Home
Workplace Planner Help
Contents
1. Proplanner Workplace Planner xm Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Part Sequence cycle Al Cydes Value Added Content Charting LEAN Assessment 100 4 r 100 90 90 80 80 70 4 r 70 60 4 60 amp z 50 E 40 40 30 30 20 4 p 20 10 4 10 0 Lo Operator Bl Waking NonValue Process Bi Value Process Bl Non Value and Necessary B Internal Delay Help Goto AutoCAD The final and most comprehensive output is the report generated on the Reports tab These are generated by selecting get image to take a picture of the current screen setting a station takt time selecting which cycle or all to show results for and pushing the Generate Report button Selecting a sequence to report for is done in the pull down window The report generated should look similar to the one below KE WPP Routing Windows Internet Explorer ojee CG 5 cAUsers dave AppData Local Temp WPPReport XML S ER x Googie 2 ve de WPP Routing ov E od Page G Tools v proplanner STATION Tutorial TAKT TIME 20 00 SPEED CARRIER NaN PLANNED EFFECIENCY 700 00 ACTUAL TAKT TIME 20 00 MODEL M1 M2 OPERATOR ST DiL SYMBOL SEP _ LOCATION DESCRIPTION ELEMENTIACTIVITY FREQUENCY DISTANCE PROCESS WALK DELAY T
2. STEP 4 Create Routings Insert Create Routi Remove Add m Start secs Description Model Options Part Name 0 M1 with M1 X Update The Sequencing tab provides functions for importing a ProBalance study of tasks and generating a Workplace Planner process routing Once a line balancing xml file is saved from the Proplanner Line Balance tool it can be imported into the Workplace Planner on this tab This tab then selects the model and options to be simulated within a work station and creates a routing that can be analyzed edited or animated NOTE The information within the Sequencing tab is only used when performing Moving Part studies where the processing steps are imported from ProBalance Users who are performing Stationary studies need not enter any information into this tab Open Scenario Selects the Line Balancing xml file to open for simulation Save Scenario Saves the scenario and any changes made to LB routing data in the WPP This optionis available only when one model option mix has been selected Open Sequence Opens a pre made sequence file that contains numerous model option mixes in a given sequence This can be used to create the routings file once Line Balancing information has been loaded and a station selected Save Sequence When model option mixes are added and put into the desired sequence it can be saved to a file which can be loaded in the future
3. r EL Type Symbol Part Cycle Time To Loc orAt Loc Cycle Name Freq LEAN WGT SC 8 C v NN CAR 50 Assemble 2nd Part Ol al oj oj o Results Loc amp Path Selection Oper Dist Ft Time sec Walk VA NVBN NV ID XD Rast sequence cyde Entire drawing ALLCYCLES Y Window Area Percentages by All Lo Longest Each Operator Takt Time 0 i File Open New Clear Save As Goto AutoCAD Li Help Insert Row Remove Row Add Row IMU Update Row Calculate Stationary Part Moving Part J Flow on Part Calculate 22 Reference Section 5 1 7 Workplace Planner with Proplanner The Proplanner application can export the Elements of an Activity by using the Export option in the Activity Time Calculated tab These Elements will be exported to a CSV file of the format required by the WPP application Likewise you may import a WPP routing CSV file into the element list of a Proplanner activity In the 2 0 Version of Proplanner and above WPP CSV files can be exported from and also imported to Operations within Proplanner In this situation each routing line in the WPP application will correspond to an Activity time and thus only Walking time tasks will actually be imported back into Proplanner from the WPP application For more information on Using the Workplace Planner with Proplanner please consult the Proplanner User Manual 2013 Proplanner Routings Tab 23 5 2 Locations Tab
4. 2013 Proplanner 2 Reference Section 5 1 6 Moving Part Cycles The WPP application will allow you to define the entry of multiple sequential parts for moving part calculations moving part option only Up to 25 sequential parts can be specified within the standard WPP application A new part entry cycle is specified with the C element type and each cycle may be given a unique name and reference a unique part defined on the Parts tab to help identify the unique work content contained within that cycle If you do not define a cycle as the first element in your routing then the WPP application will assume a part cycle with no name that starts at time O The routing lines that follow the start of a part cycle are directed to that part for all locations on that part This referencing continues to either the start of the next part cycle or to the end of the routing file whichever comes first Obviously the routing lines elements for each part cycle can be different In this way you could model a part with no options in the first cycle followed by a part with many options in the second and third cycles and then back to a no option part in the fourth and final cycle Operators will begin work on a following cycle after they complete work from a previous cycle Thus an operator that is running over the cycle time on a prior part will begin work late on the next part after it may have entered quite a way into the operator s worksta
5. E al cJ i 2013 Proplanner amp Tutorial If your layout drawing looks like the top view of a 3D drawing solid filled boxes instead of wire frame outlines as shown above then you need to select the 2 D wire frame view of the layout To do this select the 2D Wireframe icon located in the top right corner of the AutoCAD or within the view tab dropdown depending on your AutoCAD version If you could not find the 2D Wireframe icon please right click at the blank space on the toolbar choose from the popup menu ACAD gt Shade or ACAD gt View Style depending on your AutoCAD version Cee 63 Drafting amp Annotation M WPP_Moving dwg Home Inset Annotate Layout Parametric i Manage Output Plug ins Online Express Tools W Pan YNAMIC 2D Wireframe X F m S IES amp Materials Browser X amp S E DYNAMIC 2D e 9 m amp ala db Orbit STATIC 2D m B C Materials Editor 4g 5 D View Tool Properties Sheet Set E gt Extents Top Manager tore Palettes Manager f 5 Visual Styles X8 Navigate 2D Views 2D Wireframe Conceptual Hidden Palettes Shaded Shaded wi Shades of Gray Sketchy Top 2D Wireframe Wireframe X Ray EE Save as a New Visual Style Visual Styles Manager STEP 3 Once your view is correct you will want to go into the WPP application Depending upon how you are starting this tutorial do the
6. Routings Locations Paths Stations Operators Parts I Animate LEAN Reports Sequencing Licensing Settings Location x Y Save Locations File MILL 237 25 730 35 OUTPUT CHECK 119 06 732 10 RACK 31409 557 95 Petit START 373 61 728 60 EraseLocation TABLE 199 47 558 30 DWG Select Add Location Erase All Locs f Erase Temp Locs V Auto Erase Temp Locs Location TextHeight 6 Inches Update Help Goto AutoCAD Locations referenced by the WPP are simple text located on a layer called PP LOCATIONS within the drawing Text positions are referenced via their insertion points which WPP sets at Bottom Center when using the Add Location controls Users adding text to this layer manually will want to specify the text insertion points accordingly Special Feature Selecting the Location column heading in the display will sort the locations alphabetically or by X or Y value correspondingly Add Location Will prompt the user to enter a location name and position within the AutoCAD drawing environment and also adds it to the location display list Erase Location Erases the selected location from the list and in the drawing If you wish to erase locations from the drawing you can select the Goto AutoCAD control on the Routings tab and use the AutoCAD erase command Erase All Locs Erases all of the locations from the list and in the drawing If the window option
7. 9 DecmalPlaces Help amp Tutorial Step 15 The output abilities of the WPP can be seen in the summary results window in the bottom left side of the routings window the Lean chart on the LEAN tab and the reports created on the Reports tab The Lean chart is automatically created for the stationary example should look similar to that below r Proplanner Workplace Planner ES Routings Locations Paths Stations Operators l Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings LEAN Assessment TRAN 8 The Station Report can be created on the Reports tab by selecting get image setting your stations takt time and hitting Generate Report The Station Report output can be exported directly to Excel saved or printed Congratulations You have now completed the first tutorial on using the Proplanner Workplace Planner for stationary parts You may now continue on to the next tutorial on using the WPP for moving parts or you may wish to continue on to the WPP Manual pdf for more detailed information on the WPP options Special Note Your analysis summary will appear in the lower left corner of the routings screen You may right click in this window to copy these results to the clipboard In fact you can right click and copy all WPP display list window information for subsequent pasting into other windows
8. DESCRIPTION ELEMENT ACTIVITY aoe DISTANCE NVBN Walk 1 34 01 RACKR1 RACKR1 TR 29 52 Assemble 1st Part 1 Walk to Rac1 7R 32 52 1R 36 44 1R 38 44 RACKR1 RACKR1 TR 82 99 1 Walk to back of car Walk to front of car 1 Walk to Rack 1 1 zmarse Walk to back of cr STARTR OPERATOR OL1 T Assemble 4th Part 1 Return to Start position 1 0 00 Animation Lean station report E My Computer 1 Once the calculations have been completed the WPP can be used to animate the operator s performance 2013 Proplanner How To Guide 123 Animate 50 9 Sec 4 oe im ox e 2 Ed E xi SI BINS OANE MIX B A A P Standard Y 26 OR1 5 Walk to back of car OL1 Walk to front of car ByLayer v ByLayer Nj M W OR1 Assemble 4th Part OL1 3 Assemble 3rd Part EO 58 i gt oo A IE ak im Eesti nmi HAINE Command Command v Command lt gt 3 8 11 16 33 5 1 16 0 0 SNAP GRID ORTHO POLAR osNaP OTRACK LWT MODEL Sy Animation 2 This can take place in the static 2 D view or 3 D if the blocks and drawing was originally created in this perspective 3 The trace file can also be saved to be used with other 3 D animation engines 4 Operator and one car block is included with the demo files To replace these in the simulation with custom blocks the user needs
9. section of this document If the element type P for Integrated is selected then the WPP will parse this field to get the process time even if no parsing method is selected In this situation you need to enter a time for the processing activity This time can be specified as a number in decimal minutes or seconds as selected in the Options tab Optionally you may also specify a walk time component and a machining time component If a walk and machine time is specified the WPP will ignore the walk time and will add the machine time to the manual process time The syntax for specifying process times in this field is shown below shown with time unit set to seconds Manual time walk time machine time general form 3 4 specifies manual 3 4 seconds 3 4 2 5 specifies manual 3 4 sec and walk of 2 5 3 5 2 5 4 2 specifies manual 3 4 sec walk of 2 4 machine of 4 2 3 5 4 2 specifies manual 3 4 sec machine of 4 2 4 2 specifies machine time of 4 2 seconds To or at Loc To Location for walkpath analysis and continuity evaluation Man walk machine Time Shows the breakdown of times into their manual walking and machine usage times Freq Frequency is the number of times that the process or walk activity is performed per cycle Dist Move Distance from drawing for Hands H or walking W Time Time in seconds to move or process Times can also be specified in the hours minutes seconds format as sho
10. RACK1 2 BOX1 LW lt B BOX1 LW RACK1 2 LW lt D START1 RW RACK2 2 RW lt D RW RACK2 2 RWe lt D START2 L 6 29 L 20 29 LW lt B 27 23 LW lt B 32 23 LW 34 09 LW 37 09 LW lt D 43 61 LW lt D 55 61 RW 4 98 RW 13 98 RWe lt D 20 63 RW lt D 23 63 RW 27 17 RW 29 17 RW lt D 36 93 RWe lt D 42 93 oo oo CJ foo C3 C C 0 C C C CO oa 0 0 0 0 C C CO C C C3 377 9845 140 130 7043 105 0387 D 60 52937 50 31 08403 82 43454 30 212 7002 D 119 9929 120 64 72373 298 9874 90 99 04411 182 0529 30 215 20 137 4169 D 87 99504 60 105 6544 6 2851 14 2 178404 1 750646 2 1 0129 5 0 518067 1 3455 3 3 545004 1 1 9711 12 1 078729 4 9813 9 1 650735 2 2 9999 3 3 5417 2 2 290282 4 1 4661 5 1 760907 2013 Proplanner File Formats 131 9 4 2 2 Location File LOC The WPP application can create a comma delimited text file that contains the X Y coordinates of all locations in the drawing as well as the limits of the drawing for use in scaling these values into other coordinate systems File Example OCATIONS NAME START 41 27886074 959 0241136 STARTL 1 14 39969858 959 4311767 ee BEEN poc y RACKL 1 184 3432071 895 1150395 336 2512049 944 3698027 sd STARTR 1 37 20626017 1054 277127 RACKR 1 180 2706065 1101 089505 6 34 365 5085379 1002 456442 11111 20 34 225 5085379 1002 45643 W B 29 2
11. Tutorial STEP 14 Select the Calculate button to re Calculate the workstation cycle time and paths Since you added a new location that has not yet been placed in the drawing the WPP will display the following window alerting you to this fact Selecting OK on this window will take you into the AutoCAD window and allow you to select the position for the missing location PPWP2013 OM es Some Locations are missing Select OK to add them Now select a position in the drawing for our new BOX in the place shown below yd d Moving Locations To move locations select the Goto AutoCAD button and either use the AutoCAD Stretch command crossing window option or the Move command to relocate the Location text Using the Stretch option will also move the end points for the flow paths whereby the Move option will not The user may also just grab the location text and drag it to the new location 2013 Proplanner Stationary Part Analysis Metric at Upon returning to the WPP and selecting Calculate the flow paths that were stretched will report their new distances correctly however the program will not automatically regenerate new flow paths for the relocated Location text so those paths will report the same distances that they had in the prior Calculate As such you need to either go to the Paths Tab and delete the paths that would be affected by the relocated Location text labels or you need to select the All Paths on Ca
12. following tasks after their preceding tasks are complete The operation checks to see that all routings before it s row are found true before any of the synchronized operator s routings after this row can begin 3 If the operators need to be working on the same task an equal time for their process at this location can be given to both of them Predetermined time parsing 1 The pre loaded parsers can be set to read input in predetermined time systems such as Modapts MTM and user defined systems 2 The output will be in either seconds or decimal minutes 3 The WPP can also create walk type element data to update the walk codes User defined time parsing 1 Using this type of parsing is just like using the MTM parser however the operator can open the user k1 csv and edit key words and their times to personalize their own standard 2 Exact details on the format of this file can be found in the user manual 3 Once the desired key words are defined and times are assigned to them go to the Licensing Settings also known in older versions as options help tab and set the Process Parse Default type to User K1 2013 Proplanner Proplanner Workplace Planner How To Guide Routings Locations Paths Operators Parts Animate LEAN Ergonomics Reports Sequencing Options Help AutoCAD SN 400 68352304 WPP Version Version 1 6e4 License Code secondi Expration qenve biankifindefinite Update License Ap
13. Longest Takt Time 2013 Proplanner 8 Troubleshoot Symptom Possible Causes Solution 1 WPP will not start up 2 csv file does not open 2013 Proplanner Previous version was not uninstalled before this installation If using the stand alone version that comes with AutoCAD included Supplemental Install was not performed Microsoft NET version 1 1 may not be installed on your computer The menu bar was not installed Excel by default saved the file as a tab delimited csv or an xls instead of a comma delimited csv Uninstall by going to Add Remove Programs in the control panel selecting Proplanner AutoCAD Programs and selecting remove When done install from the disk This setup file can be found on the install disk in a folder titled Supplemental There is a folder titled Microsoft NET Install on the install disk The setup file is called dotnetfx exe If using an older version of our software this folder may not be there In that case this file can be downloaded and automatically installed by going to Windows Update which can most commonly be reached by clicking a link in the Control Panel or by going to Microsoft com For the 2002 to 2005 versions of AutoCAD Go to Tools VBA Manager and load MENULOAD dvb Go to Tools Macros and run the addtoolbar macro For the 2006 or higher versions of AutoCAD or AutoCAD Engine type cuiload in the command li
14. OPR1 BOX MILL 1 00 Mes List Select OPR1 MILL OUTPUT CHECK 2 00 9 10 20 OPR1 OUTPUT CHECK RACK1 1 00 21 9 47 Erase Path OPR1 RACK1 TABLE 1 00 9 6 62 OPR1 TABLE MILL 1 00 14 8 15 Edit Redo Path OPR1 OUTPUT CHECK TABLE 1 00 15 11 ee Erase Listed Paths DWG Select Erase Path On Calc Path Arrows Path Labels Query Path All Paths 1 2 Missing Paths xam pase E i Path Ends Life ee Edit Redo Path V Ends Only L C Path Vertices Update b 3 Update h BEDE STE Erase DWG Paths On Line Arrow Width 6 Inches Label Height 6 Inches Arrow Length 6 Inches Precision 0 Decimal Places Help Goto AutoCAD 2013 Proplanner s Tutorial STEP 8 The WPP window will now disappear and you will be in the AutoCAD application window AutoCAD is prompting you to select a path to replace with a new manually drawn one Select the path to be moved as indicated by the white arrow below FIXTURE TABLE E MD Age TABLE STEP 9 The original path will now disappear and you will be prompted to enter a path from START to FIXTURE Simply pick points starting from where the path originated around the table and then finally to the FIXTURE as shown below When you pick your last point at the fixture you can press Enter on the keyboard or your Right mouse button A WPP Alert window will show up Click OK You will then be returned to the Paths tab in the WPP application Setting path regeneration to Missing Only Regeneratin
15. 100 Symbol Operation process symbols used to add another degree of detail and recognizability to route data in the reporting outputs Oper Operator Name Unique operator names will appear in the Operatortab You can add new operators by simply typing in a new operator name in the routings editor This new operator will immediate appear as a valid operator within the Operator s tab Process Process Code to be parsed if parsing method selected Otherwise this text is just a notation for the user as to the activity being performed and is not required to be specified reference exception for P element types discussed below The text in this field will be passed to other programs that may parse the time code provided that parsing is not selected within the WPP Putting the text DESC in this field upper or lower case will tell the parser to look in that element s Left Hand Description field for the codes to parse A DESC DESC could be specified to tell the parser to look in the Left and Right hand description fields for both the left and right hand codes respectively Finally a DESC M2P2 would also be valid to tell the parser to look in the left hand description field for the left hand code and to use the codes specified in the process field for the right hand i e 2013 Proplanner Reference Section M2P2 which is a MODAPTS code for this example For additional information on parsing options refer to the Parsing Options
16. 4 12 12 11 64 4 6 00 12 11 94 17 0 57 1 6 00 11 11 40 On Calc All Paths Path Labels M Path Dist Labels Path Arrows M Path Arrows Delete Delete List Select Erase Path Edit Redo Path Erase Listed Paths Goto AutoCAD Erase DWG Paths DWG Select Erase Path Query Path Edit Redo Path Missing Paths PS M Ends Onl Ends y Above Line Update Inches C Path Vertices C OnLine Label Height 6 Indes o Decimal Places Arrow Width 12 Arrow Length 12 Inches Precision Path information Proplanner Workplace Planner Routings Locations Paths Operators Parts Animate LEAN Ergonomics Reports Sequencing Options Help LEAN Assessment Operator NonValue Process B value Process Bl Walking Lean information Update Bl Non Value and Necessary Save Paths File B internal Delay 2013 Proplanner How To Guide 113 wep Routing Microsoft Internet Explorer eS File Edit View Favorites Tools Help Aw D x 2 JO search SX Favorites A amp jw Du Address ej C Documents and Settings Adam PROPLANNER Local Settings Temp WPPReport XML vi Go Links amp Iproplanner STATION REPORT STATION Station 1 TAKT TIME 85 00 SPEED CARRIER 30 00 LOCATION DESCRIPTION ELEMENT ACTIVITY HEN DISTANCE PROCESS WALK DELAY TOTAL 1R 9 19 Walk 1 3401 9 2400 9 9 0000 9 4 20
17. 5 23 0 100 21 9 5 23 0 8 M NN On 4 Pikupc RACK1 4 0 0 1 00 o 4 0 Save As 9 W NWN O Walk to TABLE 0 2 0 100 9 7 2 00 0 ID xj 10 M NN O 120 Assembl TABLE 120 0 0 1 00 o 120 0 eee eee a a M NN D Setdow TABLE ajojo 1 00 o 4 0 Goto AutoCAD 12 w NAN O Walk to Mil MILL 0 3 52 0 100 14 8 3 52 L RE 13 M NN O 30 Unload Mill MILL 30 0 0 1 00 0 30 0 F 14 W NN O Walk to OUTPUT CH 0 2 1 0 100 9 10 2 10 0 15 M NN Ou 4 Place as OUTPUT CH 4 0 0 1 00 0 4 0 Up Down 16 W NWN O Walk to TABLE 0 3 83 0 1 00 16 3 83 0 17 W NN O Walk to TABLE 0 3 83 0 1 00 16 3 83 0 Insert Row M e e Weld ca 0 Tl Remove Row ls w L1 f Add Row EL Type Symbol Oper Process To Loc orAt Loc Description Freq LEAN WGT sc 18 Mtv NN v OPRI wv 180 BOX Weld casing assembly 1 00 0 0 0 Update Row Results Loc amp Path Selection Calculate Oper Dist Ft Time sec Walk VA NVBN NV ID XD Part Sequence cycle Entire drawing Stationary Part OPR1 96 4 420 30 5 0 0 95 0 0 ALLCYCLES ai Window Area Moving Part Percentages by Longest Q9 Each Operator pn eae es Takt Time 0 Calculate 2013 Proplanner s Tutorial STEP 14 Select the Calculate button to re Calculate the workstation cycle time and paths Since you added a new location that has not yet been placed in the drawing the WPP will display the following window alerting you to this fact Selecting OK on this w
18. Adobe PDF Type a question for help Station_1 Q1R Walk 0 11 41 0 Q1C Walk 0 10 81 0 14 1C Assemble 14 0 0 RACKL1 Walk to Rz 0 3 01 0 BOX L1 Walk to Bc0 2 73 0 2 BOX L1 Pickup par 2 0 0 3L Walk to 1 0 3 12 0 5 3L Assemble 5 0 0 BOX L1 Walk to Bc0 2 67 0 Q1 Walk to frc 0 2 19 0 3 1L Assemble 3 0 0 RACKL2 Walk to R 0 2 6 0 1RACKL2 Pickup par 1 0 0 7L Walk to bz 0 3 8 0 12 7L Assemble 12 0 0 STARTL Return to 0 4 31 0 9 1R Assemble 9 0 0 RACKR1 Walk to Rz0 4 97 0 2 RACKR1 Pickup par 2 0 0 QR Walk to bz 0 5 8 0 3 7R Assemble 3 0 0 Q1R Walk to frc 0 3 95 0 2 1R Assemble 2 0 0 RACKR1 Walk to Rz 0 2 8 0 4 RACKR1 Pickup par 4 0 0 7R Walk to bz 0 3 66 0 15 Q7R Assemble 15 0 0 STARTR Return to 0 4 33 0 Excel O2013Proplamer 00000000000 T no Troubleshoot Proplanner Workplace Planner Routings Locations Paths Operators Parts Animate LEAN Ergonomics Reports Sequencing Options Help w P w w P w P w w P w P w P w P w P To Loc or At Loc lex mon mo e ow m Pump Tops Percentages by Each Operator C Longest Takt Time OutputUnits FEET Base Drawing Units INCHES Process Parsing None Path Thickness Inches Freq Precision NE Route Editor 3 Make sure that either Moving or Stationary is selected on the routings tab dependant on if you want to have workers moving with a moving part or if they work on it in stationary
