Home
        user manual - sinclair air conditioners
         Contents
1.    INSTRUCTIONS          STE AM        s    ENAMELED INDIRECT  WATER HEATERS             ST 300DE       D  SIIICLCOIR    HEAT PUMPS    Please read this manual carefully before installing the heater     Dear Customer   Sinclair Corporationt Ltd  thanks you for your decision to use a product of our brand     The manufacturer reserves the right to modify the product   This product is designed for permanent contact with  drinking water        Table of Contents    Application   Product Description   Important Cautions   Commissioning of the Heater   Specifications and Description of the Heater  Connecting the Heater to the Hot Water Distribution System  Safety Fittings   Spare Parts   Cleaning the Heater and Replacing the Anode Rod  Installation Regulations   Connecting the Heater to the Heating System    en E ee als    2  2  3  3  4  5  5  6  6  6  7    pal  d     Operating Conditions   We recommend to use this product in an indoor environment with air temperatures from  2  C to  45  C and a  relative humidity of maximum 80      1  APPLICATION    The ST 300DE indirect stationary heater is designed to prepare the hot water in connection with a heat pump   Additional heating can be done by electric heating element TJ 6 4      2  PRODUCT DESCRIPTION    The heater tank   s welded from a steel sheet and the entire tank is protected by a hot water resistant enamel  As an  additional protection against corrosion  a magnesium anode rod is installed inside the tank  This rod changes the  
2.  Pa     c  OQ  O    ST   300DE    Fig  1              Heating  water outlet              RR    N NZ       e                         OS        Cold water inlet       670          6  CONNECTING THE HEATER TO THE HOT WATER DISTRIBUTION SYSTEM  Fig  3    Mixing valve    PS XK Hot water output           Cold water                           Cold water input        Z      V  DN    A           X      s 5  o          S  gt  2 03  D 2 22       z   S  2 C o     gt       T  Q Q   8 Q 0 G  gt       Q C n O a o     a Mo    IK    The cold water inlet of the heater must be fitted with a T fitting with a drain valve to discharge water from the heater  if needed  see Section 11     Each heater that can be individually blocked must also be equipped with a test valve  check valve  safety valve and  pressure gauge at the hot water inlet     1 SAFETY FITTINGS    Each pressure hot water heater must have a membrane spring loaded safety valve  Nominal clearance of safety  valves is determined according to CSN 06 0830 standard  Heaters are not equipped with a safety valve  The safety  valve must be eas  ly accessible and as close to the heater as possible  The inlet pipe must have at least the same  clearance as the safety valve  The safety valve must be placed high enough to ensure dripping water drain by gravity   We recommend to mount the safety valve onto a branch pipe  This allows you to easier replace the valve without  having to drain the water from the heater  Safety valves with fixed pressure
3.  set by the manufacturer are used for the  assembly  The opening pressure of the safety valve must be identical to the maximum allowed heater pressure  and at  least 20  higher than the maximum pressure in the water distribution system  If the pressure in the water distribution  system exceeds this value  a reduction valve must be included in the system  No stop valve can be put between the  heater and safety valve  Follow the installation manual provided by the manufacturer of the safety valve  Safety  valve must be checked each time before putting it into operation  The check is performed by manual moving of the  membrane away from its seat by turning the knob of the releasing device always in the arrow direction  After being  turned  the knob must click back into a notch  The proper function of the releasing device results in water draining  through the safety valve drain pipe  If the releasing device functions properly  water runs off the safety valve drain  pipe  In normal operation  it is necessary to perform this check at least once a month and each time  when the heater  was shut down for more than 5 days  Water may be dripping from the safety valve drain pipe  the pipe must be  opened into the air  pointed down and placed in an environment where the temperatures does not drop below the  freezing point    When draining the heater  use the recommended drain valve  First  close water inlet of the heater     You can find the required pressures in the following Max allowa
4. 2001 Coll  as    gt     A  amended  at EKO KOM a s  Client number of the company 1s   F06020274  Dispose of packaging material at a public waste   disposal site  Uninstall the discarded and unserviceable product   after the end of operation and transport it to the waste recycling   centre  collecting yard   or contact the manufacturer     Warranty Card    Product data  Store full address and stamp   Date of sale     Type   Type number     Serial number  Professional plumbing was made by     Date of Installation   Production date     Full address  stamp  sign     Add data from the manufacturing label or stick  the label     The product has passed the final technical inspection and met the   following tests    Professional electrical installation was made by   Insulation resistance measurements using the test voltage of 500V  AN   Measurement of contact resistance using current 10A at voltage 0  Date of Installation    12V AC    Test using applied voltage of 1300V  Full address  stamp  sign    Functional test with simultaneous measurement of both active and   leakage currents    Tank pressure test       WARRANTY    Product replacement or withdrawal from the contract is subject to applicable provisions of the Civil Code  The product will be  repaired free of charge within the warranty period    f a product defect that is not caused by user or an unavoidable event  e g  a  natural disaster  occurs  The warranty period of the product starts from the date of sale to the end custome
