Home
        Greenheck Fan 474118 Fan User Manual
         Contents
1.                    2  Unit Identification         0 00 3  Installation   Plenum Cabinet           0 000 cece eee eee eee 4   Unit Weights       0 0    cece ee eee 4  Plenum Service Clearances and Access          5  Assembly and Installation   Roof Curb and Plenum Cabinet              5 6  Duct Connections   Plenum Inlet    2 2 0 0    cece ee eee 7   Duct Connections         cece eee eee eee 7  Drain Traps    sssaaa uoaa au eee aa a a at a a 8  Coils   Water Coil          2    cee es 8 9   Coil Checklist            000 c cece eee ees 9  Filter Replacement            0000 eee eee eens 9  Coating Touch Up Procedure               55 10  Optional Accessories   Dirty Filter Sensor  Magnehelic Gauge          10   Vapor Tight LightS        0 0 0 cece eee eee 10  Routine Maintenance   COIS  6 S e eden ted ncarees euctive ate A 11   Fitesa etai nre a pia a Bena eaei Eana 11   Drain Pal ss  i505 samaga oa Aa E cre ai y E 11  Service   Coil Replacement               202002eeeee 12  Reference   Maintenance Log        2 0 e eee e eee eee 12   Wanay sanie saara Paces R Ss ae ei 12  A    Unit Identification    System Identification Tags    The tag shown is an example of an identification  label on the fan  The information provides general  details about the fan  as well as containing specific  information unique to the unit  When contacting  your Greenheck representative with future needs or  questions  please have the information on this label  available  Tags  are mounted in  an area which
2.        Determine the placement of the plenum sections  relative to each other  Please refer to the submittal  drawing for the orientation of any bypass air plenum   BAP  dampers or air inlet locations     2  Cut roof opening and locate curb  Layout the unit roof openings such that exhaust  inlet of the unit will line up with the corresponding  ductwork  refer to Recommended Roof Openings  on page 7   Do not make opening larger than  necessary  Be sure to allow for the recommended  service clearances    3  Install roof curbs  Locate curb over roof opening  Check that the  diagonal dimensions are within  1 8 inch of each  other and adjust as necessary  Shim as required  to level  Secure curb to roof deck  Attach  supplied gasketing to top of curb    4  Set the ERS plenum cabinet  Lift ERS plenum cabinet to a point directly above  the curb and duct openings  While lowering   guide cabinet to align with duct opening  Roof  curbs fit inside the unit base  Set ERS plenum  cabinet into place on assembled VK ERS roof  curb  Allow gasketing on curb to compress before  setting the fan bypass air plenum  Make sure the  unit is properly seated on the curb and is level        C                      Pre installed    gt  a gasket material  ERS   gt   Plenum      Cabinet                                                         o    Roof   Curb    ERS Plenum Cabinet  Installed on Roof Curb                      Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust   5     Set the Vektor fan b
3.   P  GREENHECK    Building Value in Air     Part Number 474118    Energy Recovery Laboratory Exhaust    Installation  Operation and Maintenance Manual    Please read and save these instructions  Read carefully before attempting to assemble  install  operate or maintain the  product described  Protect yourself and others by observing all safety information  Failure to comply with instructions  could result in personal injury and or property damage  Retain instructions for future reference        Vektor ERS MD    Greenheck model VKERS is a pre engineered energy  recovery system designed to connect directly to a  Vektor MD high plume dilution blower with bypass air  plenum  This installation manual covers procedures  for receiving  installing and maintaining the energy  recovery coil section     For additional instruction and maintenance  information on the Vektor MD high plume dilution  blowers  visit www greenheck com and download the  VK MD instruction manual  part number 464652     General Safety Information    Only qualified personnel should install this fan system   Personnel should have a clear understanding of these  instructions and should be aware of general safety  precautions  Improper installation can result in electric  shock  possible injury due to coming in contact with  moving parts  as well as other potential hazards   Other considerations may be required if high winds   or seismic activity are present  If more information   is needed  contact a licensed profes