19. Block Name m OPR1 Yes 4 17 3 33 START 0 2 Yelow OPR1 X 0 0 PP PERSON v Update Description Read DWGBlocks Help Goto AutoCAD 2013 Proplanner s Tutorial STEP 12 Select the Operators tab and select the Person Block name of PERSON or PP PERSON in the pull down box shown highlighted below Next select the Animate tab to see the animation options Finally select the Animate button at the top of the screen to watch the operator perform the work in 2D Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Oper Calc UnldSpdFt s LoadSpdFt s StartLocation Delay secs Path Color Station Prev Dist in Next Dist in Block Name OPR1 Yes 4 17 3 33 Speed Ft s Oper Calc Unloade Loaded StartLocation OPR1 Yes v 4 17 3 33 START v Description START 0 2 OPR1 o PP_PERSON Feet Delay Color Station Prev Next Dist Block Name ni 0 2Yelow OPR1 m 0 o EE v Update Time 5 3 4 0 19 120 0 Read DWG Blocks Help Goto AutoCAD Desc Walk to Rack1 Pick up casing Walk to Table Assemble casing 2013 Proplanner Stationary Part Analysis As the animation runs you will see the screen shown below with the animation time displayed Note this time is dependent on your simulation Move Increment value specified in the Animate tab window and thus may not agree exactly with the final results Decreasing the move inc
20. Help 11 P O OL 3 ei 1 00 0 61 3 100 m 12 W Te OL RACKL2 1 00 2 04 1 36 0 133 P O Ol 1 RACKL2 1 00 0 00 1 100 14 w T OL en 1 00 5 06 3 37 0 Up 15 P O OL 12 e 1 00 2 44 12 100 15 W Tan OL START 1 00 5 15 3 43 0 Insert Row 17 P O ORL 9 OR 1 00 1 83 9 50 Id 18 W Te ORL RACKR1 1 00 5 53 3 69 0 19 P O ORI 2 ws RACKR1 1 00 0 00 2 50 FRET m Add Row EL Type Symbol Oper To Loc or At Loc Description WGT i qw rsx ou em wak of Update Row dL Part Sequence cycle Loc amp Path Selection Calculate Ti VA NV NV gt i G Oper I me Wa we se xo Entire drawing Stationary Part OR1 42 30 5461 44 47 0 8 0 cS OL1 36 54 55 01 36 63 0 1 0 C Window Area Moving Part Percentages E M Flow on Part C Longest Each Operator EI AutoCAD 2008 NOT FOR RESALE C Users dave Documents Proplanner Walkpath Tutorials Metric Semicolon Walkpath FCAD dwg fo PA File Edit View Insert Format Tools Draw Dimension Modify Express Window Help YEH wv gt 99emno u5jEgERm S 335 SwoDO H 9las9e i AE 3 14 a gt PONT Layout Layout Press ESC or ENTER to exit or right click to display shortcut menu Command 10199 6538 30647 9785 0 0000 SNAP GRID ORTHO POLAR OSNAP OTRACK DUCS DYN LWT MODEL Annotation Scale 1 8 1 0 v 4 P You will notice that in this example you have two dif
21. NOTE Station Data only STAT1 0 12 192 A used for Moving Part Calculations only Users performing stationary part studies need not define stations Save to Part Path Draw Part Path Station Description Start mm Lenath mm STAT 1 0 12 192 Update Add Remove Import Assignments Container Insert Help Goto AutoCAD 2013 Proplanner 9 Tutorial Now you can return to the Routings tab and simply select the Calculate button at the lower right of the window You will see the results shown in the Results Window lower left of window and Drawing see examples below actual results will vary slightly from these examples due to changes in the individual sample files Proplanner Workplace Planner Ex Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings EL Type sy Oper Process secs D To Loc or AtLoc Man Wak Mach Freg ___Dist M Time sec LEAN w Fle Open 1 W Ta ORI R 1 00 6 13 4 09 0 2 WT 0d 1C 1 00 5 42 3 61 0 New Cl 3s P On di 14 ve IC 1 00 2 85 14 100 ARI 4 WT OL wes RACKLI 1 00 2 53 1 68 0 5 w T OL BOX L1 1 00 2 10 14 0 Save As 6 P O OL 2 BOX L1 1 00 0 00 2 50 7 WT OL ex 1 00 3 37 2 25 0 8 P O OL 5 ex 1 00 10 5 75 Goto AutoCAD 9 Wo Tes OL BOX L1 1 00 2 50 1 66 0 d 10 WT OL eu 1 00 1 46 0 97 0
22. Number used to synchronize specific element routings rows in WPP with other applications such as Proplanner ff you are having the WPP compute distances for Walk and Hand oriented processes which you wish to re import back to Proplanner or other applications it is recommended that you not modify these numbers for existing routings Proplanner will automatically insert an asterisk for all new routings Type Element Type NOTE When defining your process elements your entire routing file must use EITHER P M W type or I type elements Do not combine a routing file with both types of elements EITHER P or Mor T or X Manual or Automated process element The WPP will attempt to parse the text in the Process field upon Calc if a parser type has been selected The P M and T types are for different processes machine dependent operator dependent etc as specified by MTM standards The X element tells the program to ignore the parsing of the process code for that element line W Walk move tells WPP to compute the walk distance in Feet or Meters The WPP will also parse this element and attempt to use the computed distance in the computation of time for that element code upon Calc if a parser type has been selected and if text is entered into the Process Field A walk type code is optional for W type elements OR e Integrated Walk to and Process at element tells WPP to compute the walk distance in Feet
23. Routings Locations Paths Operators Parts Animate LEAN Ergonomics Reports Sequencing Options Help Open Scenario Build Sequence Station M1 with STOL E M1 with Define Product Model M1 Goto AutoCAD Sequence Start secs Description 60 Line Balancing 3 From there it can create and save the build order sequence save elemental order data or add new tasks 4 New elements can be added here and returned from WPP to the Line Balancing tool as well 5 This acts as a powerful evaluation tool for ensuring the quality and functionality of a Line Balancing Scenario Advanced Reporting The WPP offers numerous ways of reporting the simulation data once a calculation is run 2013 Proplanner How To Guide ne Proplanner Workplace Planner Routings Locations Paths Operators Parts Animate LEAN Ergonomics Reports Sequencing Options Help Station Station 1 Model Moving TAKT go Seconds Production Volume 96 92 Planned Eff 100 Line Speed 30 Feet Minute Report Settings Report Image Activities and Elements Image Select Orientation activities Onlv Current Display C Rotated Elements Only C Window Select Display Combine Events per Row Value Added Time Reg Time Report Type Man Machine X If Image is off center re select Get Image button Reporting 1 The drawing can be imported to the WPP as a jpg
24. Save Settings Process Parser None Start Walk Time secs First 333mm yc Wi n SERRE Start at tart Use Standard Derived Walk Time D Min Dist M C Start at First Element Loc Predetermined Factor 1 0 Differentiate After M C Start at Last Element Loc MODAPTS 0 Beginning Walk Speed M s Part Grid Increment MODAPTS Walk by 5 MODS 1 Default UnLoaded Walk Speed M s LER ito 7 mi Total Mod Format W25 0 5 Default Loaded Walk Speed M s CRAM Ato D C Mutilple Mod Format 5 W5 10 Consider Loaded above Kilograms V 1orAisatfrontofpart Time Units Output Units METERS v Always route last loc to first loc Hours Minutes Seconds Base Drawing Units MILLIMETERS c EE C Hours Decimal minutes E Path Thickness miliM Freq 50 iv Automatically Renumber Elements Parts File Name C Users dave Documents P Precision 2 V Automatially Erase Temp Locations Location Text Layer PP_LOCATIONS Update Help Goto AutoCAD STEP 1 Now that you have learned how to run a part study from a pre constructed routing file it is time to create one from data that has been output from Proplanner Line Balance The first step is to open the drawing file Multi Station Moving dwg You will notice that this example has multiple stations and parts STEP 2 Start the Workplace Planner by clicking on the W in the menu bar and clicking anywhere on the splash screen that pops up
25. This will take you to the routings tab the main interface of the WPP STEP 3 Click on the Sequencing tab to start importing the Line Balance data and select Open Scenario STEP 4 Open the pre made Line Balance scenario file _BData xml This can be found in the same directory as the other example files usually in c Program Files Proplanner AutoCAD Programs For more information on making the Line Balance input file with Proplanner Line Balance sold separately consult the Line Balance user manual 2013 Proplanner Sequencing from Line Balance data Metric 55 STEP 5 To begin with we will start by manually creating a build sequence The first step of this is setting up the build information The first build s information should be a start time of 0 model should be set to M1 and the part name CAR Click the Add button This step is where options would be selected as well however this line balance data does not contain option information STEP 6 To create a second build set the start time to a relative time sixty seconds after the first build s start with 60 Again use model M1 and to use a different part select CAR2 Click Add again STEP 7 Next select the stations for which you wish to simulate For this example select station ST 0O1L ST 01R ST 02L and ST 02R Your screen should look similar to below Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts
26. and Unloaded walk speed from the settings on the Options tab Default 4 17 feet second The user is allowed to specify a unique layer color for each operator Calc Allows the user to turn off the calculation of all walkpath flows for the specified operator With this option set to off the walkpaths will not be updated or included in the total walkpath distance and time calculations and the operator will not animate Delay The delay time is set to 0 by default This time allows the user to delay the availability of the operator within the workplace A time in seconds may be entered into this field The distance option is allowed for moving part analyses so that workers in downstream stations can begin work when the part travels the specified distance from the beginning of the line to their station Start Location Determines if and where WPP should begin the operator s movement prior to assuming the first position specified for that operator in the routing file A value of NONE default tells the WPP to ignore that operator s initial location Station Assigns the operator to a station to prevent the operator from trying to reach locations within other work stations Previous Distance Next Distance Sets the distance which an operator is allowed to move 2013 Proplanner s Reference Section into the previous and next station in order to intercept the part This calculation does not take into account the length of the part if
27. applications such as MS Word or MS Excel 2013 Proplanner Stationary Part Analysis Metric 8 6 4 Moving Part Analysis Metric This tutorial was developed with the drawing units set to millimeters and the reporting units set to meters In addition the files have been saved in a semi colon delimited format with numbers specified in the format 1 200 15 which is common in France Germany Italy Sweden and other countries Before starting the tutorial itis advised that you go to the Licensing Settings tab and ensure that your settings are set as shown below Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settinos AutoCAD SN 000 00000000 WPP Version Full 2 6 0 License Code Update License EE Leave blank if indefinite Application Settings and Defaults Process Parsing Options Walk Speed Options Moving Part Options Save Settings Process Parser None Start Walk Time secs First 333mm ne er m EIS Startat tart Use Standard Derived Walk Time 9 Min Dist M C Start at First Element Loc Predetermined Factor Lee 0 Differentiate After M C Start at Last Element Loc MODAPTS Beginning Walk Speed M s Part Grid Increment MODAPTS Walk by 5 MODS 1 Default UnLoaded Walk Speed M s LCR ito 7 m Total Mod Format W25 0 5 Default Loaded Walk Speed M s CRAWN Ato D Y C Mutilp
28. can be clicked to open a new description window In the case of some time standards such as MTM B MTM UAS or MOST and non predetermined time itis optional to put the process description in the description field if it involves more than one statement In this situation MTM it is necessary to put the word DESC DESC or DESC 2013 Proplanner Routings Tab DESC in the Process field of the routing to direct the parser to look for codes in the left hand right hand or left and right hand description fields respectively Main Left Hand Misc Right Hand Walk Save Exit Cancel Exit Upon selecting the carrot next to the description field the user can input both right and left hand descriptions as seen below Results Window in lower left of Routings tab Oper Operator for which the results are shown Dist Distance being traveled for entire process Time Total time of operations or time of each cycle Walk Percent of total time spent walking VA Value added percent NVABN Non value added but necessary NV Non value added percent ID Internal Delay is time spent waiting on a machine or synchronized operator XD External Delay is time spent waiting on a part to reach the station Results Oper Dist Ft Time sec Walk VA NVBN NV ID XD OR1 120 2 58 74 41 44 0 11 0 4 OL1 119 4 54 28 36 64 0 0 0 0 2013 Proplanner 12 Reference Section 5 1 2 Route Format EL Element
29. following e New into AutoCAD Perform step 2 in the first Tutorial From Goto AutoCAD in WPP Select the Return to Workplace Planner button from the WPP modeless window located in the top left corner of the screen 2013 Proplanner Moving Part Analysis e STEP 4 Now in the Routings tab select the File Open button at the top right and load the MOVING CSV file Your screen should look like that shown below when you are done Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings EL Type Symbol Oper Process secs Description ToLocor AtLoc Man Walk Mach MOD or MU Freq Dist ft Time sec LEAN We File Open 1 W TT ORI Walk R 0 4 28 0 100 6 5 4 28 0 m 2 Ww TT OL1 Walk 1c 0 3 82 0 1 00 5 9 3 82 0 New Clear 3 P O OL1 14 Assemb 1C 14 0 0 100 2 10 14 100 J Q 4 W TT Ol Walk to RACKL1 0 1 9 0 100 2 10 19 0 F Save As 5 wo FT OL1 Walk to BOX_L1 0 1 4 0 1 00 2 1 1 4 0 6 P O Di 2 Pickup BOXL1 2 0 0 1 00 o 2 50 7 Ww TT Oi Walk to 3L 0 1 13 0 1 00 1 8 1 13 0 8 P Di Os 5 Assemb 3L 5 0 0 1 00 f 5 75 mus 9 Ww TT O Walk to BOX_L1 0 0 98 0 1 00 1 6 0 98 0 10 W Tie OL Wak to IL 0 1 16 0 1 00 1 9 1 16 0 11 P O Oi 3 Assemb iL 3 0 0 1 00 F 3 100 Up Down 12 Ww TT Qi Walk to RACKL2 0 1 87 0 100 2 10 1 87 0 ij Py D DEO Pickup RACKL2 1 0 0 1 00 0 1 100 Insert Row 14 W T
30. in this window From this window you can set the walking speed of your operators and the color of their flow paths An ability to set the maximum distance traveled into the previous workstation to work on a moving part has also been included here IIProplenner Workplace Planner lt Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settinas Unid Spd M s Path Color Station 1 5 Speed M s Meters Oper Cale Unloaded Loaded Start Location Delay Color Station Prev Dist Next Dist Block Name opri ves s 1 START zll o 2velon sari gt 0 o PERSON m Read DWG Blocks Help Goto AutoCAD 2013 Proplanner Tutorial STEP 12 Select the Operators tab and select the Person Block name of PERSON in the pull down box shown above Next select the Animate tab and set the animation options see below Finally select the Animate button in the bottom right corner to watch the operator perform the work in 2D Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Move Increment 0 1 Seconds Motion Delay Q Tenths of Seconds Automatic Rerun Save Anim Trace Draw Part Path When the animation finishes you will see the screen shown below with the total animation time displayed Note this time is dependent on your simulation Move Increment value specified in the
31. is selected on the routings tab then only the locations within that window will be erased Erase Temp Locs Erases all of the temporary locations from the list and in the drawing Temporary locations are those automatically created by the WPP application within a moving part study to mark operator positions at the part along the assembly line These locations are automatically erased and regenerated upon every selection of the Calculation command 2013 Proplanner Reference Section Save Locations File Saves the location display to a comma delimited CSV file in the same format as shown in the display Used for exportation of locations to other applications The WPP application does not read these files Location Text Height Update Specifying a new location text height and selecting Update will change the size of all text on the PP LOCATIONS layer 2013 Proplanner Locations Tab 25 5 3 Paths Tab Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Oper From To Freq Dist Save Paths File OPR1 TABLE MILL 2 00 14 8 15 7 List Select OPR1 MILL OUTPUT_CHECK 2 00 9 10 20 OPR1 OUTPUT_CHECK RACK1 1 00 21 9 47 Erase Path OPR1 RACK1 TABLE 1 00 9 6 62 OPR1 OUTPUT CHECK TABLE 1 00 15 11 Edit Redo Path Erase Listed Paths DWG Select Erase Path On Calc Path Arrows Path Labels Query Path All Paths
32. only place the desired blocks within the drawing before opening WPP They will be available to set as the part or operator blocks from then on 5 The animation speed can be changed by altering the increments at which AutoCAD renders The smaller the increment the slower the animation will move 6 These animations are a powerful tool in picking up incorrect routing information that may not have been obvious in the calculation output Robot analysis 1 To simulate a robot working the drawing needs to be loaded as usual The effective work zone of the robot should also be defined within the drawing to help spot when the work may need to be moved closer 2013 Proplanner 14 Troubleshoot 2 The main difference is that the robot arm will be simulated by a block representing the manipulator and not the entire arm It will calculate the times for the operations and travel of the manipulator itself 3 Note that the WPP will not alert when there are interference problems with the manipulator arm and the surrounding environment This tool can be used to identify problems if the operator s path crosses paths between the active manipulator and its base seen in the animation 4 To show interactions between the manipulator and the worker a synchronize route will be needed to make them meet at the right place and time This will show when delays are added due to one waiting on the other 5 When these interactions are calculated the m
33. or Meters from the operator s previous location to this new location specified in the From field and then apply the process time at this location as specified in the process field With the Integrated element type you do not specify the process time in the Time field as you do with the M P T or X element type Instead you specify your time in the Process field according to the rules for specifying time in this field discussed in the process section below A Activity Header Not Fully Implemented This provides for the future opportunity to define elements within an activity and have the individual element times be automatically aggregated into the Activity time The WPP application will only evaluate the Element rows and then update the Activity row with the aggregated time values H Hand move tells WPP to compute the distance in inches if output Feet or millimeters if output Meters and replace for distance in hand move code such as Reach or Move in MTM 1 The WPP will attempt to parse the text in the Process field upon Calc if a parser type has been selected This feature is not yet implemented e S Synchronized Move indicates that this task Walk or Process cannot begin until all 2013 Proplanner Routings Tab 13 of the operators who are being synchronized have completed their last task prior to the Synchronized element To use synchronized moves you must select a row in the routing file that is after all
34. percentage of walking value added processing non value added processing non value added but necessary processing and internal delay for each operator in the workplace Part Sequence Cycle The dropdown window here again lets the user chose which cycle or all cycles for which to show the lean percentages 2013 Proplanner s Reference Section 5 9 Ergonomics Tab Proplanner Walkpath Calculator E x Routings Locations Paths Operators Parts Animate LEAN Ergonomics Gender Shift Length 4 Hours 75 Female Task Focus i00 C 75 Male Lift Assessment Carry Assessment 180 180 160 140 120 100 80 60 40 20 OP1 OP2 OP3 OP4 Operator Operator The Ergonomics tab charts the operator safety for the Lift and Carry tasks involving weight and posture defined within the routings The WPP uses the SNOOK tables developed by Liberty Mutual Insurance in 1991 and approved by OSHA The WPP allows the user to compute results for both 75 Females and 75 Males SHIFT LENGTH The SNOOK tables require a number of cycles or repetitions of the routing performed over a given period of time The Shift length determines the total duration of time during which the routing is performed Together with the Task Focus defined below and the routing cycle time the WPP is able to determine the number of repetitions per day over the shift length time to determine the safety of the task T
35. s fields separated by commas not shown below 1 2 3 rr The first field contains the code name any string cannot include tabs spaces or commas The second field contains description of the task represented by the code This field is for user use only as the program does not parse this field The third field contains the time for the code in the units specified in the time code field at the beginning of the file The fourth field contains the description of the task frequency i e Each Per Foot etc This field is for user use only as the program does not parse this field The fifth field contains a number 0 1 or 2 The 0 number means that the time is a manual operator time the 1 code means that the time is a machine processing time and the 2 code means that the time is for walking The sixth field contains the percentage of value added work content in this process The percentage is represented by an integer number from 0 to 100 inclusive LWR SHIELD POS ELECTRODE amp STRIKE iecur TEE ARC 0 05EA 100 RAISE SHIELD amp REMOVE ELECTRODE O0 05EA E o 100 E ss SHRT GRPS OF WELDS NO RAISE ue EIS A03 SHLD 0 02EA E 10 A04 REPOS LONG 0 04EA E O 100 2013 Proplanner Routings Tab 1 5 1 5 Synchronized Operators The WPP application will allow you to synchronize up to 4 concurrent operators within a workplace This feature is most often used when you have tasks that must be performed by mo
36. slash character The parser will use the longest processing time of the left or right and thus assumes a High skill level by default You may also optionally place a capital H in the SC field to signify High skill level If the task is of low skill level and thus the left and right hand codes should be added together thus these tasks are performed sequentially then a capital L should be placed in the SC field to signify Low skill level Partial Code Repetition Part of the code syntax can be repeated by placing the codes to be repeated in parentheses that are prefixed by a multiplication factor For example in MODAPTS an M2P2 5 W5 would cause the parser to compute 29 MODs where the W5 parameter number would be multiplied by 5 Likewise in MODAPTS a 3 M2P2 would evaluate to 12 Simultaneous Motions Part of the code syntax can be ignored by placing the codes to be ignored in angle brackets i e In some situations you may wish to document a set of simultaneously occurring tasks but have the parser ignore some of these tasks which can be performed concurrently For example if the operator was doing a Move and Place task while walking and the walking should be ignored then the code should be specified as M2P2 lt W5 gt Direct Time Specification for I type elements As mentioned in the discussion for Hype elements the process time must be specified in the process field This can be done by specifying a parse method and including
