Home
        Light Level Sensor – Ceiling Mounted
         Contents
1.     Startup charge time to  first transmission   Sustaining charge   Time to full charge   Operation time in total  darkness  Configuration Interface    RF Standard  Transmission Range  EnOcean Equipment  Profile   Dimensions    Weight  Mounting Position    Environment    Agency Compliance    Solar energy harvesting   0     1020 lux   4 lux      5    full scale  68  F   1 minute   After measurement if change  gt  50 lux  since last transmission   Heartbeat every 20     30 minutes   affected at random    5 minutes   200 lux for operation  from empty energy store   3 hours per day   200 lux   30 hours  200 lux   80 hours    after full charge    2 Buttons  2 LED for device  configuration  amp  manual control  EnOcean 902 MHz   80 ft   25 m    A5 06 02    6 30  L x 2 36  W x 1 15  D   160 mm x 60 mm x 37 mm   4 40z   125g   At the ceiling  close to the ambient  light source  window     Indoor use only    32   to 140   F  0   to 60   C     20  to 85  relative  humidity  non condensing   FCC  IC  ROHS      Natural bright light  2000 lux  can be temporarily used to significantly    shorten startup charge times     Specified lux values are for typical fluorescent lighting  Lux level    requirements for LED and other types may vary     For lux reference  OSHA standards require a minimum of 323 lux for    office areas     Page 1    Lips    enocean    1  Planning iii  Insert the first screw loosely and level the    Light Level Sensor   Ceiling Mounted    mounting plate   Take a moment t
2.    lt 50 lux  1 blinks  50 250 lux  2 blinks  251 500 lux  3 blinks  501 750 lux  4 blinks  751 1000 lux  5 blinks   gt 1000 lux    4  This test mode will be active for 3 minutes  It can be exit    at any time by pressing the Link button     4  Troubleshooting    Problem Solution Checklist    Sensor does not generate    Press Test button to transmit radio   a wireless message message     Verify the solar cell is charged  properly   m Check position using light test   E Force radio message by pressing Test  button    m Check for environment or range issues    Linked device does not  respond to wireless  messages      Verify the device is linked       Check the transceiver connection and  the wiring for errors   m Check if appropriate devices are  linked according to good system  planning    FCC  SZV STM300U  IC  5713A STM300U    C Contains       This device complies with part 15 of the FCC rules and Industry Canada ICES 003    Operation is subject to the following two conditions   1  This device may not cause harmful  interference  and  2  this device must accept any interference received  including interference  that may cause undesired operation    IMPORTANT  Any changes or modifications not expressly approved by the party responsible for    compliance could void the user s authority to operate this equipment     Page 3    
3. Light Level Sensor   Ceiling Mounted    Button interface    6 3   159 96mm       Solar Cell  Package Contents Tools Required        Power drill  3 16    bit        Screwdriver    E Light Level Sensor   E 2 screws  2 wall  anchors     E Wire bracket    E Light meter    Product Description    The ceiling mounted Light Level Sensor is wireless  powered  by natural light  and uses the solar cell to measure outside    illumination to control open loop dimming systems     Every minute the light level sensor measures the current    light level via the solar cell     If the change since last transmission is  gt 50 lux it will  immediately transmit an RF signal including the current  measurement value  Otherwise there will be a heartbeat    transmission after 20 30min     In addition the device provides a light test mode which can    be used to find a suitable position for installation     Product Features     m Interoperable  Communicates wirelessly with other devices using the  EnOcean wireless standard    E Harvests ambient solar energy to power the sensor and  wireless communication    m Measures light level via the solar cell  E Mounts easily on any ceiling material    m Enables daylight harvesting in individual fixtures or zones  controlled by LEDR and LEDD or other open loop  dimming systems       2015 EnOcean GmbH V1 0    Las    enocean    Specifications  typ  values     Power Supply  Measurement Range  Resolution   Typical Accuracy  Measurement interval  Transmission interval
4. ed location and switch light on and off  Only small flatten the wire bracket so it is  changes of the reported illumination should be seen  Snug against the mounting plate       Consider the construction materials  such as metal  in the vii  On the back of the ceiling tile  twist me  space and obstacles that may interfere with RF signals l cat  the wires together to hold the E      mounting plate securely   2  Installing    E E er OE TOO OTE EE OO O EE SES T vili  Replace the ceiling tile   The light level sensor can be mounted on most surfaces with       the provided screws  or mounted on dropped ceilings  using 4  Attach the sensor to the    the provided wire bracket  mounting plate   NOTE  It is often easier to link the sensor before it is With the 2 button interface  mounted  Refer to the    Linking    section  facing you  slide the sensor    to the left on the mounting                1  Decide where you want to install the light level sensor      l        plate until it snaps into  The solar cell must point towards the window in order to    ace   measure outside illumination P    5  Confirm the sensor is properly positioned to measure  2  Remove the mounting plate from the sensor  a a o  l  outside illumination and has sufficient light to operate     3  Determine which of the two installation methods is most    appropriate  o   3  Linking    A  Screw Mounting Plate to the Mounting Surface            Linking is the process by which different devices are  i  Hold the mount
