Home

РУКОВОДСТВО ПО ЭКСПЛУАТАЦИИ

image

Contents

1. 4 1 2 The Manufacturer s Company trademark is situated on the face part of gas preparation device vw SPACE CABIN 4 1 3 The Dealer s Company trade mark may be situated on the face part of gas preparation device 9 5 PREPARATION FOR PLANT S FUNCTIONING AND USE Plant s assemblage fitting and initial start up should be realized by an authorized representative of the Manufacturer Dealer 5 1 Assemblage Order Plant s assembly fitting and initial start up should be realized in compliance with the assembly instruction which is attached to the shipment documentation CAUTION Improper Assembly may cause injury and damage to people animals or equipment The Manufacturer does not bear responsibility for any such damages The Plant delivered to the Consumer consists of 6 modular pieces blocks which should be assembled at the place of end use platform base with electric power board gas preparation device client cabin cabin door control board stage The assembly begins with the preparation of the site for cryosauina s installation This should be a flat level surface site with an inclination of no more than 0 5 5 mm per 1m of length ASSEMBLY INSTRUCTION 1 After the site has been prepared the platform is to be mounted on the site being aligned as shown in Figure Pos Ne 1 as illustrated below 2 The gas preparation device is to be mounted on the platform been fixed by 4 bolt
2. compartment and the pipe for refilling should be returned to the lower position Press button 18 DRYING for 60 minutes After the time has been expired device switches off automatically Press and hold down for 1 1 5 sec button 9 OFF wait for the control board monitor panel to switch off go dark Switch off the electric power by switching the POWER switch on the right side to the down position 5 3 5 SESSION PROCEDURES Set the desired time of the session and refer to display panel 3 situated on the control board The available time frame for each session is between 60 and 240 seconds Labeled or buttons 13 or 17 control this Ask the customer to step inside the cabin and close the door tightly If necessary adjust the height of the client lift by using the height control or v buttons 11 or 15 situated on the control block Lift of lower the client until top of shoulders are level with the top cut of the cabin Press the button 10 Start situated on the control block After that starts the automatic refilling with cryogenic component working vessel will commence in the gas preparation device and the cabin will fill with gasiform nitrogen When the session is finished the automatic evacuation of cold gas from the client s cabin occurs and the Plant returns to the readiness mode for next session CAUTION Before using the device first time for the day and when al
3. lifts B re lubricate the screw mechanism of the pipe and hoist verification of the hermetically sealed state of air chargers and air conductors verification of three way valve functioning CAUTION In case of emergency shut down of electric power supply in the room where the cooling device is installed during a session operating personnel should immediately take the following actions 1 Open the cabin s door and let the client go out 2 Switch off the automatic differential device located on the right side of control board remove the power plug from the electric outlet 3 Wait until the power will be restored make sure the main power switch is in the OFF down position plug the power cord back into the electrical receptacle switch on the Plant lift take in pipe take off the vessel of liquid nitrogen lower the pipe and activate the DRYING function 4 After this the sessions may be continued 8 PROBABLE MALFUNCTIONS AND RECTIFICATIONS 8 1 Common solutions of probable malfunctions is indicated in table 1 Table 1 NN of order Description of malfunction Probable cause Means of elimination its symptoms 1 When the motor is working Belt s tension failure Correct the belt s tension to the intake pipe will not lift proper setting 2 When the motor is working the Correct the belt s tension to the client s platform will not lift or Belt s tension failure proper settin