4.  and workmanship for a period of one year from  the shipment date  Any units or parts which prove defective during the warranty period will be replaced at our option  when returned to our factory  transportation prepaid  Motors are warranted by the motor manufacturer for a period of  one year  Should motors furnished by Greenheck prove defective during this period  they should be returned to the  nearest authorized motor service station  Greenheck will not be responsible for any removal or installation costs     As a result of our commitment to continuous improvement  Greenheck reserves the right to change specifications  without notice     Greenheck Catalog Vektor ERS MD provides additional  information describing the equipment  fan performance   available accessories  and specification data       AIGREENHECK    Building Value in Air        AMCA Publication 410 96  Safety Practices for Users and  Installers of Industrial and Commercial Fans  provides  additional safety information  This publication can be  obtained from AMCA International  Inc  at  www amca org     Phone   715  359 6171    Fax   715  355 2399 e E mail  gfcinfo greenheck com    Website  www greenheck com    12  474118    Model VKERS MD IOM  Rev  1  April 2011    Copyright 2011    Greenheck Fan Corp     
5.  by referencing the bill   of lading to ensure all items were received  Inspect  each crate for shipping damage before accepting  delivery  Notify the carrier if any damage is noticed   The carrier will make notification on the delivery  receipt acknowledging any damage to the product   All damage should be noted on all the copies of the  bill of lading which is countersigned by the delivering  carrier  A Carrier Inspection Report should be filled out  by the carrier upon arrival and the Traffic Department   If damaged upon arrival  file claim with carrier  Any  physical damage to the unit after acceptance is not  the responsibility of Greenheck Fan Corporation   Unpacking   Verify that all required parts and the correct quantity  of each item have been received  including accessory  kit containing flex connector  gasketing  etc  If any  items are missing  report shortages to your local  representative to arrange for obtaining missing   parts  Sometimes it is not possible that all items   for the unit be shipped together due to availability   of transportation and truck space  Confirmation of  shipment s  must be limited to only items on the bill of  lading     Handling    Fans are to be rigged and moved by the lifting  brackets provided or by the skid when a forklift is  used  Location of brackets varies by model and  size  Handle each piece in such a manner as to keep  from scratching or chipping the coating  Damaged  finish may reduce ability of fan to resist corrosion   S
6.  is  clearly visible   usually on the  side of the fan  cabinet        GREENHECK    718 359 6171                                           ERS and Vektor fan systems may arrive in component  pieces due to shipping restrictions  Individual  components of a system have matching identification  tags which should be used to identify and assemble  the complete system  Assembling systems with  different identification tags can cause reductions in  the fan s  performance     General Information    To ensure a successful installation  the instructions in  this manual should be read and adhered to  Failure to  comply with proper installation procedures may void  the warranty     Pre Installation Checks    Prior to fully assembling and installing the ERS plenum  cabinet and Vektor fan bypass plenum components   inspect plenums  coils  and fan assembly to make  sure they are in working order     Storage    When an ERS plenum cabinet is not going to be   in service for an extended period of time  certain  procedures should be followed to keep the plenum  and coils in proper operating condition  Cover unit  with tarp to protect from dirt and moisture     NOTE       Do not use a black tarp as this will promote  condensation                                      Ens                Plenum  3 P ae I at  Cabinet             Fan Bypass  Air Plenum   BAP                                                        Fan System Components    Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust Ej    In
7. Industrial Gray  041  enamel with  Material Data Safety Sheet    4 disposable foam brushes   1 sheet of sandpaper   2 technical data sheets for the two pints  1 repair procedure             1  Scuff affected area to be repaired using medium  sandpaper  provided  or medium Scotch Brite     pad  Feather the edges     2  Clean affected area to be touched up using an  alkaline based cleaner and rinse     3  Apply Kem Kromik primer using 1 inch foam  brush  provided   Follow technical data sheet  instructions     4  Allow primer to dry a minimum of 2 1 2 hours  before top coating     5  Topcoat with Industrial enamel using 1 inch foam  brush  provided   Follow technical data sheets  instructions  Allow painted units to air dry and  cure before putting into service  See Technical  Data sheets for detailed drying and cure  schedules at different temperatures     To order coating repair kits  please reference  Greenheck   s part number HAZ2037 HI PRO GRAY  FIELD DAMAGE REPAIR KIT  Please contact factory  with your fan   s serial number for colors other than our  standard Industrial Gray  041      10  Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust    Optional Accessories    Dirty Filter Sensor  Magnehelic Gauge     Dirty filter sensor monitors pressure drop across the  exhaust air filters  Visual gauge on the side of the  plenum cabinet indicates the pressure across the filter  section  Periodic inspection is necessary to determine  whether filters need to be replaced     Vap