37. the workstation view looks correct If using a window select selecting get image a second time may zoom in more precisely on the section selected Once your view is acceptable select the Station Report button to generate your report Using the Value Added Time Reg Time option will create the same station report with VA NVA percentages and times Another option is the Man Machine report to demonstrate the difference in manual versus machine work times in the same format as the original station report note this report is available upon request Once the report is generated simply select the File Save option in the browser window to save your report These reports can be set to show both Activities and Elements or either choice separately This will help the user gauge how much information is needed to be displayed Note the total time calculated on the Station Report does not include the external delay added by waiting for the next part only the actual time spent working on this part 2013 Proplanner 3 Reference Section 5 11 Sequencing Tab Proplanner Workplace Planner ES Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings STEP 1 Open Scenario File STEP 2 Load and or Define Build Sequence Start secs Description Model Options Part Open Sequence 1 0 M1 with Mi CAR 2 60 M1 with M1 CAR2 Save Sequence Up Down
38. to avoid recreating the operation sequence Up Down Moves selected build up or down in the Build Sequence window Insert Insert s a row similar to the selected option model mix above this row Will use 2013 Proplanner Sequencing Tab s information provided in the Sequence Start and Description field instead of the attributes of the selected build if they are different Remove Erases the option model mix selected from the Build Sequence window Add Adds Line Balancing data for the selected station and model option mix to the sequence that can later be used to create a routing file to run a WPP simulation Update Updates the selected build with the Sequence Start and Description information in the input fields to the left of this button Station Selects which work station to simulate from the Line Balancing file that will contain all stations within the plant Model Defines the specific model for which this routings will be made You can choose different mixes and add them to the sequence Options Sets the options for which the simulation will be created You can choose different mixes and add them to the sequence Create Routings Uses the selected station model and options to create the routings file for activities and operations done within that work station in that scenario In other words this generates the actual simulation routing file 2013 Proplanner 40 Reference Section 5 12 Licensing Setting
39. total distance back from the front and lastly followed by a R C or L indicating which side work is done on Ie 3R would be 3 7 back from the front right side e When the calculation is done for a moving study all routings are regenerated every time This will mean anytime the user needs to edit a path to go around an object it will be redrawn straight unless the user puts an interim location at the vertices to avoid an object instead of walking through it 2 Stationary studies represent either a cellular type manufacturing where the part is still while work is performed It can also be used to represent a part that is on a conveyer and stopped or picked off to be worked on In this example picture the user can make the operator go around that table he is currently walking through 2013 Proplanner How To Guide 115 E File Edit View Insert Format Tools Draw Dimension Modify Window Help 8 x HR RG SLR 72 Eg Ev d GU BWV OOA NEM Ya AAA Standard whe 9 C9 OOH Q MTLMIMA s ByLayer ByLayer ByLayer M Ww F 4 7 a gt 4 Ab Qs amp 88 a T q amp TABLE rc EN gt d i D La st A by r4 Command Specify opposite corner Command _ erase 3 foun Command 33 10 1 4 64 8 15 16 0 0 SNAP GRID ORTHO POLAR osNaP OTRACK LWT MODEL E Y Stationary studies Multi station operator and part 1 Multiple operators are created whenever more operators a
40. window and sets this as the cycle time for each operator Internal delay time is then added for the operators with the shorter cycle times TAKT Time Allows the user to specify a line TAKT time and then sets this as each operator s individual cycle time Note that the TAKT time needs to be larger than any of the operator cycle times Loc amp Path Selection Determines if flow paths part paths locations labels and arrows are to be evaluated and modified for the entire drawing in the case of one workplace per drawing or for a selected window area within the drawing All Locs Option the All Locs option allows WPP to use reference locations outside of the windows selection area only applicable if window area is selected Routing Editor Controls Insert Row Inserts a row above the selected row and copies the information from the input boxes below the routing display into this new row as a default starting point Remove Row Removes the selected row Add Row Takes the data in the input boxes below the routing display and adds them to the end of the routing file Update Row Takes the data in the input boxes below the routing display and updates them to the selected routing in that display Up or Down Moves the selected row up or down one row Description shown below ls where the general description and those for the left and right hand processes are stored Description WaktoMi O The up arrow to the right of the text field
41. you however you could add additional location s by selecting the Add Location button in the middle right of this screen under DWG Select or by going into AutoCAD and simply placing text manually on this layer Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Location X Y Save Locations File MILL 237 25 730 35 OUTPUT CHECK 119 06 732 10 A List Select RACK1 314 09 557 95 START 373 61 728 60 Erase Location TABLE 199 47 558 30 DWG Select Add Location Erase All Locs Erase Temp Locs v Auto Erase Temp Locs Location TextHeight 6 Inches Update Help Goto AutoCAD STEP 6 You can now select the GotoAutoCAD to see the walk paths that were drawn by Proplanner in the workplace between the locations Proplanner automatically generates flow paths using Euclidean point to point lines 2013 Proplanner Stationary Part Analysis 53 STEP 7 Flow paths may be set to move through other objects In this example one of the flow paths currently moves through a table To replace this straight line flow path with one that moves around the table select the Edit Redo Path button in the DWG Select section of the Paths Tab as shown below Routings Locations Paths stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Oper From To Freq Dist Save Paths File
42. 00 4 T 2 4 1 8 82 1 3 9500 3 95 2 4100 TR 82 89 Assemble th Part 15 0000 15 00 STARTR Return to Start position 1 16 38 5 0100 5 01 35 0000 33 1800 0 0000 68 18 2 41 RACKR1 Walk to Rac 1 RACKR1 Pickup part at Rack 2 TR 47 99 Walk to back of car 24 00 20 00 3 17 3 00 00 00 3 20 1R 18 19 Assemble 1st Part EE BE 7R 29 52 Walk to back of car 5 1700 1R 38 44 Walk to front of car a se2l OPERATOR OL1 T T E My Computer Reported information Moving Vs Stationary part studies 1 Moving studies represent lines where work is done on the part when it is moving and a travel distance will exist while a process is being done on the part 2013 Proplanner m Troubleshoot Ep Eile Edit View Insert Format Tools Draw Dimension Modify Window Qs Te Est M E m E 4H 9lAg9snao tc 19 BAS OSA NEM ne 4 4 1 Standard wee 9 Q WO Q MTLMIMA m ox ByLayer ByLayer ByLayer e V Z ej Ze E 5 4h i I amp Hg ag ar Or 9 cu mips E o9 a e m db L3 gt a st A b r4 z I4 4 0 T Command Command Command 5 2693E 02 99 5 11 16 0 0 SNAP GRID ORTHO POLAR fosnar OTRACK LWT MODEL W ov Moving studies e These studies deal with the different locations a worker can be at on the part with the use of characters followed by a number to represent the fraction of the part s
43. 2R 2 3 17 0 2 STO2R_RACK 2 3 53 0 1 00 5 29 5 53 0 N CAR2 60 M 0 1 00 0 00 Up I N ST O1 10 0 0 3 1C 10 4 09 0 1 00 6 14 14 09 0 I N ST O1 0 10 0 4 STO1L RACK 0 2 95 0 1 00 4 43 2 95 0 Insert Row I N ST O1 10 0 0 1 1C 10 2 45 0 1 00 3 67 12 45 0 _ I N ST_OIL 2 10 0 2 STO1L RACK 2 1 89 0 1 00 2 83 3 89 0 SI N STOA 10 0 0 3 1C 10 4 36 0 1 00 6 54 14 36 o Exi Eee Hom 4 m Add Row Symbol Part Cyde Time Cyde Name Update Row Loc amp Path Selection Calculate Entire drawing Stationary Part Window Area Moving Part Iv Flow on Part C Longest Each Operator The blue box highlights the pull down window that selects which cycle to show results for whether all or individual part cycles Below that are radio buttons that select how the output percentages are Calculated This can be set to be a percentage of the longest operator s time each individual operator s time or as a percentage of a set TAKT time 2013 Proplanner EN Tutorial The second output tool of the WPP is the LEAN tab which automatically creates a bar chart depicting the percentages of time performing value added non value added non value added but necessary and delay times This can be representative of all the cycles or an individual cycle selected in the pull down window and should look like that below for the sequencing tutorial
44. 3 197 0274325 966 4564334 W lt B 34 23 147 0274325 966 456429 sid W 43 00 0 453680626 966 4564263 W 46 00 30 45368063 966 4564236 1111 W D 52 81 81 95607918 966 4564466 W lt D 64 81 38 04392082 966 4564362 sd W 6 66 362 0426321 1038 456442 W 15 66 272 0426321 1038 456434 W D 22 97 379 1037947 1038 456458 sd W D 25 97 349 1037947 1038 456456 sd W 29 51 134 1038002 1038 456456 sd W 31 51 114 1038002 1038 456454 W lt D 38 30 226 4649621 1038 456476 111 W lt D 53 30 76 46496209 1038 456463 sd DRAWING EXTENTS MINX 122 8498 478 9541 428 6794 1182 4564 o START STARTL 1 RACKL 1 STARTR 1 RACKR 1 eee oe ee ore DRAWING EXTENTS MINX 122 8498 2013 Proplanner 132 Appendix 9 4 2 3 Path File PTH The WPP application can create a comma delimited text file that contains the X Y coordinates of all path vertices in the drawing as well as the limits of the drawing for use in scaling these Additional information about the path is also provided such as distance frequency operator from and to location File Example FLOW PATHS PATHNUM DRAWING EXTENTS MINX OPERATOR 1OPERL 1 2OPERL 1 3OPERL 1 4OPERL 1 SOPERL 1 6OPERL 1 7OPERL 1 SOPERL 1 9OPERL 1 10OPERL 1 110PERL 1 120PERL 1 13OPERL 1 14O0PERR 1 1SOPERR 1 16OPERR 1 17 OPERR 1 1S OPERR 1 19OPERR 1 20 OPERR 1 210PERR 1 22 OPERR 1 230PERR 1 24OPERR 1 MINY 122 84
45. 6 w M mooi Wall tn TARIE n ann n n n n n Add Row EL Type Symbol Oper Process To Loc orAt Loc Description Freq LEAN WGT SC 17 Mt v NN v OPRI 180 TABLE v Weld casing assembly 1 00 oj ol o Update Row Results Loc amp Path Selection Calculate Oper Dist Ft Time sec Wak VA NVBN NV ID XD Put sine ERN Entire drawing Stationary Part i Window Area Moving Part Percentages by Longest Each Operator C Takt Time 0 Calculate 2013 Proplanner Stationary Part Analysis 51 STEP 4 You should now be able to select the Calculate button in the bottom right of the screen to analyze the initial workplace layout If it prompts that not all locations are present add them by clicking on a location on the drawing If an error states that a station has no length go to the stations tab and update the length to 40 The results of this Calculate can be seen in the Distance and Time columns in the right side of the routings window and in the Results Area in the bottom left corner In addition the flow lines should have been drawn in your layout as shown below Depending on your version of AutoCAD and the specific tutorial files that were loaded the drawing and routings may vary FIXTURE TRIES TBARS 2013 Proplanner 52 Tutorial STEP 5 You can now select the Locations tab to see the location text that Proplanner found on the PP LOCATIONS layer within the drawing This text has already been added for
46. 96209 Y1 x2 959 4311767 365 5085379 1002 456442 225 5085379 1002 45643 184 3432071 895 1150395 336 2512049 944 3698027 197 0274325 966 4564334 147 0274325 966 456429 336 2512049 944 3698027 0 453680626 966 4564263 30 45368063 966 4564236 184 3432071 895 1150395 81 95607918 966 4564466 38 04392082 966 4564362 14 39969858 1054 277127 362 0426321 1038 456442 272 0426321 1038 456434 180 2706065 1101 089505 379 1037947 1038 456458 349 1037947 1038 456456 134 1038002 1038 456456 114 1038002 1038 456454 180 2706065 1101 089505 226 4649621 1038 456476 76 46496209 1038 456463 37 20626017 Y2 in 1002 456442 1002 45643 895 1150395 944 3698027 966 4564334 966 456429 944 3698027 966 4564263 966 4564236 895 1150395 966 4564466 966 4564362 959 4311767 1038 456442 1038 456434 1101 089505 1038 456458 1038 456456 1038 456456 1038 456454 1101 089505 1038 456476 1038 456463 1054 277127 9 4 2 4 Trace File TRC The WPP application can create a text file that contains the animation event sequence for all operators in a WPP Analysis This trace file includes the event time in seconds from time 0 as well as the event AT FROM location and event TO location if appropriate Position and Path information reference by locations and paths in this trace file can be found in the Locations LOC and Paths PTH output files LEGEND of Event Types D User defined Delay at beginning of operator cycle such as
47. 98 478 9541 FROM LOC STARTL 1 L 6 34 L 20 34 RACKL 1 BOX1 LW lt B 29 23 LW lt B 34 23 BOX1 L W 43 00 L W 46 00 RACKL 1 LW lt D 52 81 L lt D 64 81 STARTR 1 RW 6 66 RW 15 66 RACKR 1 RW lt D 22 97 RW lt D 25 97 RW 29 51 RW 31 51 RACKR 1 RW lt D 38 30 RW lt D 53 30 MAXX 428 6794 TO LOC L 6 34 L 20 34 RACKL 1 BOX1 LW lt B 29 23 LW lt B 34 23 BOX1 L W 43 00 LW 46 00 RACKL 1 LW lt D 52 81 LW lt D 64 81 STARTL 1 RW 6 66 RW 15 66 RACKR 1 RW lt D 22 97 RW lt D 25 97 RW 29 51 RW 31 51 RACKR 1 RW lt D 38 30 RW lt D 53 30 STARTR 1 MAXY in INCHES 1182 4564 DISTANCE 382 336817 140 114 9641622 159 6936802 140 9648114 50 190 5084121 337 4285092 30 226 3344783 124 7907061 120 24 665837 399 5622255 90 111 1080832 208 4647098 30 214 9999946 20 91 10952362 77 82554028 150 114 7668949 FREQUENCY EA EFE HH E FEH H E FH HR HF FH HR HR HR H SH H H H 2013 Proplanner File Formats 133 PATH VERTICES PATHNUM 2013 Proplanner C CH R CO P9 LE 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 VERTICES X1 2 1439969858 2 365 5085379 2 225 5085379 2 184 3432071 2 336 2512049 2 197 0274325 2 147 0274325 2 336 2512049 2 0 453680626 2 30 45368063 2 184 3432071 2 81 95607918 2 38 04392082 2 37 20626017 2 362 0426321 2 272 0426321 2 180 2706065 2 379 1037947 2 349 1037947 2 134 1038002 2 114 1038002 2 180 2706065 2 226 4649621 2 76 464
48. ASK FOCUS The task focus defines the percentage of time during the shift that the operator is performing the activities defined in the routing For example if the operator is working an 8 hour shift as defined in the shift length but only performs the routing cycle 12 of the time during this shift then the Task Focus value would be 50 to represent 5096 2013 Proplanner 5 10 Reports Tab Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Ergonomics Tab Station TRANO8 Model Stationary TAKT 200 Seconds Production Volume 96 92 Planned Eff 100 Line Speed 40 Meters Minute Report Image E Report Settings Image Select Orientation Activities and Elements Current Display Rotated Activities Only Window Select Display Get Image Elements Only Combine Events per Row Value Added Time Reg Time Report Type Station Report Simple Cycle All Cydes Show Report If Image is off center re select Get Image button again Help j Goto AutoCAD The Reports tab is where you generate your workstation report The workstation report includes an image of your workstation along with workstation header information that you can enter in the top right of the screen Select the Get Image button to get the current view of your workplace You may need to select the Goto AutoCAD button in order to adjust your display such that
49. Animate LEAN Ergonomics Reports Sequencing Licensing Settings STEP 1 Open Scenario File STEP 2 Load and or Define Build Sequence Start secs Description Model Options Part Open Sequence 0 M1 with Mi CAR 60 M1 with Mi CAR2 Save Sequence Up Down mela STEP 4 Create Routings Create Routi Remove Start secs Description Model Options Part Name 0 M1 with M1 X Update STEP 8 Click Create Routings and Yes when it asks you if you re sure You will then be taken to the Routings tab automatically where the routings will have been created for the two cycles using two different parts in four work locations 2013 Proplanner 9 Tutorial STEP 9 Chose the Operators tab to make sure that your four operators have been created Assign each operator to the station with their same name They will be assigned to station Statt and Stat2 at first This is done by selecting the operator you wish to edit selecting the station pull down menu selecting the appropriate station and then selecting the Update button When completed it should look like the example below Proplanner Workplace Planner mx Routings Locations Paths Stations Operators Parts Animate l LEAN Ergonomics Reports Sequencing Licensing Settings _Load Spd M s Start Location loves _ Path cob stato Prev Det Next on Bl
50. Animate tab window and thus may not agree exactly with the final results Decreasing the move increment will increase the accuracy of your results and will slow down your animation You can also slow down the animation by entering a delay factor in the Motion Delay input box Top 2D Wireframe 90 1 Seconds Desc Walk to Rack1 Pick up casing Walk to Table Assemble casing 2013 Proplanner Stationary Part Analysis Metric STEP 13 Now you are going to add a new route just before the end of our existing routing To do this select the last row in the routing window Element 18 and press the nsert Row button Now select this new row and enter the location name BOX in the To Loc column and then press the Update button You have just changed the routing from RACK to the FIXTURE to instead go from RACK to the BOX and then to the FIXTURE Atthis point you could go to the Locations tab and add the location BOX however we are instead just going to let the WPP prompt us for this location when we select the Calculate button Your final result should look like that below Proplanner Workplace Planner ES Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Sy Process secs _ D To Loc or At Loc Man Wak Mach File Open 1 W Ta OPRI
51. Ato D jv C Mutilple Mod Format 5 W5 10 Consider Loaded above Kilograms V 1orAisatfrontofpart Time Units Output Units METERS hd Always route last loc to first loc Hours Minutes Seconds Base Drawing Units MILLIMETERS v MILLIMETERS m iur C Hours Decimal minutes Path Thickness miliM Freq 50 M Automatically Renumber Elements Parts File Name C Users dave Documents Precision 2 M Automatially Erase Temp Locations Location Text Layer PP_LOCATIONS Update Help Goto AutoCAD STEP 1 To get started make sure all other drawings in AutoCAD are closed If you have already been working in Workplace Planner click the New Clear button in the Routings tab Then Open the file WALKPATH 2D DWG make certain that you use only the tutorial files from the metric semicolon directory You should be able to see the Proplanner Applications menu on your screen If not you will need to load this menu using the Menu Installation Guide included in the Install pdf STEP 2 If Workplace Planner is not already open select the W icon button in the Proplanner ribbon STEP 3 To import an existing workplace routing file select the File Open button from the top right corner of the Routings tab screen as shown below Then select the STATIONARY CSV file provided with the WPP application 2013 Proplanner Stationary Part Analysis Metric pod EEE See 1 w T OPRI1 TM 100 Bc 0 2 M O
52. Guide included in the Install pdf STEP 2 Select the W icon button in the Proplanner ribbon 2013 Proplanner so Tutorial STEP 3 To impor an existing workplace routing file select the File Open button from the top right corner of the Routings tab screen as shown below Then select the STATIONARY CSV file provided with the WPP application Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings EL Type S Oper Process Description ToLocorAtLoc Man Wal Freq Dist ft Time sec LEAN Weight SC E File Open 1 W Ne OPRI Walk to Mil MILL 0 1 00 0 0 0 0 0 2 M N OPR1 20 Load Mill MILL 0 1 00 0 0 0 0 0 New Clear 3 M N OPRI 2 Start Mil MILL 0 1 00 0 0 0 0 0 4 W Ne OPRI Walk to OUTPUT CH 0 1 00 o 0 0 0 0 Save As 5 M Ne OPRI 30 Inspect OUTPUT CH 0 1 00 0 0 0 0 0 6 M N ORI 4 Set don OUTPUT CH 0 1 00 0 0 0 0 0 7 W N OPRI Walk to RACKi 0 1 00 0 0 0 0 0 F LIRE 8 M N OPRI 4 Pick upc RACK1 0 1 00 o 0 0 0 0 Help 9 W N OPRI Walk to TABLE 0 1 00 0 0 0 0 0 10 MN OPRI 120 Assembl TABLE 0 1 00 0 0 0 0 0 11 M N OPRI 4 Setdow TABLE 0 1 00 0 0 0 0 0 Up Down 12 W N OPRI Walk to Mil MILL 0 1 00 0 0 0 0 0 SS 13 M N OPRI 30 Unload Mil MILL 0 1 00 0 0 0 0 0 E Insert Row 14 W N OPRI Walk to OUTPUT CH 0 1 00 0 0 0 0 0 15 M N OPRI 4 Place as OUTPUT CH 0 1 00 0 0 0 0 0 E RemoveRow 1
53. In OL Wak to 7L 0 2 38 0 1 00 37 2 38 0 15 D P ai 12 Accamh an 12 0 40 inn ru 12 1nn E Remove Row n b Add Row EL Type Symbol Oper Process To Loc or At Loc Description Freq LEAN WGT SC 1 W TT v ORI G1R Walk 1 00 0 0 0 Update Row Results Loc amp Path Selection Calculate Oper Dist Ft Time sec Walk VA NVBN NV ID XD FETE GES Entire drawing Stationary Part Window Area Moving Part Percentages by Longest Each Operator TNI Wn MET D Takt Time 0 Calculate You will notice that in the lower right of the screen that your Calculate option was changed from Stationary part to Moving Part because the application noticed the characters at the beginning of some of your From and To locations From a routing file perspective the only difference between a stationary part and a moving part analysis is that in a moving part study you need to reference where you want to be on the part and let the WPP determine where the part is at the time that you wish to go to or from it In order to specify where you wish to be on the part you use a simple coding system that is prefixed with an character to specify that the location is a relative one just like in AutoCAD The second character is a number representative of a fraction of the total distance back from the front of the part followed by an L or an R uppercase as are all location names 2013 Proplanner amp Tutorial The method to specif
54. NCH GAP 0 004 EA E AAH CAULK 2 INCH GAP 0 004 EA E AA CAULK 2 1 4 INCH GAP 0 006 EA E AA CAULK 2 1 2 INCH GAP 0 005 EA E AAK CAULK 2 3 4 INCH GAP 0 006 EA E AAL CAULK 3 INCH GAP 0 006 EA E AAM CAULK 3 1 4 INCH GAP 0 007 EA E AAN CAULK 3 1 2 INCH GAP 0 007 EA E AAD CALAK 3 3 4 INCH GAP 0 008 EA E CAULK 4 INCH GAP E M Indude Description zj Oper pest Crt time sec Wal LEAN Dely 2013 Proplanner Licensing Settings Tab Use Standard Derived Walk Time ff this option is selected then the operator speed specified in the Operators tab is ignored and the distance is used to compute the walk time by using the user selected predetermined time system MODAPTS or USER P Increment MODAPTS walk by 5 MODS If the MODAPTS time parsing is selected then the application will automatically round up walk distances in increments of 5 MODS Even if this option is not checked the application will never report a walk time of less than 5 MODS Example HE Increment by 5 MODS 5 12 3 Time Units Hours Minutes Seconds Allows for the entry by the user and output by the application for time in an Hours Minutes Seconds format As such a time of 91 6 will be automatically interpreted as 1 31 6 one minute thirty one point six seconds Hours Decimal Minutes Allows for the entry by the user and output by the application for time in an Hours Minutes format As such a time of 91 6 will be automatically inte