4. absolutely prohibited to open the gas preparation device cover while the Plant is functioning 2 3 Cryogenic vessel The cryogenic vessel CK 25 or XA 34 BM is destined for storage and refilling of liquid nitrogen according to the Plant s needs CAUTION All operating personnel must follow all safety measures relative to the storage and handling of liquid nitrogen stipulated in this manual for the vessel XA34 bM as defined herein When working with liquid nitrogen vessels of a type Dewar it is absolutely prohibited to allow nitrogen drops contact unexposed human skin 2 4 System of compulsory ventilation in the upper part of client cabin The gasiform nitrogen contains very little oxygen content and thus the zone of its contact with body should be extremely limited Hypoxia protection is guaranteed by compulsory ventilation of upper part of the client cabin The recirculation ventilation unit of the system is to be mounted in the upper part of cabin The height of a client s position in the cabin is regulated by hoist lift unit the top of the client s shoulders must align with the upper cut of the cabin There is a ventilation hole provided in the upper part of the cabin which is facilitating the expulsion the overflow of gasiform nitrogen ATTENTION When working with gasiform nitrogen its mixture with ambient air which surrounds us may occur in the zone where the operating personnel is stationed this may cause a lowering of the
5. desired by the Consumer The room s door frame must be at least 30 in width A special opening is to be provided in a wall ceiling or window pane in order to mount a crimp tube intended for the used nitrogen vapor expulsion 5 12 diameter Note there is no need to mount sewerage system or water supply piping Electric power requirements are 230 240 Volts 2 phase The power plug should be provided with a proper ground contact receptacle Only operators specially trained by Manufacturer Dealer should be allowed to operate the Plant Before any maintenance or repair the Plant should be unplugged If safety rules are violated during Plant s functioning there is a risk of an accident serious injury 2 DESCRIPTION OF THE CONCEPT OF THE PLANT Designation of the Plant The Plant is designed for skin and body care skin surface cooling general skin tone improvement etc Composition of the Plant From a design point of view the Plant is a monoblock which is to be assembled at the place of final use and consists of the following components client s cabin gas preparation device control board and so on The blocks are to be assembled on common platform joining each other by assembling bolts Special seals and packing ensure the hermetically sealed channels leading from the gas preparation device to the cabin and back again CAUTION in case of dis hermetization please consult the chapter entitled Safety instructions To
6. safety of the Plant its use and maintenance Please keep this manual on site and consult with it any time you have questions on how to operate or maintain the Plant These warnings are designed to ensure the maximum safety of all during the use of the Plant This manual will help the Consumer observe the safety demands specified by the Manufacturer and to avoid mistakes omissions or problems which may occur during installation or use The Consumer will take full responsibility for any and all repair costs if it is determined that any errors or omissions have transpired during installation or use of the Plant by the consumer Another purpose of these warnings as referred to in this USER MANUAL is to alert the Consumer to pay attention to safety considerations while the Plant is in use The present USER MANUAL provides information regarding detailed instructions of use installation and maintenance of the Plant to ensure maximum safety and continuous use of the Plant If the Plant is subject to resale or to be passed to another owner and or it is to be relocated the Manufacturer Dealer must be notified of such action so that a representative may consult and supervise during the transition Further this same representative must take care of the installation of the Plant in its new location The operations room must be at least 81 sq ft There are no special requirements for walls and ceiling so it may be decorated with wallpaper or other finishes as
7. supply electric power for this purpose displace the start switch of the Plant Power on the right side of the Plant in the up position press the red button 6 located on the control board The liquid nitrogen vapor tel 877 ICE 4395 E OFF 3 PROCE DURE 73 PROCE DURE ro VENTI LATION 2 VENTI LATION zs REFLEXION OF TEMPERATURE IN CABIN NITROGEN SUPPLY TIME PAUSE REFLEXION REFLEXION OF PROCEDURE TIME OR TIME TO THE PROCEDURE BEING FINISHE OR TIME THE CURRENT MODE BE FINISHED TIME THE CURRENT MODE BE FINISHED INFORMATIONS DATA THE STATE OF NITROGEN VOLUME PLAN S START STOP MAINTENANCE DISCONECTION OF PLANT O START 1 HOIST moveable floor of cabin UP 2 PIPE UP 3 TO INCREASE THE PROCEDURE TIME 4 PRIMERY COOLING OF THE PLANT 5 HOIST moveable floor of cabin DOWN 6 PIPE DOWN 7 REDUCE THE PROCEDURE TIME 8 DRYING OF THE PLANT 9 INCREASE THE TIME OF NITROGEN SUPPLY 20 INCREASE THE PAUSE TIMEBETWEEN NITROGEN SUPPLY 21 INCREASE THE TIME OF VENYILATION AFTER PROCEDURE 22 MEMORY 23 REDUCE THE PAUSE TIME OF NITRIGEN SUPPLYINGS 24 REDUCE THEPAUSE TIME BPEMA IIAV3bI BETWEEN NITROGEN SUPPLYINGS 25 REDUCE THE VENTILATION TIME AFTER PROCEDURE evacuation fan starts working simultaneously with the start of this phase of operation Lift the intake pipe by pressing down the button 12 on the control board to put the cryogenic vessel with liquid nitrogen into the r