5. ing plate in place and use a pencil to l l l l    configured to work with each other in a system  Sometimes  lightly mark two small l l l l    this process is also called Teach in or Learn in   dots for the screw drill  points  Specifically for the Light Level Sensor  linking is the process    i   by which it identifies itself to another device that is capable  il  Drill two holes with a    3 16  drill bit and insert    the wall anchors     of receiving processing its sensor data  e g  an LED    Controller  a Central Controller or a Gateway            2015 EnOcean GmbH V1 0 Page 2    Light Level Sensor   Ceiling Mounted    Note that the Light Level Sensor cannot be linked to devices  such as sensors or switches that cannot receive or process its    input data     Linking or unlinking the Light Level Sensor    To link the Light Level Sensor with a suitable device  this  device must be powered  within wireless range of the Light  Level Sensor and set to linking or unlinking mode to receive    specific link messages     Once these conditions are met  the Light Level Sensor is    triggered to send a link radio telegram     The other device receives this link radio telegram and  identifies the sensor ID and sensor type based on the    information presented therein     The other device then stores these parameters permanently  so that it can automatically accept and process future    telegrams originating from the Light Level Sensor     This relationship between the Light Level Sen
6. o plan for the sensor s successful operation    and optimal communication with other system components  iv  Insert thesecona screw ana then nand tignten    the first screw   Remove the sensor from its packaging and place it under a  bright light to provide the required startup charge  B  Mount Using the Wire Bracket  Choose a proper installation location taking the following I  Remove the ceiling tile where you want to  oe mount the sensor   points Into account     m The sensor should be located at the ceiling  close to a ii  Place the mounting plate squarely on the ceiling tile    window  or directly at the upper end of the interior and use the wire to mark two points for the holes     window sidewall i fice cae  iii  Punch two small holes through the ceiling tile at    m The chosen location should provide natural light only   the sensor solar cell should not measure artificial light    m The sensor should be mounted such that the solar cell iv  Insert the wire bracket through the  points towards the window so that it measures the two holes in the mounting plate   amount of incoming daylight light only     the marked points     Make sure the ends are roughly even   m Use light test mode to see if the sensor properly       measured daylight only  Light test mode blink rate v  Feed the wires through the  should not change if artificial lights are switched on and holes in the ceiling tile   off   E In addition  during dusk or dawn use a light meter at the a ee i EELO me  intend
7. sor and the  device it is linked to can be terminated by unlinking the    Light Level Sensor from the other device     Link   unlink procedure    1  Set the external device  e g  controller or gateway  to  Link or Unlink mode  refer to that device s installation    guide    2  Shortly click the Link button    on the side of the sensor    Link Test  Button    Button    once   This sends a link unlink radio    telegram        3  The external device will  receive this link unlink radio telegram and link or unlink    the Light Level Sensor accordingly     NOTE  The button interface on the sensor is used for linking    and testing only     Refer to the    Linking    section of the transceiver    controller installation guides to complete the linking  amp     setup process        2015 EnOcean GmbH V1 0    Lips    enocealr  Light Test    Before starting light test  ensure the sensor s energy storage  is fully charged by placing it under bright light  2000 lux  for  1 5 hours     Use the light test to measure real time light levels and  confirm whether the light level sensor has sufficient natural  light  is not influenced by artificial lighting and whether the  light level is within its measurement range     1  Hold up or temporary mount the sensor to the intended    mounting position     2  Press and hold the Test button for 5 seconds   e  gt  Red  amp  green LEDs will blink to confirm light test is    active     3  Watch the LED blink rate to determine the light strength   0 blink
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
ZEPHAIRE-200-E - Blodgett Oven  SRA 6.0 User's Guide  slc® eco d 98 - Sant Just Parquets  MODEL OM-9300  en savoir plus - Cheops Technology, spécialiste des Datacenters  StarTech.com 10m USB 2.0 Active Extension Cable - M/F  Kensington MicroSaver® Laptop Lock - Single Keyed  WORKSHOP ON C-DOT DSS PRODUCTS    Copyright © All rights reserved. 
   Failed to retrieve file