55. OPR1 2 m sy 2jojo 1 00 0 00 Ta 100 d 3 M O OPR1 1 FIXTURE 1 0 0 1 00 0 00 1 50 MI 4 w T OPRI TBAR1 0 0 39 0 1 00 1 94 0 39 0 5 M O OPR1 15 TBARL 1 5 0 0 1 00 0 00 15 100 Save As 6 M O OPR1 3 TBARI 3 0 0 1 00 0 00 3 100 7 w T OPRI RACKL 0 0 48 0 1 00 2 39 0 48 0 8 W T OPRI RACKS 0 0 67 0 1 00 3 34 0 67 0 9 Wo T OPR1 TABLE 0 0 43 0 1 00 2 17 0 43 0 10 M O OPR1 2 TABLE 2 0 0 1 00 0 00 2 100 11 M O OPR1 TABLE 0 0 0 1 00 0 00 0 75 12 W T OPR1 RACK4 0 0 46 0 1 00 2 32 0 46 0 13 w T OPR1 FIXTURE2 0 0 43 0 1 00 2 16 0 43 0 14 M O OPR1 2 5 FIXTURE2 2 5 0 0 1 00 0 00 2 5 100 15 w T OPR1 TBAR2 0 0 23 0 1 00 1 17 0 23 0 16 w T OPRI FIXTURE 0 0 79 0 1 00 3 97 0 79 0 17 W Ta OPR1 RACK2 0 1 13 0 1 00 5 66 113 0 18 W T OPR1 FIXTURE 0 1 13 0 1 00 5 66 1 13 0 m r Add Row EL Type Oper Process secs To Loc or At Loc LEAN Be oe Bru iw BH cD s Update Row m Loc amp Path Selection Calculate i Entire drawing Stationar OPR1 38 00 19 60 39 59 0 3 0 f Mos A E e Sa Window Area C Moving Part Percentages T AliLocs M Flow on Part C Longest Each Operator 4 m E 7 Takt Time 0 Update Calculate 2013 Proplanner Tutorial STEP 4 You should now be able to select the Calculate button bottom right of the screen to analyze the initial workplace layout The results of this Calculate can be seen in th
56. RE 1 19 8488 3 96977 0 2013 Proplanner File Formats 129 9 4 2 Output File Formats Routing file CSV Location file LOC Path file PTH Trace file TRC 2013 Proplanner 9 4 2 1 Routing File CSV The WPP application automatically adds a first line to the original routing CSV file that specifies the units of measurement for the distances in that file The WPP also adds a Summary table at the end that contains the operator total walk distance and time for each unique operator referenced in the routing file File Example FEET 1F 2P 3F 4F 5p 6F 7P 8F 9F 10P 12F 13P 14F 15P 16F 17F 18P 19F 20P 21F 22P 23F 24p 25F 26P 27F 28P 29F OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER1 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 OPER2 PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC START1 L L RACK 1 2 BOX1 BOX1 LW lt B LW lt B BOX1 LW LW RACK 1 2 RACK1 2 LW lt D LW lt D START2 RW RW RACK2 2 RACK2 2 RW lt D RW lt D TRW RW RACK2 2 RACK2 2 RW lt D RW lt D STARTI L 6 29 L 20 29 BOX1 LW lt B 27 23 LW lt B 32 23 BOX1 LW 34 09 LW 37 09 RACK1 2 L WzD 43 61 LW lt D 55 61 START2 RW 4 98 RW 13 98 RACK2 2 RW lt D 20 63 RWe lt D 23 63 RW 27 17 RW 29 17 RACK2 2 RW lt D 36 93 RW lt D 42 93 L
57. Sequence cyde Entire drawing Stationary Part ALLCYCLES z Window Area Moving Part Percentages by Longest Q Each Operator Takt Time 0 Calculate 2013 Proplanner Routings Tab 21 Alternatively you can specify a parts entry time as 50 seconds relative to a previous parts entry such as shown in the example below by simply prefixing the time with the character 2013 Proplanner Routings Locations Paths Stations Operators Parts Anima te LEAN Reports Sequencing Licensing Settings i j EL Type Symbol Oper Process secs Description ToLocor AtLoc Man Walk Mach MOD or MU Freq Dist ft Time sec LEAN We 1 w TT ORI Walk iR 0 4 28 0 1 00 6 5 4 28 0 2 w T Di Walk eic 0 3 82 0 1 00 5 9 3 82 0 3 P os OL1 14 Assemb 1C 14 0 0 1 00 2 10 14 100 a 4 w Tt Obi Walk to RACKL1 0 1 9 0 1 00 2 10 19 0 1 5 w TT OL1 Walk to BOX_L1 0 1 4 0 1 00 2 1 14 0 6 P ou Di 2 Pickup BOX L1 2 0 0 1 00 0 2 50 7 w T T i Walk to 3L 0 1 13 0 1 00 1 8 1 13 0 8 G N jo 0 0 9 w T3 OL1 Walk to BOX L1 0 0 98 0 1 00 1 6 0 98 0 10 w TT OL1 Walk to amp iL 0 1 16 0 1 00 1 9 1 16 0 11 P D OL1 3 Assemb 1L 3 0 0 1 00 7 3 100 12 w FF OL Walk to RACKL2 0 1 87 0 100 2 10 1 87 0 13 P O ORs 4d Pickup RACKL2 1 0 0 1 00 0 1 100 14 w TF OL1 Walk to ex 0 2 38 0 1 00 37 2 38 0 15 D A mi 179 ccamh mA 12 n in ann vo 17 ann m
58. URE2 5 293 74 18 202 59 RACK1 946 92 14 914 09 RACK2 892 97 13 153 04 RACK3 2 362 25 15 363 34 DS RACK4 5 185 83 16 046 20 START 7 130 37 16 131 95 TABLE 3 261 48 17 340 03 Erase locaton TBAR1 1 000 87 17 304 09 TBAR2 4 232 65 17 699 43 DWG Select Add Location Erase All Locs Erase Temp Locs M Auto Erase Temp Locs Location Text Height 200 milimeters Update STEP 6 You can now select the GotoAutoCAD to see the walk paths that were drawn by Proplanner in the workplace between the locations Proplanner automatically generates flow paths using Euclidean point to point lines 2013 Proplanner Tutorial STEP 7 One of the flow paths currently moves through a table To replace this straight line flow path with one that moves around the table select the Edit Redo Path button in the DWG Select section of the Paths Tab shown below in red oval Proplanner Workplace Plann Ex Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settinas Save Paths File List Select Erase Path Edit Redo Path Erase Listed Paths DWG Select Erase Path On Cale Path arrows Path Labels all Paths I Path Arrows Delete Path Dist Labels Delete C Moi Erase DWG Paths Missing Paths IV Ends Only L Path Ends m E late e P Update C Path Vertices Bi C OnLine Arrow Width millimeter ha 10 Label Hei
59. V 1D xp9 Part Sequence cycle are SET X Window Area Moving Part Percentages FF Flow on Part C Longest Each Operator 4 C Takt Time Calculate You will notice that in the lower right of the screen that your Calculate option was changed from Stationary part to Moving Part because the application noticed the characters at the beginning of some of your From and To locations From a routing file perspective the only difference between a stationary part and a moving part analysis is that in a moving part study you need to reference where you want to be on the part and let the WPP determine where the part is at the time that you wish to go to or from it In order to specify where you wish to be on the part you use a simple coding system that is prefixed with an character to specify that the location is a relative one just like in AutoCAD The second character is a number representative of a fraction of the total distance back from the front of the part followed by an L or an R uppercase as are all location names Path 2013 Proplanner Moving Part Analysis Metric The method to specify a location on a Moving part A number from 1 to N where nis from 1 to 25 that specifies how many zones are longitudinally spaced along the part followed by the letter L for Left R for Right or C for Center A number 7 is the default amount of longitudinal divisions The first and last zones are directly at the fron
60. Workplace Planner Help 2013 Proplanner proplanner 2 Proplanner Work Place Planner 1 Proplanner Work Place Planner Proplanner Workplace Planner TM proplanner Click on logo to continue Help Version 3 6 Copyright Proplanner 2013 2013 Proplanner O 2 Introduction Workplace Planner allows you to Determine cycle times in a workplace operator walking and stationary or moving parts Compute processing times from predetermined time systems Perform Lean value added and Ergonomics assessments Generate animations for the workplace which allows for validation of the analysis and can enhance communication There are two versions of Workplace Planner available a stand alone version and an add on to AutoCAD The stand alone version incorporates an AutoCAD engine inside the application This allows you to use Workplace Planner even if you do not have a copy of AutoCAD Workplace Planner s AutoCAD engine does not have all the features of a full AutoCAD license itis more similar to an AutoCAD LT license For users that do have the AutoCAD program AutoCAD ADT or Mechanical Desktop the Workplace Planner add on links to the license and enhances the program with Workplace Planner s capabilities You will not be able to operate Workplace Planner fully without a licence file you will be restricted to evaluation mode and unable to use more than one routing file Please see the next section for licensing inst
61. abels Update Any change to the label size or placement option will only occur on the next calc or when this Update button is selected 2013 Proplanner Paths Tab 27 Path Labels checkbox Determines if paths should have labels Ends Only Places labels in the middle of the last segment of the path specifying the total distance of that path If checked off then labels are placed at every segment also to show the length of that segment In this case the last segment has two distance labels The one in parenthesis is the total path length and the alternate one is the segment distance Above Line On Line Determines if labels are placed center on the line or positioned slightly above the line i e text insertion point Center or Bottom Center to the center of the line segment Label Height Specifies the height of the label Precision Determines how many decimal places to show in the path distance labels On Calc Options All Paths Missing Paths When A Paths is selected WPP will first erase all existing paths in the drawing including manually generated ones and replace them with new Euclidean point to point paths Selecting only Missing Paths default will result in WPP only generating paths not yet existing Other Save Paths File Saves the location display to a comma delimited CSV file in the same format as shown in the display Used for exportation of flow path distances to other applications The WPP applic
62. an machine time chart can be generated on the reports tab where the man and machine times will be optionally displayed in a chart where machine time is displayed parallel to manual labor times 2013 Proplanner How To Guide 9 Appendix Application Limitations Application Layers Application Blocks File Formats 2013 Proplanner 9 1 Application Limitations These application limitations have been defined in order to limit potentially excessive memory requirements of the application If these limits prove constraining for certain situations please contact your Proplanner representative with your specific request Input Routing Lines file length 2 000 Total Flow Paths 1 000 Total Operators 25 Total Dynamic Cycles 25 Total Locations 2 000 Total Synchronous Operators 4 Total Manual Flow Path Segments 10 Total Part Flow Path Segments 5 Total 9 2 Application Layers All Proplanner layers begin with PP The application will consistently add and remove graphics from those layers Proplanner will not alter any graphics on layers other than those beginning with PP Note opname is the operator name specified in the routing file PP LOCATIONS contains the location text PP FLOW opname contains the flow paths for the specified operator PP FLOW ARO opname contains arrows and text labels for the flow paths PP PART PATH contains the polyline that defines the part path PP PART LOCATIONS contains the t
63. anc g9g 5 4 Q Q l EB Join A E V V a Return To Workplace Planner 1 View Viewport Tool Properties Sheet Set g Top Manager Configuration Ca Restore Palettes Manager 2 QueryPath Erase Path Views Visual Styles E Model Viewports Palettes Edit Upd Path Add Loc Add Labels Erase Labels Add Arrows Erase Arrow 2013 Proplanner Moving Part Analysis Metric If your layout drawing looks like the top view of a 3D drawing solid filled boxes instead of wire frame outlines as shown above then you need to select the 2 D wire frame view of the layout To do this select the 2D Wireframe icon located in the top right corner of the AutoCAD window as shown below If you could not find the 2D Wireframe icon please right click at the blank space on the toolbar choose from the popup menu ACAD gt Shade or ACAD View Style depending on your AutoCAD version Cee 6 Drafting amp Annotation M WPP_Moving dwg Home Inset Annotate Layout Parametric i Manage Output Plug ins W Pan YNAMIC 2D Wireframe X F m S IES amp Materials Browser X amp S E DYNAMIC 2D e 9 m amp ala db Orbit STATIC 2D m B C Materials Editor 4g 5 D View Tool Properties Sheet Set E gt Extents Top Manager tore Palettes Manager f 5 Visual Styles X8 Navigate 2D Views 2D Wireframe Conceptual Hidden Palettes Shaded Shaded wi Shad
64. application when the Calculate option is selected from the main routings 2013 Proplanner s Reference Section tab Automatic Rerun Causes the animation to automatically rerun until stopped by the user This setting is ideal for presentation and demonstration purposes where it is desired for the animation to run continuously in an unattended mode Animate Selecting this button will switch control to the AutoCAD window and begin the animation while displaying the animation counter in the Modeless WPP control window Once complete the user will have the option to Return to Walkpath or ReRun the Animation The animation can be stopped and started with the Alt key Top 2D Wireframe 90 1 Seconds Desc Walk to Rack1 Pick up casing Walk to Table Assemble casing Rerun Stop Return Draw Part Path draw the moving part path It is used for Moving Part study 2013 Proplanner Animate Tab 35 5 8 Lean Tab Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Part Sequence cycle A11 CYCLES E 120 120 110 110 100 100 90 90 80 80 70 70 E 60 60 z 50 50 40 40 30 30 20 20 10 10 0 0 10 10 20 20 OR1 OL1 Operator EH Internal Delay M Non Value and Necessary WW Value Process NonValue Process EEE Walking Help Goto AutoCAD The LEAN tab charts the
65. ation does not read these files 2013 Proplanner 2 Reference Section 5 4 Stations Tab Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings NOTE Station Data only Station Description Strt On jLength n usedforMovingPart OPR1 0 40 Calculations Users performing stationary studies need notdefine stations Save to Part Path Draw Part Path Station Description Start in Length in OPR1 0 40 Update Add Remove Import Assignments Container Insert Help Goto AutoCAD The Stations Window is where all the part path information for the individual stations is accessed within the WPP The data itself is stored within the part path poly line within the drawing NOTE The information within the Stations tab is only used when performing Moving Part studies Users who are performing Stationary studies need not enter any information into this tab Station This input box is where the station names are assigned Description Allows the user to describe the station for future reference Start This is the distance from the beginning of the Part Path line where the station begins Length This is the length of the station starting at the start distance Update Updates the station list with the new information Add This button adds the station created to the list Remove Removes the selected sta
66. ave option in the browser window to save your report 2013 Proplanner Tutorial 6 3 Stationary Part Analysis Metric This tutorial was developed with the drawing units set to millimeters and the reporting units set to meters In addition the files have been saved in a semi colon delimited format with numbers specified in the format 1 200 15 which is common in France Germany Italy Sweden and other countries Before starting the tutorial itis advised that you go to the Licensing Settings tab and ensure that your settings are set as shown below Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings AutoCAD SN 000 00000000 WPP Version Full 2 6 0 License Code Update License Draun Leave blank if indefinite Application Settings and Defaults Process Parsing Options Walk Speed Options Moving Part Options Save Settings Er ae Process Parser None Start Walk Time secs First 333mm ae ts ent tmd Start at Op Start Use Standard Derived Walk Time 9 Min Dist M C Start at First Element Loc Predetermined Factor 4 0 Differentiate After M Start at Last Element Loc MODAPTS 0 Beginning Walk Speed M s Part Grid Increment MODAPTS Walk by 5 MODS 1l Default UnLoaded Walk Speed M s LCR ito 7 jx Total Mod Format W25 0 5 Default Loaded Walk Speed M s CRAN
67. b in the WPP application Setting path regeneration to Missing Only Regenerating all paths would erase manual path You can do this again for the line from TBAR2 to the FIXTURE When complete you drawing should now look as shown below BM AutoCAD 2008 NOT FOR RESALE CA Users dave Documents VProplannerWalkpath Tutorials Metric Semicolon Walkpath 2D dwg R File Edit View Insert Format Tools Draw Dimension Modify Express Window Help 1 von 9 Q9 5p Q MTLMIMA SLR Er E X 2A 6 2 e 79 EE S amp S BE a Q G SENA Layout of Ortho off Command Next point FIXTURE return when done ins Command Next point FIXTURE return when done Command 425 1088 18667 5156 0 0000 SNAP GRID ORTHO POLAR OSNAP oTRACK Ducs DYN Lwr MODEL Annotation Scale 1 17 4 fi O 2013 Proplanner Stationary Part Analysis Metric STEP 10 To evaluate the impact of this change Simply select the Routings tab at the top and re select the Calculate button Make sure that the study is set to stationary part Calculate in the bottom right of the routings tab Your new total walk distance and time will be updated and your paths will look like those shown below pe s Proplanner Workplace Planner EJ Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequen
68. cal Settings Temp WPPReport XML v Go Links amp STATION REPORT STATION Station_1 TAKT TIME 85 00 SPEED CARRIER 30 00 1R 18 19 Assemble 1st Part 9 0000 RACKR1 Walk to Rack1 4 2000 mo 7R 29 52 Walk to back of car 5 1700 7R 22 52 Assemble 2nd Part 3 0000 2 0000 3 24 9 00 4 20 1R 36 44 Walk to front of car 3 9500 3 95 RACKR1 Walk to Rack 1 2 4100 2 41 mare om 3 TR 82 99 Assemble th Part 15 0000 15 00 STARTR Return to Start position 1 16 38 5 0100 5 01 35 0000 33 1800 0 0000 68 18 LOCATION DESCRIPTION ELEMENT ACTIVITY TEER DISTANCE PROCESS WALK DELAY TOTAL 1R 9 19 Walk 1 34 01 9 2400 9 2 1 8 82 1 OPERATOR OL1 T T E My Computer Station report 4 Lean station report is similar to the Station report Instead of the time and distance information all the lean VA NVA NVABN information for each operator is displayed 2013 Proplanner 122 Troubleshoot 2 WPP Routing Microsoft Internet Explorer File Edit View Favorites Tools Help Q gt x a JO search She Favorites A p jw m Fel MAL Lj Address ej C Documents and Settings Adam PROPLANNER Local Settings Temp WPPReport XML v EJ co Links amp STATION REPORT STATION TAKT TIME SPEED CARRIER PLANNED EFFECIENCY ACTUAL TAKT TIME LOCATION proplanner 1R 9 19 1R 18 19
69. cations as static locations 10 Run the calculation A Moving part study will now be drawn on the AutoCAD drawing 11 Now that the calculation is complete return to the Routings tab and look at the Results Window in the lower left side of the WPP window Results The results window should equal those below if the calculation has been run correctly Results Oper 1 Distt Delay OL1 99 6 370 47 7 0 0 0 OR1 97 3 369 92 J 0 0 0 Exercise Five Improving layout to reduce labor times There are many different ways to improve our layouts For now we will use the drawing in Proplanner fold Help Files PPWPP_Exercise_Samples WPP_Stationary_3 dwg and in Proplanner fold Help Files PPWPP_Exercise_Samples WPP2 csv so that we have a common set of output The most obvious ways of improving a layout may be to push locations closer together Because in many cases there are locations which cannot be moved we assumed the racks and tables to be the only mobile locations To move the locations simply grab the text for the location and drag it to the new desired locations 1 Open the drawing in AutoCAD and CSV within the WPP 2 Notice that the racks have been moved to reduce walk time and increase free space 2013 Proplanner 3 Run a Stationary calculation to see the results Results You should see results similar to below Notice the drop in time and walk percentage 54 5 418 24 Percentages by Each Operator
70. cing Licensing Settings 2 M O OPRI 2 FIXTURE 2 0 0 3 M O OPRI 1 FIXTURE 1 0 0 1 00 0 00 1 50 ER 4 W T OPRI vs TBARI 0 1 3 0 1 00 1 94 13 0 5 M O OPRI 15 TBARI 1 5 0 0 1 00 0 00 1 5 100 Save As 6 M O OPRI 3 TBAR1 3 0 0 1 00 0 00 3 100 a w T OPR1 RACK1 0 1 59 0 1 00 2 39 1 59 0 8 WT OPRI ves RACK3 0 2 23 0 1 00 3 34 2 23 0 Goto AutoCAD 9 Wo Ta OPRI TABLE 0 1 45 0 1 00 2 17 1 45 LLL 10 M O OPRI 2 TABLE Jo 1 00 0 00 2 100 Heb 11 M O OPRI TABLE 0 0 0 1 00 0 00 0 75 12 W To OMi RACK4 0 1 55 0 1 00 2 32 1 55 0 13 W Tas OPRL FIXTURE2 0 1 44 0 1 00 2 16 1 44 0 14 M O OPRI 25 FIXTURE2 2 5 0 0 1 00 0 00 2 5 100 Up 15 w T OPR1I TBAR2 0 0 78 0 1 00 1 17 0 78 0 16 W T OPRI FIXTURE 0 3 14 0 1 00 4 70 3 14 0 Insert Row 17 W T a OPRI RACK2 0 3 78 0 1 00 5 66 3 78 0 18 W Tas OPRI FIXTURE 0 3 78 0 1 00 5 66 3 78 0 EN m Add Row EL Type Symbol Oper To Loc or At Loc Description s WGT 1 wz t Jf or J FIXTURE wak of Update Row Part Sequence cycle Loc amp Path Selection Calculate Oper Dist Time sec Wa VA NV Nv9e ID Xp c n OPR1 39 12 38 08 68 30 0 1 0 WT aces __ El Eee SESE C Window Area C Moving Part Percentages ri F C Longest Each Operator STEP 11 Now select the Operators tab to see the operator in your study This window is filled when you load or define your routings Every time that you use a unique operator name it will appear
71. e animation in 3D if using FCAD DWG Now double click on the DYNAMIC 3D option and select OK 2013 Proplanner 9 Tutorial STEP 10 Now select the ReRun Animation button and watch the show Remember that selecting the Alt key and reselecting it will start and stop the animation STEP 11 After all the calculations have been completed you can go to the reports window Routings Locations Paths Stations Operators Parts Animate LEAN Reports If Image is off center re select Get Image button again Sequencing Licensing Settings Station Stston 1 Model Moving TAKT 80 Seconds Production Volume 96 92 Planned Eff 100 Line Speed 40 Meters Minute Report Image Report Settings Image Select Orientation Activities andElements Current Display Rotated Activities Only Window Select Display Elements Only Get image Combine Events per Row Value Added Time Reg Time Report Type Station Report Simple Cycle ALLCYCLES Show Report Help Goto AutoCAD The workstation report includes an image of your workstation along with workstation header information that you can enter in the top right of the screen Similarly the Man Machine report displays the breakdown of both manual and machine related labor times These reports can be set to output Activities and their Elements or either option separately Select the Get Image button to get the current view of your workplace You may n
72. e Distance and Time columns in the right side of the routings window and in the Results Area in the bottom left corner In addition the flow lines should have been drawn in your layout as shown below E AutoCAD 2008 NOT FOR RESALE C Users dave Documents Proplanner Walkpath Tutorials Metric Semicolon Walkpath 2D dwg less is File Edit View Insert Format Tools Draw Dimension Modify Express Window Help S x x a QE do s X amp Q OS YO Q MTLMIMA 39 38 ER S A X ove ib 4 93 He BwWBHI eElLASt 27 i 2E E EEM MELEE L X 7 2 692 Command Cancel Command Cancel Command redraw Command 9469 2854 19741 4600 0 0000 SNAP GRID ORTHO POLAR OSNAP orRack DUCS DYN LwT MODEL Annotation Scale 1 17 4 2013 Proplanner Stationary Part Analysis Metric STEP 5 You can now select the Locations tab to see the location text that Proplanner found on the PP LOCATIONS layer within the drawing This text has already been added for you however you could add additional location s by selecting the Add Location button in the middle right of this screen under DWG Select or by going into AutoCAD and simply placing text manually on this layer mmm Workplace Planner J Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Location Xx Y i FIXTURE 383 94 18 669 81 Save Locations File FIXT