8. view the warnings regarding possible dis hermetization of the Plant please refer to the Chapter entitled Safety instructions 2 1 Client cabin The cabin is destined to provide immediate cooling of a human s skin surface down to the super low temperature with the vapor nitrogen The cabin is of a cylindrical construction which is to be sealed and to be equipped with a door for the customer s entrance and exit Also the cabin is equipped with system of channels which ensure the uniform movement of gasiform nitrogen vapor currents within the cabin The upper part of the client s cabin has a channel with a window for recirculation of the gas preparation device as well as a line for exhausted air and gasiform vapor evacuation The cabin is provided with an electrically operated hoist lift to regulate the level of the client in the cabin based on the height of the individual CAUTION Client s contact with liquid nitrogen inside the cabin is absolutely impossible as per its design 2 2 Gas preparation device The device for gas preparation ensures supply and regeneration of gasiform nitrogen which is circulating through the cabin and its total evacuation from the cabin when the session is over The gas preparation device includes A short cycle contact heat exchange unit which delivers gasiform nitrogen into the cabin The cooling down to temperature minus 200 275 F is ensured due to the liquid nitrogen evaporation CAUTION t is
9. COOLING EQUIPMENT SPACE CABIN millennium ICE USER MANUAL Supe mu wr mA om m mE BSE Content General indications Description and the concept Technical characteristics Marking Preparation for functioning and use Safety instructions Technical maintenance Probable malfunctions and simple fix methods Packing Storage Transportation Warranty Acceptance certificate Conformity declaration O Qu un W 0 13 13 14 14 15 15 16 1 GENERAL INDICATIONS The present USER MANUAL contains the description of the device the concept of its functionality its technical characteristics and the user manual for the cooling device SPACE CABIN hereinafter Plant Also it contains the necessary rules and regulations concerning the AC Electrical specifications which must be followed while assembling and installing the Plant The Plant is designed for skin and body care general skin tone improvement and is to be used in skin care salons in sport and fitness centers resorts sanatoriums private use and so on The Plant by no means and under no circumstances is to be considered to be medical equipment Thus the demands of instruction 93 42 EEC do not apply The USER MANUAL is an integral part of the product and should be delivered to the Consumer along with the delivery and the equipment installation Please read all the warnings in this manual carefully You will find important information relating to the
10. authorized by the Manufacturer C If alien objects such as substances liquids insects animals and so on are found inside the Plant causing damage D Non observance of warnings specifications and instructions as to the Plant s regime of use as defined in this present manual E Unauthorized de installation and relocation transportation to another place of operation without the manufacturer s knowledge F If the cause of damage was determined to be due to an accident caused by power supply alterations lightning fire flooding and other natural causes or acts of God The guarantee term is not subject to extension renewal or any other change if a consequent resale takes place 13 ACCEPTANCE CERTIFICATE Ne OF COOLING DEVICE kept with the Consumer Technical characteristics 1 Temperature inside the client cabin during the procedure is from minus 166 F up to minus 274 F 2 Time to reach operation regime in client s cabin not more than 30 sec 3 Liquid nitrogen consumption for one procedure not more than 6 6 Ib 4 Nitrogen consumption during primary cooling not more than 7 7 lb 5 Consumption power not more than 1 5 kW Power voltage 230 240 V Power frequency 50 60 Hz Dimension Length not more than 2000 mm Width not more than 1900 mm Height not more than 2300 mm The set of Plant SPACE CABIN fabrique Ne year of manufacture passed assembled on its site Cooling device received in th