8. and  serious injury may occur        Once the unit has been put into operation  a routine  maintenance program should be set up to preserve  reliability and performance  Items to be included in   this program are     e internal Filter  Check for cleanliness  Replace if required     e Door Seal   Check if intact and pliable   e Coil Maintenance   Check for cleanliness  coil and drain pan    e Winterizing Coils   Drain  Fill with antifreeze  Drain     Coil Maintenance     Cleaning    Coils should be kept clean to maintain maximum  performance  For operation at its highest efficiency   the coil should be cleaned often during periods   of high cooling demand or when dirty conditions  prevail  Power should be disconnected and locked  out and motors should be covered to insure that no  moisture penetrates into the windings causing motor  failure if applicable  Remove large debris from the  coils and straighten fins before cleaning  Clean coils  with cold water and detergent or with one of the  commercially available chemical coil cleaners  Rinse  coils thoroughly after cleaning  For coils with fragile  fins or high fin density  foaming chemical sprays and  washes air available  Many coil cleaners contain  harsh chemicals  so they must be used with caution  by qualified personnel only  Care must be taken not  to damage the coils  FINS ARE SHARP  Use caution  when working with coils     CAUTION    Do not use acidic chemical coil cleaners  Do not use  alkaline chemical coil cleaners t
9. ducts  Duct connections to collar type  openings can be made with S cleats or overlapping  joints  Apply caulking around the duct connection   Failure to ensure a tight fit and properly seal duct  connections can cause air leakage and system  performance problems from the contaminated  airstream     Bottom Inlet    Energy Recovery Cabinet          oe    Contractor        Installed        Ductwork    me    Roof Deck          Curb                            Energy Recovery Cabinet    a on    Contr actor  Installed  Ductwork                                 Curb                Roof Deck    Plenum Side Inlet    Gasket or Sealant     by others   Contractor  Installed  Ductwork   Screws   by others     Gasket or Sealant   by others        Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust    Drain Trap    Coils are provided with a stainless steel drain pan  with 1 1 4 inch male NPT drain connection  A drain  trap must be connected to the drain connection to  allow excess water to flow out of the drain pan  More  importantly though  due to the negative internal static  pressure of the coil compartment  installing the drain  trap prevents outdoor air from being pulled into the  drain pan and consequently forcing water out of the  pan and into the unit     To ensure the drain trap works properly  the trap  height must account for the difference in static  pressure between ambient conditions outside the  unit and the internal negative pressure of the coil  compartment     Refer to 
10. ee coating repair section of this manual for details  involving touch up of damaged surfaces     Fans should never be lifted by the shaft  fan housing   motor  belt guard  weatherhood  windband or other  accessories     Storage    Fans are protected against damage during shipment  If  the unit cannot be installed and operated immediately   precautions need to be taken to prevent deterioration  of the unit during storage  The user assumes  responsibility of the fan and accessories while in  storage  The manufacturer will not be responsible   for damage during storage  These suggestions are  provided solely as a convenience to the user     INDOOR    The ideal environment for the storage of fans and  accessories is indoors  above grade  in a low humidity  atmosphere which is sealed to prevent the entry of  blowing dust  rain  or snow  Temperatures should   be evenly maintained between 30  F   7  C  and   110  F  43  C   wide temperature swings may cause  condensation and    sweating    of metal parts   All  accessories must be stored indoors in a clean  dry  atmosphere     2   Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust    Remove any accumulations of dirt  water  ice or snow  and wipe dry before moving to indoor storage  To  avoid    sweating    of metal parts allow cold parts to  reach room temperature  To dry parts and packages  use a portable electric heater to get rid of any  moisture build up  Leave coverings loose to permit air  circulation and to allow for per