73. e default directory and file for the parts file used in WPP Save Settings Saves the values specified in the Application Settings and Defaults frame so that they will be default for all subsequent sessions 2013 Proplanner Reference Section 6 Tutorial There are three tutorials to help you become familiar with Proplanner s Workplace Planner These tutorials both Metric and Footlnch versions are located in subdirectories within the HELP subdirectory located in the directory where the program was installed typically c program files proplanner autocad programs The Metric tutorials base unit is millimeter are available in two forms comma and semi colon delimited The comma delimited metric tutorials are for those countries who use the same number format as the United States i e 1 200 52 and the semi colon tutorials are for those countries Germany Italy France Sweden etc who reverse the comma and decimal point i e 1 200 52 Stationary Part Analysis Moving Part Analysis Sequencing from Line Balance data 2013 Proplanner 6 1 Stationary Part Analysis STEP 1 To get started make sure all other drawings in AutoCAD are closed If you have already been working in Workplace Planner click the New Clear button in the Routings tab Then Open the file WALKPATH 2D DWG You should be able to see the Proplanner Applications menu on your screen If not you will need to load this menu using the Menu Installation
74. eed to select 2013 Proplanner Moving Part Analysis Metric 9 the Goto AutoCAD button in order to adjust your display such that the workstation view looks correct You can also get image from a window For best results getting image by a selected window hit Get Image twice Once your view is acceptable select the Station Report button to generate your report This report can also be made to show VA NVA percentages by checking the checkbox Once the report is generated simply select the File Save option in the browser window to save your report 2013 Proplanner o Tutorial 6 5 Sequencing from Line Balance data Metric This tutorial was developed with the drawing units set to millimeters and the reporting units set to meters In addition the files have been saved in a semi colon delimited format with numbers specified in the format 1 200 15 which is common in France Germany Italy Sweden and other countries Before starting the tutorial it is advised that you go to the Licensing Settings tab and ensure that your settings are set as shown below n Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settinos AutoCAD SN 000 00000000 WPP Version Full 2 6 0 License Code Update License Er Leave blank if indefinite Application Settings and Defaults Process Parsing Options Walk Speed Options Moving Part Options
75. emporary locations along the part path Also Animation of operators occurs on the respective PP FLOW layer for that operator Animation of the part occurs on the PP PART PATH layer Thus blocks being animated will assume the color of the respective operators layer color provided that those blocks were defined on layer O with their entities having the color property of BYLAYER 9 3 Application Blocks e Proplanner will create a block called PP ARROW for representing the arrowheads along the flow lines e Proplanner will also create a person block PP PERSON and e A part block PP PART if the user selects animation and does not specify any different blocks to be animated 9 4 File Formats Input File Format Output File Formats Routing file CSV Location file LOC Path file PTH Trace file TRC 2013 Proplanner File Formats 127 gt K OK ok 9 4 1 Input File Format The input file is a comma delimited file with a CSV extension As such no commas are allowed within the text in a field Proplanner can also read the output files as input files In this situation Proplanner will ignore the first row that specifies the distance units since it will also ignore those distances and also the last rows from the word SUMMARY on to the end of the file Data Value Element ID Integer Number 1 2000 2 Element Type F P S T M X 4 Process Code a slash seperates LCode from RCode 5 From Loc LCode based on F P String up t
76. eports Sequencing Licensing Settings _ NOTE Station Data only Station Description Start in Length in used forMovingPart OR1 0 40 Messa Dee performing stationary OL1 B ja studies need notdefine OPR1 0 40 stations STAT1 0 40 Save to Part Path Draw Part Path Station Description Start in Length in 0 40 Add Remove Container Insert OR1 Import Assignments Help Goto AutoCAD 2013 Proplanner s Tutorial Now you can return to the Routings tab and simply select the Calculate button at the lower right of the window You will see the results shown in the Results Window lower left of window and Drawing see examples below actual results will vary slightly from these examples due to changes in the individual sample files Results Oper Dist Ft Time sec Walk VA NVBN NV ID XD OR1 155 7 59 41 54 43 0 3 OL1 132 7 57 51 40 60 0 0 0 0 0 0 RACKBL 2 18 Fi D co m 1L 1 You will notice that in this example you have two different operators and their flow paths are shown in different colors To generate this diagram the WPP computed the speed of the vehicle and the speed of the operator walking The WPP then took into account the process times at the vehicle and at the containers and racks along the line The WPP then computed all of the line part operator intersection locations created labels for these locatio
77. es of Gray Sketchy Online Express Tools Top 2D Wireframe Wireframe X Ray EE Save as a New Visual Style Visual Styles Manager STEP 3 Once your view is correct you will want to go into the WPP application Depending upon how you are starting this tutorial do the following New into AutoCAD Perform steps 2 3 and 4 in the first Tutorial e From Goto AutoCAD in WPP Select the Return to Walkplace Planner button from the WPP modeless window located in the top left corner of the screen 2013 Proplanner s Tutorial STEP 4 Nowinthe Routings tab select the File Open button at the top right and load the MOVING CSV file Your screen should look like that shown below when you are done Proplanner Workplace Planner EJ Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings T Sy 1 w T 2 w T 3 P a 4 w Ta 5 w Tae 6 P Q 7 w T 8 P O 9 w T 10 w Tae 11 P O 12 w Tu 13 P O 14 w T 15 P 0 16 w T 17 P O 18 w Tae E 19 P O ORI 2 RACKR1 2 0 0 1 00_ 0 00 2 m m r EL Type To Loc or At Loc Description WGT 1 w Fi r5 I ou gt R wak of Update Row LEZ Loc amp Path Selection Calculate Oper Dist M Time sec Wa vase NV N
78. et as well as the special options available within the application The Help button will access the on line help document which is also available as a PDF file located in the program directory for easier print out All entries in this tab window are saved between user sessions 5 12 1 License Codes When you first run the application you will need to go to the options menu and enter your License Code License codes are provided by your Proplanner sales representative or can also be obtained by contacting Technical Support License codes are generated to link the WPP to your copy of AutoCAD Therefore you will need to provide the Proplanner representative with your AutoCAD serial number shown on the options screen so that they can generate the appropriate code for you Upon entering the code and selecting the Update License button the WPP will save this code to a license file inthe WPP application directory specified at installation time License Code This is where you enter the code given to you by the Proplanner representative Codes are case sensitive capital and lower case letters are considered to be different You may copy this code from the email sent to you by Proplanner and then paste it in this field Expiration This is where you enter the expiration month and year for the software For example if the expiration date is 6 2006 the last day the product will work would be May 31 Purchased licenses will not have an expiration da
79. f the way back uro oe sas LW or LW lt A lee _ F bum mm u RW or RW A OLD d Part 5 12 6 Other Settings Output Units Sets the default distance units for output information from the program Base Drawing Units Sets the default distance units to read distances from the drawing Location Text Layer The layer that the WPP will look to find location text Default is PP_LOCATIONS Path Thickness Determines how thick a path should be for each unit of travel frequency specified in the flow path routing A value of zero will generate dimensionless thick flow lines Path thicknesses are generated during a Calc command Automatically Renumber Elements If this is set then the program will constantly renumber your elements sequentially NOTE some applications that you interface with my require the element numbers not to be changed in the WPP application Always route last loc to first loc Automatically route the last location in the element list to the first location 2013 Proplanner Licensing Settings Tab Line Delimiter This setting allows the user to select either the comma or semi colon for the delimiter it uses to separate information in the input files The default comma separated files are not always standard for foreign numeric notations that use commas instead of periods Automatically Erase Temp Locations Automatically erase the temporary locations generated in the drawing Parts File Name Th
80. ferent operators and their flow paths are shown in different colors To generate this diagram the WPP computed the speed of the vehicle and the speed of the operator walking The WPP then took into account the process times at the vehicle and at the containers and racks along the line The WPP then computed all of the line part operator intersection locations created labels for these locations along the part path white text 2013 Proplanner Moving Part Analysis Metric 9 perpendicular to part path and generated the flow lines accordingly with path labels and flow arrows STEP 7 Once you have completed the analysis you can select the Parts tab to make sure that the part block is set to CAR Operator tab to make sure the operator is set to PERSON and then proceed to the Animate tab to perform the following step STEP 8 Now onthe Animate tab select the Animate button in the bottom right of the screen and watch the operators at work You will notice that when the operators are working on the car they travel at the speed of the car but when the walk around the workplace they travel at their walking speeds which are faster and must be than that of the car For optimal animation you will want to set your animation move increment to 0 1 seconds Step 9 Finally and once the animation is complete but before selecting the Return to WalkPath button you will need to select the view icon or type in the VIEW command to see th
81. file and displayed within the Station Report 2 A man machine time chart can be used to display the operators activity times in a Gantt chart layout 2013 Proplanner Troubleshoot WPP Routing Microsoft Internet Explorer File Edit View Favorites Tools Help Dis 8 A D de 62 3 m D EA Address fe v Ee Links MAN MACHINE CHART ELEMET RESOURCE PROCESS Walk Walk Assemble 1st part Walk to Rack 1 Walk to Box 1 Pickup part at Box 1 Walk to 1 3 back on car Assemble 2nd Part Walk to Box 1 o 1 2 3 4 5 e 7 8 9 Walk to front of car Assemble 3rd Part Walk to Rack 2 Pickup part at Rack 2 Walk to back of car Assemble 4th Part Return to Start position Assemble 1st Part Walk to Rack Pickup part at Rack 1 Walk to back of car Assemble 2nd Part Walk to front of car Assemble 3rd Part Walk to Rack 1 Pickup part at Rack 2 Walk to back of car Assemble 4th Part Return to Start position Man machine time chart 3 The station report is the comprehensive report file for all the time distance and performance data calculated within the Workplace Planner 2013 Proplanner How To Guide 121 wep Routing Microsoft Internet Explorer File Edit View Favorites Tools Help O O DAD D Xr BE a We Address fs C Documents and Settings Adam PROPLANNER Lo
82. file in Excel and do a Find and Replace or ctrl h Replace the comma symbol with nothing Go to the Options Help tab and enter the license code exactly as it was emailed to you It is case sensitive Also enter the expiration date in the same way if applicable The best way is to just copy and paste it from the email you received from Proplanner Enter the license code exactly as it was emailed to you It is case sensitive Also enter the expiration date in the same way if applicable The best way is to just copy and paste it from the email you received from Proplanner Make sure there are no extra spaces in the input box before you paste Go to the Options Help tab and select the appropriate units feet inches meters and millimeters If you do not know the drawing units go to AutoCAD and type UNITS into the command line This will bring up a window where you can get or enter the desired units Hit Calculate on the routings tab before generating the reports or checking the Paths tab Go to Windows Update for which a link is usually located in the Control Panel under Settings and update to the latest version 2013 Proplanner 8 When moving part calculation is run it asks for the on part locations as fixed locations 9 Part locations do not work correctly 10 Path lines are either too small or too large 11 Despite the operator being limited to a set distance it can go
83. g all paths would erase manual path 2013 Proplanner Stationary Part Analysis 55 STEP 10 To evaluate the impact of this change Simply select the Routings tab at the top and re select the Calculate button Make sure that the study is set to stationary part Calculate in the bottom right of the routings tab Your new total walk distance and time will be updated and your paths will look like those shown below If the distances cannot be seen within the paths tab there are options to increase arrow width and height as well as path labels Clicking update will change the labels lengths automatically to the new height STEP 11 Now select the Operators tab to see the operator in your study This window is filled when you load or define your routings Every time that you use a unique operator name it will appear in this window From this window you can set the walking speed of your operators and the color of their flow paths An ability to set the maximum distance traveled into the previous workstation to work on a moving part has also been included here Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Oper Calc Unld SpdFt s Load SpdFt s StartLocation Delay secs Path Color Station PrevDist in Next Dist in Block Name OPR1 Yes 4 17 mu START 0 2 OPR1 0 0 PP_PERSON Speed Ft s Feet Oper Calc Unloade Loaded StartLocation Delay Color Station Prev Next Dist
84. g routes and P or M for process times etc Also do not forget to specify a location in the From field for all processing rows in order to tell WPP where the processing is to occur 4 3 Conducting the Analysis Now that your drawing is drawn to actual scale and your routing has been created you are ready to select the Calculate command on the main routings window Calculate will create your operators for you and will also ensure that all locations From and To specified in the routings are actually located within your drawing If any routing locations are missing WPP will prompt you to locate those within the drawing Once all locations have been specified WPP will update the walk times and distances in the routing editor and will compute the summary distance time and lean information in the results window and on the LEAN and Ergonomics Charts Selecting the Save As button will save your results out to a file The input routing data and output results data are stored in the same file This file is a simple comma delimited text file that is easy to import into a word processor or spreadsheet 2013 Proplanner Conducting the Analysis 5 Reference Section Routings Tab Locations Tab Paths Tab Stations Tab Operators Tab Parts Tab Animate Tab Lean Tab Ergonomics Tab Reports Tab Sequencing Tab Licensing Settings Tab 2013 Proplanner 8 Reference Section 5 1 Routings Tab Routings Locations Paths Stations O
85. g with a load 2013 Proplanner Reference Section when new operators are added by the WPP Consider Loaded Above f the routing elements weight is GREATER THAN this value then the WPP will use the Loaded Speed for that operator otherwise the WPP will use the Unloaded speed Times in Feet Second fannie Deut Cor fav e owns e o peeieMu NE 278 ol Beginning Walk Speed Default UnLoaded Walk Speed Default Loaded Walk Speed Consider Loaded above 2013 Proplanner Licensing Settings Tab 45 5 12 5 Moving Part Options 5 12 5 1 Start Position if First Loc on Part Determines the FROM location when the To At location for the First element is a relative location on the part and or when the first element s type is Integrated Start at Op Start Location The WPP will start the operator at that Operator s START location as specified in the Operator s tab Start at last Element Location If the location of the last element is not a relative location on the part then the WPP will start the operator at this location and then move to the location specified in the first element If the last element s location is on the part then the WPP will default to using the Operator s Start location as the from location for the first element 5 12 5 2 Part Grid 1 to L C R A number from 1 to N where nis from 1 to 25 that specifies how many zones are longitudinally spaced along the part followed by the letter L f
86. ght ioo milimeters Arrow Length 10 milimeters Precision o Decimal Places Help Goto AutoCAD 2013 Proplanner Stationary Part Analysis Metric STEP 8 The WPP window will now disappear and you will be in the AutoCAD application window AutoCAD is prompting you to select a path to replace with a new manually drawn one Select the path in the top middle as indicated by the white arrow below LELA i BW AutoCAD 2008 NOT FOR RESALE C Users dave Documents Proplanner Walkpath Tutorials Metric Semicolon Walkpath 2D ia File Edit View Insert Format Tools Draw Dimension Modify Express Window Help WH a MTLMIMA s Q2Ols AS AB 3 amp amp Select objects Specify base point Specify rotation angle Command 9395 5615 15695 1794 0 0000 2013 Proplanner or Copy Reference 0 00 SNAP GRID ORTHO POLAR OSNAP OTRACK pucs DYN LWT MODEL D ei O Annotation Scale 1 31 v Tutorial STEP 9 The original path will now disappear and you will be prompted to enter a path from START to FIXTURE Simply pick points starting from where the path originated around the table and then finally to the FIXTURE as shown below When you pick your last point at the fixture you can press Enter on the keyboard or your Right mouse button A WPP Alert window will show up Click OK You will then be returned to the Paths ta
87. hs and part paths and fill their associated displays New Clear Clears the current routings list so that new routings may be entered Save As Saves the routings in the editor to a file along with the units of the study and any results in the lower left results window Goto AutoCAD Hides the WPP Modal window and displays a smaller Modeless editing window This command is used when you need to work in the AutoCAD editor environment but wish to return to the WPP application and retain your information The Modeless window shown below will appear in the far upper left corner of the AutoCAD window The controls included within this modeless window are discussed in their respective sections i e Locations Paths etc Return To Workplace Planner QueryPath Erase Path Edit Upd Path Add Loc Add Labels Erase Labels Add Arrows Erase Arrow Modeless Window displayed after clicking Goto AutoCAD Calculate The calculate button performs the distance and time calculations and generates and updates the flow paths Calculate first looks in the drawing to see that all of the referenced locations exist If some locations that appear in the routing do not appear in the drawng then WPP will prompt the user to enter each location In this case the user will be prompted to select the calculate button again to resume the calculate procedure once all of the input locations have been specified Calculate al
88. i C sr a V Path Arrows Delete v nn Delete issing Pa a g Path Ends V Element abel Edit Redo Path _ _ v Ends Only l Path Vertices Update b Update LT Erase DWG Paths On Line Arrow Width 6 Inches Label Height 6 Inches Arrow Length 6 Inches Precision 0 Decimal Places Help Goto AutoCAD The Paths tab is the main control for path editing and annotation List Select Erase Path Selects in the drawing the currently selected path from the path display list and then deletes it from the drawing and the path display list The path will be regenerated automatically by WPP on the next Calc Edit Redo Path Selects in the drawing the currently selected path from the path display list which WPP will automatically delete and then prompt the user to select vertices up to 11 vertices to create a maximum of 10 segments for a new path to replace it User defined paths are replaced by Euclidean paths when WPP creates new paths such as is done in ALL Moving part studies or when the All Paths option is selected on this path window during stationary part studies Erase Listed Paths Will erase all the walk flow paths shown in the current list which are paths in the Drawing referenced by this routing file 2013 Proplanner Reference Section Drawing Select Erase Path Allows the user to select a path in the drawing and then deletes it from the drawing and the path display list The pa
89. ies for the Moving Part Calculation This is where the part blocks are assigned to the part names referenced in the routings The part information is stored in the parts prt file in the AutoCAD Programs folder with the rest of the Workplace Planner files This file name can be changed on the Licensing Settings tab NOTE The information within the Parts tab is only used when performing Moving Part studies Users who are performing Stationary studies need not enter any information into this tab Part Info Open Save Parts Allows the user to store or open pre made part information for different scenarios Part Name Generic part name linked to the routings and each cycle that uses that part Block Name Name of block which has been assigned to represent the given part name when the animation is run 2013 Proplanner Reference Section Blocks are loaded upon startup of the WPP so if the user adds a new block to the drawing WPP will need to be restarted before it will read the block in this drawing Only valid blocks currently available within the drawing are shown in the pull down list Blocks must be defined with their default direction and insertion point as shown below 5 Insertion Point SPECIAL NOTE Backup and Metric or Standard versions of the default blocks can be found on the installation CD in the folder called SAMPLE FILES Length Determines the part length for the A B C and D longitudinal offset para
90. iles PPWPP_Exercise_Samples WPP_Stationary_2 dwg instead of the drawing file just created along with in Proplanner fold Help FilesNPPWPP Exercise Samples WPP2 csv will ensure that we get the same results when this exercise is complete 1 Open the drawing and notice that all the locations have been placed as in exercise two You may note that there is a person block placed in the drawing Leave this there for use when animating if you chose to do so at a later time 2 Start the Workplace Planner and open the CSV mentioned above It should be identical for the most part to the CSV file created in the first exercise 3 Check the Routings tab to make sure all the data has been imported into the correct fields 4 Go to the Licensing Settings tab to ensure that the units are in feet and inches and that the operator start location is set to Operator Start 5 Return to the Routings tab and select the Stationary Part Calculation radio button If this option is set to moving the calculation will not complete because that method needs a path for the part to move on 6 Run the calculation A Stationary part study will now be drawn on the AutoCAD drawing 7 Now that the calculation is complete return to the Routings tab and look at the Results Window in the lower left side of the WPP window Results The results window should equal those below if the calculation has been run correctly Results OPR1 81 8 423 69 6 0 0 0 Perce