11. aws and regulations of the region in which the Plant is being operated 6 1 Rules of Safety when working with the cryogenic vessel 1 The vessel s mouth should be closed only with its standard cover it is not permitted to use another cover or plug for this purpose 2 Itis not permitted to insert into the vessel cotton pads or other accessories for cryogenic therapy procedures 3 The accumulation of such material inside the vessel with liquid nitrogen may generate an ice plug inside the vessel and cause the destruction of the vessel 4 Inorder to avoid an excessive evaporation of liquid nitrogen from the vessel the vessel should be stored far from heating devices 5 If during the use of vessel a hoar frost strip appears on the surface of the vessel and this strip increases in size due to the evaporation of liquid nitrogen this might indicate a vacuum loss In this case the liquid nitrogen should be removed from the vessel and then the vessel must be heated and dried for 24 hours After this procedure the vessel should be repaired 6 Never refill liquid nitrogen in a vessel which has lost vacuum symptoms 7 Please remember that internal vessel is hanging on the mouth of the external vessel with no additional supports Thus all operations and handling of the vessel must be conducted with extreme care Careless use of the vessel strikes drops and etc may cause the vessel s destruction 8 TECHNICAL MAINTENANCE CAUTION The v
12. conducted by personnel whom have been specially qualified and trained by the Manufacturer The Plant should be connected to the power network in accordance with national and regional regulations for consumer safety CAUTION Failure to abide by the assembly and installation instructions as stipulated herein can cause serious injury death and or property damage 5 3 Use of the Plant CAUTION The voltage used in the Plant is high voltage and can case serious injury or death 5 3 1 There are two main modes when the Plant is functioning Operational and Drying The Operational mode serves to fulfill consecutively all of the stages of the flow sheet technological cycle It consists of 4 sub modes 5 3 1 A Refilling The Plant is switched on the aspiration pipe is placed in the upper position The door is opened at the base and the Dewar vessel of liquid nitrogen is rolled in on wheels until it is seated in its proper receptacle Check the match of the vessel s mouth with air superchargers When the lowering of aspiration pipe is finished the process of refilling is finished also In the sub mode Refilling about 8 8 Ib of liquid nitrogen are to be moved from cryogenic vessel to the gas preparation device 5 3 1 B Supplying step supplies liquid nitrogen to the evaporator where it converts into gasiform state Then it is ready to be passed to the client s cabin via the mixture system In the Supplying sub mod
13. e the filling of the cabin with gasiform nitrogen occurs Gasiform nitrogen will drop down to the lower sections of the cabin and in 20 30 sec will reach the level of the recirculation channel Through this channel it s partially taken to the gas preparation device the rest of the gas is to be evacuated by the fan 5 3 1 C Pumping out The pumping out of discharged gasiform nitrogen vapor from the cabin after the session is finished should be facilitated via crimp flexible piping 5 3 1 D Pause The Pause Sub mode indicates the state of certain aspects and operations of the Plant during pauses between sessions It means periods of personnel shift or short term stand by During these periods only the extraction fan is working for the effect of liquid nitrogen discharged gases evacuation The recommended duration of the Pause sub mode is up to 5 min 5 3 2 The Plant works in two modes automatic mode or automatic manual mode All operations are controlled from the control board dr 3 COOLING 14 A4 DRYING te 7 MEMORY 22 NITROGEN a 8 NITROGEN 3317 0 SERVICE al Ug FE NITROGEN PAUSE ag t 9 NITROGEN PAUSE z Dr 3 The layout of the control board 5 3 3 GUIDELINES AND PROCEDURE FOR REFILLING PLANT WITH LIQUID NITROGEN n connecting the Plant to an electric power source 230 240V 50 60Hz Use a power plug with PROPER GROUND connection only To