11. fety glasses  steel toe boots and gloves are  recommended during the installation and maintenance  of the coil    All field piping must be self supporting  System piping  should be flexible enough to allow for the thermal  expansion and contraction of the coil     Water Coil Installation Recommendations    1  Piping should be in accordance with accepted  industry standards  Always use a back up wrench  on the coil connections when attaching the piping  to the coil if pipe thread connections are utilized      Connect the water supply to the bottom  connection on the air leaving side and the water  return to the top connection on the air entering  side      The air vent at the uppermost point should be  temporarily opened during system start up to  release all of the air from the coil  To maintain  heat transfer capacity  periodically vent any air in  the coil      Water coils are not normally recommended for  use with entering air temperatures below 40  F   Glycol solutions or brines are the only freeze safe  media for operation of water coils for low entering  air conditions      Two position control valves  modulating valves   three way valves or a combination of these  controls can accomplish control of water coils   Follow the recommendations of the control  manufacturer regarding types  sizing and  locations  Face and bypass dampers may also  be used  but do not close off tightly  Air leakage  in cooling applications has no appreciable  affect  In heating applications  ho
12. hat  after mixing   have a ph value greater than 8 5 without also using    an aluminum corrosion inhibitor in the cleaning  solution  Failure to follow these guidelines or the  manufacturer   s instructions for use of cleaning  chemicals could result in damage to the unit        Fin Straightening    Coil fins may have been bent during shipping or  servicing  and should be straightened to maintain  maximum heat transfer  Reduction of the effective   coil surface will correspondingly reduce coil capacity   Always check fin appearance after any handling of the  coil and after any servicing is done near the coils  Fin  combs are sized according to number of fins per inch  of the coil  For relatively small bends that require only  minor repair  other tools may be used to evenly space  the fins  Be careful not to damage the coils     Winterizing Coils  During any extended down time  all water should  be drained from the coil  The coil should then be    thoroughly flushed with a glycol solution to prevent  freeze damage     Filters    Filters upstream of the coil should be checked  regularly for dirtiness and clogging  If the filters are  dirty  they should be replaced  It is important that the  coils stay clean to maintain maximum heat transfer  capability     Drain Pan    Drain pans may contain moisture  therefore  algae and  other organisms will grow due to airborne spores and  bacteria  Scheduled cleaning is necessary to prevent  build up from clogging the drain  Drain pans shou
13. iodic inspection     The unit should be stored at least 3  in   89 mm  off  the floor on wooden blocks covered with moisture  proof paper or polyethylene sheathing  Aisles between  parts and along all walls should be provided to permit  air circulation and space for inspection     OUTDOOR    Fans designed for outdoor applications may be stored  outdoors  if absolutely necessary  Roads or aisles for  portable cranes and hauling equipment are needed     The fan should be placed on a level surface to prevent  water from leaking into the fan  The fan should be  elevated on an adequate number of wooden blocks so  that it is above water and snow levels and has enough  blocking to prevent it from settling into soft ground   Locate parts far enough apart to permit air circulation   sunlight  and space for periodic inspection  To  minimize water accumulation  place all fan parts on  blocking supports so that rain water will run off     Do not cover parts with plastic film or tarps as these  cause condensation of moisture from the air passing  through heating and cooling cycles     Fan wheels should be blocked to prevent spinning  caused by strong winds     Inspection and Maintenance during  Storage    While in storage  inspect fans once per month  Keep a  record of inspection and maintenance performed  see  page 12     If moisture or dirt accumulations are found on parts   the source should be located and eliminated  At each  inspection  rotate the wheel by hand ten to fifteen  revolu