91. ill allow you to save the created build sequence or upload a pre existing one Selecting Open Sequence will allow you to open LBData Seq xml which is the same as the sequence you just simulated If you create routings and Calculate the results should be the same STEP 14 To see the results Calculated there are three main places for this First of all the rough summary output can be seen in the bottom left side of the routings tab shown below The results are boxed in red Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencdng Licensing Settings Epelera ee hee fes D Tense de Manion fre Dei Teide ie n Wa c N Le I N ST_O1 e STO1L_RACK o4 27 0 1 00 6 41 us 70 New Clear I N ST O1 10 0 0 1 1C 10 3 64 0 1 00 5 46 13 64 0 I N ST O1L 2 10 0 2 STO1L RACK 2 2 57 0 1 00 3 86 4 57 0 I N ST 02 0 0 24 0 4 STO2L RACK 0 7 24 0 1 00 10 86 7 24 0 Save As I N ST 02 10 4 57 0 1 IC 10 4 36 0 1 00 6 54 14 36 0 I N ST 02 2 3 17 0 2 STO2L RACK 2 3 1 0 1 00 4 65 5 1 0 I N STOIR 0 10 0 4 STO1R RACK 0 7 58 0 1 00 11 37 7 58 0 Goto AutoCAD I N ST_OIR 10 0 0 1 1C 10 3 3 0 1 00 4 95 13 3 0 EM I N ST OIR 2 10 0 2 STO1R RACK 2 2 27 0 1 00 3 40 4 27 0 Help I N ST 02R 0 0 24 0 4 STO2R_RACK 0 9 66 0 1 00 14 48 9 66 0 I N ST 02R 10 4 57 0 1 1C 10 4 69 0 1 00 7 04 14 69 0 I N ST 0
92. indow will take you into the AutoCAD window and allow you to select the position for the missing location ppwp2013 E o es Some Locations are missing Select OK to add them Now select a position in the drawing for our new BOX in the place shown below yd K Moving Locations To move locations select the Goto AutoCAD button and either use the AutoCAD Stretch command crossing window option or the Move command to relocate the Location text Using the Stretch option will also move the end points for the flow paths whereby the Move option will not The user may also just grab the location text and drag it to the new location 2013 Proplanner Stationary Part Analysis s Upon returning to the WPP and selecting Calculate the flow paths that were stretched will report their new distances correctly however the program will not automatically regenerate new flow paths for the relocated Location text so those paths will report the same distances that they had in the prior Calculate As such you need to either go to the Paths Tab and delete the paths that would be affected by the relocated Location text labels or you need to select the All Paths on Calc option in this menu and then select the Calculate button as shown in the example screen below Selecting All Paths will tell the WPP to first delete all of the flow paths and then regenerate them to their current Location text positions Selecting All Paths is recommended i
93. ing the AutoCAD LIMITS command You will then need to follow the limits command wth the ZOOM ALL command in order to ensure that you are viewing the entire work area Since WPP reads the distance from your drawing it is important that the drawing is created in actual size This means that if the distance between a table and a box is 3 6 in the real world then the drawing needs to be created such that the table is 42 base units from the box in foot inch units of course The drawing does not need to be highly detailed for WPP to work Essentially the drawing needs to contain enough detail so that the WPP user can determine where locations specified in the operator routing would be located within the workplace 4 2 Preparing the Routing The workplace routings can be defined in another application such as MS Excel and imported into WPP or the routings can be defined within the WPP application If you wish to create your 2013 Proplanner 6 Getting Started routing file in MS Excel it is best to first import the stationary or moving csv files into Excel and modify them in an effort to ensure that the file format is correct Documentation on the format of each field in this file can be found in the appendix of this manual You may define a workplace routing within WPP by adding and Inserting lines within the routing editor Make certain to use unique element numbers for each row and to use the proper element code for a row W for walkin
94. into the previous station it still walks further than that to reach the back of the moving part 12 Simulation sends worker to other stations or to the origin when doing a moving part study 13 Frequency line and arrow thickness are increasing every time a calculation is performed 2013 Proplanner Analysis type is set to Stationary Part There are now two syntaxes for entering the part location The wrong one being selected will cause an error These do not automatically scale so must be set manually This is due to the length of the part path There are duplicate part paths or locations in the drawing often caused by drawings with multiple stations Operator name contains an improper character Change the radio button on the Routings tab to Moving Part On the Options Help tab make sure that the part grid format is set to the r I w or I c r whichever is the format the routings follow Also the number of spots on the part is now default of 7 and set to letters up to D This can be changed to the desired amount of divisions in the pull down window to the right of the Part Grid box These can be set manually on the Routings tab under Path Thickness Frequency This thickness is scaled in the drawing units This can be overcome by adding a delay to the process to let the part enter the work zone or shortening the part path so that the worker does not start working on it until the enti
95. lc option in this menu and then select the Calculate button as shown in the example screen below Selecting All Paths will tell the WPP to first delete all of the flow paths and then regenerate them to their current Location text positions Selecting All Paths is recommended in situations whereby you do not have many manual paths specified as those manual paths will also be deleted by the All Paths option thus requiring the user to re specify them 2013 Proplanner gt Proplanner Workplace Planner Routings Locations Paths stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Oper From To Freq Dist 5 OPR1 TBAR2 FIXTURE 1 00 4 70 Save Paths File OPR1 START FIXTURE 1 00 7 59 OPR1 RACK2 FIXTURE 0 00 5 66 Pre OPR1 FIXTURE RACK2 1 00 5 66 OPR1 FIXTURE2 TBAR2 1 00 117 Erase Path OPR1 RACK4 FIXTURE2 1 00 2 16 OPR1 TABLE RACK4 1 00 2 32 1 OPR1 RACKS TABLE 1 00 2 17 EM Redo Path OPR1 RACK1 RACK3 1 00 3 34 lil OPR1 TBAR1 RACK1 1 00 2 39 Erase Listed Paths OPR1 FIXTURE TBAR1 1 00 1 94 OPR1 RACK2 BOX 1 00 1 84 OPR1 BOX FIXTURE 1 00 4 62 DWG Select Erase Path Query Path Edit Redo Path Path Arrows Path Labels IV Path Arrows Delete v Path Dist Labels Delete rm t Erase DWG Paths v il Path Ends ELS Update cy Update Path Vertices Ip C OnLine Arrow Width milimeters 10 Label Height 100 milimeters REED 10 Predson
96. le Mod Format 5 W5 10 Consider Loaded above Kilograms V 1orAisatfrontofpart Time Units Output Units METERS v Always route last loc to first loc Hours Minutes Seconds Base Drawing Units MILLIMETERS v ee ehe z Hours Decimal minutes Path Thickness miliM Freq 50 M Automatically Renumber Elements Parts File Name C Users dave Documents P Precision 2 M Automatially Erase Temp Locations Location TextLayer PP_LOCATIONS _Undate Help Goto AutoCAD 2013 Proplanner e Tutorial STEP 1 To get started make sure all other drawings in AutoCAD are closed If you have already been working in Workplace Planner click the New Clear button in the Routings tab Then Open the file WALKPATH FCAD DWG just as you did in the first Tutorial If you are already in AutoCAD you need not leave and reload AutoCAD however you will need to go to the Routings tab and select the Goto AutoCAD button as shown below STEP 2 You should now be in the AutoCAD screen and will be looking at the 2D or 3D static workplace layout To view the moving part dynamic workplace layout select the view icon or type in the VIEW command just as you did in Step 15 of the first tutorial and double click on the D YNAMIC 2D option and select OK Home Inset Annotate Layout Parametric PAYG Manage Output Plug ins Online Express Tools LE zx ma z N fe MM 20 Wireframe M ES Named S als s
97. meters in the relative part location syntax i e GOL B references a location in the center of the part 1 3 of the way back from the front Width Determines the part width for the W offset parameter in the relative part location syntax i e LW references the beginning of the part at the width offset 1 2 width from the center of the part s flow path Speed Determines the speed of the vehicle for animation and Moving Part positional calculation Remember that part speed must be less than operator speed preferably by at least a factor of 2 or the operators will not be able to catch the part Draw Part Path Prompts the user for points that make up a polyline path on the PP PART PATH layer A maximum of 5 segments are allowed for a part path within a workstation A part path must be specified before a Moving Part calculation can be performed 2013 Proplanner Parts Tab 33 5 7 Animate Tab Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Move Increment 0 1 Seconds Animate Motion Delay 0 Tenths of Seconds Automatic Rerun Save Anim Trace Draw Part Path Help Goto AutoCAD The animate window sets up the animation speed precision and repetitions This tab also allows the user to save a trace file that can be used to create an animation in other programs Move Increment Determines the resolution of the animation Smaller val
98. n situations whereby you do not have many manual paths specified as those manual paths will also be deleted by the All Paths option thus requiring the user to re specify them Ratings Locations Paths Stations Operators Paris Animate LEAN Reports Sequencing Licensing Setings Oper From To Freq Dist Save Paths File M a 10 OPR1 BOX ILL 1 00 5 10 List Select OPR1 MILL OUTPUT CHECK 2 00 9 10 20 OPR1 OUTPUT CHECK RACK1 1 00 21 9 47 Erase Path OPR1 RACK1 TABLE 1 00 9 6 62 M OPR1 TABLE MILL 1 00 14 8 15 Edit Redo Path OPR1 OUTPUT CHECK TABLE 1 00 15 11 f Erase ListedPaths DWG Select Erase Path On Calc Path Arrows Path Labels Query Path All Paths V Path Arrows 7 Distance Label cen Delete Fa ae Delete _ Sa issing Pa E i Path Ends vi emen abe Edit Redo Path FIERI EE v Ends Only ru E e Path Vertices Update AD Y Update a 2 ove Lc Erase DWG Paths On Line J Arrow Width 6 Inches Label Height 6 Inches Arrow Length 6 Inches Precision 0 Decimal Places Help Goto AutoCAD 2013 Proplanner e Tutorial Step 15 The output abilities of the WPP can be seen in the summary results window in the bottom left side of the routings window the Lean chart on the LEAN tab and the reports created on the Reports tab The Lean chart is automatically created for the stationary example and will have different amounts
99. nd stat2 were unassigned from the operators remove them at this point 2013 Proplanner ss Tutorial STEP 11 The only information left to be checked is on the Parts tab Make sure that CAR and CAR2 are going at 12 2 M min You can also assign a different block to CAR2 at this point by selecting CAR2 and in the Block Name pull down menu selecting police and hitting Update a different vehicle will be animated to represent that part STEP 12 The final step is to go to the Routings tab select Moving Part as calculation method and hit Calculate for the routings that you have created The output should look like this and you will notice that when you animate two different vehicles are animated representing the two cycles of work Kh e tt 4 MIB Layoutt z Q bo Q MTLMIMA mA A IR CR AIPA AS utoCAD 2008 NOT FOR RESALE C Users dave Documents Proplanner Walkpath Tutorials Metric Semicolon Multi Station BERE s Eile Edit View Insert Format Tools Draw Dimension Modify Express Window Help RAKISI oiL AIRT ARTL 4203 4203 Command 8180 6479 19398 5208 0 0000 Specify first corner Specify opposite corner SNAP GRID ORTHO POLAR OSNAP oTRACK Ducs DYN LWT MODEL Annotation Scale 131v 4 Pi 2013 Proplanner Sequencing from Line Balance data Metric 9 STEP 13 Returning to the Workplace Planner and selecting the Sequencing tab again w
100. ne then load PP cui from proplanner install fold More detailed steps can be found in the Install guide on the Proplanner AutoCAD Programs disk In Excel select Save As and choose csv comma delimited from the Save As Type pull down menu Note that there is also an we Troubleshoot 3 Workplace Planner will only open the Moving and Stationary examples 4 License code is rejected 5 Distances and times are drastically incorrect 6 No paths reports or output information is shown 7 Reports are showing no information or format is being distorted when opened An extra comma has been placed in the document making the program think there is an extra column of information License code and or expiration date has not been entered License code or expiration date is not typed correctly Proplanner units differ from drawing units Calculation has not been performed since new information has been added All this information is stored on the drawing or in the input files once the calculation is run but this is not automatically created until the first calculation is run or any time there is a change in information Operator is using old version of Internet Explorer with which some of the reporting functions are not compatible option to save as csv tab delimited This is sometimes the default csv setting within Excel and is what causes this problem most ofen Open the
101. ng Licensing Settings Station 5teton 1 Model Moving TAKT 80 Seconds Production Volume 96 92 Planned Eff 100 Line Speed 40 Meters Minute Report Image Report Settings TE Select EEDD Activities and Elements Current Display Rotated Activities Only Window Select Display Elements Only Get image Combine Events per Row Value Added Time Reg Time Report Type Station Report Simple v Cyde ALLCYCLES v Show Report If Image is off center re select Get Image button again Help Goto AutoCAD The workstation report includes an image of your workstation along with workstation header information that you can enter in the top right of the screen Similarly the Man Machine report displays the breakdown of both manual and machine related labor times These reports can be set to output Activities and their Elements or either option separately 2013 Proplanner Moving Part Analysis e Select the Get Image button to get the current view of your workplace You may need to select the Goto AutoCAD button in order to adjust your display such that the workstation view looks correct You can also get image from a window For best results getting image by a selected window hit Get Image twice Once your view is acceptable select the Station Report button to generate your report This report can also be made to show VA NVA percentages by checking the checkbox Once the report is generated simply select the File S
102. ns along the part path white text perpendicular to part path and generated the flow lines accordingly with path labels and flow arrows STEP 7 Once you have completed the analysis you can select the Parts tab to make sure that the part block is set to CAR Operator tab to make sure the operator is set to 30PSDFEM and 2013 Proplanner Moving Part Analysis then proceed to the Animate tab to perform the following step STEP 8 Now onthe Animate tab select the Animate button in the bottom right of the screen and watch the operators at work You will notice that when the operators are working on the car they travel at the speed of the car but when the walk around the workplace they travel at their walking speeds which are faster and must be than that of the car Step 9 Finally and once the animation is complete but before selecting the Return to WalkPath button you will need to select the view icon or type in the VIEW command to see the animation in 3D if using FCAD DWG Now double click on the DYNAMIC 3D option and select OK 2013 Proplanner 9 Tutorial STEP 10 Now select the ReRun Animation button and watch the show Remember that selecting the A t key and reselecting it will start and stop the animation zu STEP 11 After all the calculations have been completed you can go to the reports window Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequenci
103. ntages by Each Operator Longest Takt Time Exercise Four Perform a Moving Part study Hn Open the drawing in Proplanner fold Help FilesNPPWPP Exercise SamplesWPP Moving dwg You may note that there is a person and car block placed in the drawing Leave this there for use when animating if you chose to do so at a later time 2 Start the Workplace Planner and open the CSV in Proplanner fold Help 2013 Proplanner Files PPWPP_Exercise_Samples WPP3 csv 3 Check the Routings tab to make sure all the data has been imported into the correct fields 4 Go to the Options tab to ensure that the units are in feet and inches and that the operator start location is set to Operator Start instead of first or last activity location 5 On the Licensing Settings tab set the part speed to 5 feet per minute 6 Use the Draw Part Path button to go to AutoCAD and draw a horizontal line connecting the middle of both vertical cell boundary lines similar to the moving example in the Tutorial 7 On the Operators tab assign the two operators their respective start locations of START_L and START_R 8 Make sure they are assigned to station stat1 on the operators tab and that the station stat1 is defined with the start of O and length of 480 or 40 9 Return to the Routings tab and select the Moving Part Calculation radio button If this option is set to stationary the calculation will ask for all the on part or moving lo
104. o 0 5 100 0 0 10 M OPRI M22 TABLE 1 0 o 0 6 100 0 0 n w OPRI ws TAELE RACK4 1 0 1 1 6 0 0 0 12 w OPRI ws RACKS FIXTURE 1 0 ls LS 0 0 0 13 M OPR1 MiP2 2 G3 E2 FIXTURE2 1 0 o 1 4 so 0 0 14 w OPRI we FIXTURE TBAR2 1 0 o 0 7 0 00 15 Ww OPRI we TBAR2 FIXTURE 1 0 1 2 7 0 0 0 16 w OPRI wiz FIXTURE RACK2 1 0 2 3 7 0 oo X From Loc or At Loc t M OPR1 amp M1P2 M2G3 FIXTURE 6 0 0 2 1 40 20 00 3 w OPRI ws FIXTURE TBAR1 1 0 1 16 0 0 0 w OPR wis START RACKL 1 0 5 5 0 00 4 M OPRI E2 03 XE2 TBAR T 1 0 0 1 1 so 0 0 a M OPR2 M2P2 RACK1 3 0 o 0 6 50 0 0 5 M OPRI M4P2 TOBAR 1 0 o 0 9 100 0 0 6 w OPRI w3 TBARI RACKI 10 o0 0 8 0 0 0 w OPR2 wit RACKL TABLE 1 0 1 3 2 0 0 0 7 w OPRI we RACKI RACKS 1 0 1 23 0 0 0 8 w OPRI ws RACKS TABLE 1 0 1 1 5 0 0 0 be 5 OPR Lo p Q 0 0 9 M OPRI M2P2 TABLE 10 o os 100 0 0 10 M OPRI M2P2 TABLE 1 0 o 0 6 100 00 i w OPRI ws TABLE RACKS 10 1 1 6 0 00 12 w OPRI ws RACKS FIXTURE2 1 0 1 1 5 0 0 13 M OPRI M1P2 2163 E2 FIXTURE2 1 0 0 1 4 50 00 14 w OPRI w2 FIXTURE2 TBAR2 1 0 0 0 7 0 0 0 15 w OPRI we TBAR2 FIXTURE 1 0 E 27 0 0 0 16 w OPRI wiz FIXTURE RACKZ 1 0 z 3 7 0 o o S v In both situations OPR1 and OPR2 will both wait at location TABLE although they could just as easily be waiting at two different locations until both operators are available When they are both available OPR1 will process at the TABLE and OPR2 will also perform its activity not shown in the current display
105. o 25 Chars LCode Desc String up to 255 Chars 7 To Loc RCode based on F P String up to 25 Chars RCode Desc String up to 255 Chars Frequency Real Number O in 10 Distance only used on F Real Number O in Distance only used on F Real Number O inf __ specified in Feet or Meters depending on first row value Time Real Number O inf in seconds 12 LEAN Integer from 0 to 100 lt 14 Special Codes String up to 10 Chars 15 Miscellaneous user field OPTIONAL EE Activity ID information from Proplanner Proplanner USE ONLY 16 OPTIONAL 2M opri Ria d 0 3F OPR FIXTURE Desc TBARI 1 9 05439 1 81088 0 4M lorri Gta 1 007 0 sM lorri Ria S 1 o 0 6F opri TBAR Desc RACKi 1 6 9345 1 3869 0 7F opri RACKi Desc Rack3 1 13 3539 2 67079 0 8F opri RACK3 Desc TABLE L1 7588798 LES 0 m borri cia RS Vp aeuo ooa 10M lorri Ria 13 0 0 1 F PRI TABLE Desc RACKd 1 7 86218 1 57244 0 12 PRI RACK4 Desc FIXTURE 1 8 66101 17322 0 13M lorri MIOB RIOB J d d 0072 g 14F OPRI FIXTURE2 Desc TBAR2 1 428715 0 85743 Q0 15F OPRI TBAR2 Desc FIXTURE 1 16 0786 321571 16F OPRI FIXTURE Desc RACK2 1 19913 3 98261 0 2013 Proplanner upbeat see SI CNN RES NR GC RT a nee 0 09 0 i7F R1 RACK Desc FIXTU
106. ock Name 0 7 ST 02L Yes L5 1 START 0 2 STAT2 0 PERSON ST _O1R Yes E 1 START 0 3 STATI 0 Q0 PERSON yy W zd Speed M s Meters Calc Unloaded Loaded Start Location Prev Dist Next Dist Block Name ST_OR 1 5 1 START 0 4Cyan STAT2 0 PERSON v Update Description ee LLL Read DWG Blocks Help Goto AutoCAD 2013 Proplanner Sequencing from Line Balance data Metric STEP 10 Go to the Stations tab and make sure that the stations used are defined correctly The ST 01L and ST 01H stations should start at the 0 distance along the part path and have a distance of 12 2 meters The ST 02L and ST_02R stations should have a start at the 12 2 meter and be an additional 12 2 meters long Because the input is in millimeters this will be in put as 12 200 Your Station information should look like that below Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Sen Descrpten sereni Let rm NOTE Station Data only STAT2 12 200 12 200 used for Moving Part ST 01 0 12 200 Calculations only Users Fees e Se performing stationary part ST_OR 12 200 12 200 studies need not define stations Save to Part Path Draw Part Path Station Description Start mm Lenath mm star o 12 200 Update Add Remove Import Assignments Container Insert Help Goto AutoCAD Because stati a
107. of Value and Walking depending on the speeds and distances that are set Reutings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Part Sequence cycle ali CYCLES 120 120 110 110 100 100 90 90 80 80 x 70 70 60 60 50 50 40 40 30 30 20 20 10 10 0 0 OPR1 Operator EHE Internal Delay EEE Non Value and Necessary MMMM Value Process NonValue Process EEE Walking Help Goto AutoCAD The Station Report can be created on the Reports tab by selecting get image setting your stations takt time and clicking Generate Report The Station Report output can be exported directly to Excel saved or printed Congratulations You have now completed the first tutorial on using the Proplanner Workplace Planner for stationary parts You may now continue on to the next tutorial on using the WPP for moving parts or you may wish to continue on to the WPP Manual pdf for more detailed information on the WPP options Special Note Your analysis summary will appear in the lower left corner of the routings screen You may right click in this window to copy these results to the clipboard In fact you can right click and copy all WPP display list window information for subsequent pasting into other windows applications such as MS Word or MS Excel 2013 Proplanner Stationary Part Analysis st 6 2 Moving Pa