14. e applies to women s bra or brazier if necessary before being allowed to enter the cabin During the session the client should move slowly 5 In order to avoid overcooling of upper extremities the client should raise his hands up to the upper level of cabin put on the upper edge of cabin 6 Do not open the cabin door unless it is absolutely necessary until a session been finished and automatic evacuation of gasiform nitrogen from the cabin has completed 7 Incase of emergency opening of cabin gasiform nitrogen discharges into the ambient air a 1 2 min air ventilation is highly recommended 8 Under no circumstances should and liquid nitrogen come into contact with the skin As such the Dewar vessels must be closed only with covers specially designed for this purpose 9 It is prohibited to close the vessel s mouth tightly because evaporation of liquid nitrogen creates excessive pressure inside the vessel The increased pressure creates the danger of vessel s damage and or unintended discharge of liquid nitrogen 10 In case of the contact of liquid nitrogen with skin the affected area should be immediately washed with large quantities of water The operating personnel should know and observe all safety instructions and precautions Any violation should be considered a violation of the discipline of the operator s service which should be met with severe reprimand or disciplinary actions or even legal action in compliance with the L
15. e full set and in a good working order The personnel to work at the Plant has been fully trained as to its proper use maintenance and shall observe all safety instructions and precautions as defined herein User manual with the Certificate issued ofthe matter CERTIFITAE Ne No claims and remarks This Acceptance Certificate of cooling device is composed of two copies one copy for each party ON BEHALF OF DEALER ON BEHALF OF THE BYUER Millennium ICE Inc 200 r 200 r Stamp Stamp 13 1 ACCEPTANCE CERTIFICATE Ne OF COOLING DEVICE kept with Dealer Technical characteristics 1 Temperature inside the client s cabin during the procedure carrying out from minus 166 F up to minus 274 F 2 Time to achieve operation regime in client s cabin not more than 30 sec 3 Liquid nitrogen consumption for one procedure not more than 6 6 Ib 4 Nitrogen consumption during primary cooling not more than 7 7 lb 5 Consumption power not more than 1 5 kW Power voltage 230 240 V Power frequency 50 60 Hz Dimension Length not more than 2000 mm Width not more than 1900 mm High not more than 2300 mm The set of Plant SPACE CABIN fabrique Ne year of manufacturing passed assembled on its site Cooling device received in the full set and in a good working order The personnel to work at the Plant has been formed as for use maintenance and main rules of safety measures due to the present U
16. efilling compartment and press button 16 on the control board 5 3 4 STARTING INSTRUCTIONS FOR THE PLANT SPACE CABIN Put the switch POWER in upper position Press the red button placed on the control board 6 Press button 18 DRYING for 5 10 minutes Press button 7 STOP Press button 12 after this the liquid nitrogen pipe will be raised Install the standard cryogenic vessel into the refilling compartment by pressing down button 16 Press button 14 for pre cooling the Plant If the Plant has been idle for more than 1 hour use pre cooling procedure again By pressing down the or buttons 13 or 17 located on the control board the operator can set up the planned time of the next session New time of the session will be indicated on the monitor display 3 Ask the client to step inside the cabin By pressing down the or v buttons 11 or 15 located on the control board the operator can adjust the height of moveable floor to the proper level of elevation which is the alignment of the client s shoulders with upper cut of the cabin Press button 10 START on the control board NOTE The operator must maintain verbal contact with the client throughout all the whole session After the session has been finished ask the client to step out of the cabin After all sessions have been finished for the day you should take off the cryogenic vessel from refilling
17. eparation device 23 6 86 02 50 6 441 3 Electric board 9 45 31 5 13 77 66 4 Stage 20 47 12 6 21 65 22 Packing List Table 2 NeNe n n Denomination Quantity Notes 1 Platform for the power electric board 1 2 Gas preparation device 1 3 Client s cabin 1 4 Cabin s door 1 5 Control board 1 6 Stage 1 7 Cryogenic vessel 2 2 additional for extra cost 8 Fitting and assemblage materials 1 set 9 Extraction air conductor 1 10 User manual 1 Attention As per the manufacturer s specifications all shipments and subsequent relocations of the Plant must include the User manual and must be rendered Russian or in English in accordance with whichever region in which the plant is to be installed The firmware and all the labeling which the Plant carries as well are to be rendered in the language stipulated by the Shipping Agreement 3 TECHICAL CHARACTERISTICS 3 1 Technical characteristics 1 Temperature in the client cabin during the executing of procedure is from minus 200 F up to minus 275 F 2 Time to reach working conditions in the client s cabin from 80 F down to 130 F not more than 30 sec 3 Liquid nitrogen consumption for one procedure not more than 6 6 Ib 4 Liquid nitrogen consumption for the start not more than 7 7 1b 5 Power consumption not more than 1 5 kw 9 Voltage 230 240 V 10 Network frequency 50 60 Hz 3 2 The Plant is manufactured due to the climatic demand N 3 3 The normal functi