14. ld  also be kept clean to prevent growth of bacteria and  the spread of disease     WARNING  Biological Hazard  All drain pans and coils should    be cleaned on a regular schedule by qualified  personnel to prevent the growth of bacteria        Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust 11     Service    Coil Change Out Procedure    Coils can only be pulled out through the side of the  plenum cabinet  Side panels which are nearest to the  coil can be removed if the coil needs to be replaced   Size 020 ERS plenums only have a single coil and do  not require coil removal clearances on both sides  If  necessary  both coils can be removed through the  same side of the plenum housing  This process would  require the removal of an additional spacer panel that  separates the two coils within the unit                                Cabinet Minimum Clearance  Size  inches   020 114  030 74  each side   040 100  each side   060 132  each side           a I 1  Service Doors i       gt  i RRO ENEA E EEE     NSE A      Nee ee  ra   x z      Coil Service Ho 7 T ato Coil Service  Clearance ss Coil bd Coil oA Clearance                                                                                             Warranty    Maintenance Log                                                             Date Time AM PM  Notes   Date Time AM PM  Notes   Date Time AM PM  Notes   Date Time AM PM  Notes                    Greenheck warrants this equipment to be free from defects in material
15. local codes to determine drainage  requirements  If draining onto roof  place a drip pan  below drain to protect roof  If draining onto roof is  not acceptable  a drain line must be attached to the  trap  The drain line must be pitched away from the  unit at least 1 8 in  per foot  On longer runs  an air  break should be used to ensure proper drainage   Local codes may require drainage into a waste water  system     Drainage problems not only occur from improper drain  trap design  but also from lack of maintenance of   the cooling coil compartment  Algae can form in the  drain pan and trap  and cause reduced  water flow  which can  result in backup into  the system  Regular  maintenance will  prevent this from  occurring  If the  drains have a clean   out opening  be sure  to close the opening  after cleaning     1  inch minimum    TSP   Total Static Pressure  H   TSP   1  inch minimum       NOTE       A conservative method of trap design is to add  1 1 4 inches minimum to total static pressure     Em Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust    Coils    Installation of Water Coil Piping    Guidelines for the installation of the coil have been  provided to ensure proper performance of the coils  and their longevity  These are general guidelines   that may have to be tailored to meet the specific  requirements of any one job  As always  a qualified  party or individual should perform the installation and  maintenance of the coil  Protective equipment such  as sa
16. or Tight Lights    Vapor tight lights provide light to each of the  compartments in the energy recovery plenum  The  lights are wired to a junction box mounted on the  outside of the unit  The switch requires a separate  power source to allow for power to the lights when the  unit main disconnect is off for servicing     Electrical Package    The electrical package consists of a switch and GFCI  receptor mounted in a two gang     in use    NEMA    3R rated box with cover plate  This box would be  mounted at the factory near the ERS plenum access  doors     The GFCI is rated for 15A  125VAC and is provided  with SafeLock    Protection  This feature denies  power if the GFCI is incorrectly wired or if the GFCI  is damaged and protection is lost  The GFCI is also  equipped with a trip indicator light to easily identify  tripped condition  Receptor uses a NEMA 5 15 R  configuration     Supplied switch is industrial extra heavy duty grade  with back and side wiring  The switch has a rating of  20A  120 277VAC and single pole  The switch comes  from the factory pre wired to lights within ERS plenum  section     Electrical wiring for power to the electrical panel is to  be installed by a licensed electrician in compliance  with all local and national codes     Routine Maintenance    CAUTION    Use caution when removing access panels or other  unit components  especially while standing on a    ladder or other potentially unsteady base  Access  panels and unit components can be heavy 