108. of vision In Motion and Simultaneous Activities Currently the MODAPTS and User P Most parsers will assume simultaneous Left and Right hand motion unless an L must be capital is put in the SC field in which the program will add both the left and right hand times 2013 Proplanner 16 Reference Section 5 1 3 Parsing Options for Used P MOST and MODAPTS The MOST and MODAPTS predetermined work measurement systems are parameter based systems in which the parameter values numbers following the parameter codes letters are simply added together in order to determine the appropriate number of TMUs or MODs that define a particular activity These TMUs or MODs are then multiplied by a fractional seconds value shown below in order to determine time in seconds or Decimal minutes as specified in the Options tab MODAPTS Conversion 1 MOD 0 129 Seconds MTM MOST User P Conversion 1 TMU 0 036 Seconds For example a Move and Place task would be defined in MODAPTS as an M2P2 which would evaluate to 4 MODS and thus 0 516 Seconds For more information on the MODAPTS and MOST language syntax please contact the user manuals produced by their appropriate organizations The WPP application includes special capabilities for parsing these parameter based codes These capabilities are described below Left and Right Hand tasks with High or Low skill level Left and right hand codes can be specified by simply separating the codes by a
109. or Left R for Right or C for Center A number 7 is the default amount of longitudinal divisions The first and last zones are directly at the front and the back of the part respectively e 2L specifies a location on the left side at the width and 2 7 back e 1R specifies a location on the right side at the front 3C specifies a location at the center and 3 7 back 7L amp L 5L 4L 3L 2L IL 2013 Proplanner EI Reference Section R L W A to The method to specify a location on a Moving part L Left R Right W Width and then a letter from A to Z that specifies how many zones are longitudinally spaced along the part The letter D is the default The first and last zones are directly at the front and the back of the part respectively You must always place an At symbol at the beginning of this location name You may optionally replace the letter W with a distance from the center of the part out to the side Feet or Meters You may also optionally replace the longitudinal letters i e A to D with a distance from the front of the part to the back The examples below assume the default of Ato D and units of Feet e LW lt B specifies a location on the left side at the width and 1 3 back e R specifies a location on the right side at the front e RW lt 2 5 specifies a location on the right side at the width and 2 5 feet back R1 2 lt C specifies a location on the right side 1 2 feet from the center and 2 3 o
110. ora OSDLIV z sro RAck erask 4 1 841 4 2700 427 OODLIV aleic VTASK2 1 10 0000 10 00 OS amp DLIV 3 e c TASK 2 1 5 84 3 9600 3 2 OoDLIV 4 sTO1L RACK 2 TASK 1 1 2 0000 2 00 ODU 4 stot_Rack 2 TASK 1 1 4 88 3 2500 325 72 12000 __11 4800 00000 2348 OPERATOR ST 02L SYMBOL STEP LOCATION DESCRIPTION ELEMENTACTIVITY FREQUENCY DISTANCE PROCESS WALK DELAY TOTAL OSDLIV s sroa acx erask 1 1086 7 240 724 O gt DOV eleic TASK2 1 10 0000 10 00 OSDLIV eleic TASK 2 1 5 4 3600 438 OcDLIV 7 sro2L RAck zAsk 1 1 2 0000 2 00 O DOV 7 srozL RAck z TAsk 1 1 537 3 5800 3 58 Done Wl Computer Protected Mode Off R10 2013 Proplanner Sequencing from Line Balance data Metric 11 7 Exercise Plant wide material flow analysis The objective of this exercise will be to use the techniques learned in the Tutorial along with the aid of the How To Guide and Sample WPP Input in Proplanner fold Help Files PPWPP_Exercise_Samples to take a simple set of workplace and operator data and perform a complete Workplace Planner analysis Exercise One Format a data set for importing to the Workplace Planner Use this Excel spreadsheet in Proplanner fold Help Files PPWPP_Exercise_Samples WPP1 xls of station and operator data along with the Sample WPP Input to create a CSV file to import into the WPP 1 To do this extract the data and format it similar to the sample input 2 Include only the necessary inf
111. ormation outlined in the sample input file It will need picked out of the original spreadsheet and re organized 3 Make sure there are no special characters in the CSV data by opening it in notepad Also remove any superfluous commas at the end of the element lines The Sample WPP Input has more details on this Most common errors include spaces and quotation marks 4 Once the data is set up correctly open the WPP within AutoCAD and try opening the CSV If done correctly the files will open flawlessly Ui If the files cause an error consult your instructor or the Troubleshooting Guide Results Workplace Planner will open the files with no errors Exercise Two Prepare layout drawing 1 Open in Proplanner fold Help FilesNPPWPP Exercise SamplesWPP Stationary 1 dwg in AutoCAD You may note that there is a person block placed in the drawing Leave this there for use when animating if you chose to do so at a later time 2 Create layer PP LOCATIONS by opening the WPP 3 Insert the names of the locations using the Workplace Planner s Add Location command The location names can be found in the CSV file 4 Once this is done open in Proplanner fold Help FilesNPPWPP Exercise Samples WWPP2 csv to run a stationary part calculation Results Workplace Planner will not ask user to place locations when a calculation is run 2013 Proplanner Exercise Three Perform a Stationary Part study Using in Proplanner fold Help F
112. perators Parts Animate LEAN Reports Sequencing Licensing Settings EL Type S Oper Process Description TolLocor AtLoc Man Wal Freq Dist ft Time sec LEAN Weight SC Sal File Open 1 W N OPRI Walk to Mil MILL 0 1 00 o 0 0 0 0 2 M N OPR1 20 Load Mill MILL 0 1 00 0 0 0 0 0 New Clear 3 M N e OPRI 2 Start Mill MILL 0 1 00 0 0 0 0 0 4 W Ne OPRI Walk to OUTPUT CH 0 1 00 0 0 0 0 0 Save As 5 M N OPR1 30 Inspect OUTPUT CH 0 1 00 0 0 0 0 0 6 M N OP 4 Setdow OUTPUT CH 0 1 00 0 0 0 0 0 7 W N e OPRI Walk to RACK1 0 1 00 o 0 0 0 0 3 on 8 M Ne OPRI 4 Pickup c RACKi 0 1 00 0 0 0 0 0 Help 9 W N OPRI Walkto TABLE 0 1 00 o 0 0 0 0 10 M N OPRI 120 Assembl TABLE 0 1 00 0 0 0 0 0 11 M N OPRI 4 Setdow TABLE 0 1 00 o 0 0 0 0 Up Down 12 W N OPRI Walk to Mil MILL 0 1 00 0 0 0 0 0 SS 13 M N OPRI 30 Unload Mil MILL 0 1 00 0 0 0 0 0 Insert Row 14 W N OPRI Walk to OUTPUT CH 0 1 00 0 0 0 0 0 15 M N OPRI 4 Place as OUTPUT CH 0 1 00 0 0 0 0 0 SEE 16 AM M Moo 1 Wisll ta TARIE n ann n n n n n Add Row EL Type Symbol Oper Process To Loc or At Loc Description Freq LEAN WGT sc 17 MJ NN v OPRI 180 TABLE v Weld casing assembly 1 00 0 0 0 Update Row Results Loc amp Path Selection Calculate Oper Dist Ft Time sec Wak VA NVBN NV ID XD Part Sequence ade Entire drawing Stationary Part bi Window Area 5 Moving Part Percentages by 5 Longest Each Operato
113. plication Settings and Defaults Process Parsing Options Process Parse Default None IV Use Standard Derived Walk Time MODAPTS IV Increment MODAPTS Walk by 5 MODS Total Mod Format W25 Mutilple Mod Format 5 W5 Time Units Hours Minutes Seconds Hours Decimal minutes Walk Speed Options EE Start Walk Time secs First Foot 3 Min Dist Feet Differentiate After Feet 2 Beginning Walk Speed Feet s 47 Default UnLoaded Walk Speed Feet s 3 33 Default Loaded Walk Speed Feet s 5 Consider Loaded above Pounds Output Units FEET S Base Drawing Units INCHES E Location TextLayer pp LOCATIONS Licensing Settings Moving Part Options Start Loc if first element is I type C Startat Op Start Start at First Element Loc C Start at Last Element Loc Part Grid LCR 1t 7 m CRAN Ato D M tor Ais at front of part Always route last loc to first loc Line Delimiter z M Automatically Renumber Elements Save Settings Help 4 From now on any time one of the key words is used in the process field the predetermined time for that word will be used to calculate the results Sequencing Line Balancing Interaction 1 The Workplace Planner has the ability to interact with Proplanner Line Balancing as well 2 The WPP takes Line Balancing data and imports it into the program to create a simulated sequence 2013 Proplanner 118 Troubleshoot Proplanner Workplace Planner
114. positions More specific details on the two types can be found below Loc amp Path Selection m Calculate Entire drawing Stationary Part C Window Area Moving Part F All Locs I Flow on Part 4 Once calculate is selected on the routings tab WPP will take the locations and route the operator between them and calculate the times based upon the task times entered plus the walk times 5 This walking diagram will be created directly on the drawing file 2013 Proplanner How To Guide u x Help 8 File Edit View Insert Format Tools Draw Dimension Modify Window ep e n 5 H or LL Dr D Modity H eRe sO KG et AERIS BIS OOANE MX EN A LZ Standard whe 9 Q9 BEI G MTLMIMA e ByLayer ByL ayer ByLayer ME 4 Z a 3 4h Alg amp Hg 88 C Qaam o a rv n o ra Lai m db L3 gt a sf A b 4 CIRE Command Command Command 5 2693E 02 99 5 11 16 0 0 SNAP GRID ORTHO POLAR fosnar OTRACK LWT MODEL moy Walking diagram 6 Observe summary results on the routings tab path information Lean information or reported information 2013 Proplanner 112 Troubleshoot Proplanner Workplace Planner Routings Locations Paths Operators Parts Animate LEAN Ergonomics Reports Sequencing Options Help 31 7 71 Z 10 0 14 15 11 96 16 9 86 2 6 00 14 4 78 7 9 87 1 6 00 7 3 46 7
115. r The routings tab is the main window of the WPP interface In this window you can Import Save and Calculate your studies as well as enter and edit part routings and processes Each route also referred to as an element identifies a move or process activity for an operator These routes need to be defined in the order in which they occur for each operator There is no required order for routes between operators For example it would not matter if you alternated the routes for Operatori and Operator2 versus first specifying all Operatori routes and then Operator2 routes the only exception occurring with Synchronized operators discussed in the following paragraphs Special Note Your analysis summary will appear in the lower left corner of the routings screen You may right click in this window to copy these results to the clipboard In fact you can right click and copy all WPP display list window information for subsequent pasting into other windows applications such as MS Word or MS Excel Main Controls Route Format Parsing Options for User P MOST and MODAPTS Parsing Options for user defined User K1 and User K2 Synchronized Operators Moving Part Cycles Workplace Planner with Proplanner 2013 Proplanner Routings Tab 9 5 1 1 Main Controls File Open Loads the routing file into the routing editor The import control will also set the Calc Stationary Moving Part option and read the drawing for location text walk pat
116. re part has moved within the work zone Select by Window Area on the Routings tab and puta box around the workstation the study is focusing on Operator names are only allowed to have letters numbers dashes and underscores Remove any other characters from the operator name and hit update on the operators tab 107 108 Troubleshoot 8 1 How To Guide Workstation Labor Analysis Base Steps 1 Import plant drawing to AutoCAD AutoCAD 2005 NOT FOR RESALE C Program Files Proplanner AutoCAD Programs Walkpath 2D dwg ME File Edit View Insert Format Tools Draw Dimension Modify Window Help X oga SDS AOZ SIAR AERIS BNF CO OA NE ME EN A h Hi Stendad Y 6 9 O EI Q MTLMIMA vis XX E ByLayer v ByLayer v ByLayer v eC 8 Ze P 2g EN o 23 n Rack Rack go i a RACKRI ux Og O QI E Ed b iN e Fa 2 s ae rg b a d a a A RACKL1 22 oy amp K ve n a o WEER aon Command Command Regenerating model v Command lt gt 43 10 1 4 33 5 11 16 0 0 SNAP GRID ORTHO POLAR OSN amp P OTRACK LWT MODEL mg Plant drawing 2 Input routing information by using our route building system or using Excel to copy and paste the larger quantities of information into the proper columns to be imported directly to WPP 2013 Proplanner How To Guide 109 E Microsoft Excel moving csv FE fie gdt view Insert Format Tools Data Window Help
117. re referenced within the routing 2 Multiple stations can be simulated by spacing the work locations in different cells or further down the part path if it is a moving study These are defined on the stations tab by entering the distance along the part path at which the station starts and how long the station is 3 Multiple parts are simulated by cycles These are explained below 4 For a system of stations linked together along a moving part line the operators will need to have a station defined on the stations tab and assigned to them on the operators tab to ensure they don t start working until the part enters their station Cycles 1 Cycles create a new part going down the line 2 There are two ways to define the start of a new cycle The start time can be absolute 2013 Proplanner 16 Troubleshoot starting from time O or relative starting from the beginning of the previous part s time 3 Absolute start times are noted by a plain number being input in the cycle time field 4 For relative start times a 9 is used in front of the number 5 If the first cycle takes too long the second cycle will start later due to waiting on the operator These results will be very obvious when the moving part study is animated Synchronization 1 Synchronization can be used to make sure that all included operators have a mutual start time 2 The Synchronization line is just a line linking up to four operators that will begin the
118. re than one operator concurrently or when an operator cannot begin a particular task until another operator has completed a prior task Operators can be synchronized in stationary and moving part studies An operator will wait for another operator at the last specified location that he she is routed to prior to the task after the synchronization element In moving part studies it is possible that an operator might be waiting ona moving part for another operator and thus this situation should be taken into consideration when viewing the animation of synchronized operators in moving part studies All routes elements for synchronized operators must be completed prior to the synchronization element before the WPP application will continue on to those tasks listed after the synchronization element The order of the tasks specified between operators prior to the synchronization element can be listed alternately or sequentially as shown in the two examples below Process From Loc or At Loc To Loc or MOO TMU Freq Dist Ft x 1 M OPRI amp M1P2 M263 FIXTURE 6 0 o 21 40 20 0 0 3 Ww OPRI ws FIXTURE TBAR1 1 0 1 1 6 0 0 0 4 M OPRI E2 03 XE2 TBARI 1 0 o 1 1 so 00 S M OPRI Map TBARI 1 0 o 0 0 6 w OPRI w3 TBARI RACKI 1 0 o 0 0 7 wW OPRI wa RACK1 RACKS 1 0 1 0 0 8 w OPRI ws RACKS TABLE 1 0 1 0 0 9 w OPR2 wis START RACK 1 0 2 0 0 M OPR2 M2P2 RACK1 3 0 o 0 0 wW RACK 1 0 js 2 0 0 d 1 0 o ij 0 E M OPR1 M2P2 TAELE 1 0
119. rement will increase the accuracy of your results and will slow down your animation You can also slow down the animation by entering a delay factor in the Motion Delay input box I IITop I2D Wireframe 90 1 Seconds Time Desc OPR1 5 3 Walk to Rack1 OPR1 4 0 Pick up casing OPR1 19 Walk to Table OPR1 120 0 Assemble casing Rerun Stop Return STEP 13 Now you are going to add a new route just before the end of our existing routing To do this select the last row in the routing window and press the Insert Row button Now select this new row and enter the location name BOX in the To Loc column and then press the Update Row button You have just changed the routing from RACK to the FIXTURE to instead go from RACK to the BOX and then to the FIXTURE Atthis point you could go to the Locations tab and add the location BOX however we are instead just going to let the WPP prompt us for this location when we select the Calculate button Your final result should look like that below Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings EL Type Symbol Oper Process secs Description ToLocor AtLoc Man Walk Mach MOD or MU Freq Dist ft Time sec LEAN We File Open 5 M NWN O 30 Inspect OUTPUT CH 30 0 0 1 00 0 30 0 SS 6 M NN Ou 4 Setdow OUTPUT CH 4 0 0 1 00 0 4 0 New Clear 7 W NWN O Walk to RACK1 0
120. routes and processes that must be performed prior to the synchronized activity for all operators being synchronized You then create a row with the element type S for synchronous and put the names of the operators that you are synchronizing in the following fields Operator Process From and To As such there is a maximum possible of 4 operators that can be synchronized For more information please reference the Synchronized Operators section of this document OPR2 wis START RACK w M OPR2 M2P3 RACK 5 0 wW OPR2 W11 RACK1 TABLE 9 M OPR1 M2P2 TABLE 4 0 10 M OPRI M2P3 TABLE 5 0 11 Ww OPR1 ws TARIF RACK4 C New Cycle is used only for moving part studies in order to set the arrival of the next part After this line all relative locations are referenced from this new part and thus the prior part is ignored from this line forward Cycles can optionally have names i e 2CAR shown below and start times Start times can be specified in absolute time with a time entry such as 40 for 40 seconds from the beginning of the first part entering the WPP session or in relative time 240 for 40 seconds from the beginning of the prior part entering the WPP session For more information please reference the Moving Part Cycles section of this document 56 P OPERR 2 PROC PRW lt D 1 0 10 15 75 57 w OPERR 2 Rw lt D STARTR 2 1 0 3 6 0 7 0 8 s 2CAR 0 o D 1 w OPERL 1 STARTL 1 a 1 0 11 6 2 3 0 2 P OPERL 1 PROC a 1 0 9 4 14
121. rpreted as 1 31 6 one hour thirty one point six minutes 5 12 4 Walk Speed Options The WPP walk speed options give you extensive flexibility in specifying workplace walk time estimates Note these time calculations are bypassed if the user selects the USER STANDARD DERIVED WALK TIME option AND if the parser is set to the MODAPTS or USER P Start Walk Time secs The time for the first foot or 1 3 meter of walk distance If this value is zero then the WPP will use the operator s Loaded Unloaded speed for this initial distance Min Dist The minimum distance for any move If this value is zero then the WPP will use a minimum distance of 1 Inch or 1 millimeter Differentiate After The distance after the first foot or 1 3 meter for the WPP to use for the BEGINNING WALK SPEED after which the WPP will use either the Loaded or Unloaded speed If this value is zero then the WPP will use the operator s Loaded Unloaded speed for the distance after the first foot or 1 3 meter Beginning Walk Speed The speed used by the WPP for the distance up to and including the distance specified in the DIFFERENTIATE AFTER FIELD A value of zero in this field will cause the WPP to use the operator s Loaded Unloaded speed for this initial distance Default UnLoaded Walk Speed The default speed that the WPP will use for walking without a load when new operators are added by the WPP Default Loaded Walk Speed The default speed that the WPP will use for walkin
122. rt Analysis STEP 1 To get started make sure all other drawings in AutoCAD are closed If you have already been working in Workplace Planner click the New Clear button in the Routings tab Then Open the file WALKPATH FCAD DWG for Metric tutorials or WPP_Moving DWG for Footlnch just as you did in the first Tutorial If you are already in AutoCAD you need not leave and reload AutoCAD however you will also need to go to the Routings tab and select the Goto AutoCAD button as shown below STEP 2 You should now be in the AutoCAD screen and will be looking at the 2D or 3D static workplace layout To view the moving part dynamic workplace layout select the view icon or type inthe VIEW command in the command line and double click on the DYNAMIC 2D option and select OK Home Inset Annotate Layout Parametric View Manage Output Plug ins Online Express Tools LE e eal CA ts DYNAMIC 2D a fe Bl 20 Wireframe X ES Named E NA ees STATIC 20 9Q O 5 4 3 Q Join 4 E Return To Workplace Plann View e Viewport E Tool Properties Sheet Set a E etui o Workplace Planner ET ME OP Manager Configuration A Restore Palettes Manager x Views Visual Styles x Model Viewports Palettes QueryPath Erase Path Edit Upd Path Add Loc Add Labels Erase Labels Add Arrows Erase Arrow R Cut L RACK Re 1R 2H4
123. ructions 2013 Proplanner 4 Introduction 3 Licensing To use Workplace Planner you have two different options You will see a screen similar to the one below when you open Workplace Planner r ay Proplanner Licensing x Welcome to Proplanner License Activation Wizard A A vaid license is required to use Pro Time Estimation Activate your copy of Pro TimeEstimation to receive the license file Start free trial usage Free 30 day trial period allows evaluating all product features Activate by emai Emai the bcense request code and receive the icense file from Proplanner Support aes e Start free trial usage If you would like to try Workplace Planner select this option to begin a 30 day trial period for full feature evaluation A status bar will appear when you open Workplace Planner to indicate how many days remain on your trial license Activate by email To activate and register your copy of Workplace Planner by email you may select this option and you will see the window similar to the one below Fill in your Company name then click the Copy Info button Then click on licensing proplanner com to start an email message and paste the info into the message A Proplanner representative will determine if you re eligible for an extended or permanent license file and will respond with further instructions 2013 Proplanner uj Proplanner Licensing Welcome to Proplanner Licen
124. s Tab Rowings Locations paths Stations Operators Parts animate LEAN Reports Sequencing UcensneSettns AutoCAD SN 000 00000000 WPP Version Full 3 2 0 License Code xwxxsxsnlireVRMHC Update License Expiration Leave blank if indefinite Application Settings and Defaults Process Parsing Options Walk Speed Options Moving Part Options Save Settings Process Parser None X 0 72 Start Walk Time secs First Foot Start Loc if first element is I type V Use Standard Derived Walk Time 3 Min Dist Feet Serei e Predetermined Factor 1 Start at First Element Loc MODAPTS 6 Differentiate After Feet Start at Last Element Loc Increment MODAPTS Walk by 5 MODS 2 78 Beginning Walk Speed Feet s Part Grid Total Mod Format W25 4 17 Default UnLoaded Walk Speed Feet s L C R ito 7 v Mutilple Mod Format 5 W5 3 33 Default Loaded Walk Speed Feet s R L W Ato D Mutilple Mod Format in Frequency 5 ConsiderLoaded above Pounds V tor Ais atfront of part Time Units Output Units FEET Y Always routelast locto firstloc Hours Minutes Seconds Hours Decimal minutes BaseDrawingUnits INCHES LineDelimiter Parts File Name C Autodesk Proplanne Path Thickness Inches Freq 4 Update V Automatically RenumberElements Location Text Layer PP LOCATIONS Update Precision 2 V Automatially Erase TempLocations Help Goto AutoCAD J The Licensing Settings tab is where the licensing codes and expiration dates are s
125. se Actreabon Wizard CA valid license is required to use Proplanner i Please email the Company Name and System Info tc licensing proplanner com to obtain a license file License Request information Company Proplanner System info MOBGAEUAQgBGAEIARGBGADAAMAAwADEAM AAZAEUANQABAHSAPGBGADGAMOBCADGARGA 3AEEA Copy info Click on Copy Info button to copy the above information to the clipboard You can then Paste this infoemabon in your email If you already have a license file from Proplanner please select it using the Browse button Browse to activate the product Back Close If you have any issues or questions in regards to obtaining a license for Workplace Planner please contact licensing proplanner com 4 Getting Started 4 1 Preparing and Loading the Drawing WPP can work in either Engineering Foot Inch or Decimal Metric units By default the application will assume that if your drawing is set to Engineering units Done with the Units command in AutoCAD that your base unit is 1 inch in size If your drawing is set to Decimal units then Proplanner will assume that your base drawing unit is 1 millimeter Once the WPP is running you can reset your default base units to Inches Millimeters or Meters in the Licensing Settings tab if the selected default is incorrect AutoCAD Note Hemember that if you use the AutoCAD UNITS command to change your drawing units you will likely need to set your drawing limits size by us