18. g lower 3 Mechanisms will not switch on power is not being supplied to the Check that the power plug is Plant or the automatic power properly inserted into the wall supply device is switched off receptacle switch on the main power switch 4 After pressing down the red Open battery compartment button 6 on the control board situated inside the box behind the control board doesnot The electric power supply is the control board below the grey switch on absent cover and verify or fix the contacts Or replace batteries 5 The temperature in client s Op et Increase the expulsion of seb erat A Shortage of liquid nitrogen in the ETEN ue PUSION O ae P Dewar vessel or bellows are nitrogen using button 19 in 1 2 temperature indicated in this d d values manual Er de To change the bellows 6 The control board does not Verify the switcher POWER switch on The electric power supply is on the right literal of the Plant which must be placed in upper absent ae position CAUTION In the case of malfunction of the Plant or severe failure the Plant must be unplugged from its power source Please do not attempt any repair or direct intervention Non observance of above mentioned caution may cause sever injury or loss of life and damage of the Plant and other equipment Please seek the services of qualified personnel whom are authorized to repair and maintian of this equipment by the Manufacturer 9 PACKING 9 1 Each ite
19. l sessions are finished for the day or after every 20 sessions whatever is first the operator should dry the gas preparation device For this purpose take off the cryogenic vessel from the refilling compartment and lower the intake pipe to the low position Press button 18 Drying This will start drying procedure The procedure will stop automatically in 60 minutes if not terminated earlier by the operator DURING THE PROCEDURE IT IS NECESSARY FOR THE OPERATOR TO CONTROL THE PROCESS OF REFILLING OF CABIN WITH GASIFORM NITROGEN AND TO OBSERVE AND ASSESS THE CLIENT S STATE THROUGHOUT THE ENTIRE PROCEDURE AND AT ALL TIME WHEN THE CLIENT IS IN THE CABIN 6 SAFETY INSTRUCTIONS PRECAUTIONS While operating Plant and while storing moving and handling liquid nitrogen vessel type Dewar 1 During the session control of the cabin s refilling with gasiform nitrogen vapor is very important 2 Atall times throughout the session the operator should observe and asses the state of the client inside the cabin 3 Itis the responsibility of the operator to insure that it is impossible for gasiform nitrogen to be inhaled by the client by adjusting the movable floor lift of the cabin and by having the client lift their head back to avoid rising vapors if necessary 4 Inorder to avoid overcooling of lower extremities it is the responsibility of the operator to ensure that the client puts warm wool or cotton only socks and cotton pants the sam
20. m to be shipped is to be placed on a pallet and packed in corrugated cardboard box or pressed cardboard box The dimensions of each packed piece as to its length width and high are indicated in table 2 below Table 2 e Width W mm High H mm Length L mm Denomination Not more Not more Not more 1 Cabin 900 900 1800 2 Fower block gas generator 800 1200 1300 electric board stage 3 Foot 2 Dewar vessels 800 950 1300 9 2 All the technical and shipping documentation of the Plant to be delivered is involved in polyethylene bag and placed in main box Ne 2 with the electric control board 9 3 Each box carries inside a packing list in accordance with table 3 No Denomination Quantity of pieces Notes bf place 1 Cabin 1 2 ter block gas generator electric board 1 1 1 stage 3 foot 2 Dewar vessels 1 2 9 4 The front part of the box carries the most important labeling and handling instructions Number of cargo pieces indicated in fraction such as number 1 of 3 e Information inscription Dimensions of piece in centimeters Net weight and gross weight in kilograms Volume of the piece in cubic meters The inscription export made in Ukraine Handling Instructions Handle with care fragile Up Keep Dry Lift here The box bears the trade mark of the Manufacturer The place of applica