17. s Plenum  Assembly Installed on Roof Curb    6   Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust    Inside the ERS plenum are slots along the  marrying sections          which accept the                  bolt and washer RA          assemblies  Using be Slots  gt H   Q  the hardware kit  a le ean  attach the unit bie  gt     d  sections by bolting    together frame pie  gt     d  trusion from th F  oe one s Slot Detail                                              Tighten the bolt washer assemblies to the top  and both sides of the joining sections  Start on  the lower sides and work towards the top  As  the bolts are tightened  the plenum sections  will draw together  Use anti seize gel to prevent  galling   welding of all stainless steel fasteners   If necessary  pull the units together with a  mechanical come along device at the structural  base of the unit or at lifting lugs     External brackets  one for each side  transition  and connect lower section of the bypass air  plenum to the ERS cabinet  These brackets ship  with the BAP and also complete the connection  between the BAP and roof curb          Attach to fan bypass air  plenum section    Attach to ERS plenum  Pa  section A    Skirt Bracket    After the ERS plenum and Vektor fan BAP are  joined and secured  the Vektor fans can be set  on the BAP  Refer to Vektor Fan installation  instruction  part number 464652  on this  procedure     Installation   Installations with inlet configurations that deviate from  
18. sional engineer  before moving forward     DANGER    Always disconnect power before working on or near  a fan  Lock and tag the disconnect switch or breaker  to prevent accidental power up     CAUTION    When servicing the fan  motor may be hot enough  to cause pain or injury  Allow motor to cool before  servicing     CAUTION    Precaution should be taken in explosive  atmospheres     1  Vektor ERS Energy Recovery Plenum Laboratory Exhaust             A    by GREENHECK      Follow all local electrical and safety codes  as well    as the National Electrical Code  NEC   the National  Fire Protection Agency  NFPA   where applicable   Follow the Canadian Electric Code  CEC  in  Canada       The rotation of the wheel is critical  It must be free    to rotate without striking or rubbing any stationary  objects       Motor must be securely and adequately grounded     Do not spin fan wheel faster than maximum    cataloged fan rpm  Adjustments to fan speed  significantly effects motor load  If the fan RPM is  changed  the motor current should be checked to  make sure it is not exceeding the motor nameplate  amps       Do not allow the power cable to kink or come in    contact with oil  grease  hot surfaces or chemicals   Replace cord immediately if damaged       Verify that the power source is compatible with the    equipment       Never open access doors to a duct while the fan is    running     Receiving    Upon receiving the product  check to make sure   all items are accounted for
19. stallation    ERS plenum cabinets and fan bypass air plenums  are to be rigged and moved by the lifting brackets  provided  Handle       in such a manner  as to keep from    scratching or  chipping the              coating  Damaged Fan Bypass  finish may reduce Air Plenum  Lift Points    ability of cabinet  to resist corrosion  va MS                            manual for details  involving touch   up of damaged  surfaces     See coating repair Va  Top view of    section of this  Bypass Air Plenum    ERS Plenum Housing    Lifting Bracket   removable after  installation     Roof Curb                                                                                                                                              CAUTION  When installing an ERS plenum cabinet  ensure    the proper protective devices are used to protect  personnel from moving parts and other hazards        4   Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust       Check local codes to ensure compliance for all  protective devices     ERS plenum cabinet with coil section should be lifted   hoisted by lifting brackets provided  These brackets  are located around the lower perimeter of the plenum  cabinet     1     2     Before lifting  be sure that all shipping material  has been removed from unit    To assist in determining rigging requirements   weights are shown below       Unit must be lifted by the lifting brackets    provided on base structure       Rigger to use suitable mating hardware to a
20. this panel to run plumbing or punch  appropriately sized holes in the panel to allow  piping to pass without rubbing and space for  piping insulation  sealant and grommets  by  others      Vent and drain connections are provided on  Greenheck water coils unless otherwise specified   This allows the coils to be drained  Keep in mind  that when draining the coils  all water may not drain    from the coil  In order to completely drain the coil   to prevent the possibility of freezing during cold  ambient temperatures  air or nitrogen pressure must  be utilized to blow any remaining water from the  coil        Coil Installation Checklist  Use the following checklist to verify that all necessary  installation procedures have been completed    1  Coils are installed with airflow in same direction  as indicated on the coil nameplate or casing    2  Condensate drain pans and piping is installed  with a trap in the condensate line and piping is  insulated and heated if installed in applications  that are below freezing     3  Clean filters are installed upstream     A Vektor ERS MD Energy Recovery Plenum Laboratory Exhaust EK     Vektor Field Coating Touch up Procedure  for Scratched Areas  Standard coating and color for the Vektor laboratory    exhaust system is Greenheck   s LabCoat      Industrial  Gray  041      The procedure below details the correct method for  repairing minor scratches in the coating        Repair Kit Contents       1 pint Kem Kromik primer with MSDS    1 pint 