126. signed blocks to be animated with For the Foot Inch example a part speed of 40 feet minute and a part length and width of 15 2 or 182 inches and 5 4 or 64 inches has been used When entering feet do not forget to include the single quote after the number or the program will assume that your input is being specified in Inches You may also wish to select the Operators tab to verify that the default operator speed is what you want The WPP sets Operator walking speeds to 4 17 per second which is an industry standard used in MTM time studies Another option on this tab is to set a max distance that the operator can travel into a previous station to reach the part If the part size is too big the operator may still go further than the limit so part length should be taken into consideration when setting this number or the length of the part path 2013 Proplanner Moving Part Analysis 65 STEP 6 The Calculation is nearly ready to be ran The only step left is to define the station dimensions on the Stations tab shown below Name the station select what distance on the part path the station begins and how long the station is Hit the add button to add the station or the update button to save changes and now you re ready to do a Calculate In this example the correct station information should have be present if not enter 40 as the length Routings Locations Paths Stations Operators Parts Animate LEAN R
127. so computes the trace information needed for the Animation and thus calculate must be run prior to viewing the Animation Stationary Part or Moving Part Determines which calculate method to use For example if a file containing relative part locations i e L5 would be calculated with Stationary Part option then WPP will prompt the user for the location L5 which will be referred to thereafter as a fixed location Likewise calculating a Stationary routing file with the Moving Part option will actually work the same as if it were calculated with the Stationary option 2013 Proplanner 10 Reference Section Flow on Part This checkbox is available for selection when the Moving Part optionis chosen By default this option is selected on which means that WPP will add flow distances for the operator when they are working on the moving part and thus moving with the part Checking this option off will tell WPP to ignore reporting walk distances for the worker when traveling with the part i e riding the conveyor Obviously the total operator times will be reported identically in either situation Part Sequence cycle This button selects which single cycle or all to show results and lean values for Percentage Chooses the value by which to calculate the walk lean and delay percentages Each Operator Uses the actual cycle time computed for each operator Longest Takes the longest cycle time of the operators in the results
128. t and the back of the part respectively e 2L specifies a location on the left side at the width and 2 7 back e 1R specifies a location on the right side at the front e S8C specifies a location at the center and 3 7 back The actual distances of the width and length offsets are determined by the part size which is specified in the Parts tab in the WPP as shown below m Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Part Block Length mm _Width mm Speed M Open Parts CAR CAR 4 600 1 600 12 200 Draw Part Path CAR CAR 4 600 1 600 12 200 Update Add Remove Part Name Block Name Length mm Width mm Speed M Min Read DWG Blocks Help Goto AutoCAD STEP 5 Now that the routing file is loaded you should ensure that your part dimensions and part path speeds are correct The Parts tab shown above is also where the parts are assigned blocks to be animated with For the Foot Inch example a part speed of 12 2 meters minute and a part length and width of 4 6 meters and 1 6 meters has been used 2013 Proplanner Tutorial You may also wish to select the Operators tab to verify that the default operator speed is what you want The WPP sets Operator walking speeds to 1 5 meters per second Another option on this tab is to set a max dis
129. tance that the operator can travel into a previous station to reach the part If the part size is too big the operator may still go further than the limit so part length should be taken into consideration when setting this number or the length of the part path Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings OR1 Yes 1 5 1 START 0 2 STATI OL1 Yes 1 5 1 START 0 1 STATI Block Name 0 0 PERSON 0 0 PERSON it Speed M s Meters Oper Calc Unloaded Loaded StartLocation Delay Color Station Prev Dist Next Dist Block Name OL1 Yes bdl 1 5 1 START SA 0 1 Red v STATI s 0 0 PERSON v Update Read DWG Blocks Help Goto AutoCAD 2013 Proplanner Moving Part Analysis Metric STEP 6 The Calculation is nearly ready to be ran The only step left is to define the station dimensions on the Stations tab shown below Name the station select what distance on the part path the station begins and how long the station is Hit the add button to add the station and now you re ready to do a Calculate In this example the correct station information has already been input Proplanner Workplace Planner Routings Locations Paths Stations Operators Parts Animate LEAN Ergonomics Reports Sequencing Licensing Settings Station Description start techo 85 1 1
130. te and thus this field must be left blank You must enter the expiration date EXACTLY as itis given from Proplanner for example 9 05 is different than 9 2005 You may copy this code from the email sent to you by Proplanner and then paste it in 2013 Proplanner Licensing Settings Tab this field 5 12 2 Process Parsing Options Process Parsing Determines if the WPP should attempt to evaluate the Process code column for the routings and compute the appropriate process times MTM B MODAPTS User P MOST and User K1 or User K2 user defined keyword parser are available in the application by default Users may request the MTM 1 MTM 2 MTM 4M and MTM UAS standards from the MTM Association or a Proplanner representative Remember that Proplanner s Time estimation module will also parse these Process codes and can Import and Export files from to the WPP Proplanner can import export a Workplace Planner study as ELEMENTS of an ACTIVITY or as ACTIVITIES of an OPERATION whereby the walk tasks are assigned as delays to the ACTIVITY links within the OPERATION For additional information on parsing options refer to the Parsing Options section of this document Also for additional information on the interface between Proplanner and the Workplace Planner refer to the Workplace Planner with Proplanner section of this document When any of the Keyword based parse methods MTM B MTM UAS MTM 2 User K1 or User K2 is chosen you may select the b
131. th will be regenerated automatically by WPP on the next Calc Query Path Allows the user to select a path in the drawing and display its properties as shown in the example below Operator OR1 Path From PPWALK To 7R 1 27 52 43 Length 15 11 99 Freq 1 Edit Redo Path Allows the user to select a path in the drawing which WPP will automatically delete and then prompt the user to select vertices up to 11 vertices to create a maximum of 10 segments for a new path to replace it User defined paths are replaced by Euclidean paths when WPP creates new paths such as is done in ALL Moving part studies or when the All Paths option is selected on this path window during stationary part studies Erase DWG Paths Will erase all of the walk flow paths in the current drawing regardless of if they are referenced by this routing file or not Path Arrows Delete Deletes all arrows Update Any change to the arrow size or placement option will only occur on the next calc or when this Update button is selected Path Arrows checkbox Determines if paths should have arrows Path Ends Path Vertices Determines if arrows are to be placed at path ends only or also at each path vertex Arrow Width Arrow Length Specifies the size of the arrow for a zero width path As the path is scaled larger by the Path Thickness value and the Path Frequency the arrows for those specific paths will be factored accordingly Path Labels Delete Deletes all l
132. the codes for that particular method in this field or it can be accomplished by specifying the time directly as a direct value as per the format shown below This format for specifying the process time can be used if no parse method is selected or if any parse method is selected even though the 2013 Proplanner Routings Tab following format is not valid for that parse method Manual time walk time machine time general form 3 4 specifies manual 3 4 seconds 3 4 2 5 specifies manual 3 4 sec and walk of 2 5 3 5 2 5 4 2 specifies manual 3 4 sec walk of 2 4 machine of 4 2 3 5 4 2 specifies manual 3 4 sec machine of 4 2 4 2 specifies machine time of 4 2 seconds 2013 Proplanner 13 Reference Section 5 1 4 Parsing Options for user defined User K1 and User K2 The WPP application allows you to define your own user defined keyword based parsing method To define your own time standard file simply create a comma delimited text file CSV of the format shown below following the time code definitions The first line of this file must contain the 3 letter code for the units of the times specified in the following file Unit types and their 3 letter codes are shown below MIN decimal minutes SEC decimal seconds TMU MTM Association TMUs which equal 0 036 seconds MUS MTM Association MUS which equal 0 0036 seconds MOD MODAPTS Association MOD s which equal 0 129 seconds The sample code file has it
133. the part is long and at the beginning of the walkpath while the operator goes to the end of the part the operator may still walk further into the previous workstation This is easily overcome by subtracting the part length from the value entered into this field or adding an operator delay Block Name Allows the user to represent the operators with any individual blocks inserted in the drawing before the WPP was opened Special Feature Changing the name of the operator and selecting the update button will automatically search and replace all occurrences of that operator name in the routings file Special Note Operator names cannot contain any special characters other than dashes and underscores I 1 amp and other non letter characters are not allowed 2013 Proplanner Operators Tab 31 5 6 Parts Tab Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings Part Block Length in Width in Speed ft min NOTE Part Data only used n for Moving Part calculations CAR CAR 15 2 54 40 Users performing stationary C CAR 15 2 5 4 40 studies need not define Eo EAR 5 4 40 parts Open Parts Save Parts m Draw Part Path Part Name Block Name Length in Width in Speed Ft Min CAR3 CAR X 15 2 5 4 40 Update Add Remove Read DWGBlocks Help Goto AutoCAD The Parts tab controls the part and path propert
134. tion A new part will enter 30 seconds from the beginning of the analysis shown below Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings EL Type Symbol Oper Process secs Description ToLocor AtLoc Man Walk Mach MOD or MU Freq Dist ft Time sec LEAN We File Open 1 W TT ORL Walk iR 0 4 28 0 100 6 5 4 28 0 n 2 Wo TtT OL Walk ic 0 3 82 0 1 00 5 9 3 82 0 New Clear 3 P O Ol 14 Assemb 1C 14 0 0 100 2 10 14 100 UT 4 W ry OL Walk to RACKL1 0 1 9 0 100 2 10 1 9 0 F Save As 5 WwW FT Oi Walk to BOX 1 0 1 4 0 100 2 1 14 0 6 P OD O 2 Pickup BOX L1 2 0 0 1 00 0 2 50 cs Goto AutoCAD 7 MW o TIo D Walk to 3L 0 1 13 0 1 00 1 8 1 13 0 8 c 5 0 0 E E 0 Help D w TJ Ok Walk to BOX 1 0 0 98 0 1 00 1 6 0 98 0 10 W TT OLi Walk to amp iL 0 1 16 0 1 00 1 9 1 16 0 11 P Das ME 3 Assemb iL 3 0 0 1 00 7 3 100 Up Down 2 w 34 i Walk to RACKL2 0 1 87 0 100 2 10 1 87 0 MM Hm P ou i i Pickup RACKL2 1 0 0 1 00 0 1 100 Insert Row 14 WwW TT OL Walk to 7L 0 2 38 0 100 3 7 2 38 0 165 D N Mi 12 Accomh A 12 n in 1 nn um 12 ann i Remove Row 4 m r Add Row EL Type Symbol Part Cycle Time To Loc or At Loc Cycle Name Freq LEAN WGT SC 8 C v NN CAR 30 Assemble 2nd Part 1 0 D 0 Update Row Results Loc amp Path Selection Calculate Oper Dist Ft Time sec Walk VA NVBN NV ID XD Part
135. tion from the list of available stations Save to Part Path Saves the station data into the Part Path line on the AutoCAD drawing Draw Part Path Allows the user to draw the path on which the parts will travel The first point is considered the start or zero distance This would be set as 0 if a station was being defined as starting here Import Assignments Allows for station assignments to be imported as a csv file Container Insert Can be used to create containers for stations 2013 Proplanner Stations Tab 5 5 Operators Tab Routings Locations Paths I Stations Operators Parts Animate Juan Reports Sequencing Licensing Settings Oper Calc UnldSpdFt s LoadSpdFt s StartLocation Delay secs Path Color Station Prev Dist in NextDist in Block Name OPR1 Yes 4 17 3 33 START 0 2 OPR1 0 0 PP_PERSON Speed Ft s Feet Oper Calc Unloade Loaded StartLocation Delay Color Station Prev Next Dist Block Name m OPR1 Yes v 4 17 3 33 START v 0 2 Yelow OPRI v 0 0 PP_PERSON X Update Description Read DWGBlocks Help Goto AutoCAD J Operators are automatically listed in the Operators display when they are uniquely specified in the routings file The WPP will automatically generate their respective flow path layers as each operator s flow is generated on a unique layer PP_FLOW opname in which all of the operator information is stored on the drawing In addition the WPP will generate a default Loaded
136. ue percentage only applies to the process time component of the integrated element as the walk time for the Ftype element is always assumed by the WPP to be non value added For example if an type element had a process time of 12 seconds and a walk time of 5 seconds and if the LEAN percentage was specified as 50 i e 5096 then the WPP would consider the entire element to have 6 seconds of Value Added work content and 11 seconds of Non Value added work content Weight Currently a weight is entered into this field for use by the Ergonomics Evaluator Weight can be entered as an integer number for walking Type W to be used in the Carry Assessment and also with a posture and integer weight value for Lifting ina process element For example a lift from the floor to the waist for a 10 Ib object would be represented as F10 In addition a combo approach can be used if lifting between two or three zones as shown in the following examples FK10 is a lift from the Floor to the Shoulder for a 10lb object FH10 is a lift from the Floor to above the Head for a 10 Ib object e F Lift from Floor to Knuckle height when standing e K Lift from Knuckle height just below waist to shoulder height H Lift over Head from shoulder to above SC Special Codes field used for process time parsing Some time estimation languages such as MTM 1 and 4M require the addition of Special Codes that are used to define attributes of the element such as field
137. ues minimum of 0 05 will make the animation run more accurately and more slowly and smoothly Larger values will provide the opposite effect As such the final workstation animation time could be different than the calculated workstation cycle time as displayed in the operator results display on the Routings tab In this situation the values in the routings tab are ALWAYS more accurate Motion Delay Allows the operator to slow down the animation by inserting a delay between each animation move This delay value will often be needed when viewing animations in 2D with simple i e default operator and part blocks Save Animation Trace The Calculation process generates an animation trace events list which is used by the animation engine to present the results of the calculation to the user This trace list can be optionally saved to a file for use in evaluating the animation events textually or possibly for use by other external animation applications If other applications are to use this trace file then it is likely that those applications will also need the location and path coordinate information stored in the Locations LOC and Paths PTH files respectively Together the LOC PTH and TRC files provide all of the information required by any external animation application to replay the events generated by the WPP application The WPP application does not read or use a saved trace file as this information is automatically created by the WPP
138. utton just to the right of the Process field as shown below to pull up the process list This process list is a view of your process standards file and it lets you select a particular standard so that you do not need to type it in e The standard times in the list will be in the units of the list i e Minutes Seconds TMU s MU s MOD s and will be automatically converted into the current WPP session units Minutes or Seconds upon selection e If you want to override the process time as specified in your standards file you can do so by selecting the Process Type X This will tell the parser to ignore parsing the process code in that element 2013 Proplanner Reference Section For those standards that are specified in distance or per item you can use the frequency field to factor the number of occurrences of the process type within your element line Selecting the option to Include Description will copy the standard s description into the element description field within the routing editor Process List LWR SHIELD POS ELECTRODE amp STRIKE ARC E D RAISE SHIELD amp REMOVE ELECTRODE E AD3 REPOS SHRT GRPS OF WELDS NO RAISE SHLD 0 02 EA E AD4 REPOS LONG 0 04 EA E AAA CAULK 1 4 INCH GAP 0 002 EA E AAB CAULK 1 2 INCH GAP 0 002 EA E AAC CAULK 3 4 INCH GAP 0 002 EA E AAD CAULK 1 INCH GAP 0 002 EA E AAE CAULK 1 1 4 INCH GAP 0 003 EA E AAF CALAK 1 1 2 INCH GAP 0 003 EA E AAG CAULK 1 3 4 I
139. ve FIXTURE 0 5 06 0 1 00 7 59 5 06 0 2 M O OPRI 2 FIXTURE 2 0 0 1 00 0 00 2 100 3 M O OPRi 1 FIXTURE 1 0 0 1 00 0 00 1 50 pren Cle 4 Wo T OPRI ve TBAR1 0 1 3 0 1 00 1 94 13 0 5 M O OPR1 15 TBAR1 1 5 0 0 1 00 0 00 1 5 100 Save As 6 M O OPRI 3 s TBARI 1 00 0 00 3 100 7 W T OPRI ve RACKL 0 1 59 0 1 00 2 39 1 59 0 8 W T OPRI ve RACK3 0 2 23 0 1 00 3 34 2 23 0 Goto AutoCAD 5 Wo T OPRI TABLE 0 1 45 0 1 00 2 17 1 45 0 10 M O OPRI 2 vee TABLE 2jofo 1 00 0 00 2 100 Help 11 M O OPRI vee TABLE 0 0 0 1 00 0 00 0 75 12 W T OPRI we RACK4 0 1 55 0 1 00 2 32 1 55 13 W Tas OPRI FIXTURE2 0 1 44 0 1 00 2 16 1 44 0 14 M O OPRI 25 FIXTURE2 2 5 0 0 1 00 0 00 2 5 100 Up 15 W T OPRI TBAR2 0 0 78 0 1 00 117 0 78 0 16 W T OPRI FIXTURE 0 3 14 0 1 00 4 70 3 14 0 InsertRow 17 W Tan OPRI ve RACK2 0 3 78 0 1 00 5 66 3 78 0 18 W T OPRI BOX 0 1 23 0 1 00 1 84 1 23 0 19 W T OPRI FIXTURE 0 3 08 0 1 00 4 62 3 08 o C oM 4 Add Row EL Type Symbol Oper To Loc or AtLoc Description WGT 1 wsfr zll or J FIXTURE wak J of Update Row Reate i j E Loc amp Path Selection Calculate Oper __Dist M Time sec wa va nv Nv 10 xo Entre dreving Statonary Part OPR1 3 62 69 30 0 1 0 ABT ices C Window Area C Moving Part Percentages F C Longest Each Operator C Takt Time ur Calculate 2013 Proplanner 9
140. waiting for part to enter workstation W Walking FROM a location TO a location P Processing AT a static location R Processing AT a moving location I Internal delay at a static position caused by operator synchronization L Internal delay at a moving position caused by operator synchronization File Example OPERL 1 W6 STARTL 1 L 5 96 R20 L 5 96 L 19 96 W22 L 19 96 RACKL 1 W24 8 RACKL 1 BOX1 P26 8 BOX1 W29 1 BOX1 LW B 29 10 R34 1 LW B 29 10 LW B 34 10 W 37 3 LW B 34 10 BOX1 W42 9 BOX1 LW 42 93 R45 9 LW 42 93 LW 45 93 W49 6 LW 45 93 RACKL 1 P50 6 RACKL 1 W53 RACKL 1 LW D 52 98 R65 LW D 52 98 LW D 64 98 W66 1 LW D 64 98 STARTL 1 OPERR 1 W 5 8 STARTR 1 RW 5 84 R14 8 RW 5 84 RW 14 84 W16 8 RW 14 84 RACKR 1 P18 8 RACKR 1 W 22 4 RACKR 1 RW D 22 37 R25 4 RW D 22 37 RW D 25 37 W 28 9 RW D 25 37 RW 28 91 R30 9 RW 28 91 RW 30 91 W32 3 RW 30 91 RACKR 1 I45 9 RACKR 1 P49 9 RACKR 1 W52 1 RACKR 1 RW lt D 52 11 R67 1 RW D 52 11 RW D 67 11 W68 8 RW D 67 11 STARTR 1 2013 Proplanner
141. wn in the example below or in Decimal Minutes according to the settings in the Options tab 2 42 12 5 would be 2 hours 42 minutes and 12 5 seconds Only times associated with element type W moves are computed if no parser is selected In this situation times are expected to be entered by the user or contained within the imported file LEAN Defines the value added content for the element For example walking is considered to be totally non value added while Operating or Assembling is 10096 value added Other Processing tasks such as reach grasp move etc may be partially value added or may include Non Value Added but Necessary content LEAN values are whole numbers integers specified from 0 to 100 inclusive and may 2013 Proplanner Routings Tab 15 optionally include a second part to represent Non Value Added but Necessary content The first part before a slash represents the Value Added content and the second part after a slash represents the Non Value Added but Necessary content The slashis optional if there is no Non Value Added but Necessary content The following examples represent valid syntax for LEAN values 100 is10096 Value Added 100 0 is 100 Value Added s ash and zero at end is optional 50 20 is 50 Value Added and 20 Non Value Added but Necessary 40 is 40 Non Value Added but Necessary 0 40 is 40 Non Value Added but Necessary 0 before slash is optional For Hype elements the LEAN val
142. y a location on a Moving part A number from 1 to N where nis from 1 to 25 that specifies how many zones are longitudinally spaced along the part followed by the letter L for Left R for Right or C for Center A number 7 is the default amount of longitudinal divisions The first and last zones are directly at the front and the back of the part respectively e 2L specifies a location on the left side at the width and 2 7 back e 1R specifies a location on the right side at the front e S8C specifies a location at the center and 3 7 back The actual distances of the width and length offsets are determined by the part size which is specified in the Parts tab in the WPP as shown below Routings Locations Paths Stations Operators Parts Animate LEAN Reports Sequencing Licensing Settings NOTE Part Data only used Part Block Length e Width 0n Speed Gin for Moving Part calculations CAR CAR 15 2 54 40 Users performing stationary C CR wT 5 4 40 studies need not define Ce C BET 5 4 40 parts Open Parts Save Parts Draw Part Path Part Name Block Name Length in Width in Speed Ft Min CAR3 PP PART X 15 27 5 4 Update Add Remove Read DWG Blocks Help Goto AutoCAD STEP 5 Now that the routing file is loaded you should ensure that your part dimensions and part path speeds are correct The Parts tab shown above is also where the parts are as
Download Pdf Manuals
Related Search
Related Contents
NXP Semiconductors PIP3210-R User's Manual Singer Heavy Duty Sewing Machine ProClick P110 & ProClick P210E Samsung S24B750H Наръчник за потребителя Paris truqués, football et corruption Multi-function Wire Tracker N8160-75 外付けMO(USB)取扱説明書 MODEL TAF-550 Installation and Operating Instructions Magazine de la Chambre Régionale de Métiers et de l`Artisanat de 取扱説明書 盗難発生警報装置 Copyright © All rights reserved.
Failed to retrieve file