21. oltage of 230 240V is present in the Plant 7 1 General indications 7 1 1 Only personnel who have thoroughly studied the operations manual and who have the Special Certificate issued by the Dealer Millennium ICE Inc should be allowed to work on operate and maintain the Plant 7 2 Technical maintenance involves preventative maintenance and proper use immediate rectification of problems and failures elimination of malfunctions etc which may occur in the process of use 7 2 1 Daily maintenance includes dust elimination and simple cleaning of interior part of the cabin with soft flannel cloth The moveable floor cleaning with wet soaped flannel cloth should be done daily and any dirt particles should be removed immediately 7 2 2 Instructions for Maintenance and Service Examination and verification of the proper functioning of all components and operations of the Plant CAUTION Before beginning any service or maintenance the Plant must be unplugged from the 230V power outlet FAILURE TO OBSERVE THIS SAFETY PRECAUTION MAY RESULT IN SERIOUS INJURY OR DEATH 7 2 3 A thorough service and maintenance should be performed after the first 14 months from the date of the Plant s manufacture This work is to be fulfilled in accordance with the agreement of post guarantee service This work includes verification of the operation of electric equipment checking the hoist function changing of wedged shaped belts of the hoists
22. oning requirements and conditions are as follows e The environment temperature indoor 60 80 F Relative humidity indoor 30 50 3 4 The Plant s construction has the safety level of manufacture IP54 3 5 Time of uninterrupted service of the Plant 120 min 3 6 The service term of the Plant is 10 years originating from the date of its manufacture 3 7 The hoist lifts a client to the high not less than 11 8 inch 3 7 Maximum weight the hoist lifts up to 245 Ib 3 8 Recommended temperature in cooling device from minus 184 to minus 274 F 3 9 Acoustic pressure less than 70dBa 4 MARKINGS 4 1 Plant Markings 4 1 1 The Plant s labeling is shown on label pic 2 This label is fixed on the electric board which is close to the start device and contains the data as follows Denomination of the type of the Plant SPACE CABIN Cryocarrier liquid nitrogen Power network voltage 230 240V e Network frequency 50 60Hz Consumption power not more than 1 5 kw Safety level IP e Year of manufacture Serial number e Made in Ukraine The Right to be marked CE is reserved Manufacturer Company CRIOMED Ltd Cooling Plant SPACE CABIN 230 240 V 50 60 Hz class I Power consumption 1 5 kw Security level IP 54 Cryogenic component liquid nitrogen Year of manufacturing 200 made in Ukraine Serial number CE Pic 2 The format of the marking label on the Plant
23. oxygen content of this ambient air causing an oxygen deficiency for the operator So the cabin s doors should not be opened unless it is absolutely necessary until the procedure is over and the automatic evacuation of nitrogen vapor from cabin is completed 2 5 All liquid nitrogen is to be handled stored and transported in accordance with any and all local and national regulations of the region in which the Plant is to be operated Liquid nitrogen liquid gas boiling at low temperature is colorless and odorless with a boiling temperature 71 35 K Nitrogen itself is neither toxic nor explosive The main dangers that exist when working with liquid nitrogen are associated with its low temperature since during the evaporation of liquid nitrogen a considerable portion of gasiform nitrogen appears This gas if allowed to escape into the ambient air of a closed area can lower the oxygen content of the ambient air to the point where it will impair a person s normal respiration causing serious injury or even death Should the oxygen content of the ambient air reach a value of less than 6 loss of consciousness can occur without any prior warning or symptoms such as giddiness or such 2 6 Dimensions and weight of components Table 1 No Weight Ib Denomination Dimensions inch no more No more than than Width High Length 1 Client s cabinet 30 1 68 9 30 1 265 2 Gas pr
24. s M10 x 22 Pos Ne 2 3 The platform raised part 1s destined for the client s cabin and 1s to be fixed by 3 bolts M10 x 60 to the gas preparation device 3 bolts MIO x 40 to the base Pos Ne 3 4 The door is to be mounted on its hinges The test of hermetic seal and integrity should be carried out pos Ne 4 5 The control board is to be fixed to the cabin s wall by combined screws M6 x 60 6 ps then fix the wedge shaped belt inside the board with section sq A 1 600 mm of tension ensured pos Ne 5 6 To adjust the step to meet the cabin entry area pos Ne 6 7 Attach by screws the air superchargers pos Ne 7 Eux mb Gus M8x60 m 5 2 After Plant s assembly been finished the initial start up and testing can commence connection of electric equipment ground connection if necessary test of wedge shaped belts tension by belts flexion not less than 0 6 inch mounting of air conductor for evacuation of discharged gases test start and control of efficiency of all mechanisms and including the operating abilities at idling motion without nitrogen preparation and installation of the liquid nitrogen vessel test of full operational functionality including trials in the presence of the Buyer CAUTION An incorrectly mounted ground contact or its absence may cause a risk of serious injury or death All assembly and installation work performed on the site and the Plant should be