5. after checking the safety valve  according to the instructions attached to the valve   the heater may be  put into operation     Procedure    a  Check the plumbing and electrical installation including the connection to the hot water heating system  Check  the proper placement of both operational and safety thermostat sensors  The sensors must be inserted all the way  in the socket  first the operational thermostat and then the safety thermostat    b  Open the hot water valve on the mixing battery    c  Open the valve on the cold water inlet to the heater    d  When the water starts to flow through the hot water valve  the heater is filled up and the valve should be closed    e  Should a leakage  of the flange cover  occur  we recommend to tighten the bolts of the flange cover    f  When heating the sanitary water using the thermal energy from the hot water heating system  switch off the  electricity and open the valves on the inlet and outlet of heating water  eventually bleed the heat exchanger  When  commencing operation  flush the heater until the cloudiness disappears    g  Fill properly the warranty card     Js SPECIFICATIONS AND DESCRIPTION OF THE HEATER    Table 1 1    e     ST 300DE  Storage volume lp 286          Protective anode rod  Sensor socket    Heating water inlet    Circulation  Sensor socket              Q           Hot water outlet                   SR        D R S    5  3 35        gt  C  O OF       o       oO C O       O c  z O  E ce Z       3  D  D E   
6. ble    table  l Opening working  For proper operation of the safety valve  the check pressure of the   overpressure of   Max pressure in  valve must be mounted on the inlet pipe to prevent safety the water the cold water    spontaneous draining of the heater and penetration valve MPa  heater MPa  piping  MPa   of hot water back into the water distribution system        Follow the CSN 06 0830 standard when installing safety devices     8  SPARE PARTS      Magnesium anode    Contact thermometer  Give part name  type  and type number from the heater label when ordering spare parts     9  CLEANING THE HEATER AND REPLACING THE ANODE ROD    Repeated heating of water causes a limescale deposition on the enamelled tank surface and mainly on the flange  cover  Deposition depends on the hardness of heated water  its temperature  and the amount of hot water consumed   We recommend to check the tank and the anode rod after two years of operation and remove the limescale or  replace the anode rod if needed  The expected lifetime of the anode rod is two years of operation  however  it  varies according to the hardness and chemical composition of the water at the place of use  Based on this inspection   it is possible to schedule the next replacement of the anode rod  Call a service company to clean the tank or replace  the anode rod  When draining water from the heater  hot water valve of the mixing battery must be opened to avoid  underpressure in the tank  which would prevent water from 
7. draining     10  INSTALLATION REGULATIONS    Regulations and instructions that must be followed when installing the heater   a  concerning the heating systems  CSN 06 0310   Heating systems in buildings   Design and installation  CSN 06 0830   Heating systems in buildings   Safety devices  concerning the electrical systems  CSN 33 2180   CSN electric engineering regulations  Rules for installation of electrical apparatus and appliances  CSN 33 2000 4 41   Low voltage electrical installations   Protection for safety   Protection against electric shock  CSN 33 2000 7 701   Electrical installations of buildings   Requirements for special installations or locations    Locations containing a bath or shower  c  concerning the hot water heating systems  CSN 06 0320   Heating systems in buildings   Generation of domestic hot water   Designing  CSN 06 0830     Heating systems in buildings   Safety devices  CSN 73 6660   Water supply in buildings  CSN 07 7401   Water and steam for hot water and steam boilers with nominal steam pressure of up to 8 MPa  CSN 06 1010   Storage water heaters with water and steam heating and combined with electric heating  Technical  requirements  Testing  CSN EN 12897   Water supply   Specification for indirectly heated unvented  closed  storage water heaters    b    NN    Both electric and water installations must follow and meet the requirements and regulations in the country of use   WARNING     To prevent the growth of bacteria  e g  Legionella pneumoph
