recessed into siding The vinyl siding standoff is required for walls with vinyl siding Minimum components for a Dura Vent Hori zontal Installation A Dura Vent Horizontal Termination Kit B Wall Thimble required for combustible walls Minimum components for a Dura Vent Verti cal Termination D Dura Vent Vertical Termination Kit See above for pipe lengths HORIZONTAL TERMINATIONS 1 Setthe unit in its desired location Check to determine if wall studs are in the way when the venting system is attached If this is the case you may want to adjust the location of the unit 2 Assemble the desired combination of pipe and elbow to the appliance adapter with pipe seams oriented down Offset the pipe seams as double seams in one place will cause the outer pipe to take an oval shape Kit comes complete with 18 of straight vent 6 5 8 dia black outer pipe and 4 dia inner vent 3 With the pipe attached to the stove slide the stove into its correct location and mark the wall fora 9 1 2 inside dimensions round hole The center of the round hole should line up with the centerline of the horizontal pipe
82. tal pipe length is 30 feet with minimum of 6 feet total vertical and maximum 8 feet total horizontal Please note minimum 1 foot between 90 elbows is required Lengths do not include elbow indicated Vent restrictor position A fully open refer to the Vent Restrictor Postion section Horizontal Venting with Two 2 90 Elbows One 90 elbow Two 45 elbows With these options max 1 Min 3 Max total pipe length is 30 feet 2 Min 5 Max with min of 8 feet total rm vertical and max 8 feet 4 Min 6 Max total horizontal 6 Min 7 Max Please note min 1 foot 8 Min 8 Max between 90 elbows is required Lengths do not include elbow indicated Vent restrictor position A fully open refer to the Vent Restrictor Postion section Hampton H15 1 Direct Vent Freestanding Gas Stove 15 INSTALLATION Vertical Venting with Two 2 90 Elbows One 90 elbow Two 45 elbows Option V H V1 With these options max total A 4 Maxi 2 Min 5 Maxi 3 Min 6 Maxi 4 Min T Maxi o Min 8 Max Lengths do not include elbow indicated 6 Min pipe length is 30 feet with min of 6feettotal vertical and max 8 feet total horizontal Please note min 1 foot between 90 elbows is re quired Vent restrictor position A fully open refer to the Vent Restrictor Postion section
83. ting plate To thermopile A E S OG 5 appo e eg Z M Ne To wall switch 4 IES C ns LN remote control lt dc or thermostat lt V H Lm Min 1 Choose a convenient location on the wall to install the receiver and the receptacle box protection from extreme heat is very important Run wires from the fireplace to that location use Thermostat Wire Table 2 Connect the wires as per the wiring diagram below CAUTION Do not connect the millivolt remote control wires to the 120V wires 3 Install 3AAAalkaline batteries in transmitter and 4 AA alkaline batteries in the receiver Install the receiver and its cover in the wall Switch the remote receiver to remote mode The remote control is now ready for operation FINAL CHECK Before leaving this unit with the customer the installer must ensure that the appliance is firing correctly This includes 1 Clocking the appliance to ensure the cor rect firing rate rate noted on label at 15 minutes 2 Ifrequired adjusting the primary airto ensure that the flame does not carbon First allow the unit to burn for 15 min to stabilize 3 Check for proper draft CAUTION Any alteration to the product that causes sooting or carboning that results in damage to the exterior facia is notthe responsibility of the manufacturer 34 Hampton H15 1 Direct Vent Freestanding
84. tions The appliance and vent should be enclosed when installed in or passing through a living area where children may come in contact with it 5 This appliance must be connected to the specified vent and termination cap to the outside of the building envelope Never vent to another room or inside a building Make sure that the vent is fitted as per the instructions starting in the Exterior Vent Terminal Locations section 6 Inspect the venting system annually for blockage and any signs of deterioration 7 Venting terminals shall not be recessed into a wall or siding 8 Anysafety glass removed for servicing must be replaced prior to operating the appli ance 9 To prevent injury do not allow anyone who is unfamiliar with the operation to use the fireplace Emissions from burning wood or gas could contain chemicals known to the State of Cali fornia to cause cancer birth defects or other reproductive harm INSTALLATION CHECKLIST 1 Locate your gas appliance Refer to the following sections a Locating Your Gas Stove b Clearances to Combustibles c Venting Introduction to Exterior Vent Terminal Locations sections 2 Install Optional Fan Refer to the Optional Fan Installation section 3 Setventrestrictor Refertothe Vent Restric tor Position section 4 Install venting Check all venting require ments See Venting Introduction to Dura Vent Vertical Termination sections 5 Make
85. to the bottom of the flex pipe The Top Adaptor and the Retro Connector are attached to the existing chimney with sheet metal screws The appliance is then connected to the chimney with appropriate black direct vent pipe and an adjustable length section B Through the wall of an existing masonry chimney A typical conversion of an existing masonry chimney is shown in Diagram 6 A TopAdaptor 985K and Flashing are used at the top of the masonry chimney The 4 inch aluminum liner is connected to the adaptor and is passed down the chimney and out through the masonry wall and attached to the Retro Connector 909B The Retro Connector is attached to the masonry wall and then connected to the direct vent pipe leading to the appliance Prior to installation and connection of the vent system to a factory built or masonry chimney the chimney mustbe inspected and thoroughly cleaned by a qualified service person such as a certified chimney sweep or home inspection service The direct vent system must not be con nected to a damaged factory built or masonry chimney For factory built zero clearance and ma sonry chimneys cleanout doors and caps or plugs for cleanout tee fittings and ash dumps shall be secured in place and sealed before installing a Direct Vent system within the chimney If the appliance shuts off during operation contact a qualified service person to de termine if a negative pressure and or leaky chimney condition e