25. ser manual with the Certificate issued of the matter CERTIFITAE Ne No claims and remarks The present Cooling device Acceptance Certificate been composed in two copies one copy for each part ON BEHALF OF DEALER ON BEHALF OF THE BYUER Millennium ICE Inc 200 r 200 r Stamp Stamp 14 CONFORMITY DECLARATION We hereby the CRIOMED LTD declares than the Plant SPACE CABIN corresponds to all the necessary instructions demands and standards 98 37 EC Demand for Machines Standards EN ISO 12100 1 2003 EN ISO 12100 2 2003 EN ISO 13732 3 2005 2006 95 ES Instructions for low voltage equipment Standard EN 60335 1 2002 2004 108 EC Instruction for electric and magnetic coincidence Standard EN 61000 6 3 2001 EN 55014 1 2000 EN 61000 6 1 2001 EN 61000 4 4 2004 EN 61000 4 5 1995 EN 61000 4 11 2004 EN 55014 2 1997
26. tion of signs and inscriptions including lineal dimensions is shown in drawing 4 below Drawing 4 External appearance of packed block 10 STORAGE 10 1 The Plant should be stored in packed form in a heated and ventilated warehouse The storage conditions of the Plant should correspond to the demands as follows Environmental temperature 15 24 C relative humidity 30 45 96 10 2 The storage place must be free of harmful steams acids alkaline solutions or any other agents which may cause corrosion 10 3 The maximum recommended term of the Plant s storage when maintained under the above stated conditions is not more than 18 months 11 TRANSPORTATION 11 1 The Plant may be transported by any kind of transport except on an open decks of sea ship due to the transportation rules in compliance with the transportation regulations in force regarding maritime transportation of cargo 11 2 Placement and securing of a packed Plant during transport should be free of any strikes displacements inversion or any other potentially damaging conditions or actions 11 3 The pallet allows loading unloading relocation by means of loading device i e forklift 11 4 The conditions of the Plant s transportation are stipulated in the Shipment Ageement 12 WARANTY OF THE DEALER The Manufacturer guarantees the performance and reliability to the cooling device s Technical Specifications under the condition that the Consumer has full
27. y complied with the manufacturer s specifications for transportation handling installation assembly initial start up testing and regular use as defined herein and in the sales and shipping agreements The manufacturer shall warranty this product from defect for a period of 36 months from the date of receipt of the Plant as per the delivery receipt or waybill but not more than 36 months from the date of shipment to the Consumer The Plant must be used only in compliance with the indicated specifications and instructions for its usage The usage in any other manner will be considered as misuse The DEALER or MANUFACTURER does not bear any responsibility for any misuse or failure to follow the manufacturers recommended installation testing regular usage safety precautions transportation maintenance and repair During the above stated term of the manufacturer warranty any sub system or component is defected by fault of the manufacturer the Consumer has the right to repair or replacement free of charge In this case the spares to be repaired or changed during the guarantee term are ensured with guarantee for the rest of primary guarantee term The Manufacturer does not bear any responsibility of guarantee and does not accept any gratis maintenance of the Plant cases as follows A There is evidence of non qualified or unauthorized repair of the Plant B If the defect is caused by changes done in the construction or electric scheme not

Download Pdf Manuals

image

Related Search

Related Contents

商品番号 33177 品名キャリパーサポート  VERSO Hi-PoE IPM    IP-Stile User Guide  Quick Reference Guide  Supermicro X9DRW-7TPF+  Multi-Oscillator Synthesis System  Owners Manual Schweizer 269C Hook Kit 120-081-00  Interrupt Response Time of the XC16x Family  

Copyright © All rights reserved.
Failed to retrieve file