8. electrical potential inside the tank and thus reduces the effects of corrosion  Inside the tank  there   s welded a helical  heat exchanger that is made of steel pipes with an outside enamel coating  hot water  cold water and circulation  connections and thermostat socket  The tube heat exchanger is intended only for the heating circuit     On the heater side  there is a cleaning and inspection opening with flange cover  flange inside diameter is 110mm   secured by eight M8 bolts with 150mm spacing  The heater has also a G 1   opening for screwing an auxiliary  heating element  This option is used to heat up water in the upper part of the heater to the required temperature  when  the heater is connected to a heat pump system  The tank is insulated with 50mm or 60mm polyurethane CFC free  foam  heater case is made of plastic     3  IMPORTANT CAUTIONS    e Warranty card is invalid without certification from a professional firm  which confirms the electrical installation  and plumbing    Check the protective Mg anode regularly and replace it 1f needed    No stop valve can be put between the heater and safety valve    All hot water outputs must be fitted with a mixing battery    Before filling the heater with water for the first time  it is recommended to tighten the nuts on the flange  connection of the tank     4  COMMISSIONING OF THE HEATER    After connecting the heater to the water distribution system  hot water heating system  and eventually to the electrical  network  and 
9. ila  in the tank heaters  it is recommended  if inevitable   to periodically and temporarily increase the temperature of the hot water to at least 70   C  Another way to disinfect  hot water may also be applied     11  CONNECTING THE HEATER TO THE HEATING SYSTEM    The heater 1s to be placed on the ground next to a heating source  or in its vicinity  The heating circuit 1s connected to  the marked inlets and outlets of the heater exchanger  and the bleeding valve 1s to be mounted at the highest point  It  is necessary to install a filter into the heating circuit to protect the pumps  three way valve  check valves and heat  exchanger from clogging  We recommend to flush the heating circuit before the installation  All interconnecting  piping must be properly thermally insulated  If the system will work with the priority heating of DHW using a three   way valve  follow the installation instructions provided by the manufacturer of the three way valve     Example of group of heaters connected using the Tichelmann method for balanced consumption of hot water  from all tanks    Fig  3    DHW output       CW input    HeW     Heating water DHW   Domestic hot water  CW   Cold water 1     Check valve  C     circulation 2   Pump    Disposal of packaging material and non functional product   A service fee for providing return and recovery of packaging   material has been paid for the packaging in which the water 3  heater was delivered    The service fee was paid pursuant to Act no  477 
10. r and lasts   e 5 years for the inner tank of the heater including case  thermal insulating layer and the flange cover   e 2 years for electrical installation  heater element and other accessories   e The warranty period for replacement parts is 24 months   1  Conditions for a warranty claim   e The warranty card must be properly filled out  with a confirmed date of sale   e Installation of the product must be performed by an authorized person  confirmed in the warranty card    e The buyer is obligated to familiarize himself with the relevant installation and operational instructions before putting the  product into operation   2  Termination of Warranty   If the customer did not meet the conditions of point 1   If any repair during the warranty period was not performed by the seller nor its authorized service partner   If the product defect was obviously caused by improper installation or use of the product   If the product was not being used according to installation and operational instructions given by the seller or manufacturer   If any unauthorized modifications or construction changes of the product have been made   If the production label with serial number is damaged or missing   3  Service   e Warranty and after warranty repairs are provided by the seller  SINCLAIR CORPORATION Ltd  1 4 Argyll St   London   UK using its own service centre  or through contractual or authorised contractual service partners   4  Warranty claim procedure   e End customer will report the 
11. type of defect  serial number  type number  date of purchase of the product  from the warranty  card  and brief description of the problem to 1ts contractual service partner or directly to the seller   e The customer will wait for a technician  who will fix the defect or take another necessary measures to settle the claim   e Never uninstall the product from the system  it is important to assess the defect    e In the case of unjustified claim  the customer will be charged directly for the claim related costs     4 2014    Manufacturer     Sinclair Corporation Ltd   1 4 Argyll Street   London W1F 7LD  UK    Supplier and technical support   Nepa  spol s r o    Purkynova 45   612 00 Brno   Czech Republic    www nepa CZz    Toll free info line  C       420 800 100 285    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
取扱説明書 - hhstyle.com  Sony VAIO VGN-Z790DEB User Guide Manual  ワイデック 新商品カタログ  DTL-960e User Manual Single Channel Colour Digital Video Recorder  Ergotron Neo Flex LCD Arm  WATERPROOF SPORTS CAMCORDER    UNIVERSITÉ DU QUÉBEC MÉMOIRE PRÉSENTÉ À  Contrato para Mensajería Corporativa - Prepago  STADT ELECTRONIC IGNITION OPERATING INSTRUCTIONS    Copyright © All rights reserved. 
   Failed to retrieve file