21. this standard may result in reduced fan performance   Restricted or unstable flow at the fan inlet can cause  pre rotation of incoming air or uneven loading of the  fan wheel yielding large system losses and increased  sound levels     Vektor Riser Installation   Check curb or structural supports for levelness  Both  must be level to ensure proper drainage from plenum  and fan s      Duct Connections    Plenum Bottom Inlet Opening                                                                                                                                        Length  ini a ini     T    aad  Width  a x  O am  D om  Service  Door  Cabinet Length Width  Size  inches   inches   020 86 25  030 120 25  040 172 25  060 236 25                Plenum Side Inlet Duct Dimension       Peo r i                p  rae 9                                                                Height                                                                                  hoe i  ai  Cabinet Length Height  Size  inches   inches   020 86 30  030 120 30  040 172 30  060 236 30                                           Duct Connections    Installation of all ducts should be done in accordance  with SMACNA and AMCA guidelines     Connect primary exhaust air ducts to unit using  flanged connections  Screw ducts directly to unit  using stainless steel self tapping sheet metal screws   Contractor is responsible for providing transitions  to accommodate difference in sizing between unit  and building 
22. tions to distribute lubricant on motor and  bearings  If paint deterioration begins  consideration  should be given to touch up or repainting  Fans with  special coatings may require special techniques for  touch up or repair     Machined parts coated with rust preventive should  be restored to good condition promptly if signs of  rust occur  Immediately remove the original rust  preventive coating with petroleum solvent and clean  with lint free cloths  Polish any remaining rust from  surface with crocus cloth or fine emery paper and oil   Do not destroy the continuity of the surfaces  Wipe  clean thoroughly with Tectyl   506  Ashland Inc   or  the equivalent  For hard to reach internal surfaces or  for occasional use  consider using Tectyl   511M Rust  Preventive or WD 40e or the equivalent     Removing from Storage    As fans are removed from storage to be installed   in their final location  they should be protected and  maintained in a similar fashion  until the fan equipment  goes into operation     Prior to assembly and installation of the Vektor fan  and system components  inspect the fan assembly to  make sure it is in working order     1  Check all fasteners  set screws on the fan  wheel   bearings  drive  motor base and accessories for  tightness     2  Rotate the fan wheel s  by hand and assure  no parts are rubbing  Access to the wheel is  obtained through a bolted panel located on the  side of the fan housing     Table of Contents    Receiving  Handling  Storage
23. to page 12 for coil clearances     Side or Bottom Intake Opening    Lift  Bracket         Filters                                                        Optional 4 Service Doors  External   Piping   by others                    Internal Pipe  Chase       pos    Optional  Internal  Piping   by others     under  Vektor fans    i Weatherhood s     ees       Vektor bypass   air plenum  optional mounting  locations shown                      Assembly of Roof Curbs and ERS Plenum  Cabinet to the Bypass Air Plenum  BAP     Rooftop units require curbs to be mounted first  The  duct connections must be located so they will be clear  of structural members of the building     1  Assemble factory supplied roof curbs  Roof curbs are Model VK ERS  which are shipped  knocked down and require field assembly  by  others   Assembly instructions are included with  the roof curb     Gasketing material   supplied  to be  attached to top edge  of all curb sections           Curb section   for Vektor fan   bypass air  plenum    Anchor curb to roof deck structure in accordance  with project construction documents     Gasketing material  shipped with Vektor fan  should  be placed on the top edge of secured roof curb  prior to placing the ERS plenum cabinet and Vektor  bypass air plenum on the curb     If fan bypass air plenum  BAP  is in sections  these  should be assembled first  prior to connection to  ERS plenum cabinet  Refer to Vektor Fan IOM  part  number 464652  on how to assemble the fan BAP 