86. troller 7 8 Thermodisc Re attach control panel with 3 screws reversing step 3 Slide Thermodisc into the bracket on the left side of the rear firebox Thermodisc Bracket Hampton H15 1 Direct Vent Freestanding Gas Stove INSTALLATION 9 Remove 2 screws from unit 12 Slide fan into place and secure with the two 14 Connect fan ground wire to lug nut at base screws removed in step 9 of unit 10 Place grommet in rear plate through the bottom of the opening as shown below 13 Connectlong black amp redwirestothermodisc 15 Before re attaching the rear access panel and secure wires the valve wires and the fan wires need to be connected Re connect the red and grey valve wires removed in step 2 Rear Plate Grommet Connect the black and white fan wires as per the wiring diagram below 11 Place the blower close to the base of the unit and feed the wires through the grommet in the rear plate 16 Slide the Rear Access Panel back into posi Wires tion and secure with 2 screws PEREA EA A E EE EE EE A n nie ede ae a rete re re ae a et eene EEE Grounding Lug Detail 120V AC Ground wire from fan x Lockwasher 9 E 0 STFS Q e E 7 I nut nut Star washer I x CET o Star washer Ss Ground wire Rotary Speed Minimum Convection from power cord Control Air Temp Switch normally open WARNING Electrical
87. unit in its desired location Check to determine if wall studs will be in the way of the venting system adjust location until all clearances are met and there are no obstructions Note A1 1 2 38mm clearance around the outer pipe mustbe maintained except that only a 1 25mm clearance is needed at the termination end IMPORTANT Do not locate termination hood where excessive snow or ice buildup may occur Be sure to check vent termination area after snow falls and clearto prevent accidental blockage of venting system When using snow blowers make sure snow is not directed towards vent termination area for any other manufacturer s products b Install wall thimbles on both interior and exterior wall with 4 wood screws center 8 x 1 per thimble of hole Attach the 2 piece adjustable pipe sec tion to the vent terminal and slide into i position from the exterior The larger I Centerline Kho 4 4 dec diameter end of the adjustable pipe l goes to the vent terminal l l G gt Install the 90 elbow onto the adjust _ 6 able pipe to determine the vertical 5 centerline I I l amp E Note ifthe centerline cannot be met An E the adjustable sections will have to Zo be cut Q e EI Cut the 4 ft section of rigid pipe to iO 3 length Attach the 45 elbow to the rigid Z pipe and ensure that the pipe length when cut with the 45 elb
88. xists Do notoperate the appliance until the problem is corrected Approved for US Installations Only The use of an existing chimney as an air intake is not covered under the ANSI Z21 88b 1999 CSA 2 33b M99 test methods and the resulting ITS WHI product certification The code Authority Having Jurisdiction must be consulted prior to proceeding with this instal lation method Converting a Factory Built Metal Chimney 1 Remove the existing chimney cap 2 Measure the distance from the top end of the chimney to the bottom of the ceiling support box add 3 76mm to this measurement and cut a section of the 4 flex pipe to that length the flex should already be extended to its nominal length E Termination Cap Top Adaptor Part 0985K 0986K or 0987K Existing Metal Chimney 4 Aluminum System Flex Pipe JL Retro Connector Part 0909B Any Simpson i d Dura Vent black direct vent GS pipe plus an adjustable length to make a proper connection Diagram 1 3 Connect the end of the flex pipe section to the underside of the Top Adaptor using 3 sheet metal screws Diagram 2 sheet N metal 4 Aluminum screws to Flex Pipe secure joint 4 Passthe flex pipe down through the center ofthe chimney system and centerthe adap tor on the top of the chimney pipe Drill four 1 8 diameter holes through the adaptor and into the chimney
89. y to select the proper length of vent pipe ticular installation for your particular requirements Determine the minimum clearance to combustibles from the rear of the unit to the wall It is also important to note the wall thickness Before cutting the vent hole through the wall ensure that ALL vent and Horizontal Terminal termination clearances Refer to the Exterior iy Part 640 530 P Vent Terminal Locations section will be met S vinyl Siding Standoff Optional l Part 946 205 Ifthis is an outside corner the minimum distance NZJ EU 5 D i between the vent and the outside corner is 6 is Sf WE combustible walls r i Part 946 219 P __ Part 640 545 P 8 15cm See F on the diagram in the Exterior Pet 9E AstroCap Termination Cap SQ if Part 946 523 P Pipe Length max 18 l m i Vent Terminal Locations section ee Dia d Dis NI Vinyl Siding Standoff Optional Baier Part 946 206 QN W l Wel e DAN A DPA a OY 4i I yi D Wall Thimble EE required for combustible walls Pipe Length max 12 Kit 1380 946 Min 2 51mm Minimum components for a Horizontal Installation If outside comer see note above 640 944 Horizontal Termination Kit which includes 1 6 5 8 Dia x 18 Black Pipe 1 4 Dia x 18 Aluminum Vent 1 946 202 Wall Penetration Heat Shield Wall Thimble 2 pcs 1 640 530 P Riser Vent Terminal BEN

Download Pdf Manuals

image

Related Search

Related Contents

NP3250/NP2250/ NP1250/NP3250W  48" - 60" Heavy Duty Split Frame Manual  Philips USB Flash Drive FM02FD60B    Aquatic HEART AI6648H User's Manual  8051 CROSS ASSEMBLER USER`S MANUAL MetaLink  de la COCOBEN - Communauté de communes de Benfeld et environs  Oasis Clean 61 S.indd    

Copyright © All rights reserved.
Failed to retrieve file