24. ttach    to unit lifting brackets       Two spreader bars must span the unit to prevent    damage to the cabinet by the lift cables       Always test lift the unit to check for proper    balance and rigging before hoisting to desired  location   Never lift units in windy conditions       Preparation of curb and roof openings should be    completed prior to lifting unit to the roof  Verify  the curb has the gasket seal on the top surface       Do not use fork lifts for handling unit     Unit Weights  ERS Plenum Section Only                                      Cabinet Cabinet Weight   Size Height  Ibs    075 3700      a 090 4500  075 4300   i 090 4900  075 5400   i 090 6100  075 6900   060 090 7800  110 8300                 Weights shown are for largest coil and filter  options per cabinet size  Based on dry  weight  Weights for custom designed units  may vary     Plenum Service Clearances and  Access Locations    ERS plenum cabinet and Vektor fan bypass air plenum   BAP  require minimum clearances for access on three  sides for routine maintenance  Filter replacement   drain pan inspection and cleaning  coil inspection   damper actuator adjustments and inspection  fan  bearing lubrication and belt adjustment  belt drive  units   are examples of routine maintenance that must  be performed  Coil and filter sections are always  provided with a service door or panel for proper  component access  Clearances for component  removal may be greater than the service clearances   Refer 
25. wever  the air  temperature may rise several degrees and should  be considered in system design  Low leakage  dampers may be required     Filter Replacement    Filters are located only in the coil plenum section   Access is needed from both sides of the plenum to  change all the filters  Unit may have either 2 inch  MERV 8 filters or 4 inch MERV 11 filters depending on  the application requirements  Use equivalent MERV    RETURN RETURN    Airflow       __  gt           Airflow    SUPPLY SUPPLY rating filters when replacing   External Pipe External Pipe Change the filters regularly  Pressure drop readings  Connection Connection can be used to determine when a filter should be  n m a n replaced  Prefilters should be replaced at filter          manufacturers recommended pressure drop change  out or as required by system design     All filter sections have access provided by a door   Filters used in Greenheck ERS plenums can be   LI changed in most cases by sliding them out and   replacing  In some cases  filters are secured to frames   using a clip                                                                 Internal Internal  Pipe Pipe  Chase Chase                                                       6  Pipe sizes for the system must be selected on the  basis of the head  pressure  available from the  circulating pump    7  Internal coil plumbing  Under each fan there is  a raised  insulated cover panel to be used when  internal pipe connections are desired  Either  remove 
26. ypass air plenum   Before moving the Vektor fan BAP into position   gasketing must be installed to seal the plenum  sections against leakage     Gasketing                                                                                           gasketing is Z ii       MZ  attached to the  ng Tep  ERS plenum cabinet  he Otay   prior to shipment  Verify Ying  sIk                                        that it is in place and not  damaged or missing prior to joining  the two plenums together        The assembly Assembly Hardware Kit       hardware  aramas 5 16   18 UNC x 2 1 2 lag bolts  steel bolts  required 5 16 inch flat washers   to join the sections iS   1 2 inch flat washers   located in the Vektor   3 4 inch flat washers   fan bypass air plenum   Quantities in hardware kit will vary          accessory kit  by unit size and configuration        Lift and set the Vektor fan BAP on the curb  against the ERS plenum  Follow rigging and   lifting instructions in the Vektor MD installation  instruction  part number 464652   Push fan bypass  air plenum tight against ERS plenum  making sure  to line up bolt holes  Be certain to compress foam  gasket to form an airtight seal           E     z z Push    l Plenum  oe       ERS   p a   e l o oe  Plenum     oo  Js   4                            Cabinet                                                                         Fan Bypass    i Air Plenum  S    BAP        T ITT Te J  n n  nn    Roof   Curb             ERS and Vektor Fan Bypas
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Canon Digital Rebel XT Instruction Manual for Macintosh    Acondicionadores ROOF TOP SERIE ACTIVA  TouchSystems M11790R-SME touch screen monitor  角度計 Revo  Manual del propietario YTGas® 2003  Philips EcoClassic Standard lamp Halogen Bulb 872790025281125  Outils pedagogiques  Samsung 650TS-2 manual do usuário  Sharp XLHF202PH    Copyright © All rights reserved. 
   Failed to retrieve file